試驗(yàn)程序e008電控面板e(cuò)lectrical power panel missioning procedure rev.0-issue_第1頁
試驗(yàn)程序e008電控面板e(cuò)lectrical power panel missioning procedure rev.0-issue_第2頁
試驗(yàn)程序e008電控面板e(cuò)lectrical power panel missioning procedure rev.0-issue_第3頁
試驗(yàn)程序e008電控面板e(cuò)lectrical power panel missioning procedure rev.0-issue_第4頁
試驗(yàn)程序e008電控面板e(cuò)lectrical power panel missioning procedure rev.0-issue_第5頁
已閱讀5頁,還剩23頁未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡介

1、TABLE OF CONTENTS 目錄1GENERAL 概述31.11.21.3Pure目的3Responsibility職責(zé)3References and drawings參考文件31.3.11.3.21.3.3List of Equipment 設(shè)備. 3Engineering Drawings工程圖紙5Electrical Completion Inspection Test Record 電氣完工測試. 72345SYSTEM DESCRIPTION系統(tǒng)描述8SCOPE 范圍8PRE-REQUISITIES 前提條件8EXECUTION 執(zhí)行95.15.25.35.4Preparat

2、ion checks 預(yù)先檢查9Safety precautions安全保護(hù)措施9Fieldnel Deployment部署10mising by Vendors Service Represenive供應(yīng)商檢查106COMMISING PROCEDURES 調(diào)試程序106.16.2Voltage of Outgoing Feeder Breaker 分電箱斷路器輸出電壓11Check Emergency Lights 測試應(yīng)急照明1178TABLES 表格11TEST ACCEPTANCE 測試驗(yàn)收29Pakge 2 of 291GENERAL 概述1.1Pure 目的The pure of

3、 this procedure is to give clear instructions for the activities to be carried out tocomplete the commising of the described system.這個(gè)程序的目的是為了給予工作明確的指示,完成所述系統(tǒng)的調(diào)試。1.2Responsibility 職責(zé)Any updates/revis of thiswill be the responsibility of the Commising Team.任何更新/文件的修改都是調(diào)試團(tuán)隊(duì)的義務(wù)。Any deviations from this

4、 procedure will have to beed.程序任何的偏差都需In case of major changes下來。he work describedhis procedure(e.g. reduced scope of operatingtests to be performed), a reviof the procedure is required.假如發(fā)生變化(例如:減少操作測試),這個(gè)程序的工作必須修改程序版本。1.3References and drawings 參考文件1.3.1List of Equipment 設(shè)備Pakge 3 of 29No.Descript

5、ion 描述Location 位置1480V Laundryanel(4LP) 480V 洗衣間配電板(4LP)Laundry Room(110)(110)2480V Galleyanel(4GP) 480V 廚房間配電板(4GP)Galley AHU(341)廚房空調(diào)間(341)3480V Workshopanel(4WP)機(jī)修間 480V 配電板(4WP)Mechanical Workshop機(jī)修間4480V Electrical Workshopanel(4ETLP) 480V 電工間配電板(4ETLP)Electrical Workshop電工間5230V Galleyanel(2GP

6、) 230V 廚房設(shè)備配電板(2GP)Galley AHU(341)廚房空調(diào)間(341)6230V Lighting Panel(1L) 230V 照明分電箱(1L)Air Compressor Room D空壓機(jī)室(下)7230V Lighting Panel(2L) 230V 照明分電箱(2L)Electrical Workshop電工間8230V Lighting Panel(3L) 230V 照明分電箱(3L)Main Deck Cable Trunk(107)主甲板電纜通道(107)9230V Lighting Panel(4-PL) 230V 照明分電箱(4-PL)Change R

7、oom(109)更衣間(109)10230V Lighting Panel(4-SL) 230V 照明分電箱(4-SL)Man Change Room(101)男更衣間(101)11230V Lighting Panel(5-PL) 230V 照明分電箱(5-PL)Quarter 2nd Level Fr.15.5 Port Innassage生活樓 2 層#15.5 左內(nèi)走道12230V Lighting Panel(5-SL) 230V 照明分電箱(5-SL)Quarter 2nd Level Fr.15.5 STRD InnassagePakge 4 of 2913230V Lighti

