




已閱讀5頁,還剩13頁未讀, 繼續(xù)免費閱讀
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
1 附錄: 外文資料與中文翻譯 外文資料: scheduling winch First、 Scheduling and the structural characteristics of winch scheduling winch is used to dispatch vehicles to assist traction and operating a winch. Commonly used in the mine tunnel in the haulage and supporting mine car handling、 can also be used in the mining face、 with scheduling space station、 heavy cars. Scheduling winch is full-gear transmission machinery. Gear also known as the round of the transmission system. According round of the transmission gear when the axis of space in the relative position is fixed、 can be divided into fixed and working capital of the axis round of the round. Another round of the axis of cylindrical mesh gear transmission and the cylindrical mesh gear transmission of points、 and turnover of another round of transmission and differential planetary transmission of the points. Scheduling the winch within the existing transmission gear meshing cylindrical Gear 、 another planetary transmission、 scheduling winch planetary transmission gear、 also known as the winch. Scheduling winch models commonly used mainly JD-0.4 (JD-4.5)、 JD-1 (JD) -11.4)、 JD-1 (JD-22)、 JD-2 (JD-25)、 JD-3 (JD - 40). Below the JD-1(that is、 JD-11.4) as an example of scheduling winch 2 on the composition and scheduling transmission principle. (A) JD-1-scheduling of the winch JD-1-scheduling the main component of the winch drum for、 brakes and motor frame. From the winch drum made of cast steel、 its main function is winding rope traction load. Drum、 and the slowdown in gear with the gear. Winch on the two groups with a total installed-gate that is Brake 2、 the gateway 3. Motor side of the gate 2 to brake drum brakes、 the gear in the work of three gates used to control Z7 group functioning. Use made of cast iron frame、 the motor bearings and gates with stent-positioning are fixed with bolts in the plane seat. For Flameproof for the thee-phase motor . (B) JD-1-Dispatch winch the drive principle This type of winch used two Internal Drives and a planetary gear transmission. Z1/Z2 and Z3/Z4 for two Internal Drive、 Z5、 Z6、 Z7 composition of planetary transmission mechanism. Motor head in the installation of a 5-axis extended sets of gear Z1、through the gears Z2、 with gear Z3 and Z4、 the movement spread to gear Z5、 the Z5 is the planetary gear wheel of a central round (or round of the Sun) And then led the two planetary gear Z6、 and the gear Z7. Planetary gear freely installed in the two driven and connected to a fixed axis、 the largest in the gear Z7 Gear work with the external gateway、 used to control winch drum operation. If the big gear Z7 gate on the work of three gates to live、 and will be on the brake drum gates 2 release、 this time by two motor 3 rotation within the rodents to gear wheel drive Z5、 Z6 and Z7. However、 due to Z7 gate has been living and can not rotate、 so gear Z6 only on the one hand around its own axis of rotation、 but also around the axis of gear Z5 (drum center) to the public. Thus connected with the rotation of the lead、 then Z6 the operation mode very similar to the planets in the solar system (such as Earth) movement、 also known as the planetary gear Z6、 its transmission mode known as the planetary transmission. Conversely、 if the gear Z7 in the