版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)
文檔簡介
1、工程專業(yè)優(yōu)秀英文自我評價 工程專業(yè)人員只有當(dāng)自己也沉淀下來,窺探自己的內(nèi)心, 今天就給大家 _一下英文的自我評價,歡迎來參考 First, the construction quality inspection sum _ry 1, XX February 17 to the pany after the meeting will be pleted in aordan _ with the requirements of the pany to check the Shenzhen Vanke Qian Lin Shanju project, Guangzhou Conghua Xia Wa
2、n to take the project to check the project technical documents, construction programs, construction quality, construction safety, The whole construction production system, the inspection of the quality problems, security risks, production points have been _de to _ke a prehensive reform measures and
3、technical control methods, and check the existen _ of the sub-project technical infor _tion reported to the pany. 2, aording to the examination of the problems I have done the relevant rectification and technical disclosure, and technical delivery to the fore _n under the hands of the Secretary, and
4、 cut the requirements of the _in _nagement personnel in aordan _ with relevant technical infor _tion to control the implementation of the project quality control in the implementation pro _ss Because the _nagement system does not build the leadership does not attach great importan _ to the quality o
5、f the project, not at all levels of implementation, so the implementation of the original grid is not in aordan _ with the relevant technical specifications data implementation, there is no implementation of the reasons for the _ysis; A, in aordan _ with the current project construction in the quali
6、ty, and safety issues to further _yze the quality of the project is the life, an enterprise should be quality first, safety first as the goal. First of all, the panys leadership on the quality of the project has not been a high degree of attention, the pany did not develop a clear project quality _n
7、agement objectives, safety _nagement objectives, there is no clear and feasible quality, safety control measures, and no uniform control objectives, A sub-project in the construction pro _ss will not be effectively controlled. B, the project quality _nagement is the biggest flaw is not doing a good
8、job targeted technical control of the book, senior _nagement of the sub-project quality _nagement objectives are not clear, security _nagement is not clear, not to mention there are What to guide the effective control of technical documents, volatility and randomness are relatively large, aording to
9、 the inspection results can reflect the pre-implementation pro _ss, sub-project construction is basically based on the discretion of the fore _n to _nd operations, regardless of technical level , Not in aordan _ with the relevant regulatory requirements to _ke effective control of the relevant docum
10、ents. C, good technical disclosure is one of the conditions to effectively control the quality of the project, to this end, each sub-project should be carried out before the implementation of the end, operating technology, Program, is the pro _ss of construction of specific guidan _ documents, good
11、technical first of all project _nagers should attach great importan _ to, and must be clear to the end of the content, including construction methods, quality requirements and aeptan _ criteria, the construction pro _ss should pay attention to issues that _y arise Unexpected problems and emergency m
12、easures. Key parts, or technical difficulties, the construction of plex sub-projects, do not do a good job at the end of technical sub-project, shall not enter the for _l implementation. Second, the production and quality _nagement overview 1, the construction project is a production of a single, li
13、quidity, large fluctuations, it is not like the general industrial products as the production line so standardized, a fixed production lines, a standardized production technology and improve the detection technology, Of the production equipment and stable production enviro _ent, so the project quali
14、ty is easy to produ _ fluctuations and fluctuations are still relatively large, while affecting the quality of the project is still more factors, any of which factors change, will _ke the project quality fluctuations. Such as the use of _terial specifications varieties of errors, improper constructi
15、on methods, the operation did not follow pro _dures, mechanical equipment failure, design errors, the production system construction enviro _ent, and so will cause the project quality aident. A _jor factor is the hu _n factor, aording to my pany is currently under construction projects, the existen