8、ng Panel(6-PL) 230V 照明分電箱(6-PL)Quarter 3rd Level TV/Cinema Room(322)生活樓 3 層放映室(322)14230V Lighting Panel(6-SL) 230V 照明分電箱(6-SL)Quarter 3rd Level Dry Store(339)生活樓 3 層干貨庫(339)15230V Lighting Panel(7-PL) 230V 照明分電箱(7-PL)Quarter 4th Level Recreation/TV Room(422)生活樓 4 層室(422)16230V Lighting Panel(7-SL)

9、230V 照明分電箱(7-SL)Quarter 4th Level Conference Room(454)生活樓 4 層會(huì)議室(454)17230V Lighting Panel(8L) 230V 照明分電箱(8L)Quarters Roof Top Radio Room(503)生活區(qū)頂樓無線電室(503)18230V Emergency Lighting Panel(1EL) 230V 應(yīng)急照明分電箱(1EL)Mechanical Workshop機(jī)修間19230V Emergency Lighting Panel(2EL) 230V 應(yīng)急照明分電箱(2EL)Air Compressor

10、 Room U空壓機(jī)室(上)20230V Emergency Lighting Panel (3EL)230V 應(yīng)急照明分電箱(3EL)Main Deck Cable Trunk(114)主甲板電纜通道(114)21230V Emergency Lighting Panel(4EL) 230V 應(yīng)急照明分電箱(4EL)Quarter 2nd Level Store (230)生活樓 2 層儲(chǔ)物間(230)22230V Emergency Lighting Panel(5EL) 230V 應(yīng)急照明分電箱(5EL)Quarter 4th Level Game Room(424)生活樓 4 層室(4

11、24)23230V Emergency Lighting Panel(6EL) 230V 應(yīng)急照明分電箱(6EL)Quarters Roof Top Radio Room(503)生活區(qū)頂樓無線電室(503)24230V Generaler Distributor(2-1P) 230V 總用分電箱(2-1P)Quarters Roof Top Radio Room(503)生活區(qū)頂樓無線電室(503)25230V Auxiliaryer Distributor(2-4P) 230V 輔助電源分電箱(2-4P)Machinery Deck Transformer Room機(jī)械甲板變壓器間2623

12、0V Auxiliaryer Distributor(2-5P) 230V 輔助電源分電箱(2-5P)Machinery Deck Transformer Room機(jī)械甲板變壓器間27Local Instrument Room Drill Floor Lighting Panel(LIR/LP)本地儀表間鉆臺(tái)照明配電盤(LIR/LP)Drill Floor Local Instrument RM鉆臺(tái)本地儀表間生活樓 2 層#15.5 右內(nèi)走道1.3.2Engineering Drawings 工程圖紙Pakge 5 of 29No.Drawing No. 圖紙?zhí)朌escription 描述Re

13、mark備注1HP6001-E612-01480V Main Switchboard #1 & MaCC #1 Single Line Diagram480V 主配電板#1 及主馬達(dá)控制中心#1 單線圖2HP6001-E612-02480V Main Switchboard #2 & MaCC #2 Single Line Diagram480V 主配電板#2 及主馬達(dá)控制中心#2 單線圖3HP6001-E612-11480V Laudryanel Single Line Diagram 480V 洗衣間配電板單線圖30AC230V AC Reheater Distributor 2(2-3P

14、) #2 230V 空調(diào)電加熱分電箱(2-3P)Quarters 3rd Level AHU Room(306)生活樓 3 層空調(diào)機(jī)間(306)31230V Radio Equipmenter Distributor Box(RPDB- 01)230V 無線電設(shè)備分電箱(RPDB-01)Quarters Roof Top Radio Room(503)生活區(qū)頂樓無線電室(503)32No.1 Fire Der Controler Distributor(1FDP) #1 防火風(fēng)閘控制電源分電箱(1FDP)Quarters 3rd Level AHU Room(324)生活樓 3 層空調(diào)機(jī)間(3

