




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
1、 GIA Engineers (S) Pte LtdEngineering Overview of MRT Circle Line Projects In Singapore Dr. Zhang Q.H. Oct 2006, China, NanningPossible Topics for Today1. General Overview of MRT CCL projects in Singapore2. Engineering Challenges and Main Construction Method 3. Design Code and Software used for MRT
2、projects4. Technical Brief of Incident Nicoll HighWay 5. SGP MRT Protection Code and Instrumentation Work. GIA EngineersMRT Circle Line in Singapreu The CCL (Circle line) will be 33.3 km long with 29 stations. u Costing $6.7 billion.u A fully underground orbital line will interchange with North-Sout
3、h Line, East-West Line and North East Line.u The project will be in five stages and to complete in 2010. GIA EngineersCircle Line 1 to 5 mapGIA EngineersBenefits and ChallengesBenefits - Using the CCL, will be able to bypass the busy major interchanges.Challenges -uTraffic diversions.uSoft soil cond
4、itions at the Millenia and Nicoll Highway stations.uBoring tunnels under the Kallang Basin. uInterface of tunnels with proposed KPE, DTSS tunnels Upper Paya Lebar/ Airport Road.GIA Engineers$1.39b; 5.4km; 6 Stations; Starting March 2002GIA EngineersCircle Line 1 $1.55b; 5.6km; 5 Stations; Starting A
5、ugust 2002GIA EngineersCircle Line 2 $1.2b; 5.7km; 5 Stations; Starting Oct. 2003GIA EngineersCircle Line 3 $2.5b; 17km; 13 Stations; Starting Oct. 2004GIA EngineersCircle Line 4 &5 1$2.5b; 17km; 13 Stations; Starting Oct. 2004GIA EngineersCircle Line 4 &5 2Construction Method uTop-down Cons
6、truction - Dhoby Ghaut, Museum, Convention Centre, Millenia, Nicoll Highway, Lorong Chuan and Holland stations.uConstruction of Secant Pile Wall.uConstruction of Contiguous Bored Pile Wall.uConstruction of Diaphram WalluConstruction of Sheet Pile WallGIA EngineersTop Down ConstructionGIA EngineersTo
7、p Down & Diaphram Wall GIA EngineersStrutSlabStrutStrutOpeningDeckingContiguous Bored Pile WallGIA EngineersStruttingSlabSecant Pile Wall GIA EngineersStruttingSlabSheet Pile Wall StruttingSlabGIA EngineersDesign Code & SoftwareBased on British Code. uBS5950 &CP65 Structural Use of Steel
8、work in BuildinguBS8004 FoundationuBS 8002 Earth Retaining StructureuBS 8110 PT The Structure Use of ConcreteuBS6399 PT Design Loading for BuildingCommon Used Geotechnical SoftwareuPlaxis, Excave97, Wallap, RIDO and Slope/W GIA EngineersGeotechnical Software - Plaxisu 2D &3D FEM software for Soi
9、l and Rock.u Developed in 1987 by Technical University of Delft.u Used by 30 over European Country for more than 20 years.GIA EngineersMRT Protection Code 1of 3 GIA EngineersMRT Protection Code 2of 3 GIA EngineersMRT Protection Code 3 of 3Allowable Engineering Parameter:uStructure/track Movement in
10、any Plane -15mm uDifferential movement /Twist 3mm in 6m (1:2000)uPeak Particle Velocities (Vibration) 15mm/secuChange in Pore Water Pressure 10KN/m2GIA EngineersIncident Nicoll Highway CCL Stage 1 - C824 (1 of 8)GIA EngineersIncident:u On 20 of April about 3:30pm u Cut and Cover Tunnel Sectionu 9th
11、layer strutting (9 of 10), excavation depth 30mu First layer of JPG was excavated.u 100m Temporary D-wall collapse; u Collapsed Area = 100m x130m of Nicoll Highwayu 4 Fatalitiesu Affected nearby structure: Overhead Bridge, Canal, Golden Mile towerIncident Nicoll Highway CCL Stage 1 - C824 (2 of 8)GI
12、A EngineersProject OverviewuDesign & Build. 1.6Km C&C Tunnel, 800m Bored Tunnel, BLV station.uTem. D-wall with “ bottom up” methoduExcavation: With = 19.8m, Depth = 33.5muSupporting : D-Wall Thx=800m, Depth =38 to 40 m deep, 10 layer struts u2 layer Jet Grouting, 1st 1.5m 28m, 2nd 3mformatio