16、_ of quality problems, and the vast _jority of security risks caused by hu _n factors of quality and safety issues, the total summed up in five , Hu _n factors, _terial factors, mechanical factors, construction methods, construction enviro _ent five factors. 2, personnel factors, people are the _in
17、production and operation activities, but also the construction of the project decision- _kers, _nagers, operators, the whole pro _ss of project construction, such as project planning, decision- _, surveying, design and construction, To plete. The quality of personnel, that is, peoples cultural level
18、, technical level, decision- _ ability, _nagement ability, work ability, control ability, physical quality and professional ethics, will directly affect the quality of construction, so the personnel factor is an important impact on project quality factor. Therefore, it is ne _ssary to strengthen the
19、 _nagement of their own _nagement quality, improve the quality and safety of _nagement quality, first of all from the leadership to start from the leadership. XX years to participate in the work to XX April has been in Bei _g Construction Engineering Construction Engineering Company Limited, a proje
20、ct of any technical work. Mainly to participate in bidding, writing programs and to the end, drawing on-site construction plans, do negotiations, and supervision, Party to deal with, as the pletion of plans and so on. XX in April so far in the construction of an electronic plant in the field of civi
21、l engineers (Party on-site representatives). I have been involved in the work for nearly 20 years, working in the construction field for _ny years, from the initial _intenan _, building leakage to the supervision of high-level decoration, high-rise buildings, municipal roads, bridges and so can be d
22、escribed as experien _d, , Project deputy _nager, project director, project director and other duties. From the grass-roots level to the _nagement to bear the heavy work pressure. I am well aware that only with ex _llent professional skills, good munication skills and team spirit, in order to effect
23、ively carry out their work. At the same time I also use their spare time to actively improve themselves, pleted undergraduate self (project _nagement), also suessfully passed the two construction division (housing construction, decoration) to test. I am eager to have more room for development in the
24、 new enviro _ent. Has also been in the Bei _g Construction Engineering Group, the construction pany for nearly 20 years, long-term engineering projects as chief engineer and project _nager, which has served more than 20 million square meters of project total work, and more than 10 million square met
25、ers of project Manager, has a wealth of practical experien _ in construction. Work enthusia _ and initiative, with good interpersonal skills. The University is a pla _ where I can really grow up. The university not only taught me the real skills, but more importantly, taught me how to learn and how
26、to look at things in the world in the right and unique way I think this is a better foundation for the creation of the world. I really do what you like and is a good thing in the study, in addition to poor English, the other is very good, sophomore two semesters I am also familiar with the operation
27、 of offi _ software. There autocad is also very familiar with (took a high card) .In addition to these business, the _ I still continue to enrich and improve themselves. A college radio station to do a director and then do vi _ minister of photography to do radio station deputy station _ster, along
28、the way I am in my ability to continue to climb in this pro _ss also learned a lot of knowledge, such as interpersonal, organizational _nagement - - more importantly, I know what is the responsibility! I am very interested in literature and art, leisure time often as entertai _ent to study, so writing, sketches, photography, also h
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024年鋼筋結(jié)構(gòu)施工協(xié)議
- 2025年智能交通系統(tǒng)建設(shè)反擔(dān)保合同3篇
- 2024年量子計算機(jī)技術(shù)研發(fā)與許可合同
- 2024年研發(fā)團(tuán)隊(duì)外包服務(wù)合同
- 專業(yè)化一體化服務(wù)合同范本(2024年版)版
- 2024校服生產(chǎn)與校園服裝租賃服務(wù)合同3篇
- 2024版混凝土框架結(jié)構(gòu)施工協(xié)議條款版B版
- 專業(yè)化人力資源解決方案服務(wù)協(xié)議樣本版A版
- 2025不動產(chǎn)抵押權(quán)設(shè)立與登記服務(wù)擔(dān)保合同范本3篇
- 2024年茶園土地承包管理合同樣本
- 小學(xué)思政課《愛國主義教育》
- 批量訂購車輛合同范本
- 新能源發(fā)電技術(shù)學(xué)習(xí)通課后章節(jié)答案期末考試題庫2023年
- 初中物理-初三物理模擬試卷講評課教學(xué)課件設(shè)計
- 道路危險貨物運(yùn)輸企業(yè)安全生產(chǎn)清單
- 鋼鐵生產(chǎn)企業(yè)溫室氣體核算與報告案例
- 農(nóng)業(yè)合作社全套報表(已設(shè)公式)-資產(chǎn)負(fù)債表-盈余及盈余分配表-成員權(quán)益變動表-現(xiàn)金流量表
- 深入淺出Oracle EBS之OAF學(xué)習(xí)筆記-Oracle EBS技術(shù)文檔
- 貝利嬰幼兒發(fā)展量表BSID
- 四年級計算題大全(列豎式計算,可打印)
- 年會主持詞:企業(yè)年會主持詞
評論
0/150
提交評論