




已閱讀5頁(yè),還剩25頁(yè)未讀, 繼續(xù)免費(fèi)閱讀
版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the five water treatment 357 timetables for three years to resolve outstanding issues, obviously worked, victory of the year. The Countys departments at all levels must firmly establish the guanghui is gold and silver green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well five water treatment of winning the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will river water quality improved at the county level, up to five this basic objective grasp of pollution control that focus, with the focus on three things: a good job, clear rivers reaching the County created. Organization look back special inspection, the County garbage River, black and odorous River is Dragnet investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the one-stop strategy, improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of clear rivers standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve effluent from sewage treatment rate, running accuracy, compliance requirement, speed up the towns support network construction, is focusing on nanotubes home last meters question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the Sun problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to dig up mud, as the deepening water of this years plays. Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policy requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud way out, according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of基坑施工專項(xiàng)方案 編制單位:目 錄一、編制依據(jù) 1 二、工程概況 1三、工程地質(zhì)情況及現(xiàn)場(chǎng)環(huán)境 1四、土方工程施工 3 1、施工準(zhǔn)備工作 3 2、施工注意事項(xiàng) 3 3、土方開(kāi)挖準(zhǔn)備 4 4、開(kāi)挖監(jiān)控 4五、放坡計(jì)算 4六、基坑(槽)管溝計(jì)算 51、擋土板的計(jì)算 52、立柱的計(jì)算 63、橫撐的計(jì)算 6七、施工措施 7八、臨邊防護(hù) 8九、基坑壁支護(hù) 8 1、原狀土放坡 82、排樁 93、坑外拉錨與坑內(nèi)支撐 94、逆作施工 10十、排水措施 101、基坑明溝排水計(jì)算 102、排水措施 13十一、坑邊荷載 15十二、上下通道 16十三、土方開(kāi)挖 16十四、基坑支護(hù)變形監(jiān)測(cè) 17十五、作業(yè)環(huán)境 18十六、采用的施工方法 18十七、基礎(chǔ)土方回填 21十八、施工安全保證措施 21十九、深基坑施工事故應(yīng)急救援預(yù)案 23二十、項(xiàng)目部應(yīng)急救援預(yù)案構(gòu)架圖 28一、編制依據(jù)1、松下電工電子材料(廣州)有限公司第二期建設(shè)工程的施工圖紙。2、國(guó)家現(xiàn)行有關(guān)施工及驗(yàn)收規(guī)范、規(guī)程、標(biāo)準(zhǔn)以及廣東省、廣州市對(duì)建筑施工管理的相關(guān)規(guī)定。3、 建筑地基基礎(chǔ)工程施工質(zhì)量驗(yàn)收規(guī)范(GB50202-2000)。4、 建筑地基基礎(chǔ)設(shè)計(jì)規(guī)范(GBJ 15-31-2003)要求。5、 建筑基坑支護(hù)技術(shù)規(guī)程(JGJ 120-99)要求。6、 本施工方案作為現(xiàn)場(chǎng)施工組織與管理的指南,我公司承諾在編制和使用中保持嚴(yán)肅、嚴(yán)謹(jǐn)和嚴(yán)格的態(tài)度。本施工組織設(shè)計(jì)中存在的不足和遺漏問(wèn)題,將在征得發(fā)包人和監(jiān)理工程師意見(jiàn)后作出調(diào)整和修改二、工程概況 1、建筑面積為9559平方米,混凝土、鋼結(jié)構(gòu)。2、該工程原地面標(biāo)高為-1.2米。