15、24)33No.2 Fire Der Controler Distributor(2FDP) #2 防火風(fēng)閘控制電源分電箱(2FDP)Quarters 3rd Level AHU Room(306)生活樓 3 層空調(diào)機(jī)間(306)34No.3 Fire Der Controler Distributor(3FDP) #3 防火風(fēng)閘控制電源分電箱(3FDP)Machinery Deck Engine Room機(jī)械甲板機(jī)艙35No.4 Fire Der Controler Distributor(4FDP) #4 防火風(fēng)閘控制電源分電箱(4FDP)Mezzanine Deck Electrical

16、 Workshop中間甲板電工間36No.1er Distributor Box for FWD Leg Chock(1CHOK)#1 艏部樁腿鎖緊裝置分電箱(1CHOK)Mezzanine Deck MCC Room中間甲板馬達(dá)控制間37No.2er Distributor Box for Port Leg Chock(2CHOK)#2腿鎖緊裝置分電箱(2CHOK)Mezzanine Deck MCC Room Port中間甲板馬達(dá)控制間 左38No.3er Distributor Box for Stbd Leg Chock(3CHOK)#3 右樁腿鎖緊裝置分電箱(3CHOK)Mezzan

17、ine Deck MCC Room Stbd中間甲板馬達(dá)控制間 右28Drill Floor Emergency Lighting Panel(DR/ELP)鉆臺(tái)應(yīng)急照明配電盤(DR/ELP)Drill Floor Local Instrument RM鉆臺(tái)本地儀表間29AC230V AC Reheater Distributor 1(2-2P) #1 230V 空調(diào)電加熱分電箱(2-2P)Quarters 3rd Level AHU Room(324)生活樓 3 層空調(diào)機(jī)間(324)Pakge 6 of 294HP6001-E612-12480V Galleyanel Single Line

18、 Diagram 480V 廚房間配電板單線圖5HP6001-E612-13480V Workshopanel Single Line Diagram機(jī)修間 480V 配電板單線圖6HP6001-E612-14480V Electrical Workshopanel Single Line Diagram 480V 電工間配電板單線圖7HP6001-E613-01230V Main Switchboard #1 Single Line Diagram 230V 主配電板#1 單線圖8HP6001-E613-02230V Main Switchboard #2 Single Line Diagr

19、am 230V 主配電板#2 單線圖9HP6001-E613-03230V Emergency Switchboard System Diagram 230V 應(yīng)急配電板系統(tǒng)圖10HP6001-E613-04230V Galleyanel GP Single Line Diagram 230V 廚房設(shè)備配電板單線圖11HP6001-E613-05230V Lighting Panel 1L Electrical System Diagram(Machinery Deck)230V 照明分電箱 1L 電氣系統(tǒng)圖(機(jī)械甲板)12HP6001-E613-06230V Lighting Panel 2

20、L Electrical System Diagram(Mezzanine Deck)230V 照明分電箱 2L 電氣系統(tǒng)圖(中間甲板)13HP6001-E613-07230V Lighting Panel 3L Electrical System Diagram(Main Deck)230V 照明分電箱 3L 電氣系統(tǒng)圖(主甲板)14HP6001-E613-08230V Lighting Panel 4L Electrical System Diagram(Quarter Main Deck)230V 照明分電箱 4L 電氣系統(tǒng)圖(生活樓主甲板)15HP6001-E613-09230V Li

21、ghting Panel 5L Electrical System Diagram(Quarter 2nd Level)230V 照明分電箱 5L 電氣系統(tǒng)圖(生活樓 2 層)16HP6001-E613-10230V Lighting Panel 6L Electrical System Diagram(Quarter 3rd Level)230V 照明分電箱 6L 電氣系統(tǒng)圖(生活樓 3 層)17HP6001-E613-11230V Lighting Panel 7L Electrical System Diagram(Quarter 4th Level)230V 照明分電箱 7L 電氣系統(tǒng)