13、n levelGIA EngineersIncident Nicoll Highway (3 OF 8)RecoveryGIA EngineersIncident Nicoll Highway (4 OF 8)RecoveryGIA EngineersIncident Nicoll Highway (5 OF 8)RecoveryGIA EngineersIncident Nicoll Highway (6 OF 8)RecoveryGIA EngineersIncident Nicoll Highway (7 OF 8)RecoveryGIA EngineersIncident Nicoll
14、 Highway (8 OF 8)RecoveryReal Time Instrumentation CCL MRT ProjectuStrutting Monitoring System VWSG and Load CelluStructure Monitoring EL Sensor, VW Cracking, VibrationuGround Monitoring In Place Inclinometer, Piezometer Rod ExtensometeruMRT Structure Monitoring ATM Survey, Vibration, EL track Monit
15、oringuEnvironmental Monitoring Corrosion & VWSG GIA EngineerMonitoring ResultsThe monitoring results consist of ground, structural and environmental monitoring results. All results presented in the real time display and report includes:uHorizontal, vertical and lateral deformationsuPore pressure
16、 changes / Water level changeuRotational tilting of structuresuVibration and Noise levelSOIL & FOUNDATION PTE LTDInstrumentation Database ServerWeb ServerReal Time Data VisualizationGround InstrumentStructural InstrumentEnvironmental MonitoringAutomated Survey SystemAcquisition Logging SystemNet
17、work PrinterGSM ModemGSM ModemAlarm messages sent by emailsAlarm messages on mobile phone or pagersGW Web ClientsService Network Management SystemFirewallAlarm messages sent by emailsAlarm messages on mobile phone or pagersAllow Client to View / Download Data, Report and Method Statement AnytimeAcqu
18、isition Logging SystemAcquisition Data SystemAcquisition Logging SystemReal Time Monitoring SystemGIA EngineersGround Monitoring SystemInclinometerVibrating Wire PiezometerBorehole Rod ExtensometerVW Settlement CellAlarm messages sent by emailsAlarm messages on mobile phone or pagersAlarm Alert Syst
19、emAcquisition Logging SystemReal Time VisualizationGIA EngineersStructure Monitoring SystemEL Beam SensorVibrating Wire Crack MeterVibrating Wire Strain GaugeAlarm messages sent by emailsAlarm messages on mobile phone or pagersAlarm Alert SystemAcquisition Logging SystemVibrating Wire Strain Gauge (
20、Concrete)Real Time VisualizationEL Tilt SensorGIA EngineersCorrosion Monitoring SystemCorrosion SensorAlarm messages sent by emailsAlarm messages on mobile phone or pagersAlarm Alert SystemReal Time VisualizationCorrosion SensorCorrosion SensorCorrosion SensorAcquisition Logging SystemVibration Moni
21、toring SystemVibration MonitorAlarm messages sent by emailsAlarm messages on mobile phone or pagersAlarm Alert SystemVibration MonitorVibration MonitorVibration MonitorReal Time VisualizationGIA EngineersAutomated Survey Monitoring SystemAlarm messages sent by emailsAlarm messages on mobile phone or
22、 pagersAlarm Alert SystemAcquisition Data SystemReal Time Data VisualizationTarget (Prisms)Target (Prisms)Target (Prisms)Radio / Cable NetworkRadio / Cable NetworkGIA EngineersProject PicturesGIA EngineersPictures of CCL Line -1GIA EngineersPictures of CCL Line -2GIA EngineersPictures of CCL Line -3GIA EngineersPictures of CCL Line -4GIA EngineersPictures of CCL Line -5GIA EngineersPictures of CCL Line -6GIA EngineersPictures of CCL Line -7GIA En
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 股東合作協(xié)議及條款詳解
- 2025年長沙貨車從業(yè)資格證模擬考試
- 3D打印技術(shù)與設(shè)備應用指南
- 2025年深圳道路運輸從業(yè)資格證考哪些項目
- 個人挖機機械租賃合同5篇
- 安全性評價技術(shù)服務合同
- 2025年寧夏道路貨運駕駛員從業(yè)資格證考試題庫完整
- 建筑工程木工合同
- 辦公信息化解決方案報告
- 交通意外事故賠償協(xié)議書
- 三年級語文 溪居即事市賽一等獎
- 2024年山東化工職業(yè)學院高職單招(英語/數(shù)學/語文)筆試歷年參考題庫含答案解析
- 《新病歷書寫規(guī)范》課件
- 2024年中小學生守則修訂版
- 博覽會展位裝修及布展投標方案技術(shù)標
- 顧客提問的問題100條
- 肝膿腫教學查房課件
- 跳繩之雙腳跳教案
- 拇外翻護理課件
- 六年級英語教學隨筆5篇
- 讀書分享交流會《從一到無窮大》課件
評論
0/150
提交評論