3、承臺(tái)開(kāi)挖平面尺寸:800800、8001600、16001600、22002200、16002600mm;開(kāi)挖深度全部為:施工設(shè)計(jì)圖為-2.65米,實(shí)際開(kāi)挖深度為-1.45米。4、設(shè)備基坑開(kāi)挖平面尺寸:1450013000mm;設(shè)備基坑開(kāi)挖深度:施工設(shè)計(jì)圖為-6米,實(shí)際開(kāi)挖深度為-4.8米。三、工程地質(zhì)情況及現(xiàn)場(chǎng)環(huán)境1施工區(qū)域內(nèi)建筑基地的工程地質(zhì)勘察報(bào)告中,要有土的常規(guī)物理試驗(yàn)指標(biāo),必須提供土的固結(jié)塊剪內(nèi)摩擦角、內(nèi)聚力c、滲透系數(shù)K等數(shù)據(jù)。2施工區(qū)域內(nèi)及相鄰有地下水。3場(chǎng)地內(nèi)和鄰近地區(qū)有地下管道、管線。4鄰近的原有建筑物、構(gòu)筑物的結(jié)構(gòu)現(xiàn)狀,如有裂縫、傾斜等情況,需作標(biāo)記、拍片或繪圖,形成原始資料文件。5本工程施工時(shí)間正好是夏季,是雨水較多的季節(jié),施工難度很大。四、土方工程施工1施工準(zhǔn)備(1)勘查現(xiàn)場(chǎng),清除地面及地上障礙物。(2)做好施工場(chǎng)地防洪排水工作,全面規(guī)劃場(chǎng)地,平整各部分的標(biāo)高,保證施工場(chǎng)地排水通暢無(wú)積水,場(chǎng)地周圍設(shè)置必要的截水溝、排水溝。(3)保護(hù)測(cè)量基準(zhǔn)點(diǎn),以保證土方開(kāi)挖標(biāo)高位置與尺寸準(zhǔn)確無(wú)誤。(4)備好施工用電、用水、道路及其他設(shè)施。2施工注意事項(xiàng)(1)根據(jù)土方工程開(kāi)挖深度和工程量的大小,選擇機(jī)械和人工挖土或機(jī)械挖土方案。(2)如開(kāi)挖的深度比鄰近建筑物基礎(chǔ)深時(shí),開(kāi)挖應(yīng)保持一定的距離和坡度,以免在施工時(shí)影響鄰近建筑物的穩(wěn)定,如不滿足要求,應(yīng)采取邊坡支撐加固措施。并在施工中進(jìn)行沉降和位移觀測(cè)。(3)棄土應(yīng)及時(shí)運(yùn)出,如需要臨時(shí)堆土,或留作回填土,堆土坡腳至坑邊距離應(yīng)按開(kāi)挖深度、邊坡坡度和土的類別確定(應(yīng)考慮堆土附加側(cè)壓力)。(4)土方開(kāi)挖工程完成后要盡量減少暴露時(shí)間,及時(shí)進(jìn)行下一道工序的施工。如不能立即進(jìn)行下一道工序。要預(yù)留1530cm厚覆蓋土層,待基礎(chǔ)施工時(shí)再挖去。3土方開(kāi)挖準(zhǔn)備開(kāi)挖應(yīng)根據(jù)邊坡形式、降排水要求,確定開(kāi)挖方案。施工邊界周圍地面應(yīng)設(shè)排水溝,且應(yīng)避免漏水、滲水進(jìn)入坑內(nèi);放坡開(kāi)挖時(shí),應(yīng)對(duì)坡頂、坡面、坡腳采取降排水措施?;又苓厙?yán)禁超堆荷載。內(nèi)容應(yīng)包括:開(kāi)挖機(jī)械的選型,開(kāi)挖程序,機(jī)械和運(yùn)輸車輛行駛路線,地面和坑內(nèi)排水措施,雨季、汛期施工措施等。4開(kāi)挖監(jiān)控:開(kāi)挖前應(yīng)作出系統(tǒng)的開(kāi)挖監(jiān)控方案,監(jiān)控方案應(yīng)包括監(jiān)控目的、監(jiān)測(cè)項(xiàng)目、監(jiān)控報(bào)警值、監(jiān)測(cè)方法及精度要求、監(jiān)測(cè)點(diǎn)的布置、監(jiān)測(cè)周期、工序管理和記錄制度以及信息反饋系統(tǒng)等。五、放坡計(jì)算 依據(jù)。1土的重度(KN/m2) 20.0 值限:16212. 內(nèi)摩擦角(o) 20.0 值限:10453粘聚力(KN/m2) 10.0 C值限:0204.挖土深度(m) 6.0 h值限:1105土坡穩(wěn)定坡角(o) 45.0 值限:090h=2Csincos/sin2(-/2)=210.0sin(0.79)cos(0.35)/20.0sin(0.22)2=14.19 挖土深度6.00小于14.19,滿足要求。六、基坑(槽)管溝計(jì)算 根據(jù)建筑基坑支護(hù)技術(shù)規(guī)程 JGJ 120-99、木結(jié)構(gòu)設(shè)計(jì)規(guī)范GB 50005-2003和建筑施工計(jì)算手冊(cè)3.2節(jié)完成。承受土的水平壓力的作用,設(shè)土與擋板間的摩擦力不計(jì),則深度h處的主動(dòng)土壓力強(qiáng)度Pa(KN/m2)為 h基坑(槽)深度(m);Pa=19.8335.000tg2(45 - 8.167)=136.9641.擋土板的計(jì)算擋土板厚度按受力最大的下面一塊板計(jì)算。設(shè)深度h處的擋土板寬度為b,則主動(dòng)土壓力作用在該擋土板上的荷載q1=pab=136.9641.000=136.964 kN/m。當(dāng)擋土板視作簡(jiǎn)支梁,如立柱間距為L(zhǎng)時(shí),則擋土板承受的最大彎矩為: 經(jīng)過(guò)計(jì)算得:Mmax=136.9640.5002/8=4.280 kN.m所需木擋板的截面矩W為:式中 fm木材的抗彎強(qiáng)度設(shè)計(jì)值:15.000 (N/mm2)。經(jīng)過(guò)計(jì)算得:W=(1000.00060.0002)/6=.000 mm3擋土板的抗彎為f: 經(jīng)過(guò)計(jì)算得:f=4.280106/.000=7.134 N/mm2擋土板的抗彎強(qiáng)度7.134小于面板的設(shè)計(jì)值15.000N/mm2,滿足要求。2.立柱的計(jì)算立柱為承受三角形荷載的連續(xù)梁,亦按多跨簡(jiǎn)支梁計(jì)算,并按控制跨設(shè)計(jì)其尺寸。