版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、Asia-Pacific Partnership on Clean Development and ClimateCement Task ForceChair of Cement Task ForceMinistry of Economy, Trade and Industry (METI)APP PIC Meeting, April 5, Bangkok, Thailand1Presentation Outline21. CTF Activity Review2. CTF Project Streams3. Outcomes and Next Steps of CTF Flagship pr
2、oject and other projects4. Summary of CTF Final Meeting Conclusions of CTF Final Meeting Recommendations for the Future1. CTF Activity ReviewNine task force meetings have been held to date.CSI: World Business Council for Sustainable Development (WBCSD)/Cement Sustainability Initiative ECRA: European
3、 Cement Research Academy; CEMBUREAU: The European Cement Association LBNL: Lawrence Berkeley National Laboratory3DateHost CountryKey Remarks1April 19-21,2006Berkeley, U.S.A.Sharing existing international activities such as CSI, IEA and LBNL.2Sep 20-21,2006Xian, ChinaHeld the stakeholders meeting and
4、 experts review on benchmarking.Site visit to Chinese cement plant, etc.3April 18-19,2007Delhi ,IndiaProgress report of CTF projects and review of future planning. Plant visit to Shree Cement.4Sep 12-13,2007Melbourne, AustraliaMid-term/status report of CTF project5May 13-15,2008Charleston, U.S.A.Agr
5、eed on the “Status Report” and to continue efforts to come upwith an aggregated seven-country reduction potential. Cement plant tours - Holcim, Giant, and Lafarge.6October 24,2008Tokyo ,JapanInvited IEA to discuss technology roadmapPlant visit to Kumagaya Plant of Taiheiyo Cement.7July 14, 2009Seoul
6、, South KoreaInvited ECRA, IEA & WBCSD/CSI.Plant visit to Danyang Plant of Hanil Cement Co. Ltd.8March 24,2010Vancouver, CanadaInvited CEMBUREA, ECRA, IEA and WBCSD/CSI.Concrete and green buildings tour.9Dec 14-15,2010Hawaii, U.S.A.Final Review and Discussions of all Projects. Discussion on the Post
7、 CTF/APP.2. CTF Project StreamsCOECentre of Excellence Kiln Co-generation Hazardous Wastes Biomass Fuels CO2 Sink Effect Status Report Benchmarking Legal and Regulatory Barriers Product ApplicationdatainformationPerformanceinformationDiagnosisCement Industry in APP countriesSignifies APP Flagship Pr
8、ojectAssociated Events: CSI CO2 Protocol Training Workshop, Policy Workshop and Trade Association ForumNew TechnologiesBest/good PracticesAustralia & ChinaAdvisory Committee (all partners)Survey and BenchmarkingClean Technologies3. Outcomesand Next StepsFlagship(1) :Centre of Excellence(COE)5Future
9、Direction and Recommendation The project has achieved fruitful results in enhancing capacity building, energy saving and emission reductions, especially for the Chinese cement industry. COE will play an important role as an international platform forclean technical exchange in the future.CSI CO2 Pro
10、tocol Training There were six CSI CO2 Protocol Training Workshops for the Chinese cement industry with a total of 300 Chinese engineers participating. Through these workshops, 220 engineers received training certificates. 5 Chinese cement companies joined the CSI family in 2009, and 5 Chinese expert
11、s were trained as trainers for future CSI CO2 Protocol training. It was with the Chinese CSI experts that the 5th CSI CO2 Protocol training was organized in China in November 2010.Capacity Building by COELead Countries (China, Australia), Participating Countries (Japan, USA & India)3. Outcomes and N
