水汽分析取樣裝置說(shuō)明書(shū)英文_第1頁(yè)
水汽分析取樣裝置說(shuō)明書(shū)英文_第2頁(yè)
水汽分析取樣裝置說(shuō)明書(shū)英文_第3頁(yè)
水汽分析取樣裝置說(shuō)明書(shū)英文_第4頁(yè)
水汽分析取樣裝置說(shuō)明書(shū)英文_第5頁(yè)
已閱讀5頁(yè),還剩7頁(yè)未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、 GRAND POWER Water and Steam Integrated Sampling Unit INSTRUCTIONModel: CXDJILIN CITY GRAND POWER EQUIPMENT CO., LTD.GRAND POWER 光大電力I. SummaryThis unit is adapted to pre-treatment the sample of water and steam for chemical analysis of thermo-equipment, manual sampling, on-line quality analysis of w

2、ater and steam, computer supervising of the checked parameters. This unit composes of three basic sections: CXD series Sampling Unit of Chemical analysis, which functions in pre-treatment, manual sampling, providing eligible sample for on-line chemical analysis; Analysis instrument screen, on which

3、installs on-line chemical analysis instrument and record displayer etc.; Computer control system, which functions in data collection, treatment, display, reports print, supervising, and epigynous computer control communication etc.Clients can select part of the unit or select all according to demand

4、.II. CXD series sampling unit of chemical analysis1. Technical characteristicUsing a total complete new techno-route, this unit acquires outstanding benefit that other sampling units cannot match, either domestic or overseas. In detail, the characteristics are as below:(1) The sampling unit adopts h

5、igh-efficiency temperature-pressure reductor (with patent) for fluid of high-temperature and high-pressure. When fluid of high-temperature and high-pressure (such as water, steam etc.), flows along this unit, the temperature and pressure will be reduced, that is the unit works with double functions,

6、 one is as the cooler of traditional sampling unit, the other is as the reductor.(2) The sampling unit is not set with pressure-only reductor, which puts an end to the traditional disadvantage caused by reductor block resulted in too much maintenance.(3) The sample flows along the high-efficiency te

7、mperature-pressure reductor in a status of deep puffing, with high heat-exchange efficiency. Under the same condition, the usage of the cooling water is only 1/2 2/3 that of the existing cooler.(4) The sample flows along the pipes of the high-efficiency temperature-pressure reductor with speediness

8、that helps the wall of pipes self-clean.(5) The sampling unit adopts a new-type filter, pole-style filter (with patent), barring mechanical impurity granule with diameter over 1.4mm without changing the composition of the water sample basically. Pole-style filter can self-clean for the large flux of

9、 the sample, block-proof, if need be, the exhaust drainage valve can be started to clean the filter. The pole-style filter is solid and durable, exempt from maintenance.(6) The sampling unit has a compact structure occupying little space, for example, ten-point of sampling unit is 2.5m long, 0.65m w

10、ide, and 1.6m high, every point of sampling added, only 0.2m longer needed, without changing of width and height, therefore, the occupying area is only 3/5 of the current sampling unit.2. Working conditions(1) Temperature of the environment:540(2) Power supply: 230V±10%,50Hz, 2KVA(3) Cooling wa

11、ter:A: Temperature: <35B: In/Out Pressure difference for cooling water in the temperature-pressure reductor: >0.2MPaC: Flux: subject to the number and the temperature of sampling points, fifteen points of sampling designed according to 30T/hD: The cooling water of the temperature-pressure redu

12、ctor adopts de-salted water, without rot, dirt or pollute.3. Main technical index (1) Under the condition of the temperature not higher than 560 and the pressure not bigger than 35Mpa, the temperature of the treated water is about that of the cooling water plus 5(±1GRAND POWER 光大電力), the pressu

13、re is smaller than 0.3Mpa.(2) The flux of water sample: 1500ml/min(3) Temperature of the outlet water can be set an alarming rating by the round detector by which the max absolute error measured should not be higher/lower than 1. Any exceeding of the alarm value will cause automatic alarming. The no