work release gate 3、 and will brake drum on the live gate 2、 the Z6 directly connected with the drum、 only for the rotation、 not revolution、 the Z1 from the transmission system changed to Z7 For the fixed axis of the round、 gear Z7 to go short. Inverted for the release (or live gate) gate work Brake 2 or 3、 you can make scheduling winch in the case of non-stop motor to achieve operating and parking. When the need to reverse upgrade、 must be re-activated the launch button、 reverse the motor running. It should be noted that、 when the motor is turned on、 the gate and not allowed to work Brake live gate at the same time、 it will burn motor or other accidents. Second、 scheduling winch day-to-day maintenance check the contents of (1) check each part of bolts、 pin、 nuts、 washers、 etc.、 if loose、 loss should be tightened and timely complement. (2) to check installations and electrical signal Operation button is 4 intact and whether stolen explosive phenomenon、 whether the signal sent clear and bright、 it should be repaired or replaced. (3) to check whether damaged or broken drum、 the first wire rope is firmly fixed、 bearing oil spill there、 the rope is neatly arranged、 the problems should be promptly dealt with. (4) inspection gate with a crack-free、 wear-gauge whether or not (should have a thickness of not less than 3 mm)、 the tension bar bolts、 fork first、 the gate、 such as whether there is a pin deformation or injury、 whether the loose nuts back tight、 Problems should be adjusted and dealt with. (5) Check the gate and lever action is a flexible system、 Shi gate、 the ate may not reach the level position、 it should be slightly Sangria than the horizontal position. (6) to check the roof fixed winch-and-beam is solid、 based on whether there is a bolt or bolts loose、 whether crack base、 the issue should be dealt with promptly. (7) To check whether the normal start motor idling、 whether good grounding to start with、 and so whether the explosion-proof electrical equipment and good demand. (8) Check bearings and motors、 switches、 cables、 such as whether the gate with the temperature too high、 the problem should be found to identify the reasons for、 to take measures to deal with. (9) Often wipe winch to remove dust and debris、 and maintain the environment clean and tidy. Winch the safe operation、 inspection and maintenance 5 Three、 winch common faults and deal with (A) a winch drum abnormal sound and the main approach 1. Winch drum produce abnormal sound the main reason (1) drum cartridge case bolts loose. (2) Shell and tube-round (flange) gap between too large. (3) Drum cylinder shell cracks. (4) Welding a cylinder shell welding. (5) Walks drum and hub of the fixed screw loose、 causing swimming drum and hub between the relative sliding. (6) Gap between the hub and spindle wear too large. (7) A clutch worm screw loose. 