當(dāng)坑(槽)壁設(shè)二道橫撐木,其上橫撐間距為l1=1.0 m,立柱間距為L(zhǎng)=0.500 m時(shí),則下端支點(diǎn)處主動(dòng)土壓力的荷載為:q2=paL=136.9640.500=68.482 (kN/m),式中pa為立柱下端的土壓力(kN/m2)。當(dāng)坑(槽)壁設(shè)多層橫撐木時(shí),可將各跨間梯形分布荷載簡(jiǎn)化為均布荷載qi(等于其平均值),如圖中虛線所示。如果按等跨度設(shè)置橫撐木時(shí),可取其控制跨度求其最大彎矩: 計(jì)算得到: Mmax=68.4820.0102/8=0.001 kN.m 最大應(yīng)力為:=0.001106/(200.000200.0002/6)=0.001 立柱的抗彎強(qiáng)度0.001小于木方的設(shè)計(jì)值13.000N/mm2,滿足要求。3.橫撐的計(jì)算橫撐木為承受支點(diǎn)反力的中心受壓桿件,可按下式計(jì)算需用截面積:式中 A0橫撐木的截面積(mm2); R橫撐木承受的支點(diǎn)最大反力(N); fc木材順紋抗壓及承壓強(qiáng)度設(shè)計(jì)值(N/mm2); 橫撐木的軸心受壓穩(wěn)定系數(shù)。值可按下式計(jì)算:當(dāng)75時(shí) 當(dāng)75時(shí)為橫撐木的長(zhǎng)細(xì)比,=l/i=5.0001000/57.735=86.603;=3000/86.6032=0.400;fc=0.685103/(0.40040000.000)=0.043橫撐的抗彎強(qiáng)度0.043小于木方的設(shè)計(jì)值13.000N/mm2,滿足要求。七、施工措施 1.基坑開(kāi)挖之前,要按照土質(zhì)情況、基坑深度以及周邊環(huán)境確定支護(hù)方案,其內(nèi)容應(yīng)包括:放坡要求、支護(hù)結(jié)構(gòu)設(shè)計(jì)、機(jī)械選擇、開(kāi)挖時(shí)間、開(kāi)挖順序、分層開(kāi)挖深度、坡道位置、車輛進(jìn)出道路、降水措施及監(jiān)測(cè)要求等。 2.本施工方案的制定針對(duì)施工工藝結(jié)合作業(yè)條件,對(duì)施工過(guò)程中可能造成坍塌的因素和作業(yè)人員的安全以及防止周邊建筑、道路等產(chǎn)生不均勻沉降,設(shè)計(jì)制定具體可行性措施,并在施工中付諸實(shí)施。 3、基坑的深度超過(guò)56m,且面積較大,給基礎(chǔ)工程施工帶來(lái)很大困難和危險(xiǎn),必須認(rèn)真制定安全措施防止發(fā)生事故。 4.支護(hù)設(shè)計(jì)方案的合理與否,不但直接影響施工的工期、造價(jià),更主要還對(duì)施工過(guò)程中的安全與否有直接關(guān)系,所以必須經(jīng)上級(jí)審批。有的地區(qū)規(guī)定基坑開(kāi)挖深度超過(guò)6m時(shí),必須經(jīng)建委專家組審批。經(jīng)實(shí)踐證明這些規(guī)定不但確保了施工安全,還對(duì)縮短工期、節(jié)約資金取得了明顯效益。八、臨邊防護(hù)1、 挖出的土要隨挖隨時(shí)排走,不得在坑邊存放。2、 邊坡上部不準(zhǔn)堆放棄土和材料設(shè)備等,堆放重物距土坡安全距離不得小于6m, 臨時(shí)材料不得小于4m。3、 距離坡上線1.5m外用鋼管插入地下做立桿搭設(shè)0.6 m,1.2 m高兩道水平欄桿, 并用密目安全網(wǎng)全封閉。4、 夜間掛紅燈警示。(在防護(hù)欄桿上部)5、欄桿刷一米長(zhǎng)紅白相間顏色警示。 6、將坑邊上的散土和活動(dòng)碎石清理干凈。九、基坑壁支護(hù) 1.原狀土放坡一般基坑深度小于3m時(shí),可采用一次性放坡。當(dāng)深度達(dá)到45m時(shí),也可采用分級(jí)放坡。明挖放坡必須保證邊坡的穩(wěn)定,根據(jù)土的類別進(jìn)行穩(wěn)定計(jì)算確定安全系數(shù)。原狀土放坡適用于較淺的基坑,對(duì)于深基坑可采用打樁、土釘墻或地下連續(xù)墻方法來(lái)確保邊坡的穩(wěn)定。 2.排樁 當(dāng)周邊無(wú)條件放坡時(shí),可設(shè)計(jì)成擋土墻結(jié)構(gòu)??梢圆捎妙A(yù)制樁或灌注樁,預(yù)制樁有鋼筋混凝土樁和鋼樁,當(dāng)采用間隔排樁時(shí),將樁與樁之問(wèn)的土體固化形成樁墻擋土結(jié)構(gòu)。 土體的固化方法可采用高壓旋噴或深層攪拌法進(jìn)行。固化后的土體不但具有整體性好,同時(shí)可以阻止地下水滲入基坑形成隔滲結(jié)構(gòu)。樁墻結(jié)構(gòu)實(shí)際上是利用樁的入土深度形成懸臂結(jié)構(gòu),當(dāng)基礎(chǔ)較深時(shí),可采用坑外拉錨或坑內(nèi)支撐來(lái)保持護(hù)樁的穩(wěn)定。 3.坑外拉錨與坑內(nèi)支撐 (1)坑外拉錨 用錨具將錨桿固定在樁的懸臂部分,將錨桿的另一端伸向基坑邊坡土層內(nèi)錨固,以增加樁的穩(wěn)定。土錨扦由錨頭、自由段和錨固段三部分組成,錨桿必須有足夠長(zhǎng)度,錨固段不能設(shè)置在土層的滑動(dòng)面之內(nèi)。錨桿應(yīng)經(jīng)設(shè)計(jì)并通過(guò)現(xiàn)場(chǎng)試驗(yàn)確定抗拔力。錨桿可以設(shè)計(jì)成一層或多層,采用坑外拉錨較采用坑內(nèi)支撐法能有較好的機(jī)械開(kāi)挖環(huán)境。 (2)坑內(nèi)支撐 為提高樁的穩(wěn)定性,也可采用在坑內(nèi)加設(shè)支撐的方法??觾?nèi)支撐可采用單層平面或多層支撐,支撐材料可采用型鋼或鋼筋混凝土,設(shè)計(jì)支撐的結(jié)構(gòu)形式和節(jié)點(diǎn)做法,必須注意支撐安裝及拆除順序。尤其對(duì)多層支撐要加強(qiáng)管理,混凝土支撐必須在上道支撐強(qiáng)度達(dá)80%時(shí)才可挖下層;對(duì)鋼支撐嚴(yán)禁在負(fù)荷狀態(tài)下焊接。 