22、圖(生活樓 4 層)18HP6001-E613-12230V Lighting Panel 8L Electrical System Diagram(Quarters Roof&Helideck)230V 照明分電箱 8L 電氣系統(tǒng)圖(生活樓頂甲板&直升機(jī)甲板)19HP6001-E613-14230V Emergency Lighting Panel 1EL Electrical System Diagram(Machinery Deck)230V 應(yīng)急照明分電箱 1EL 電氣系統(tǒng)圖(機(jī)械甲板)20HP6001-E613-15230V Emergency Lighting Panel 2EL

23、Electrical System Diagram(Mezzanine Deck)230V 應(yīng)急照明分電箱 2EL 電氣系統(tǒng)圖(中間甲板)1.3.3Electrical Completion Inspection Test Record 電氣完工測試Pakge 7 of 29Item項(xiàng)目Description 描述Initial 初始NameDate 日期ECReview Electrical Inspection Reports For:檢查一下電氣報(bào)驗(yàn):21HP6001-E613-16230V Emergency Lighting Panel 3EL Electrical System D

24、iagram(Main Deck)230V 應(yīng)急照明分電箱 3EL 電氣系統(tǒng)圖(主甲板)22HP6001-E613-17230V Emergency Lighting Panel 4EL Electrical System Diagram(Quarter Main Deck & 2nd Level)230V 應(yīng)急照明分電箱 4EL 電氣系統(tǒng)圖(生活樓主甲板和 2層)23HP6001-E613-18230V Emergency Lighting Panel 5EL Electrical System Diagram(Quarter 3rd & 4th Level)230V 應(yīng)急照明分電箱 5EL

25、 電氣系統(tǒng)圖(生活樓 3 層和 4 層)24HP6001-E613-19230V Emergency Lighting Panel 6EL Electrical System Diagram(Quarter Roof & Helideck)230V 應(yīng)急照明分電箱 6EL 電氣系統(tǒng)圖(生活樓頂甲板&直升機(jī)甲板)25HP6001-E613-23230V Generaler Distributor Electrical System Diagram 230V 總用分電箱電氣系統(tǒng)圖26HP6001-E613-24230V Auxiliaryer Distributor Electrical Syst

26、em Diagram 230V 輔助電源分電箱電氣系統(tǒng)圖27HP6001-E631-01Lighting Layout Machinery Deck照明布置圖 機(jī)械甲板28HP6001-E631-02Lighting Layout Mezzanine Deck照明布置圖 中間甲板29HP6001-E631-03Lighting Layout Main Deck照明布置圖 主甲板30HP6001-E631-06Lighting Layout Quarters Main Deck照明布置圖 生活樓主甲板31HP6001-E631-07Lighting Layout Quarters 2nd Lev

27、el照明布置圖 生活樓 2 層32HP6001-E631-08Lighting Layout Quarters 3rd Level照明布置圖 生活樓 3 層33HP6001-E631-09Lighting Layout Quarters 4th Level照明布置圖 生活樓 4 層34HP6001-E631-10Lighting Layout Quarters Roof & Helideck照明布置圖 生活樓頂甲板&直升機(jī)甲板35HP6001-E760- 004Normal Lighting System One Line Diagram正常照明單線圖36HP6001-E760- 005Eme

28、rgency Lighting System One Line Diagram應(yīng)急照明系統(tǒng)單線圖2SYSTEM DESCRIPTION 系統(tǒng)描述Allanels includes 480V Galleyanel, 230V Galleyanel, 480V LaundryerPanel, 480V Workshopanel, 480V Electrical Workshopanel, 230V Lighting Panels &Emergency Lighting Panels, 230V General 230V AC Reheater Distributors, Fire D Leg Ch