2. Approach According to the inspection to determine treatment. If the loosening of the nut、 in Jiao Ban shutdown when fastening If noise is not serious、 may be appropriate to reduce winch load、 pay attention to observe、 to maintain the provisions of the maintenance shutdown at the repair if the beep serious、 they should immediately Parking repaired or replaced、 so as to avoid accidents expand. (B) On the rope winch drum with Bu Shangri hazards、 causes and treatment methods、 1. Winch drum on the rope with the harm Bu Shangri (1) speed up the rope wear. Rope in the mess on the winding drum、 traction force to justice often ranked in the mess in the rope and pressure to get out、 causing serious wear、 resulting in diameter steel wire rope and wire break more ground and shorten the life of the rope. 6 (2) Of wire rope slid off the drum. Rope with Bu Shangri、 an inevitable phenomenon of a crowded heap for damage to justice board、 when the reactor crowded the edge of more than high rollers、 the rope easily slid off the drum、 light、 broken wires、 heavy sports car、 and broken rope. 2. Winch drum on the main rope with Bu Shangri (1) winch layout properly that is hoisting cable angle non-compliance requirements. (2) Winch Titanium (Preliminary round) Quemoy not with the rope on the winding drum at about sliding. (3) Ranked rope winch device failure or have been removed. (4) Improper operation the wound is not tight. 3. Approach According to different situations symptomatic treatment. The installation of quality and exclusive rope devices such as the failure to timely report on the request sent treatment、 operation or maintenance of an improper、 we should conscientiously in accordance with the provisions of meticulous operation and maintenance; Inclined Drift winch paying particular attention to removing obstacles on their way to prevent the re-delegate Of Mandrel、 tight-rope Mandrel. (C) Winch reducer operation abnormal sound and vibration generated in the causes and treatment 1. Reducer functioning of abnormal sound and vibration generated in the main (1) gears meshing space tight or too loose. 7 (2) Bearing gap is too large、 the general performance of the decentralization empty at the beep、 beep when upgrading heavy small. (3) Or bearing reducer bolts loose. (4) Reducer in the swap was foreign bodies. 2. Approach (1) adjusting the gears meshing gap to a suitable position、 if the wear and gear should be replaced. (2) Relaxation of the repair or replacement of bearings. (3) Pay attention to tighten loose screws. (4) If it has fallen into foreign body reducer、 should be immediately suspended、 and troubleshooting. (D) Winch brake gate of the reasons for and treatment of fever 1. Brake winch for fever (1) a gate too early、 too excessive. (2) Weights are often delegated to use Brake、 no electrical power winch braking system EC、 single-drum winch often such a situation. (3) Brake shoe loose bolts or excessive brake wear、 the bolt hit the first round of gate (or gateway disc). (4) Brake shoe and the gateway round (or gateway disk) was not installed correctly; the contact area is too small. (5) Gate Ferry (or gateway disc) swing more. 2. Prevention and treatment Constantly sum up experience in operations、 and explore methods of operation and improve the level of technique; strict winch the safe operation、 inspection and maintenance of traction control grid load、 8 no-load、 do not send delegate at the motor-vehicle gate flying; regular maintenance checks、 pay attention to brake shoe and the gateway Round (or gate-) exposure. (E) Disc Brake-meters does not deal with the causes and prevention methods 1. Brake-song disc is not the main meters (1) brake operation handle screw drawbars length adjustment inappropriate. (2) Brake operation handle swing point of view inappropriate. (3) Relief valve plug the hole cut expenditure or slide valve failure death card. (4) Relief valve surge devices or electro-hydraulic oil spills. (5) electro-hydraulic device moves lap surge Inch Xian welding is not strong or disconnected. 