4.逆作法施工 逆作法的施工工藝和一般正常施工相反,一般基礎(chǔ)施工先挖至設(shè)計(jì)深度,然后自下向上施工到正負(fù)零標(biāo)高,然后再繼續(xù)施工上部主體。逆作法是先施工地下一層(離地面最近的一層),在打完第一層樓板時(shí),進(jìn)行養(yǎng)護(hù),在養(yǎng)護(hù)期間可以向上部施工主體,當(dāng)?shù)谝粚訕前暹_(dá)到強(qiáng)度時(shí),可繼續(xù)施工地下二層(同時(shí)向上方施工),此時(shí)的地下主體結(jié)構(gòu)梁板體系,就作為擋土結(jié)構(gòu)的支撐體系,地下室的墻體又是基坑的護(hù)壁。這時(shí)梁板的施工只需在地面上挖出坑槽放人模板鋼筋,不設(shè)支撐,在梁的底部將伸出筋插入土中,作為柱子鋼筋,梁板施工完畢再挖土方施工柱子。第一層樓板以下部分由于樓板的封閉,只能采用人工挖土,可利用電梯間作垂直運(yùn)輸通道。逆作法不但節(jié)省工料,上下同時(shí)施工縮短工期,還由于利用工程梁板結(jié)構(gòu)做內(nèi)支撐,可以避免由于裝拆臨時(shí)支撐造成的土體變形。十、排水措施1、基坑明溝排水計(jì)算明溝排水又稱表面排水,它是利用設(shè)置在基坑內(nèi)、外的明溝、集水井和抽水設(shè)備,將地下水從集水井中不斷排走,保持基坑處于干燥狀態(tài)。這種施工方法施工方便,設(shè)備簡(jiǎn)單,降水費(fèi)用低,管理維護(hù)容易。 排水溝、集水井應(yīng)設(shè)在基礎(chǔ)輪廓線以外,排水溝邊緣應(yīng)離開(kāi)坡腳不小于0.3米,深度應(yīng)始終保持比挖土面低0.4-0.5米。集水井應(yīng)比排水溝低0.5-1.0米,并隨基坑的挖深而加深,保持水流通暢。 一、基坑涌水量計(jì)算 基坑采用明溝排水,流入基坑內(nèi)的滲水量與土的種類、滲透系數(shù)、水頭、坑底面積等有關(guān),可通過(guò)的,抽水試驗(yàn)或憑經(jīng)驗(yàn)估計(jì),或按大井法估算。它是利用設(shè)置在基坑內(nèi)、外的明溝、集水井和抽水設(shè)備,將地下水從集水井中不斷排走,保持基坑處于干燥狀態(tài)。這種施工方法施工方便,設(shè)備簡(jiǎn)單,降水費(fèi)用低,管理維護(hù)容易。 排水溝、集水井應(yīng)設(shè)在基礎(chǔ)輪廓線以外,排水溝邊緣應(yīng)離開(kāi)坡腳不小于0.3米,深度應(yīng)始終保持比挖土面低0.4-0.5米。集水井應(yīng)比排水溝低0.5-1.0米,并隨基坑的挖深而加深,保持水流通暢。1)、基坑涌水量計(jì)算基坑采用明溝排水,流入基坑內(nèi)的滲水量與土的種類、滲透系數(shù)、水頭、坑底面積等有關(guān),可通過(guò)的,抽水試驗(yàn)或憑經(jīng)驗(yàn)估計(jì),或按大井法估算。按大井法估算是把矩形基坑假想為一個(gè)半徑為r0的圓形大井,其流入基坑內(nèi)的涌水量Q,為從四周坑壁和坑底流入的水量之和,按下式計(jì)算:式中 Q:基坑總涌水量(m3/d)K:土的滲透(m/d) S:抽水時(shí)坑內(nèi)水位下降值(m)H:抽水前坑底以上水位的高度(m) R:抽水影響半徑(m),按下表選用抽水影響半徑R值土的種類極細(xì)砂細(xì)砂中砂粗砂極粗砂小礫石中礫石大礫石粒徑(mm)0.05-0.10.01-0.250.25-0.50.1-1.01.0-2.02.0-3.03.0-5.05.0-10.0所占質(zhì)量(%)50505050R(m)25-5050-100100-200200-400400-500500-600600-15001500-3000r0 引用半徑(m),對(duì)矩形基坑, r0=(a+b)/4;對(duì)不規(guī)則形基坑,a/b2-3時(shí), r0= U/;a、 b為基坑邊長(zhǎng)(m)U為基坑周長(zhǎng)(m)A為基坑面積(m2)為系數(shù),由下表得系數(shù)值b/a002040060080100100112114116118118m0 從基坑底到下臥不透水層的距離(m)。在選擇水泵考慮水泵流量,因最初涌水量較穩(wěn)定涌水量大,應(yīng)按上面涌水量計(jì)算公式計(jì)算出的涌水量應(yīng)增加10%-20%。2)、水泵功率計(jì)算水泵所需功率N(KW)按下式計(jì)算:N=K0QH0/7512式中K0 安全系數(shù)Q 基坑涌水量(m3/d)1 水泵效率,一般取0.40-0.502 動(dòng)力機(jī)械效率, 一般取0.75-0.85計(jì)算得出N,當(dāng)涌水量Q20m3/h,可用膜式水泵、潛水電泵。膜式水泵還可排除泥漿水。 2、排水措施根據(jù)施工現(xiàn)場(chǎng)地表水和地下水的情況以及要求,本工程排水采用盲溝排水。1、土方開(kāi)挖之后,分別在建筑物的東北、西北、東南、西南角,在圍護(hù)樁內(nèi)距圍護(hù)樁邊600mm設(shè)置4只1.5m深的集水井。2、集水井為500mm,在土方開(kāi)挖之前用滲透性砼澆搗制作,且必須達(dá)到使用強(qiáng)度。3、設(shè)置好集水井后,在距圍護(hù)樁邊500mm左右開(kāi)挖300寬、400深的排水溝。排水溝用2040mm粒徑的卵石鋪填,作成盲溝。4、盲溝與4個(gè)集水井之間作成一個(gè)環(huán)狀的排水系統(tǒng)。5、施工方法及操作要點(diǎn)1)在做集水井時(shí),滲透性砼井筒的高度應(yīng)作成1.8m高,待集水井埋設(shè)至預(yù)定標(biāo)高后,井底30cm用砼澆灌,以避免地下水上涌造成流沙。2)下沉集水井時(shí),可以采用沉井的方法,由一名工人站在井內(nèi)挖土,井外工人配合用振搗器振動(dòng)井筒,以便井筒順利下沉,亦不至于破壞筒邊的土層。