銅黃高速路安徽新路標(biāo)(Copper yellow highway Anhui new road sign)_第1頁(yè)
銅黃高速路安徽新路標(biāo)(Copper yellow highway Anhui new road sign)_第2頁(yè)
銅黃高速路安徽新路標(biāo)(Copper yellow highway Anhui new road sign)_第3頁(yè)
銅黃高速路安徽新路標(biāo)(Copper yellow highway Anhui new road sign)_第4頁(yè)
銅黃高速路安徽新路標(biāo)(Copper yellow highway Anhui new road sign)_第5頁(yè)
已閱讀5頁(yè),還剩13頁(yè)未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶(hù)提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、銅黃高速路安徽新路標(biāo)(Copper yellow highway Anhui new road sign)Copper yellow highway: Anhui new road signA dream, a southern people for generations yearn day and night dreams will come true.A feat, a magnificent feat in the history of the construction of the Anhui highway, has been born.After nearly four year

2、s of thousands of builders for fighting and hard tackling, along the millions of people from first to last selfless dedication and close cooperation, carrying the hopes of the people Anhui tonghuang expressway will be completed during September 28th. Ride on it, only heard a slight rustle of wheels,

3、 with wide lane asphalt pavement, smooth, slowly come straight into the eye, it felt a comfortable and smooth.Tong Huang expressway is such unique in its majestic style and thrilling, extending from the famous city in the south of the depths of the mountains, showing the high-speed era and mountain

4、creative magnificent prospect, also quietly erecting a new roadmap for highway construction in Anhui: ecological harmony and friendly environment, science and technology innovation and economic development.Road to environmental protectionThis is a road to environmental protection. The slope with hig

5、h-speed copper yellow mountain, grass vine, abundant wild. On both sides of the green mountains and rivers and reveals the truth, happy and pleased with oneself. The landscape road, seemingly at random, it is appropriate, together with nature .From the Mount Huangshan airport under the plane, the re

6、porter went straight to the car is located in the county of Qingyang copper yellow highway copper soup section project interview. The car run smoothly at County Road, the car, the Horsehead walls of a wild profusion of vegetation, green mountains and rivers so long in Beijing, reporters feel novelty

7、 and excitement. Staring out of the window for an hour or so, the reporter suddenly remembered the purpose of the trip: how far is the copper yellow Expressway?We basically walked along the copper Road, a section just three hundred or four hundred meters away from the county road. Havent you been st

8、aring at it all the time? The driver Huang asked in turn. Three hundred or four hundred meters away, there is a highway, the reporter looked for nearly an hour, even without consciousness!The car ran round a village and became more enlightened. Look, the front is copper yellow speed.! Cried Huang sh

9、ifu.Reporters carefully observed, a few pieces of road signs and speed tips card composed of a curve, vaguely discernible, curve along the mountain, stretch out into the distance. On the outside of the curve, there are still green hills. In the car up and down, not far from the high-speed copper yel

10、low slightly show guardrail Green Road and on both sides of a little black.Oh, the original is not the true face of yellow copper on the roadside!After an interview with tangtun expressway section of yellow copper and copper project office director Zheng Jianzhong soup project office director Li Xue

11、chao, reporters know for high-speed copper Huang real from nature, nature, which is saturated with blood and intelligence designers, builders of many.After the high-speed copper Huang Anhuis most famous scenic spots in Mount Huangshan, Mount Jiuhua and Pinghu too, and, like the city of Huangshan Cit

12、y is almost unique in Chinese: a city on Mount Huangshan and southern Anhui ancient residence of the two world natural and cultural heritage, as well as the Pearl beyond count historical relics scattered in the verdant the mountains. According to incomplete statistics, the copper yellow highway affe

13、cts 70% of the forest coverage in the region.The high sensitivity of highway location determines the environmental protection and ecology of copper road. It has been paid much attention to by society. The builders in the engineering practice, the full implementation of the outline of the implementat

14、ion of traffic a typical demonstration project, and resolutely take the resource-saving and environment-friendly road construction, the basic realization of environmental protection and ecological conservation road road target.Jargon says that design is the soul of engineering. Copper road is a true

15、 mountain highway in Anhui, and there is no ready-made experience to copy. The experts in relevant research institutes under the help of the Anhui province highway design experts to the pursuit of harmony , to avoid the destruction of the original ecosystem as a model, the line with the bending pote

16、ntial, and the rivers and mountains cleverly fit, as far as possible to restore the original vegetation, it is still a tea garden, the original field is Green Tea Keke; the green grass, trying to restore.On the maximum protection on the way, in the maximum recovery efforts.! This is the idea that th

17、e Brass Builders insist. In order to avoid the high filling and deep excavation, Tongtang highway increase the cost of construction, the construction of a large number of bridges and the entire tunnel road, yellow copper accounted for 34% of the total length, the total length of 30% copper soup sect