2. Prevention approaches the timely adjustment of brake operation handle moves location、 regular cleansing of the hydraulic system of oil filters、 hydraulic oil to maintain the cleanliness and avoid valve plug the hole. (F) The launch button、 do not turn the winch motor and Treatment 1. Main (1) A power failure、 such as power failures、 break phase、 motor or grounding line、 grounding the protection of power supply voltage or too low. (2) Stop button did not recover bit. (3) Have launched internal fault. 9 (4) Cable operator disconnected. (5) Motor burned. 2. Approach To check power、 such as the local power supply cables on the other electrical and mechanical equipment are a fixed、 it would surely is the power blackout、 should be promptly reported that the request transmission. Check the button、 we must switch handle hit by power outage location、 check the button may be open、 not to repair its damaged in the explosion-proof performance. Several other conditions must be full-time electrician to check processing. (G) The stop button、 the motor does not stop the causes and treatment 1. Main (1) Operating button failures or too wet. (2) Operation of short circuit or grounding. (3) Magnetic starter for the main contact point or burning auxiliary contact adhesive and can not leave. (4) arc-suppression hood stuck contact、 could not leave. (5) Contact between the open relays. (6) Magnetic starter placed unrighteousness、 touch or backward dumping beyond 15 . 2. Approach Should urgently Fishing magnetic starter、 to winch their magnetic starter handle the operation to stop fighting position. Pre-gate method should be used first to raise load stopped to prevent Lash starter when the magnetic switch in isolation have too great a 10 power outage sparks. (H) Single-phase operation of the motor causes and treatment 1 Winch motor single-phase operation of the characteristics and hazards (1) Whether positive start、 or reverse start、 the electrical occurred dull hum、 but the motor will not always turn. (2) If a motor running in single-phase operation、 while still maintaining the original motor to spin、 but obviously slow down the speed、 a humming sound、 the electrical start fever、 if the winch with Ammeter、 some point to zero、 Some larger current value. Whether or activated in motor running single-phase operation、 if not timely detection and shutdown、 it may be burning motor for the accident. 2. Single-phase operation of a motor for (1) Lack of power (of a fault). This is because of a broken fuse or a disconnection of contacts and a phase-connection is bad、 and so causes. (2) Motor stator windings of a break. Stator windings at this time because of the different connection mode、 the impact of differentiated、 that is、 stars (丫 ) of wiring than 1.30 ( ) of wiring serious. 3. Approach Rapid shut down to identify reasons for the timely reporting or maintenance electrician for processing. 11 中文翻譯: 調(diào)度絞車 一、調(diào)度絞車及其結(jié)構(gòu)特點 調(diào)度絞車是常用來調(diào)度車輛及進行輔助牽引作業(yè)的一種絞車。常用于礦井巷道中拖運礦車及輔助搬運,也可用在采掘工作面、裝車站調(diào)度空、重載礦車。 調(diào)度絞車是一種全齒傳動機械。齒輪傳動系統(tǒng)又稱輪系。根據(jù)輪系傳動時各齒輪軸線 在空間的相對位置是否固定,可分為定軸輪系和周轉(zhuǎn)輪系。