14、rmal alarm is set at 4050.(4) Pressure safety valve of the outlet water sample is set at 0.62.8Mpa, adjustable. Inlet of cooling water has pressure-overloading alarm, with lowest setting at 0.2MPa and highest setting at 0.8MPa.4. Formal dimensionsSeventeen-points sampling unit is 3.6m long, 0.65m wi

15、de and 1.60m high. 5. Debugging procedure5.1. Preparation before operation5.1.1. According to the system diagram, be familiar with the positions and functions of all sections for the sampling unit.5.1.2. Regulate the pressure limits on the contacts of cooling water, and check the alarm system if nor

16、mal.(1) Set the pressure meter on the contacts of the inlet cooling water pipe with a limit at 0.2MPa0.8MPa.(2) Set the pressure meter on the contacts of the outlet cooling water pipe with a limit at 0MPa, and the pressure difference to the inlet not lower than 0.2MPa5.1.3. Power on the round detect

17、or, set the sampling cycle and alarm values according to Instruction settings.(1) Max. value of alarm is set at 4045(2) Min. value of alarm is set at 05.1.4. Check the nodes, airproof parts, fastening parts of the sampling unit if loosed, check the valves if closed.5.2. Pour in cooling water 5.2.1.

18、Open all in/out ball-valves at all points of sampling for cooling water5.2.2. Open the valves for in/out cooling water pipes. Pressure difference between inlet and outlet of cooling water pipes should not be lower than 0.2Mpa, as normal.5.2.3. Check the alarm(1) Regulate the inlet pressure on the co

19、ntacts of cooling water at maximum (actual pressure of the cooling water, if alarmed, regard the alarm as normal. Then recover the pressure 0.8MPa.(2) Regulate the inlet pressure on the contacts of cooling water at minimum (actual pressure of the cooling water, if alarmed, regard the alarm as normal

20、. Then recover the pressure 0.2MPa.(3) After finishes the alarm debugging, regulate the pressure difference between inlet and outlet at a stable status of 0.2MPa.5.3. Operation of high-temperature and high-pressure systemOnly if the cooling water works in normal condition, the high-temperature and h

21、igh-pressure system can be operated.5.3.1. Manual sampling valve and the flowmeter knob are all opened5.3.2. Close first inlet and second inlet valves of sampling water, drainage valve and flow control valve. 5.3.3. Slowly open the first inlet valve of the sampling unit, watch the connections of fil

22、ter, the second inlet valve, contamination-drain valve to check if leaking, if leaks, fasten with special spanner (Be careful, work with gloves against scald).GRAND POWER 光大電力5.3.4. After the connections of the first inlet valve, contamination-drain valve and filter are confirmed no leakage, slowly

23、open the contamination-drain valve to drain away the water in the pipe, with the temperature of water heighten to a stable point, fully open the contamination-drain valve then close immediately, repeat the operation of on and off for about three times, then close the valve.5.3.5. Slowly open the sec

24、ond inlet valve, watch the system of high-temperature and high pressure if leaking, if leaks, close the first inlet valve, repair the leakage, then open the second inlet valve.5.3.6. Slowly open flux-control valve, watch the floater of the flowmeter rising, if the water sample flows smoothly, that w

25、ill be considered normal.5.3.7. Regulate the flux-limit valve of manual sampling, make the flowmeter displaying a flux about 500ml/min, and regulate the instrument valve to let the instrument start working.5.4. Temperature overloading protection test for the electromagnetic valve5.4.1. Sizing down t

26、he inlet flux of the cooling water (smaller the opening of the valve), watch the display of the temperature round detector, when exceeds the alarm temperature, alarms, and at the same time the electromagnetic valve starts working to cut off the flow of the sample water, that certifies the normality

27、of temperature overloading protection, then sizing up the inlet flux of cooling water (bigger the opening of the valve), recover the normal working status.5.4.2. Close the first valve, open the contamination-drain valve, the pressure of the water-flow system is reduced, open the water circuit which

28、has been cut off by the replacement of the electromagnetic valve, then close the contamination-drain valve, open the first valve, recover the normal working status. When the decontamination system pressured, the above-mentioned operation could not open the electromagnetic valve. In case of that, clo

