版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、CHECK LISTDate:Checked By:Villa EntryOPSProjectItemsRemarksDate Inspected:Inspected By:Date Inspected:Inspected By:All excess paint to be removed from access walkway.Remove all excess paint overspray on wall from bamboo screen treatment at entry doorway.No ground/earth wire provided to light fitting
2、.Exposed cabling, need to cover by installing wires in conduit and paint to match wall finish color.Entry door does not keep rain water out, floor very slippery when water inside and door rattles in wind at night and is disturbing.To provide a weather strip on bottom of door and a seal to be applied
3、 to the door frame to prohibit 'rattling' in wind.CHECK LISTDate:Checked By:Mechanical RoomOPSProjectItemsRemarksDateChecked By:DateChecked By:Aircon unit not installed properly, it is at an angle across the plant room and therefore air flow across the coils is not as good as it should be, a
4、dditionally the hot exhaust air is re-circulated inside the room and decreases efficiency of the unit.No cover on MATV junction box, individual circuits are not labeled either at the terminal box or inside the guest room wall plates for ease of identification.Exposed wiring and terminations to be re
5、placed and all terminations made in approved junction boxes.Electrical switch board circuits not labeled and no safety cover plate with circuit breakers identified.Voice and Data cabling not installed properly (blue cable).Hot and Cold water supply isolation valves not labeled.Air-conditioning scree
6、n not installed properly.CHECK LISTDate:Checked By:Room Inside/ Main Living RoomOPSProjectItemsRemarksDateChecked By:DateChecked By:Paint marked and stained on the wall beside TV.Water damage around window beside TV, suspect poorly installed window frame - to be inspected and addressed.TV cabinet da
7、mage.Mini bar not installed with good ventilation and unit operating very hot which will reduce service life of unit prematurely. Recommend to cut second slot for natural air circulation.Safety box to be secured by bolting down onto the drawer unit in the wardrobe.CHECK LISTDate:Checked By:BathroomO
8、PSProjectItemsRemarksDateChecked By:DateChecked By:Hand basin water leak.Bathroom and toilet entry doors - handles are corroding badly and finish is unacceptable. Recommend to replace all bathroom hardware fittings with better quality.Bathroom shower and toilet doors are of low quality finish, lamin
9、ate imitation wood veneer surfacing coming off doors Recommend doors are replaced with solid wood.Drain not connected properly.Note: Water pressure modulating, its not constant and needs to be addressed through the plant room domestic cold and hot water system checks.Bathroom tub drain not connected
10、 properly. Bathtub moving on floor inside bathroom and in most cases the drain connection is 'proud' of the floor so the tub floor is not flat and water 'ponds'.CHECK LISTDate:Checked By:Bathroom window - exterior screeningOPSProjectItemsRemarksDateChecked By:DateChecked By:External
11、window frame needs to be cleaned of over paint finish and properly painted.Excess wire noted on many exterior bathroom structures from construction, these need to be removed and the structures painted to a clean finish.CHECK LISTDate:Checked By:Ceiling space above bedOPSProjectItemsRemarksDateChecke
12、d By:DateChecked By:Coadunate drain line and drip tray not installed properly. If the condensate drain is not installed with a 'fall' from the catchment tray down to the main drain line then water will 'flood' the tray causing serious ceiling damage over time.Recommend that the trays
13、 and drains are tested during snagging by filling trays artificially with a water form a jug to ensure trays can drain before handover completed.CHECK LISTDate:Checked By:Deck AreaOPSProjectItemsRemarksDateChecked By:DateChecked By:Composite wood finish surrounding the Jacuzzi is not finished safely
14、.Recommend to change material for timber decking.Back terrace exterior light fitting rusting, cables exposed and to be installed inside conduit painted color as the wall finishes.External lights fitting crowded.Feature light no access to replace bulb, contractor provide method statement.Jacuzzi parts missing like headrests and overflow covers - these need to be replaced by contractor before handover.CHECK LISTDate:Checked By:Air condition
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 開(kāi)學(xué)典禮教師代表發(fā)言稿三篇
- 演講稿競(jìng)選勞動(dòng)委員演講稿5篇
- 老師的辭職申請(qǐng)書(shū)5篇
- 日處理1000噸小麥及深加工項(xiàng)目可行性報(bào)告
- 肉鴨收購(gòu)合同
- 高中物理教研組工作計(jì)劃模板5篇
- 醫(yī)藥銷售內(nèi)容總結(jié)參考5篇
- 培訓(xùn)機(jī)構(gòu)用電合同
- 銷售五月份工作總結(jié)5篇
- 硫磺廠場(chǎng)地平整服務(wù)合同
- 2024年二手物品寄售合同
- 2023年遼陽(yáng)宏偉區(qū)龍鼎山社區(qū)衛(wèi)生服務(wù)中心招聘工作人員考試真題
- 三年級(jí)數(shù)學(xué)(上)計(jì)算題專項(xiàng)練習(xí)附答案集錦
- 2024秋期國(guó)家開(kāi)放大學(xué)??啤陡叩葦?shù)學(xué)基礎(chǔ)》一平臺(tái)在線形考(形考任務(wù)一至四)試題及答案
- 《危險(xiǎn)駕駛罪》PPT課件.ppt
- (完整版)PD、QC有限快充的知識(shí)講解
- 習(xí)慣一積極主動(dòng)
- 張礦集團(tuán)人才發(fā)展規(guī)劃
- 初中美術(shù)板報(bào)設(shè)計(jì)1ppt課件
- 淺談智能化工程總包管理及智能化工程深化設(shè)計(jì)
- TPO26聽(tīng)力題目及答案
評(píng)論
0/150
提交評(píng)論