下載本文檔
版權(quán)說(shuō)明:本文檔由用戶(hù)提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
3Application 應(yīng)用TheURF25/10monitoringrelayisanalarmdeviceforoil-insulatedhigh-dutytappingswitchesoftransformerfromdamageasmightbecausedbyfailureofthetappingswitchsystemortheapplicationofexcessivecurrents(strongarc)duetoatransformerdefect.壓器本體故障引發(fā)短路電流〔大電弧〕時(shí),可起到保護(hù)分接開(kāi)關(guān)的作用。Onresponsethemonitoringrelaywillgenerateacontinuouspulseoperatingthecircuitbreakerofthetransformertobeprotectedanddisconnectingthelatterfromthesourceofsupply.Observingtheinstructionsoftheplantoperator,thetransformercanberestartedonlyafteroperationofthetestandresetbutton.損壞。依據(jù)生產(chǎn)商操作手冊(cè)的說(shuō)明,僅當(dāng)操作油流繼電器上的試驗(yàn)和復(fù)位按鈕后,變壓器才能合閘連續(xù)運(yùn)行。Themonitoringrelayisavailablewithsingleanddouble-contactcircuitsystem.Onresponseofthebaffleplateduetoanincreasedoilflow,thedouble-contactcircuitprovidestwosignals,henceimprovingoperationalsafetyoftheequipment.油流繼電器可以供給單觸點(diǎn)和雙觸點(diǎn)兩種形式。當(dāng)油流繼電器內(nèi)動(dòng)作擋板由于油流作用動(dòng)作時(shí),雙觸點(diǎn)電路可供給兩組獨(dú)立的信號(hào),這樣可以進(jìn)一步提高設(shè)備的安全性。Construction構(gòu)造Themonitoringrelayconsistsofthefollowingsub-assemblies:油流繼電器由以下部件組成:Casingassembly 機(jī)殼Coverassembly 機(jī)蓋Switchmechanism信號(hào)機(jī)構(gòu)Casingassembly 機(jī)殼Thecasingconsistsofweatherprooflightmetalcasting.Tochecktheswitchsystemforproperfunction,thecasingisprovidedwithinspectionglassesarrangedoppositeeachother.Onrequest,theinspectionglassescanbeprovidedwithhingedlids.工作狀況。如需要的話(huà),觀看窗處可另加可旋轉(zhuǎn)的保護(hù)蓋。Coverassembly 機(jī)蓋Thecoverconsistsofaweatherprooflightmetalcasting.Theconnectionbox,thetestandresetbuttonandatechnologicalbleederscrewarearrangedabovethecover.機(jī)蓋由防風(fēng)雨的輕金屬材料制成。上面安裝有接線(xiàn)盒,試驗(yàn)和復(fù)位按鈕和放油用的螺栓。Inadditiontotheearthconnection,theconnectionboxaccommodatestheelectricbushingsinthefloor.Theconnectionboxisclosedbyahingedcapsothatitisaccidental-shocksafeandnodirtgetinsidethebox.灰塵進(jìn)入內(nèi)部。TheconnectingcablecanbeinsertedoptionallythrougheitherPG16screwedconduit.Thetestandresetbuttoniscoveredbyacapnut.信號(hào)連接電纜可以從任一個(gè)PG16螺紋管內(nèi)接入。試驗(yàn)和復(fù)位按鈕上有一個(gè)螺帽保護(hù)。Switchmechanism信號(hào)機(jī)構(gòu)Theswitchmechanismconsistsofthefollowingmajorcomponents:信號(hào)機(jī)構(gòu)由以下部件構(gòu)成:Frameassupportelement支撐框架Functionalelement,switchsystem動(dòng)作單元,開(kāi)關(guān)系統(tǒng)Mechanicaltestingequipmentforfunctionaltesting測(cè)試動(dòng)作狀況的機(jī)械試驗(yàn)裝置Theswitchingsystemconsistsofthefollowingcomponents:開(kāi)關(guān)系統(tǒng)由以下部件構(gòu)成:Baffleplate擋板Switchingmagnet動(dòng)作磁鐵Magneticswitch磁性開(kāi)關(guān)Thebaffleplateisretainedinitsnormalandresponsepositionsbypermanentmagnets.Viaalink the switching magnet is firmly connected with the baffle plate and initiates thecontact-makingprocessofthemagneticswitchatacertainoilflow.