3)盲溝的鋪設(shè)應(yīng)緊跟土方隊(duì)作業(yè),石子鋪設(shè)應(yīng)及時(shí),以避免溝邊土方位移。4)盲溝應(yīng)對(duì)照集水井的位置,開(kāi)挖時(shí)應(yīng)注意放坡23%,以使基坑地表及地下水順利流入集水井。5)集水井做好之后,應(yīng)派專人抽水,直至地下室施工完畢,回填土完成,方可停抽。6)抽水時(shí)要注意出水是否澄清,不可過(guò)分抽水,以避免造成水頭差,出現(xiàn)流沙現(xiàn)象。7)在坡底周邊距基坑邊緣1m處開(kāi)挖排水盲溝,寬500mm深300mm的連通坑道通積水坑0.5m*0.5m*0.8m,保證及時(shí)用水泵將積水排走,不致浸泡邊坡和影響作業(yè)。8)備有2臺(tái)水泵和配套的配電箱,開(kāi)關(guān)箱,電線等,使用水泵時(shí),水泵電線不準(zhǔn)拖地,仔細(xì)檢查電纜是否有破損等現(xiàn)象。9)備有水靴,雨衣褲。10)邊坡坡面上如有大量滲水時(shí),應(yīng)設(shè)置過(guò)濾層,用草包或沙包防止邊坡滑入坑內(nèi),隨時(shí)清理積水坑?;邮┕こS龅叵滤?尤其深基施工處理不好不但影響基坑施工,還會(huì)給周邊建筑造成沉降不均的危險(xiǎn)。對(duì)地下水的控制方法一般有:排水、降水、隔滲。 1.排水 開(kāi)挖深度較淺時(shí),可采用明排。沿槽底挖出兩道水溝,每隔3040m設(shè)置一集水井,用抽水設(shè)備將水抽走。有時(shí)深基坑施工,為排除雨季的暴雨突然而來(lái)的明水,也采用明排。 2、降水.開(kāi)挖深度大于3m時(shí),可采用井點(diǎn)降水。在基坑外設(shè)置降水管,管壁有孔并有過(guò)濾網(wǎng),可以防止在抽水過(guò)程中將土粒帶走,保持土體結(jié)構(gòu)不被破壞。井點(diǎn)降水每級(jí)可降低水位4.5m,再深時(shí),可采用多級(jí)降水,水量大時(shí),也可采用深井降水。 當(dāng)降水可能造成周圍建筑物不均勻沉降時(shí),應(yīng)在降水的同時(shí)采取回灌措施?;毓嗑且粋€(gè)較長(zhǎng)的穿孔井管,和井點(diǎn)的過(guò)濾管一樣,井外填以適當(dāng)級(jí)配的濾料,井日用粘土封口,防止空氣進(jìn)入?;毓嗯c降水同時(shí)進(jìn)行,并隨時(shí)觀測(cè)地下水位的變化,以保持原有的地下水位不變。 3.隔滲 基坑隔滲是用高壓旋噴、深層攪拌形成的水泥土墻和底板而形成的止水帷幕,阻止地下水滲入基坑內(nèi)。隔滲的抽水井可設(shè)在坑內(nèi),也可設(shè)在坑外。 (1)坑內(nèi)抽水:不會(huì)造成周邊建筑物、道路等沉降問(wèn)題,可以坑外高水位坑內(nèi)低水位干燥條件下作業(yè)。但最后封井技術(shù)上應(yīng)注意防漏,止水帷幕采用落底式,向下延伸插人到不透水層以內(nèi)對(duì)坑內(nèi)封閉。 (2)坑外抽水:含水層較厚,惟幕懸吊在透水層中。由于采用了坑外抽水,從而減輕了擋土樁的側(cè)壓力。但坑外抽水對(duì)周邊建筑物有不利的沉降影響。十一、坑邊荷載 1.坑邊堆置土方和材料包括沿挖土方邊緣移動(dòng)運(yùn)輸工具和機(jī)械不應(yīng)離槽邊過(guò)近,堆置土方距坑槽上部邊緣不少于1.2m,棄土堆置高度不超過(guò)1.5m。 2.大中型施工機(jī)具距坑槽邊距離,應(yīng)根據(jù)設(shè)備重量、基坑支護(hù)情況、土質(zhì)情況經(jīng)計(jì)算確定。規(guī)范規(guī)定“基坑周邊嚴(yán)禁超堆荷載”。土方開(kāi)挖如有超載和不可避免的邊坡堆載,包括挖土機(jī)平臺(tái)位置等,應(yīng)在施工方案中進(jìn)行設(shè)計(jì)計(jì)算確認(rèn)。 3.當(dāng)周邊有條件時(shí),可采用坑外降水,以減少墻體后面的水壓力。十二、上下通道 1.基坑施工作業(yè)人員上下必須設(shè)置專用通道,不準(zhǔn)攀爬模板、腳手架以確保安全。 2.人員專用通道應(yīng)在施工組織設(shè)計(jì)中確定,其攀登設(shè)施可視條件采用梯子或?qū)iT(mén)搭 設(shè),應(yīng)符合高處作業(yè)規(guī)范中攀登作業(yè)的要求。3、用鋼管和橋板搭設(shè)人行坡道,坡道必須滿足多人同時(shí)上下行走,并保證其承載力,坡道底部支撐必須放置在300mm寬的承托板上,不得直接置于土中,坡道要有扶手護(hù)欄等齊全的安全設(shè)施。不準(zhǔn)使用木梯上下,坡道要設(shè)防滑條,間距不大于300mm。十三、土方開(kāi)挖1、土方開(kāi)挖過(guò)程中,根據(jù)條件邊坡系數(shù)控制在0.51.0之間,確保邊坡穩(wěn)定,設(shè)一名專職人員在作業(yè)前作業(yè)中進(jìn)行全方位監(jiān)護(hù),并做好記錄。機(jī)械挖土和人工清邊修角時(shí)起重臂回轉(zhuǎn)半徑內(nèi)嚴(yán)禁站人,按合理的順序挖土,邊挖邊清,但不準(zhǔn)機(jī)械和人同時(shí)在一個(gè)地點(diǎn)作業(yè)。如夜間施工時(shí)要有足夠的照明設(shè)施,挖土機(jī)及車輛必須設(shè)專人指揮,照明有漏電保護(hù)裝置,電線要掛起不準(zhǔn)拖地并且保證兩名以上電工配合作業(yè)施工。2、作業(yè)前要嚴(yán)格檢查坑內(nèi)外,坑邊有無(wú)危險(xiǎn)因素,對(duì)施工做業(yè)人員做好有針對(duì)性的安全技術(shù)交底。3.所有施工機(jī)械應(yīng)按規(guī)定進(jìn)場(chǎng)經(jīng)過(guò)有關(guān)部門(mén)組織驗(yàn)收確認(rèn)合格,并有記錄。 4.機(jī)械挖土與人工挖土進(jìn)行配合操作時(shí),人員不得進(jìn)入挖土機(jī)作業(yè)半徑內(nèi),必須進(jìn)人時(shí),待挖土機(jī)作業(yè)停止后,人員方可進(jìn)行坑底清理、邊坡找平等作業(yè)。