29、ock.anels, mentioned above, areer Distributor, 230V Auxiliaryer Distributor, AC er Distributor Boxes forer Controler Distributors,d respectively by 480V Main Switchboard #1, 230VMain Switchboard #1, 230V Emergency Switchboard.er goesoanels from MainCircuit Breaker and is distributed ands from

30、outgoing circuit breakers.When switchboard working, close Main Circuit Breaker anderoanel. Then closeoutgoing circuit breakers, the outgoing circuits ared. Open one outgoing circuit breaker, theoutgoing circuit is out of er.er. And open the Main Circuit Breaker, all out going circuits are out of電氣分電

31、箱包括 480V 與 230V 廚房間分電箱、480V 洗衣間分電箱、480V 機(jī)修間分電箱、480V電工間分電箱、230V 正常照明與應(yīng)急照明分電箱、230V 總用與輔助分電箱、230V 空調(diào)電加熱分電箱、230V 無線電設(shè)備分電箱、防火風(fēng)閘控制電源分電箱、樁腿鎖緊裝置分電箱。上述分電箱分別由 480V 主配電板#1 與#2、230V 主配電板#1 與#2、230V 應(yīng)急配電板供電。電源由分電箱主斷路器進(jìn)入分電箱,由分電箱對(duì)電源進(jìn)行分配,自子斷路器分配給相應(yīng)的負(fù)載。當(dāng)配電板正常供電時(shí),閉合主斷路器,電源進(jìn)入分電箱,再閉合子斷路器,就為對(duì)應(yīng)回路供電;斷開某一子斷路器,對(duì)應(yīng)回路失電;斷開主斷路器

32、,所有回路失電。3SCOPE 范圍This procedure will measure some critical da for better service.o check whether electricalanel work normally這個(gè)程序?qū)y量一些關(guān)鍵數(shù)據(jù),測試分電箱能否正常工作。4PRE-REQUISITIES 前提條件All the equipment shall be properly installed.所有設(shè)備應(yīng)正常安裝。All the electrical control panel and cables shall be properly installed

33、and connected.所有電器控制板和電纜應(yīng)正確安裝和連接。All the instruments and equipment shall be properly installed and calibrated.所有儀器和設(shè)備應(yīng)正確安裝和校準(zhǔn)。The following is required for sucsful commising of the system:下面是為了完成系統(tǒng)調(diào)試所需的設(shè)備:Two-way radio sets 對(duì)講機(jī) Infrared thermometer 點(diǎn)溫槍 Digital multimeter 數(shù)字萬用表 Megger tester 絕緣表Low o

34、hm meter 指針式歐姆表Insulation tester 絕緣測試器Clammeter 鉗形電流表Pakge 8 of 29Cable Connection電纜接線Equipment Check設(shè)備安裝檢查Note: All test instruments shall bear evidence of calibration within 12 months of test注意:所有測試儀器應(yīng)當(dāng)有在 12 個(gè)月的測試工作中有過校準(zhǔn)的證明。5EXECUTION 執(zhí)行5.1Preparation checks 預(yù)先檢查5.2Safety precautions 安全保護(hù)措施Pakge 9

35、 of 29ItemDescriptionInitialNameDateaAll activities shall be based onernationally recognized safety standards.所有操作均應(yīng)遵守國際認(rèn)可的安全標(biāo)準(zhǔn)。bAll accidents and events resulting in harm to people can be prevented.所有可能導(dǎo)致的事故均可以避免。ItemDescriptionInitialNameDate1Verify each panel has been wired as per engineering dra

36、wings and accepted by ABS/Owner.確認(rèn)所有配電板均按照各工程圖紙接線,并已通過 ABS 或船東報(bào)驗(yàn)。2Verify aller circuits have been megger checked, as per Mechanical Completion checklist and accepted by ABS/Owner.確認(rèn)所有供電回路已經(jīng)按照機(jī)械完整性檢查進(jìn)行絕緣檢測,并通過 ABS 或船東報(bào)驗(yàn)。3Verify alits are securely mounted.確認(rèn)所有設(shè)備安裝牢靠。4Verify all earthing pos are proper