18、ion tunnel, tangtun section is as high as 43%.A mountainous highway construction will leave a large number of highway slopes, which is also the key and difficult point of ecological protection. According to the traditional practice, the design unit gives the slope rate, slope height, series and prot

19、ection form of a side slope, and the construction unit can be designed and constructed. As a result, all the slopes are cut into planes, and artificial traces are particularly evident, which is very discordant with the natural curve of the mountain along the mountain.The concept of yellow copper hig

20、hway innovation slope construction takes its natural course. The low slope slopes the original natural curve and curved surface of the mountain, so that the excavation slope can be transformed and connected with the original mountain appearance. After slope excavation, fixed slope, slope segments wi

21、th different ecological restoration schemes, through different vegetation show different features of all kinds of slope, and ultimately achieve the slope King combination, like nature itself. At the same time, under the premise of ensuring slope stability, green protection is the main factor. In ord

22、er to ensure the safety of construction, the construction of moderate and advanced subgrade for afforestation is beneficial to prevent soil erosion and to ensure the completion of greening before the opening of traffic two years ago.How to implement these design concepts is a difficult problem for b

23、uilders. Owners said that the ability to have a new concept of armed construction team, is the key to the success of the project. A hitherto unknown training began, only copper soup of period of more than 420 people attending environmental training, personnel covering the staff for the project coord

24、ination services major construction enterprise management supervision units, the entire project and along the local government. Lectures include prevention and mitigation of soil erosion and environmental pollution, protection of water environment, air quality and noise pollution reduction.Interacti

25、ve and integrated highway construction management model is also actively explored on the copper road. In the mountain highway construction, environmental protection, design is difficult to step in place. Thus, in the owners organization, the site will often convene the design, construction, supervis

26、ion and other units meeting coordination, consultations to solve problems encountered in construction. The measures to encourage the introduction of new technologies, technologies and materials at home and abroad have been encouraged, and units and individuals whose opinions have been adopted have b

27、een rewarded.Construction, builders are more careful. An ordinary road construction with deep feeling told reporters that in the past the road, rarely consider the protection of the environment, and now each shovel a shovel of soil have to weigh, to meet the minimum principle of ecological destructi

28、on.They try to use fewer modern rigs to drill holes and carry out hard manual work in order to avoid spewing large quantities of mud to pollute the mountain. The project waste residue is constructed with special stone walls for easy cleaning. Temporary dumping grounds, topsoil and sludge are tapped

29、to prevent soil erosion. Shantytowns, material yard excavation, smooth, meticulous in cm; temporary occupation of farmland, forest, water, must be classified after restoration; each section is equipped with two or three per capita contracted sprinkler, regular water spray to reduce dust, regular ins

30、pection in Anhui Province Environmental Monitoring Center released dust index, accept the supervision of the community.A real environmental protection measures in the construction, with a loving always; the details through the railway before and after. In the copper soup section, ten Li Mountain Nat

31、ure Reserve and Yangmei village near, built dozens of large animal passage, wild animals can freely pass. At the viaducts pier, people hang up a scaffold and hang plants to allow the bird to adapt to the man-made landscape more quickly. To avoid the flow of water from the Tai Pinghu bridge into the

32、lake, a diversion channel is specially built to allow the sewage to flow into the sump.Copper yellow high-speed, only copper soup section of environmental protection investment of 100 million yuan. Unprecedented in the history of traffic construction in Anhui!I have done supervision in many projects

33、 in the world, and I am satisfied with the practice of environmental protection by copper and silver. Copper yellow high-speed copper soup section of Mexico Ji Francesco supervision said.Soon, he will return home, carry on the data collection of high speed copper yellow graceful graceful, green moun

34、tains and rivers.Road of harmonyThis is a road of harmony. Copper construction and temporary bridge on yellow high-speed, built a simple rural highway, permanent for the benefit of the people. Highway tunnel from the exterior to the service area, from the toll station to the viewing platform, fenqia

35、ngdaiwa Pumianerlai, Huizhou local customs and practices.Qingyang Sha Ji dream more than 20 homes for the elderly people also did not think in the old age to live in new houses. The courtyard of the new house was hardened, and a few pots of bonsai added to the life of the old.The nursing home is hig

36、h-speed copper Huang Sha Ji involved turning one of. The other more than 700 family members of the copper soup section have also been properly resettled, like the old people in the nursing home. In the process of construction, the Yellow River high speed has been adopted in the construction of Yello

37、w River high speed. In combination with the construction of new countryside, the resettlement areas for nature, transportation and social environment have been better chosen for the immigrants. The residents of centralized resettlement should be unified planned and built so that the flowers of harmo