定軸輪系又有外嚙合圓柱齒輪傳動和內(nèi)嚙合圓柱齒輪傳動之分,而周轉(zhuǎn)輪系又有差動傳動和行星傳動之分。調(diào)度絞車的傳動齒輪既有內(nèi)嚙合圓柱齒輪傳動,又有行星傳動,所以調(diào)度絞車又稱內(nèi)齒輪行星傳動絞車。 調(diào)度絞車常用型號主要有 JD 0.4(JD 4.5)、 JD 1( JD) 11.4)、 JD 1.( JD 22)、 JD 2( JD 25)、 JD 3( JD 40)等。 下面以 JD 1(即 JD 11.4)型調(diào)度絞車為例介紹調(diào)度絞車的組成及傳動原理。 (一) JD 1 型調(diào)度絞車的組成 JD 1 型調(diào)度絞車的主要組成部分為滾筒、制動裝置機座和電動機 。 絞車滾筒由鑄鋼制成,其主要功能是纏繞鋼絲繩牽引負荷。滾筒內(nèi)和大內(nèi)齒輪下裝有減速齒輪。 絞車上共裝有兩組帶式閘,即制動閘 2,工作閘 3。電動機一側(cè)的制動閘 2 用來制動滾筒,大內(nèi)齒輪上的工作閘 3 用于控制Z7組運轉(zhuǎn)。 12 機座用鑄鐵制成,電動機軸承支架及閘帶定位板等均用螺栓固定在機座上。電動機為專用隔爆三相籠型電動機。 (二) JD 1 型調(diào)度絞車的傳動原理 該型絞車采用兩級內(nèi)嚙合傳動和一級行星輪傳動。 Z1/Z2 和Z3/Z4為兩級內(nèi)嚙合傳動, Z5、 Z6、 Z7組成行星傳動機構(gòu)。 在電動機 5 軸頭上安裝著加長套的齒輪 Z1,通過內(nèi)齒輪 Z2、齒輪 Z3和內(nèi)齒輪 Z4,把運動傳到齒輪 Z5上,齒輪 Z5是行星輪系的中央輪(或稱太陽輪),再帶動兩個行星齒輪 Z6和大內(nèi)齒輪 Z7。行星齒輪自由地裝在 2 根與帶動固定連接的軸上,大內(nèi)齒輪 Z7齒圈外部裝有工作閘,用于控制絞車滾筒運轉(zhuǎn)。 若將大內(nèi)齒輪 Z7上的工作閘 3 閘住,而將滾筒上的制動閘 2松開,此時電動機轉(zhuǎn)動由兩級內(nèi)嚙輪傳動到齒輪 Z5、 Z6和 Z7。但由于 Z7已被閘住,不能轉(zhuǎn)動,所以齒輪 Z6只能一方面繞自己的軸線自轉(zhuǎn),同時還要繞齒輪 Z5 的軸線(滾筒中心線)公轉(zhuǎn)。從而帶動與其相連的帶動轉(zhuǎn)動,此時 Z6 的運行方式很類似太陽系中的行星(如地球)的運動方式,齒輪 Z6 又稱行星齒輪,其傳動方式稱為行星傳動。 反之,若將大內(nèi)齒輪 Z7上的工作閘 3 松開,而將滾筒上的制動閘 2 閘住,因 Z6與滾筒直接相連,只作自轉(zhuǎn),沒有公轉(zhuǎn),從Z1到 Z7的傳動系統(tǒng)變?yōu)槎ㄝS輪系,齒輪 Z7做空轉(zhuǎn)。倒替松開(或閘住)工作閘 3 或制動閘 2,即可使調(diào)度絞車在不停電動機的情況下實現(xiàn)運行和停車。當需要作反向提升時,必須重新按動啟動按鈕,使電機反向運轉(zhuǎn)。 需要注意的是,當電動機啟動后,不準將工作閘和制動閘同時閘住,這樣會燒壞電動機或發(fā)生其他事故。 13 二 、調(diào)度絞車日常檢查維護的內(nèi)容 (1)檢查各部位螺栓、銷子、螺母、墊圈等,如有松動、脫落,應(yīng)及時擰緊和補全。 (2)檢查信號裝置及電動機運行操作按鈕是否完好和有無失爆現(xiàn)象,信號發(fā)出是否清楚和明亮,否則應(yīng)修理或更換。 (3)檢查滾筒 有無損壞或破裂,鋼絲繩頭固定是否牢固,軸承有無漏油,鋼絲繩排列是否整齊,有問題應(yīng)及時處理。 (4)檢查閘帶有無裂紋,磨損是否超限 (應(yīng)留有不少于 3 mm厚度 ),拉桿螺栓、叉頭、閘把、銷軸等是否有損傷或變形,背緊螺母是否松動,有問題應(yīng)調(diào)整和處理。 (5)檢查閘把及杠桿系統(tǒng)動作是否靈活,施閘后,閘把不得達到水平位置,應(yīng)當比水平位置略有上翹。 (6)檢查固定絞車的頂柱和戧柱是否牢固,基礎(chǔ)螺栓或錨桿是否有松動,底座有無裂紋,有問題應(yīng)及時處理。 (7)檢查電動機空載啟動是否正常,接地是否 良好,啟動器等電氣設(shè)備是否符合防爆和完好要求。 (8)檢查軸承及電動機、開關(guān)、電纜、閘帶等是否溫度過高,發(fā)現(xiàn)問題應(yīng)查明原因,采取措施進行處理。 (9)經(jīng)常擦拭絞車,清理浮塵和雜物,保持周圍環(huán)境整潔。絞車的安全操作、檢查與維護 三 、絞車常見故障及處理 (一 )絞車滾筒產(chǎn)生異響的主要原因及處理方法 1絞車滾筒產(chǎn)生異響的主要原因 (1)滾筒筒殼螺栓松動。 14 (2)筒殼和支輪 (法蘭盤 )之間間隙過大。 (3)滾筒筒殼產(chǎn)生裂紋。 (4)焊接筒殼開焊。 (5)游動滾筒和襯套的固定螺釘松動,造成游動滾筒和襯套之間有相對滑動。 (6)襯套與主軸之間間隙磨損過大。 (7)蝸輪螺桿式離合器有松動。 2處理方法 根據(jù)檢查情況,確定處理方法。如對松動的螺帽等,可在交接班停產(chǎn)時緊固;如果響聲不嚴重,可適當減輕絞車負載,注意觀察,維持到規(guī)定的停產(chǎn)檢修時進行修理;如果響聲嚴重,則應(yīng)立即停車修理或更換,以免事故擴大。 (二 )絞車滾筒上鋼絲繩排列不整齊的危害、原因及處理方法 , 1 絞車滾筒上鋼絲繩排列不整齊的危害 (1)加快鋼絲繩磨損。鋼絲繩在滾筒上雜亂纏繞時,牽引受力繩經(jīng)常要在雜亂排繩中擠出來又壓進去,造成嚴重磨損,造成鋼絲繩直徑磨細和斷絲增多,縮短了鋼絲繩的使用壽命。 (2)造成鋼絲繩滑出滾筒外。鋼絲繩排列不整齊,必然產(chǎn)生堆擠現(xiàn)象,損壞護繩板,當堆擠高度超過滾筒邊緣高度時,鋼絲繩極易滑出滾筒外,輕者斷絲,重者斷繩跑車。 2絞車滾筒上鋼絲繩排列不整齊的主要原因 (1)絞車布置不當,即提升鋼絲繩偏角不符合規(guī)定要求
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 省中醫(yī)院護理查房
- 重慶應(yīng)用技術(shù)職業(yè)學院《中藥炮制學》2023-2024學年第一學期期末試卷
- 鐵嶺師范高等專科學?!度穗H溝通與演講》2023-2024學年第一學期期末試卷
- 《高效專利檢索策略》課件
- 蘭州交通大學《圖案創(chuàng)意與應(yīng)用》2023-2024學年第二學期期末試卷
- 云南民族大學《動畫與游戲中的音樂素材》2023-2024學年第二學期期末試卷
- 濮陽科技職業(yè)學院《大學英語精讀2》2023-2024學年第一學期期末試卷
- 樁板墻噴漿施工方案
- 石家莊信息工程職業(yè)學院《水文氣象學》2023-2024學年第二學期期末試卷
- 西安高新科技職業(yè)學院《數(shù)學建模Ⅱ》2023-2024學年第二學期期末試卷
- 小學數(shù)學跨學科主題學習的系統(tǒng)設(shè)計與實施
- 醬酒銷售技巧培訓(xùn)
- 2025中考化學詳細知識點
- 2025屆遼寧省錦州市凌海市市級名校中考化學模擬試卷含解析
- 導(dǎo)數(shù)大題題型分類
- 2025陜煤集團榆林化學限責任公司招聘596人高頻重點模擬試卷提升(共500題附帶答案詳解)
- DB23-T 3919-2024 大跨鋼結(jié)構(gòu)技術(shù)標準
- 2024年上海奉賢區(qū)招錄儲備人才筆試真題
- 2025河南中煙許昌卷煙廠招聘10人易考易錯模擬試題(共500題)試卷后附參考答案
- 2025年中國國新基金管理有限公司招聘筆試參考題庫含答案解析
- 2025年福建泉州發(fā)展集團有限公司招聘筆試參考題庫含答案解析
評論
0/150
提交評論