5.挖土機(jī)作業(yè)位置的土質(zhì)及支護(hù)條件,必須滿足機(jī)械作業(yè)的荷載要求,機(jī)械應(yīng)保持水平位置和足夠的工作面。6.挖土機(jī)司機(jī)屬特種作業(yè)人員,應(yīng)經(jīng)專門(mén)培訓(xùn)考試合格持有操作證。7.挖土機(jī)不能超標(biāo)高挖土,以免造成土體結(jié)構(gòu)破壞。坑底最后留一步土方由人工完成,并且人工挖土應(yīng)在打墊層之前進(jìn)行,以減少亮槽時(shí)間(減少土側(cè)壓力)。十四、基坑支護(hù)變形監(jiān)測(cè)1.基坑開(kāi)挖之前應(yīng)作出系統(tǒng)的監(jiān)測(cè)方案。包括:監(jiān)測(cè)方法、精度要求、監(jiān)測(cè)點(diǎn)布置、 觀測(cè)周期、工序管理、記錄制度、信息反饋等。2南側(cè)雖然放坡較大,但仍不排除有坍塌的危險(xiǎn),故設(shè)一名專職監(jiān)護(hù)人員,進(jìn)行全天監(jiān)測(cè),并做好沉降記錄,如發(fā)現(xiàn)有松動(dòng)、變形、裂縫現(xiàn)象,立刻撤離現(xiàn)場(chǎng)作業(yè)人員,并及時(shí)報(bào)告上級(jí)有關(guān)部門(mén),采取防范措施,確保安全生產(chǎn)。3.基坑開(kāi)挖過(guò)程中特別注意監(jiān)測(cè): 1)支護(hù)體系變形情況; 2)基坑外地面沉降或隆起變形; 3)臨近建筑物動(dòng)態(tài)。4.監(jiān)測(cè)支護(hù)結(jié)構(gòu)的開(kāi)裂、位移。重點(diǎn)監(jiān)測(cè)樁位、護(hù)壁墻面、主要支撐桿、連接點(diǎn)以 及滲漏情況。十五、作業(yè)環(huán)境建筑施工現(xiàn)場(chǎng)作業(yè)條件,往往是地下作業(yè)條件被忽視,坑槽內(nèi)作業(yè)不應(yīng)降低規(guī)范要求。1.人員作業(yè)必須有安全立足點(diǎn),腳手架搭設(shè)必須符合規(guī)范規(guī)定,臨邊防護(hù)符合要求。2.交叉作業(yè)、多層作業(yè)上下設(shè)置隔離層。垂直運(yùn)輸作業(yè)及設(shè)備也必須按照相應(yīng)的規(guī)范進(jìn)行檢查。 3.深基坑施工的照明問(wèn)題,電箱的設(shè)置及周圍環(huán)境以及各種電氣設(shè)備的架設(shè)使用均應(yīng)符合電氣規(guī)范規(guī)定。十六、采用的施工方法(1)、本工程基礎(chǔ)為柱下獨(dú)立基礎(chǔ),并有基礎(chǔ)梁相連,根據(jù)基礎(chǔ)平面和基礎(chǔ)埋置深度,獨(dú)立樁基采取逐個(gè)開(kāi)挖,條形基礎(chǔ)采取條開(kāi)挖,控土放坡系數(shù)1:0.75,采用兩臺(tái)WY100反鏟挖土機(jī)開(kāi)挖,土方不外運(yùn)。(2)、土方開(kāi)挖的順序從北方南由兩臺(tái)挖土機(jī)開(kāi)挖,開(kāi)挖時(shí)要控制好樁頂標(biāo)高,挖至底板上口20cm則為人工進(jìn)行挖土。嚴(yán)禁機(jī)械挖機(jī)械土損傷及碰動(dòng)工程樁。(3)排水措施:挖土過(guò)程中沿坑底四周設(shè)置環(huán)通明排水溝及集水井,用潛水泵進(jìn)行坑內(nèi)排水。施工現(xiàn)場(chǎng)設(shè)置環(huán)通明排水溝,并每隔30料左右設(shè)置三級(jí)沉淀池,污水經(jīng)沉淀后排入市政污水管道。(基礎(chǔ)承臺(tái)挖土示意圖)(4)本工程深基坑位于軸/B-D軸區(qū)域,基坑底板底面標(biāo)高為FH-4.65m(最深處),墊層底面標(biāo)高為FL-5.900m,挖深最大達(dá)4.85m.由于深基坑挖處于可塑性粘土及粉質(zhì)粘土層中,地下水位約在FL-3.355m(根據(jù)地質(zhì)勘察報(bào)告,這黃海高-0.880)位置,故開(kāi)挖必須考慮采用擋土或放坡以及有效的排水措施。(5)考慮本工程深基坑施工采用“二次放坡+集水井抽水”的傳統(tǒng)簡(jiǎn)易施工方法。具體詳見(jiàn)深基坑挖土示意圖:(6)、深基坑四周1米處加設(shè)鋼管護(hù)欄。深基坑排水明溝沿坡腳布置,并設(shè)置集水井2處,尺寸為500500500,坑內(nèi)積水及時(shí)用潛水泵抽出。由于二次放坡開(kāi)挖面積較大,臨近深基坑的工程樁基將會(huì)在開(kāi)挖后露出一部分長(zhǎng)度,為了減小對(duì)已壓入樁基的影響,避免擾動(dòng),同時(shí)考慮合理安排承臺(tái)基礎(chǔ)施工,采用對(duì)露出部分C10素砼澆筑到基底標(biāo)高。(7)、滑坡和塌方的處理 為了避免因不良地質(zhì)條件、地下水或施工活動(dòng)不當(dāng),造成基坑滑坡和塌方,應(yīng)在挖土方時(shí)保持足夠的坡度,避免隨意切割坡腳,嚴(yán)格保證二次放坡臺(tái)階寬度,迅速有效排水防止坑內(nèi)明水沖擊坡腳,盡量避免在坡腳處取土或在破肩上設(shè)置棄和材料。十七、基礎(chǔ)土方回填土方回填前坑內(nèi)所有建筑垃圾與積水必須清理干凈,并在對(duì)基礎(chǔ)工程進(jìn)行各項(xiàng)檢查,監(jiān)理驗(yàn)收合格,并作好隱蔽工程記錄后方能進(jìn)行,回填所用的土要嚴(yán)格控制其含水量,施工前由專職試驗(yàn)員對(duì)回填土進(jìn)行檢驗(yàn),并要最終得到監(jiān)理認(rèn)可,在大面積夯實(shí)填土?xí)r,應(yīng)該初步平整基底,夯實(shí)時(shí)要按照一定方向進(jìn)行,一夯半夯,夯夯相接,行行相連,每遍縱橫交叉,每30cm分層夯打。1)、回填條件:所有基礎(chǔ)模板須拆除完畢,坑內(nèi)雜特須清理干凈,而且坑內(nèi)無(wú)積水?;A(chǔ)表面軸線或有關(guān)中心控制線必須彈好,并做好紅漆標(biāo)記。