29、se the flow-control valve on the manual sampling board, then go to the rear of the manual sampling board, loose the outlet running tie-in of the flow-control valve, discharging the air as well as the pressure, so then the electromagnetic valve will automatically open.5.5. Cooling water pressure redu

30、cing alarmDuring the operation, when the inlet pressure of cooling water lower than 0.2MPa, alarms, at the same time, the electromagnetic valve closes all its actions, cuts off the water circuit, when things happened like that, find the reasons then repair it(reasons, see the descriptions in the mal

31、function analysis column), the cooling water recovers the normal working status. If the electromagnetic valve does not actionnot opened, do according to 5.4.2.5.6. Debugging of the safe valve5.6.1. The safe valve is set between the flux-control valve and the flowmeter, setting working pressure of 0.

32、6MPa, acting pressure of 0.8MPa, when the flow circuit has overloading pressure, the safe valve automatically unloads. The safe valve is regulated well when leaving the factory, normally does not need regulating during the unit working. When it operates for a period of time or finds any malfunction,

33、 if need be, rechecks and regulates the safe valve as below:Connect pressure meters at the rear of the safe valve and between the connective pipes of the safe valve (range of 1MPa), close the water circuit to the instrument, regulate the manual sampling valve to raise the interior pressure of the sa

34、mple water pipe to 0.60.8MPa. The safe valve starts to work, and be closed when the pressure lowers to 0.50.6MPa, then recover the normal working status. Otherwise, regulate the settings of the safe valve to the status above mentioned. Unload the pressure meter and install the safe valve.5.7. Operat

35、ion Stop First, close the first inlet valve of the sample water, then close the second inlet valve of the sample water and the contamination-drain valve, when the sample water stops flowing, close the inlet and outlet valve of cooling water, then close the power supply of the temperature detector.5.

36、8. MaintenanceOpen the contamination-drain valve timely, according to 5.3.4. The period of contamination drain is subject to the purity of the sample water and the operational experience.GRAND POWER 光大電力Frequently Seen Malfunctions and TreatmentSerial NumberDivision of malfunctionsPhenomenonPossible

37、 reasonsTreatment adviceISystem of cooling water(1) inlet pressure of cooling water is not enough1. outlet pressure of the pump is lowerRaise the pressure of the pump outlet(2) pressure difference between the inlet and outlet of cooling water(1) pressure of original inlet is lower(2) outlet pipe is

38、blockRaise the pressure of the pump inletDredge the pipes, enlarge the outlet valve(3) flux of cooling water is not sufficient(1) outlet diameter pump is smaller(2) diameter of pipes are smaller(3) pipes or pump has leakageEnlarge the diameter of the pipes or the pump outlet, check the pump and pipe

39、s if leak IISystem of sample water(1) temperature of sample water is higher1. temperature of cooling water is higher(2) cooling water is not sufficient(1) cooling water pipes blocked(2) pump or pipes of cooling water leaked(3) pressure difference between the inlet and outlet of cooling water is lowe

40、r(4) inlet and outlet valves of cooling water not opened enough(5) filter net blocked(1) lower the temperature of cooling water(2) dredge the cooling water pipes(3) check the water pump and piping if leaks(4) increase the outlet water drainage(5) enlarge the opening of cooling water valves(6) clean

41、the filter net2. the flux of water is not sufficient or there is no sample water fluxa) first, second high-pressure valves are not fully openedb) flowmeter, flux-control valve, flux-limit valve not opened enoughc) temperature and pressure reductor blocked or dirtyd) incoming pressure of sample water

42、 is not enough(1) enlarge the opening of the first and second high-pressure valves(2) reasonably enlarge the opening of the flowmeter, flux-control vlave and flux-limt valve(3)check the reason and dredge the pipes(4) chemical ceaning3. sample water is not clear1. pipe way is not clean2. contaminatio