38、ny will blossom brightly.The copper yellow highway used the world bank loan, a world bank project. People-oriented, pay attention to environmental protection, reflect the enterprises responsibility to society. This is our real to learn the. Project owner - Anhui transportation investment group, a pe

39、rson in charge said with emotion.Construction of copper road,It is not only a great test to the management ability of Anhui traffic builder project, but also a seamless link between them and the international practice of Engineering construction. The world bank project has a complex and rigorous reg

40、ulatory process that runs through projects, resettlement, funding, public bidding, and environmental protection. The amount of labor of managers has increased greatly, but the project has been standardized. In the construction, the management mode of construction management should be implemented, th

41、at is, contract management of construction technical specifications, engineering measurement and payment, final accounts and so on. The contract becomes the weapon, the law becomes the criterion, from the owner to the supervision, the contractor and so on, has the strong restraint mechanism, the pro

42、ject quality and the benefit also has the basic guarantee!The project started at the beginning, the owners have realized the harmony of local relation is productivity, in place when they always adhere to the five principles for your harmony: the first is to adhere to the four combination principle,

43、namely temporary engineering and engineering combined with permanent and temporary works with local planning, the combination of temporary engineering and road. With the combination of resettlement and new rural construction principle; second is to adhere to the interests of the masses no matter pri

44、nciple, actively solve the policy problems; again is to adhere to the engineering production life of the masses and principle of interference; fourth is to adhere to the principle of protection of vulnerable groups, vulnerable groups and properly handle the issue of migrant workers in the demolition

45、 (such as nursing homes) the problem; fifth is to insist on temporary land restoration principles should be flexible, Lin Zelin, Yi water is water, the house should be.These measures, although it increases the cost of highway construction, but make full use of the temporary pavement, bridge engineer

46、ing, make temporary works permanently serving the local residents, to achieve the maximization of social wealth overall benefit, and effectively reduce and resolve the contradictions in the construction of the local, to avoid blocking and other bad behavior the occurrence, to ensure the construction

47、 period, reduce downtime losses, to achieve the harmonious development of economy and society along.The builders, adhere to the safety first, prevention first principle, very careful grasp security, loving catch security. Copper yellow highway construction in strict establishment of three levels of

48、safety production management. Owners, construction enterprises, supervision enterprises have set up safety production organization and guarantee system, and establish responsibility system and accountability system at all levels. Each construction enterprise extracts the safe production special fund

49、 according to the output value 1%, implements the special account storage, special-purpose funds, and included in the production cost. In accordance with the characteristics of the project, emergency plans such as tunnel, bridge, high slope and flood season were drawn up, and the monitoring and prev

50、ention were carried out.High sense of responsibility and effective measures for the real practice of the people-oriented Scientific Outlook on Development, in the construction of high-speed copper yellow after the complex geological conditions, Flood flood test, no safety accident occurred, so full

51、of harmonious atmosphere among employees.With the continuous development of highway construction, people are more and more disgusted with the barbaric construction behavior. This requires that while repairing a clean, green, smooth and beautiful highway, we should try to create a quiet and comfortab

52、le environment for the residents around us, so as to minimize the adverse effects on peoples lives and work.The start of the project, the owners in the form of a document of civilization construction work unified regulations, regulations are made clear from the Ministry of construction, the project

53、material arrangement, construction site management, construction and supervision of all personnel listing appointment. Construction sidewalks smooth, and regular watering, moisture, all materials piled up neatly, flammable and explosive materials classified stacking and special person responsible; a

54、t night 22 hours later, from residential areas closer to the site, shall not be construction. These measures have enabled the construction site to realize site garden, production factory and management standardization.From the relationship with the local, to the safety of production, and then to the

55、 construction of civilization, the construction of copper yellow high-speed along with the harmonious spirit of the humanities all the way. Copper yellow high-speed built quickly, the concept of harmony, in Anhui traffic construction also gave birth to a root, sprout buds!The road of science and tec

56、hnologyThis is a road of science and technology. Under the geological environment called geological condition encyclopedia, the scientific and technological innovation has become a powerful engine for the construction of yellow, yellow, high speed, high quality and efficiency.The copper yellow expre

57、ssway is an encyclopedia of the geological conditions of expressways. Soft foundations, bridges, tunnels, high slopes, karst geology and mined out areas are all available. So the construction of Pinghu bridge, suspension bridge, cable-stayed bridge, thawing arch bridge technology, in Asia the same t

58、ype bridge, span ranked first.The geological condition is complex, and the technology is difficult, so the builders must face the difficult problem. It is their inevitable choice to follow the road of scientific and technological innovation.The treatment of high slope and ancient landslide is one of

59、 the key problems in the scientific research. Builders broke the rigid pattern of previous design and construction. On the basis of the original design, the concrete construction is carried out in the next five stages to ensure a radical cure and no future trouble.These five stages are analysis, evaluation, supplement survey, optimization design,

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論