37、ly secured.確認(rèn)所有接地點(diǎn)接地牢靠。5Visually inspect and manually close and trip each circuit breaker to check its mechanical operation. Correct any defects before proceeding.觀察斷路器是否有缺陷。手動(dòng)閉合、斷開每個(gè)斷路器,確認(rèn)其機(jī)械性能。 缺陷,必須在調(diào)試開始前解決。6Verify the trip setting of each breaker has been set correctly.確認(rèn)每個(gè)斷路器斷開功能正確設(shè)定。7Ensure al

38、l nesary safety devirequired for the test are functioning satisfactorily.確保所有必要的滿足工作要求。8Check circuit breaker list is attached in each panel and nameplates are provided.確認(rèn)分電箱斷路器與實(shí)物一一對(duì)應(yīng),并且有對(duì)應(yīng)的銘牌。5.3Fieldnel Deployment部署5.4mising by Vendors Service Represenive 供應(yīng)商檢查For Fuel Oil Purifier, the following

39、 checks and inspections shall be carried out by the Vendors servicerepresenive對(duì)于燃油分油機(jī),供應(yīng)商服務(wù)代表應(yīng)該核實(shí)和檢查以下內(nèi)容6COMMISING PROCEDURES 調(diào)試程序nel are to vacate from the electricalAll non-essentialanel during the testing.在分電箱調(diào)試過程中,所有無關(guān)應(yīng)。The following tests shall be performed and the results shall be recorded wit

40、h the following remarks:進(jìn)行下文測試,并用以下標(biāo)志:“OK” for satisfactory equipment performance “OK” 表示滿足要求“NA” for “not applicable” “NA” 表示不適用“UN” for unsatisfactory equipment performance “UN” 表示不滿足要求Pakge 10 of 29ItemDescriptionInitialNameDateaAll the mechanical components of the system are installed to vendors

41、 specification系統(tǒng)所有的機(jī)械按照規(guī)格安裝bAll the electrical components of the system are installed to vendors specification系統(tǒng)所有的電氣按照規(guī)格安裝cVendors service engineer to verifyt the system is ready and safe to be start up and commised供應(yīng)商工程師確保系統(tǒng)可以安全的開始調(diào)試內(nèi)容ItemDescriptionInitialNameDateaEnsure requirednel are sioned at

42、 Switchboard Room.確保相關(guān)在配電板間。bEnsure requirednel are sioned where electricalanels are located.確保相關(guān)在各個(gè)分電箱所在艙室。cEnsure there are safetyon site.確保安全在場。cIt must always be rememberedt no job is so important or urgentt it cannot be done safely.沒有工作比安全更重要。dWear insulatings and insulated tools.穿戴絕緣用品,使用絕緣工具。

43、6.1Voltage of Outgoing Feeder Breaker 分電箱斷路器輸出電壓Check the voltage at every outgoing feeder breaker of allanels and voltage within specifications.Fill in general resultsable A for respective panels.檢測分電箱斷路器輸出電壓,將結(jié)果填入表 A。6.2Check Emergency Lights 測試應(yīng)急照明De-energise the Normal Lighting Panels. Verify th

44、e “Emergency Lights” are in operation and accordingto respective areas in lighting arrangement drawings. Fill in relevant results areas.able A for respective斷開正常照明分電箱輸入電源,根據(jù)照明布置圖,檢查應(yīng)急照明分電箱是否正常工作,將結(jié)果填入表 A。7TABLES 表格Table A1: 480V Laundryanel(4LP) 480V 洗衣間分電箱(4LP)Table A2: 480V Galleyanel(4GP) 480V 廚房

45、間配電板(4GP)Table A3: 480V Workshopanel(4WP) 機(jī)修間 480V 配電板(4WP)Pakge 11 of 29S/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M14WP-Q01NAS/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M14GP-Q01NA24GP-Q02NA34GP-Q03NA44GP-Q04NA54GP-Q05NA64GP-Q06NA74GP-Q07NA84GP-Q08NA94GP-Q09NA1