12、ext StepsFlagship(2): Hazardous Wastes6Sub-Project (outline)Lead CountrySub 1 - Hazardous Waste Co-ProcessingTo facilitate introduction of international best practices on co-processing of hazardous wastes, and to create an environment to enable the development of cost-effective and efficient technol
13、ogies for the utilization of hazardous wastes.IndiaSub 2 - Solvent-Based Fuels in Cement KilnsTo develop and demonstrate techniques to scientificallytransform hazardous wastes into fuel for use in cement kilns, as a replacement for fossil fuels.AustraliaSub 3 Utilizing Biosolids in Cement KilnsTo ut
14、ilize contaminated biosolids as an alternative to fossil fuels in cement kilns and thereby demonstrate the value ofbiosolids as a renewable fuel.Australia3. Outcomesand Next StepsFlagship(2): Performance Diagnosisu Lead Country: Japanu The aim of this activity is to conduct assessments of cement fac
15、tories in China and India.u On-site surveys were conducted by Japanese experts, and based on these results, some recommendations related to energy saving and reducing environmental impact were provided.u In addition, the Best Practices, which have been identified in the assessment status report, wer
16、e disseminated to partner countries as part of the project.2nd diagnosis3rd diagnosis1st diagnosis Locations of Surveyed Eight PlantsChinaIndiaJ.k.Lakshmi cement Finished in Aug 20097Guangxi Yufeng Finished in Dec 2009Grasim Reddipalayam plant Finished in Nov 2008Tianrui Ruzhou Finished in Jan 2008Y
17、atai Haerbin Finished in Aug 2008Shree Cement Finished in Feb2008ACC Gagal Plant Finished in Nov 2008Shanxi Qinling Finished in Aug 2008Cement Technology Booklethttp:/asiapacificpartnership. org/pdf/projects/cement/ APP_Booklet_of_Cement_ Technology/pdfECRA (European Cement Research Academy) submitt
18、ed the CSI (Cement Sustainability Initiative) comprising 33technology papers upon CSIsrequest.Facilitate information exchange.8Technology booklet compiled and uploaded on APP Website4. Summary of CTF Final MeetingConclusions of CTF Final Meeting9Cement Task Force final meeting, December 14-15, Hawai
19、i, U.S.A.The following conclusions were reached at the CTF final meeting:u Out of a total of 16 projects and sub-projects, 11 should be continued and expanded under a new international framework of cooperative activities.u One “benchmarking” project will be refocused with MRV methodology.u Proposal
20、of transition to the GSEP Cement Working Group/IPEEC.u Each party will formally decide on transition to the GSEP after receiving further detailed information.4. Summary of CTF Final MeetingRecommendations for the Future10 Continuation of activities shifted from APP-CTF Focus on energy conservation and GHG emissions, as well Enhancement
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 選址分析gis課程設(shè)計(jì)
- 幼兒園小推車課程設(shè)計(jì)
- 行草教學(xué)講解課程設(shè)計(jì)
- 遠(yuǎn)程課堂課程設(shè)計(jì)
- 瓦力單片機(jī)課程設(shè)計(jì)
- 速度輪滑課程設(shè)計(jì)
- 課程設(shè)計(jì)的學(xué)習(xí)日志
- 愛和自由烘焙課程設(shè)計(jì)
- 唾液腺微生物組與炎癥性疾病-洞察分析
- 網(wǎng)箱施工安全管理-洞察分析
- 創(chuàng)新者的逆襲3:新質(zhì)生產(chǎn)力的十八堂案例課-記錄
- 2024年河南省公務(wù)員考試《行測》真題及答案解析
- 2022-2024北京初三二模英語匯編:話題作文
- 《阻燃材料與技術(shù)》-顏龍 習(xí)題解答
- 人教版八年級(jí)英語上冊Unit1-10完形填空閱讀理解專項(xiàng)訓(xùn)練
- 2024年湖北省武漢市中考英語真題(含解析)
- GB/T 44561-2024石油天然氣工業(yè)常規(guī)陸上接收站液化天然氣裝卸臂的設(shè)計(jì)與測試
- 《城市綠地設(shè)計(jì)規(guī)范》2016-20210810154931
- 網(wǎng)球場經(jīng)營方案
- 2024年公司保密工作制度(四篇)
- 重慶市康德卷2025屆高一數(shù)學(xué)第一學(xué)期期末聯(lián)考試題含解析
評(píng)論
0/150
提交評(píng)論