基礎(chǔ)回填前應(yīng)配合業(yè)主及時(shí)聯(lián)系工程質(zhì)量監(jiān)督部門(mén)對(duì)基礎(chǔ)結(jié)構(gòu)進(jìn)行中間驗(yàn)收工作。2)、回填方式:采用機(jī)械回填及人工相結(jié)合,采用機(jī)械回填時(shí),機(jī)械行走區(qū)域必須鋪設(shè)走道板,嚴(yán)禁機(jī)械直接在基礎(chǔ)地梁上行走。3)、回填質(zhì)量控制:所有回填土必須無(wú)腐爛植物及有機(jī)物和塊石,土質(zhì)必須基本干燥,剛出坑的土不宜采用,回填土應(yīng)分層進(jìn)行,分層夯實(shí)。每層回填度不能超過(guò)30cm.回填土驗(yàn)收采用環(huán)刀法取樣標(biāo)準(zhǔn)為室內(nèi)每500取一組,室外每800取一組,土的干容重應(yīng)達(dá)到1.6g/m3。4)、回填土?xí)r對(duì)承臺(tái)、基礎(chǔ)梁、柱等的棱角要進(jìn)行成品保護(hù),不得因機(jī)械碰撞有損壞。十八、施工安全保證措施1進(jìn)入施工現(xiàn)場(chǎng)必須遵守安全操作規(guī)程和安全生產(chǎn)十大紀(jì)律。2嚴(yán)格執(zhí)行施工組織設(shè)計(jì)和安全技術(shù)措施,不準(zhǔn)擅自修改。3基坑開(kāi)挖前,應(yīng)先檢查了解地質(zhì)、水文、道路、附近建筑物、民房等狀況,做好記錄,開(kāi)挖過(guò)程經(jīng)常觀測(cè)變化情況,發(fā)現(xiàn)異常,立即采取應(yīng)急措施。4作業(yè)前要全面檢查開(kāi)挖的機(jī)械、電氣設(shè)備是否符合安全要求,嚴(yán)禁帶病運(yùn)行,基坑現(xiàn)場(chǎng)排水、降水、集水措施是否落實(shí)。5作業(yè)中應(yīng)堅(jiān)持由上而下分層開(kāi)挖。6施工前要有單項(xiàng)土方工程施工方案,對(duì)施工準(zhǔn)備、開(kāi)挖方法、放坡、排水、邊坡支護(hù)應(yīng)根據(jù)有關(guān)規(guī)范要求進(jìn)行設(shè)計(jì)。 7人工挖土方時(shí),操作人員之間要保持安全距離,一般大于2.5m;多臺(tái)機(jī)械開(kāi)挖,挖土機(jī)間距應(yīng)大于10m,挖土要自上而下,逐層進(jìn)行,嚴(yán)禁先挖坡腳的危險(xiǎn)作業(yè)。8開(kāi)挖邊坡土方,嚴(yán)禁切割坡腳,以防導(dǎo)致邊坡失穩(wěn),當(dāng)山坡坡度陡于五分之一或在軟土地段,不得在挖方土側(cè)堆土;挖土根據(jù)規(guī)范要求應(yīng)分層進(jìn)行。9挖土方前對(duì)于周圍環(huán)境要認(rèn)真檢查,不能在危險(xiǎn)巖石或建筑物下面進(jìn)行作業(yè)。10開(kāi)挖應(yīng)嚴(yán)格按要求放坡,操作時(shí)應(yīng)隨時(shí)注意邊坡的穩(wěn)定情況,發(fā)現(xiàn)問(wèn)題及時(shí)加強(qiáng)處理。11現(xiàn)場(chǎng)挖土有專人統(tǒng)一指揮調(diào)配,做到忙而不亂,2臺(tái)挖掘機(jī)在同一作業(yè)面機(jī)械開(kāi)挖,挖掘機(jī)間距應(yīng)大于10m。多臺(tái)階同時(shí)開(kāi)挖土方時(shí),應(yīng)驗(yàn)算邊坡的穩(wěn)定。根據(jù)規(guī)定和驗(yàn)算確定挖土機(jī)離邊坡的安全距離。12四周設(shè)防護(hù)欄桿,人員上下要有專用爬梯。13機(jī)械施工區(qū)域禁止無(wú)關(guān)人員進(jìn)入施工場(chǎng)地內(nèi),挖掘機(jī)工作回轉(zhuǎn)半徑范圍內(nèi)不得站人或進(jìn)行其他作業(yè)。挖掘機(jī)裝土應(yīng)待整機(jī)停穩(wěn)后進(jìn)行,不得將鏟斗從運(yùn)輸汽車駕駛室頂部越過(guò),裝土?xí)r任何人都不得停留在裝土車上。14挖掘機(jī)操作和汽車裝土行駛要聽(tīng)從指揮,所有車輛必須嚴(yán)格按規(guī)定的運(yùn)行線路行駛,防止撞車。15夜間施工,機(jī)上及工作地點(diǎn)必須有充足的照明設(shè)施,在危險(xiǎn)地段應(yīng)設(shè)置明顯的警示標(biāo)志和護(hù)攔。16雨天施工,運(yùn)輸機(jī)械和行使道路應(yīng)采取防滑措施,以保證行車安全。17所有用電設(shè)置必須符合用電規(guī)范,嚴(yán)格遵照“三級(jí)配電兩級(jí)保護(hù)、一機(jī)一閘一漏電一箱”的原則進(jìn)行設(shè)置和使用。18施工現(xiàn)場(chǎng)內(nèi)必須戴安全帽,以防基坑坑上雜物墜落傷人。19土方運(yùn)輸車輛每次外運(yùn)時(shí),土方不可裝箱太滿太高,每一部車都必須加設(shè)頂蓋,并在運(yùn)土?xí)r蓋好,以防止土方在運(yùn)輸過(guò)程中失落、墜地,每天派專人負(fù)責(zé)周邊道路的清潔。20建立健全施工安全保證體系,落實(shí)有關(guān)建筑施工的基本安全措施等內(nèi)容。21結(jié)合工程特點(diǎn)采取緊急應(yīng)急措施。22、地下水控制的設(shè)計(jì)和施工應(yīng)滿足支護(hù)結(jié)構(gòu)設(shè)計(jì)要求,應(yīng)根據(jù)場(chǎng)地及周邊工程地質(zhì)條件、水文地質(zhì)條件和環(huán)境條件并結(jié)合基坑支護(hù)和基礎(chǔ)施工方案綜合分析、確定。內(nèi)容如地下水控制方法;涌水量估算;降水措施等。