46、04GP-Q10NA114GP-Q11NA124GP-Q12NAS/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M14LP-Q01NA24LP-Q02NA34LP-Q03NA44LP-Q04NA54LP-Q05NA64LP-Q06NA74LP-Q07NA84LP-Q08NA94LP-Q09NA104LP-Q10NATable A4: 480V Electrical Workshopanel(4ETLP) 480V 電工間配電板(4ETLP)Table A5:230V Galleyanel(2GP) 230V 廚房設(shè)備配

47、電板(2GP)Pakge 12 of 29S/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M12GP-Q01NA22GP-Q02NA32GP-Q03NA42GP-Q04NA52GP-Q05NA62GP-Q06NA72GP-Q07NA82GP-Q08NA92GP-Q09NA102GP-Q10NA112GP-Q11NA122GP-Q12NA132GP-Q13NA142GP-Q14NA152GP-Q15NA162GP-Q16NA172GP-Q17NA182GP-Q18NA192GP-Q19NA202GP-Q20NA212GP

48、-Q21NA222GP-Q22NA232GP-Q23NA242GP-Q24NAS/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M14ETLP-Q01NA24ETLP-Q02NA34ETLP-Q03NA44ETLP-Q04NA54ETLP-Q05NA24WP-Q02NA34WP-Q03NA44WP-Q04NA54WP-Q05NA64WP-Q06NA74WP-Q07NA84WP-Q08NA94WP-Q09NA104WP-Q10NA114WP-Q11NA124WP-Q12NATable A6: 230V Lighting P

49、anel (1L) 230V 照明分電箱(1L)Table A7: 230V Lighting Panel(2L) 230V 照明分電箱(2L)Pakge 13 of 29S/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M12L-Q01NA22L-Q02NA32L-Q03NA42L-Q04NA52L-Q05NA62L-Q06NA72L-Q07NA82L-Q08NA92L-Q09NA102L-Q10NA112L-Q11NA122L-Q12NA132L-Q13NA142L-Q14NA152L-Q15NAS/No.Panel

50、 No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M11L-Q01NA21L-Q02NA31L-Q03NA41L-Q04NA51L-Q05NA61L-Q06NA71L-Q07NA81L-Q08NA91L-Q09NA101L-Q10NA111L-Q11NA121L-Q12NA131L-Q13NA141L-Q14NA151L-Q15NA161L-Q16NA171L-Q17NA181L-Q18NA191L-Q19NA201L-Q20NA211L-Q21NA252GP-Q25NA262GP-Q26NA272GP-Q27NA282GP-Q28NATa

51、ble A8: 230V Lighting Panel (3L) 230V 照明分電箱(3L)Pakge 14 of 29S/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M13L-Q01NA23L-Q02NA33L-Q03NA43L-Q04NA53L-Q05NA63L-Q06NA73L-Q07NA83L-Q08NA93L-Q09NA103L-Q10NA113L-Q11NA123L-Q12NA133L-Q13NA143L-Q14NA153L-Q15NA163L-Q16NA173L-Q17NA183L-Q18NA193L-

52、Q19NA203L-Q20NA213L-Q21NA223L-Q22NA233L-Q23NA243L-Q24NA253L-Q25NA263L-Q26NA273L-Q27NA283L-Q28NA293L-Q29NA303L-Q30NA313L-Q31NA323L-Q32NA333L-Q33NA343L-Q34NA353L-Q35NA162L-Q16NA172L-Q17NA182L-Q18NA192L-Q19NA202L-Q20NA212L-Q21NA222L-Q22NA232L-Q23NA242L-Q24NA252L-Q25NATable A9: 230V Lighting Panel (4-PL

