廈門至成都公路貴州境
畢節(jié)至生機(黔川界)段
孔樁開挖施工作業(yè)標準化操作手冊二〇一二年十一月目錄
1施工準備·····························································11.1技術準備·······················································11.2施工現場準備·················································21.3施工機具························································52挖掘工藝·····························································82.1挖掘程序·······················································82.2挖孔質量要求················································92.3挖孔排水······················································102.4孔樁護壁······················································112.5終孔檢查······················································153文明施工及安全、環(huán)保要求····································143.1標志、標牌····················································143.2孔口圍護·······················································153.3安全用品·······················································163.4通風·····························································173.5爆破·····························································183.6環(huán)保措施·······················································1911施工準備1.1技術準備1)在開工報告批復后,編制單項施工組織設計和專項安全方案,向作業(yè)班組進行書面的三級技術交底和安全交底。2)施測墩臺十字線,定出樁孔準確位置,設置護樁并記錄,經常檢查校核。21.2施工現場準備1.2.1場地準備平整場地,清除坡面危石浮土;坡面有裂縫或坍塌跡象者應加設必要的保護措施,鏟除松軟的土層并夯實。31.2.2鎖口施工每個孔樁開挖前,將孔位四周的場地整平,進行夯實并硬化。鎖口可采用C25混凝土施工成矩形,且高出地面30cm,鎖口參照長寬尺寸:φ1.8m樁孔為2.4×2.4m、φ2.0m樁孔為2.6×2.6m、φ2.2m樁孔為2.8×2.8m。鎖口四周場地平整后,采用M7.5水泥砂漿抹面,厚度1cm。平整面積根據現場實際情況確定。4鎖口采用C25混凝土施工成矩形鎖口高出地面30cm51.3施工機具1.3.1電動吊機挖掘采用電動吊機,用10KN-20KN慢速卷揚機提升,卷揚機要設限位器。6出料吊機須安裝穩(wěn)定,特別是配重須穩(wěn)固。71.3.2提碴吊桶
吊桶要堅固結實,吊環(huán)應采用Ⅰ級鋼筋加工,吊鉤應安裝保險卡扣。82挖掘工藝2.1挖掘程序
挖掘程序視土層性質及樁孔布置而定。挖孔由人工自上而下逐層用鎬、鍬進行,遇堅硬土層用錘、釬破碎,遇孔內巖石則采用淺眼爆破,開挖由中部向周邊進行。92.2挖孔質量要求在挖孔過程中,應經常按每節(jié)護壁檢查樁孔尺寸和平面位置。1)群樁樁位誤差≯10Omm;排架樁樁位誤差≯50mm,極值≯100mm。2)直樁傾斜度不超過0.5%樁長,且不
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 【正版授權】 ISO 14811:2025 EN Ultra-low carbon high boron steel wire rod for copper cladded wire
- 承包出租屋合同協議書
- 三方物流運輸合同
- 數據記錄表-產品性能評測
- 集體“建立”用地使用權出租合同8篇
- 2025年烏魯木齊貨運從業(yè)資格證考試模擬試題及答案大全解析
- 單元房租賃合同書范本5篇
- 醫(yī)療器械運輸合同
- 公司網絡線路維護合同8篇
- 委托運輸合同樣本8篇
- 2024年家庭教育指導師考試(重點)題庫及答案(含各題型)
- 2024年儀表工程師崗位職責(20篇)
- 直腸癌術后的康復護理
- 性商老師課程培訓課件
- 拆除鍋爐可行性報告
- 二級精神病醫(yī)院評審標準實施細則
- 全套ISO45001職業(yè)健康安全管理體系文件(手冊及程序文件)
- tdp燙傷處理應急預案
- MQL4命令中文詳解手冊
- 水利工程危險源辨識清單全
- ISO20000:2018版標準培訓教材
評論
0/150
提交評論