擋板上。當(dāng)油流速度超過(guò)整定值后,動(dòng)作磁鐵就會(huì)帶動(dòng)磁性開(kāi)關(guān)的觸點(diǎn)吸合。Modeofoperation 操作方式Iftheoilflowfromthetappingswitchtotheexpansiontankisexcessiveorinadmissible,themonitoringrelaywillbetripped.Theoilflowactsonthebaffleplateandwhentheresponsevaluesetisexceeded,theplatewillbeoperated.Then,theshutoffsignalwillbetripped.到動(dòng)作位置,然后油流繼電器將發(fā)跳閘信號(hào)給主斷路器。Installation 安裝Theinstallationandoperatinginstructionssuppliedwiththemonitoringrelaydescribeindetailtheinstallationandelectricalconnectionofthemonitoringrelay.油流繼電器包裝內(nèi)有具體的安裝操作指南。有關(guān)于安裝和電氣連接請(qǐng)參考此指南。Technicaldata 技術(shù)數(shù)據(jù)Parameter參數(shù)Value/Specification/規(guī)格Notes說(shuō)明Ratedvoltage額定電壓230VA.C.230VD.C.12Vto250V12Vto250VRatedcurrent額定電流2AA.C.0.05Ato2A2AD.C.0.05Ato2AInsulationvoltage 壓Capacity容量2023VA.C.Casingcontact短路Ambienttemperature-45°Cto+55°COthers available onParameter參數(shù)環(huán)境溫度Insulatingliquid絕緣油Type類(lèi)型Temperature溫度Viscosity粘滯度
Value/Specification/規(guī)格Transformeroil變壓器油1mm2/secto1100mm2/sec
Notes說(shuō)明request承接特別要求Others available request承接特別要求Others available request承接特別要求Others available request承接特別要求Responsevaluesofthe0.9m/secbaffleplate擋板整定值1.0m/sec1.2m/sec1.5m/sec
2.0m/sec2.5m/sec3.0m/sec4.0m/sec
Others available request承接特別要求Responsetimeofthebaffleplate擋板動(dòng)作時(shí)間Nominal installationposition安裝位置Typeofprotection
<0.1sec2%risingtowardstheexpansiontank 2%to4%2%往油枕方向上翹Others available on保護(hù)等級(jí)
IP44
request承接特別要求Climaticsuitability適應(yīng)環(huán)境Types 型號(hào)
Suitableforwarmandhumidaswell Others available asextremelycoldopenairclimates request適用于各類(lèi)炎熱、潮濕和嚴(yán)寒的戶(hù)外承接特別要求環(huán)境Themonitoringrelayismanufacturedthreebasictypeswithidenticalexternaldimensions.Thefollowingtypesareavailable:此油流繼電器有三種根本型號(hào),尺寸完全一樣。分別為:URF25/10-1 Single-contactedcircuit單觸點(diǎn)(Contacts:1NOcontact,1NCcontactor1change-overcontact)〔觸點(diǎn):1常開(kāi),1常閉,1,轉(zhuǎn)換觸點(diǎn)〕URF25/10-2 Double-contactcircuit雙觸點(diǎn)(Contacts:2NOcontacts,
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 【初中生物】真菌-2024-2025學(xué)年七年級(jí)生物上冊(cè)同步教學(xué)課件(人教版2024)
- 【初中生物】微生物的分布-2024-2025學(xué)年七年級(jí)生物上冊(cè)同步備課課件(人教版2024)
- 2024就智能工廠建設(shè)與運(yùn)營(yíng)的合資合同
- 2024年度清雪業(yè)務(wù)承包合同
- 2024年度特許經(jīng)營(yíng)與加盟合同
- 2024建設(shè)工程的項(xiàng)目合作協(xié)議合同范本
- 2024個(gè)人小額貸款合同
- 2024股份合伙人合同范本
- 2024年工程設(shè)計(jì)合作伙伴協(xié)議
- 2024年度原材料采購(gòu)擔(dān)保合同
- 2023-2024學(xué)年南京地區(qū)五年級(jí)語(yǔ)文上冊(cè)期中自測(cè)(統(tǒng)編版)
- 船舶系固設(shè)備操作規(guī)程
- 新時(shí)代大中小學(xué)思政課一體化建設(shè)研究
- 工業(yè)自動(dòng)化系統(tǒng)集成項(xiàng)目驗(yàn)收方案
- 新教科版科學(xué)六年級(jí)上冊(cè)全冊(cè)實(shí)驗(yàn)匯總 (超全)
- 王洪圖黃帝內(nèi)經(jīng)80課時(shí)講稿
- 攤鋪機(jī)司機(jī)班組級(jí)安全教育試卷
- 重癥肌無(wú)力指南
- 限制被執(zhí)行人駕駛令申請(qǐng)書(shū)
- 項(xiàng)目主要施工管理人員情況
- 個(gè)人借條電子版模板
評(píng)論
0/150
提交評(píng)論