53、) 230V 照明分電箱(4-PL)Table A10: 230V Lighting Panel (4-SL) 230V 照明分電箱(4-SL)Table A11: 230V Lighting Panel (5-PL) 230V 照明分電箱(5-PL)Pakge 15 of 29S/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M15-PL-Q01NA25-PL-Q02NA35-PL-Q03NA45-PL-Q04NA55-PL-Q05NA65-PL-Q06NA75-PL-Q07NA85-PL-Q08NA95-PL-Q09

54、NA105-PL-Q10NA115-PL-Q11NAS/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M14-SL-Q01NA24-SL-Q02NA34-SL-Q03NA44-SL-Q04NA54-SL-Q05NA64-SL-Q06NA74-SL-Q07NA84-SL-Q08NA94-SL-Q09NA104-SL-Q10NA114-SL-Q11NAS/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M14-PL-Q01NA24-PL-Q02NA34-

55、PL-Q03NA44-PL-Q04NA54-PL-Q05NA64-PL-Q06NA74-PL-Q07NA84-PL-Q08NA94-PL-Q09NA104-PL-Q10NA114-PL-Q11NA363L-Q36NA373L-Q37NATable A12: 230V Lighting Panel (5-SL) 230V 照明分電箱(5-SL)Table A13: 230V Lighting Panel (6-PL) 230V 照明分電箱(6-PL)Table A14: 230V Lighting Panel (6-SL) 230V 照明分電箱(6-SL)Pakge 16 of 29S/No.P

56、anel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M16-SL-Q01NA26-SL-Q02NA36-SL-Q03NA46-SL-Q04NAS/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M16-PL-Q01NA26-PL-Q02NA36-PL-Q03NA46-PL-Q04NA56-PL-Q05NA66-PL-Q06NA76-PL-Q07NA86-PL-Q08NA96-PL-Q09NA106-PL-Q10NA116-PL-Q11NA126-PL-Q12NA1

57、36-PL-Q13NA146-PL-Q14NA156-PL-Q15NAS/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M15-SL-Q01NA25-SL-Q02NA35-SL-Q03NA45-SL-Q04NA55-SL-Q05NA65-SL-Q06NA75-SL-Q07NA85-SL-Q08NA95-SL-Q09NA105-SL-Q10NA115-SL-Q11NA125-SL-Q12NA135-SL-Q13NA145-SL-Q14NA125-PL-Q12NA135-PL-Q13NA145-PL-Q14NATable A

58、15: 230V Lighting Panel (7-PL) 230V 照明分電箱(7-PL)Table A16: 230V Lighting Panel (7-SL) 230V 照明分電箱(7-SL)Pakge 17 of 29S/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M17-SL-Q01NA27-SL-Q02NA37-SL-Q03NA47-SL-Q04NA57-SL-Q05NAS/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M17-P

59、L-Q01NA27-PL-Q02NA37-PL-Q03NA47-PL-Q04NA57-PL-Q05NA67-PL-Q06NA77-PL-Q07NA87-PL-Q08NA97-PL-Q09NA107-PL-Q10NA117-PL-Q11NA127-PL-Q12NA137-PL-Q13NA147-PL-Q14NA157-PL-Q15NA167-PL-Q16NA177-PL-Q17NA187-PL-Q18NA197-PL-Q19NA207-PL-Q20NA217-PL-Q21NA227-PL-Q22NA56-SL-Q05NA66-SL-Q06NA76-SL-Q07NA86-SL-Q08NA96-SL

60、-Q09NA106-SL-Q10NA116-SL-Q11NA126-SL-Q12NA136-SL-Q13NA146-SL-Q14NA156-SL-Q15NA166-SL-Q16NA176-SL-Q17NATable A17: 230V Lighting Panel (8L) 230V 照明分電箱(8L)Table A18: 230V Emergency Lighting Panel (1EL) 230V 應(yīng)急照明分電箱(1EL)Table A19: 230V Emergency Lighting Panel (2EL) 230V 應(yīng)急照明分電箱(2EL)Pakge 18 of 29S/No.P

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論