43、n drain is not completely1. clean control2. timely drain contamination (reasonably shorten the period of contamination drain)GRAND POWER 光大電力Serial NumberDivision of malfunctionsPhenomenonPossible reasonsTreatment adviceIIISystem of pipingInlet and outlet of cooling water and contacts leaked, system

44、 of electromagnetic valve leaked and low-pressure pipe contacts leaked(1) fastening cap loosed(2) sealing washer not well-positioned or damaged(1) fasten the screw caps(2) reseal or change the sealing washerIVOverloading Protection system for temperature and pressure 1. No alarm output(1) wrong sett

45、ing of parameter(2) malfunction of round detector(3) heat resistance damaged(4) wiring offResetRepair the detectorChangeChange the wires2. alarms but not electromagnetic motion(1) wrong way wiring(2) winding burned off(3) diode damaged(4) action pole in the valve blockedChange the wiringChange the w

46、indingChange the diodeOpen and repair3. electromagnetic cant open automatically after closed(1) higher pressure of the flow circuit(2) temperature of pipe way not reduced(3) spring blocked(1) open the contamination-drain valve, unload and reduce pressure(2) waiting for the time of temperature lowere

47、d(3) repair the spring and let it move freely4. electromagnetic cant fully close after motion1. flow circuit not clean with some dirt addicted2. action pole in the valve blocked3. sealing washer damaged1. clean the flow circuit and the closing contact surface of the valve2. uninstall and repair3. ch

48、ange the sealing washer5. safe valve does not move1. sliding piece in the valve blocked2. jaws of safe valve blocked3. safe valve with too high pressure checkedUninstall and repairClean pipes and the inletLower the pressure of spring (ordinarily not occured)6. safe valve unclosed1. seat of the valve

49、 not clean2. spring damaged3. needle surface of the valve damagedClean the seat of the valveChange the springChange the needle of valve7. safe valve not closed enoughSame as aboveSame as aboveGRAND POWER 光大電力1. 135MW sampling points of water and steam and matching instrumentsSerialNumberSampling poi

50、ntPressure(MPa)Tempe-Rature()Measurement meter value and flux (ml/min)MCCSCPHO2PO43-PNa(1) CondensatePump Outlet2.050500300300250(2) Deaerator Outlet0.9176500250(3)Econmizer Inlet15.24248500300300(4)Boiler Water, Left Side15.05343500300300200(5)Boiler Water, Right Side15.05343500300300200(6)Saturate

51、d Steam, Left Side15.05343500300(7)Saturated Steam, Right Side15.05343500300(8)Superheated Steam,Left Side13.8540500100(9)Superheated Steam,Right Side13.8540500100(10)Reheated steam2.646540500300(11)Closed Cooling Water0.6442500300300(12)High Pressure Heater Drain17248500(13)Low PressureHeater Drain

52、2.0149.3500(14)Deaerator Water-tank Outlet0.9176500(15)Boiler Continuous Drainage15.85347500(16)Boiler Regular Drainage15.85347500(17)Make-up Water0.2Regular Temperature500300Note: Sampling point; CC Sampling point through ion exchange pole; Changed by the valves of left or right side.GRAND POWER 光大

53、電力Operating Rules for chemical analysis of CXD water and steam Sampling UnitI. PreparationBefore operates, check the valves of all points if they are closed, such as first high-pressure valve, second high-pressure valve, high-pressure contamination-drain valve and manual flux-regulate valve on the p

54、anel; check the screws if they are loosed, such as that of the high-pressure contacts on the unit (pipe joints of first/second class on the temperature and pressure reductor), cooling water piping, if need be, fasten the loosed. II. Cooling waterBefore operates, let the cooling water into operation

55、with required condition. Requirements of the cooling water as below:1. Inlet temperature of cooling water <35;2. In/out pressure difference of cooling water should be not lower than 0.2MPa, (lower than 0.1MPa is definitely forbidden), calculated as inlet pressure outlet pressure (read from the pressure meters of inlet and outlet)3. Flux of cooling water should reach the required amount. If In/out pressure difference of cooling water is eligible, the flux is satisfying.4. After the normal working of the unit, the cooling water should not be stopped t

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論