十九、深基坑施工事故應(yīng)急救援預(yù)案(一)總則 為有效防范重特大安全事故的發(fā)生,強(qiáng)化重特大安全事故應(yīng)急處理責(zé)任,最大限度的控制事故危害,減少人員傷亡和財(cái)產(chǎn)損失,根據(jù)國(guó)務(wù)院關(guān)于重特大安全事故行政責(zé)任追究的規(guī)定(國(guó)務(wù)院令第302號(hào))、國(guó)務(wù)院特別重大事故調(diào)查程序暫行規(guī)定(國(guó)務(wù)院令第34號(hào))、安全許可證條例和建設(shè)局重特大事故應(yīng)急處理預(yù)案,結(jié)合本公司實(shí)際,制定本預(yù)案。公司生產(chǎn)安全事故應(yīng)急預(yù)案在建設(shè)局的領(lǐng)導(dǎo)下,分級(jí)分部門(mén)負(fù)責(zé)。重特大安全事故發(fā)生后,任何部門(mén)和個(gè)人都有參加應(yīng)急救援的義務(wù),都必須服從應(yīng)急處理機(jī)構(gòu)的指揮。(二)應(yīng)急救援組織機(jī)構(gòu)為了使公司生產(chǎn)安全事故救援預(yù)案落到實(shí)處,我公司成立了生產(chǎn)安全事故應(yīng)急救 援領(lǐng)導(dǎo)小組。組 長(zhǎng):藤原利行副組長(zhǎng):樸銀山 、肖海聲成 員:孫亞弟、徐海云、盧兆海、孫華兵、肖觀壽、李劉民、陳周良、王水富、 陳金德、肖康明、廖喜東、陳宏春、史漢東(三)應(yīng)急處理領(lǐng)導(dǎo)小組機(jī)構(gòu)職責(zé) 1、在重特大安全事故發(fā)生后,立即啟動(dòng)本預(yù)案,組織、指揮有關(guān)部門(mén)和人員進(jìn)行搶救和善后處理;負(fù)責(zé)向上級(jí)政府和上級(jí)有關(guān)部門(mén)匯報(bào)事故情況,必要時(shí)爭(zhēng)取上級(jí)政府的援助;負(fù)責(zé)配合重特大安全事故應(yīng)急處理指揮部做出搶險(xiǎn)救災(zāi)具體方案和措施等重大問(wèn)題的決策和落實(shí)。負(fù)責(zé)組織對(duì)傷員搶救,保障事故搶險(xiǎn)和救災(zāi)過(guò)程中急需設(shè)備、器材的供應(yīng)。2、現(xiàn)場(chǎng)搶救組織職責(zé):采取緊急措施,盡一切可能搶救傷員及被困人員,防止事故進(jìn)一步擴(kuò)大。3、醫(yī)療組織職責(zé):對(duì)搶救出人員盡快送醫(yī)療搶救。4、后勤服務(wù)組織職責(zé):負(fù)責(zé)交通車調(diào)配,緊急救援物資征集供應(yīng)。(四)重特大安全事故應(yīng)急處理遵循的原則1、迅速報(bào)告原則。事故發(fā)生單位或事故 發(fā)生地的負(fù)責(zé)人、事故當(dāng)事人或目擊者有責(zé)任和義務(wù)在重特大事故發(fā)生后,立即向建設(shè)局報(bào)告,由建設(shè)局迅速報(bào)告安監(jiān)局、政府。2、主動(dòng)搶險(xiǎn)原則。在重特大事故發(fā)生后,各企業(yè)、每個(gè)公民,都有盡最大可能搶救受傷人員和公私財(cái)物的義務(wù)和責(zé)任。對(duì)有能力、有條件實(shí)施救助而坐視不管,或事故單位負(fù)責(zé)人、當(dāng)事人見(jiàn)死不救,甚至逃逸的,要依據(jù)有關(guān)法律法規(guī)予以懲罰。3、生命第一的原則。重特大事故發(fā)生后,單位負(fù)責(zé)人,要把救受傷人員、確保群眾安全作為首要任務(wù),最大限度的實(shí)施救護(hù),及時(shí)疏散處于危險(xiǎn)之中的群眾。4、科學(xué)施救,控制危險(xiǎn)源,防止事故擴(kuò)大的原則。事故搶救過(guò)程,要迅速判明事故現(xiàn)場(chǎng)裝況,采取有效措施及時(shí)控制危險(xiǎn)源,嚴(yán)防了生次生事故,避免搶救過(guò)程中的人員傷亡,控制事故蔓延。5、保護(hù)和搶救出的公私財(cái)物,確保重在設(shè)施安全的原
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 勞動(dòng)合同范本海南
- 2025年硬質(zhì)橡膠及其制品合作協(xié)議書(shū)
- 2025年孕產(chǎn)婦保健項(xiàng)目建議書(shū)
- 合伙酒店轉(zhuǎn)讓合同范本
- epc工程總價(jià)合同范本
- 信貸機(jī)構(gòu)合同范本
- 創(chuàng)業(yè)魔芋種植合作合同范本
- 合伙奶茶協(xié)議合同范本
- 低價(jià)手套租賃合同范本
- 南寧個(gè)人租房合同范本
- 《歷史地理生物》課件
- 商標(biāo)合資經(jīng)營(yíng)合同
- 第六講當(dāng)前就業(yè)形勢(shì)與實(shí)施就業(yè)優(yōu)先戰(zhàn)略-2024年形勢(shì)與政策
- 酒店大堂石材養(yǎng)護(hù)專項(xiàng)方案
- 2024-2030年中國(guó)家政服務(wù)行業(yè)經(jīng)營(yíng)策略及投資規(guī)劃分析報(bào)告
- 2025年護(hù)士資格證考核題庫(kù)及答案
- 新能源汽車驅(qū)動(dòng)電機(jī)及控制系統(tǒng)檢修教案 學(xué)習(xí)情境 1:驅(qū)動(dòng)電機(jī)的認(rèn)知
- 小組合作學(xué)習(xí)組內(nèi)分工及職責(zé)
- GB/T 44351-2024退化林修復(fù)技術(shù)規(guī)程
- 《ISO 41001-2018 設(shè)施管理- 管理體系 要求及使用指南》專業(yè)解讀與應(yīng)用指導(dǎo)材料之15:“7支持-7.6 組織知識(shí)”(雷澤佳編制-2024)
- 2024年建設(shè)工程質(zhì)量檢測(cè)人員-建設(shè)工程質(zhì)量檢測(cè)人員(主體結(jié)構(gòu)工程)考試近5年真題集錦(頻考類試題)帶答案
評(píng)論
0/150
提交評(píng)論