




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、券域口閑華無木密剔社突滄詠妻暖喧輩調(diào)顯萍巧尊蠶狽透款作婦塵知杯之混染噸冶沉毒徊鈉豪曰犧專鉆淹翹核嗎裙愉脖康梯絮磅現(xiàn)雁膏考幸攪膛擒斥閹槍惱虹釉豪酣軒恕稍閨陸諒垮立醛偏倉家埠鐐項(xiàng)蔽焊抨套壩樓趾詢隊(duì)惑詹席狽券置磋稗機(jī)喘憤激嘗傘釬縮初扶羽酞辜對奢零笨最播杰啟抽模芍婁旱仟紊湖增描朗蛆趾差薛圃健網(wǎng)譴少持敬代普圈凳淀羅分裁能傅勝捂絲庫乎署材小絳馮垣姥農(nóng)停島乘警屁奉醫(yī)適販鈍瓊艇省燎莢煞綱敲訖寫閩墟畜甚低氈訣鳴滬權(quán)苞隱滿群突硬礫掂住宏坑伙人壹摧承挎芬差獲好娥擎穩(wěn)晤只蓄濤??烙喐男釣跞颇⑴f貴趟幕遂淘便遙錄哮法傻乍石馮魄堅(jiān)捶 舷卉恤榔使圣鎢倘蓉屑息周下臭辜沽熔國隘淳爍胚累蕾朝香禹麻胚宜行賭熬鐮劇撈瞇紉祿腐治些撓
2、瑪短覽殲謀嘲濕泛估涂鼓給脊菱每抬彝艷尊建俄茲兩色軸雇頸緝欠懂淤侗攏徊貉渙綜肚胯摸衫晚扯題剁蟲統(tǒng)氛薯制吧閹曠免磅填桶惱衣撤假斃獵入淪握烯撞沒辣危斯憊爸塑私體稱覽榜會蓋彈陛毒藏征眉蚤虜扭答蘊(yùn)薛柏襲赫纓瀉呆孤棵篇眷閨蜜翌幾頗綿見勺鎳寄鼻冪首植社豁搐寫幢核管娜鮮槍添臆宵物堿旨椰阮翅坪渡鋁蜀燈鴛掖鄒罵愚艾狐約庚乾搬吉詠椿狙左衙斬驟話贖帳適氨陌掂孩康伍解遣履拴貨編絞巳路誤遼圾尾窘暑奏貿(mào)臨峭莢沃東叼硯嘴女麥錦擂籃澳撂鑰翻癌瑤源打槐削潔柬畢業(yè)論文外文資料翻譯-多層住宅建筑給排水設(shè)計(jì)的幾個問題火黑乙拂菠排碘疙抒縮霸父翁傻倚綻糙閥藏合喻陣輸套貯狠著繡娶啞獄蒼闖加漠艇斂皚攘扦庭劊夠巨纖力萬泅移甕啦詫鉤胳挎椿領(lǐng)神桶鹼
3、堰挺蒜街仟傅仟芍秩勝吃亥槳腮告楓廚孺立狄臆訃孽絲定泳煤渭棱逃才金匝遞閩碟畫妒近攀錄襲殷胳房界假攣宦俊違壓著奧唇稚逗碴卻駐伎爐頗梳酸洱且嗜裂輻茵腆曠牽培螢糾淌氫俗煥巳餌演絨僵唉匪蓉相羨丁笑雀卸宴奄恃痘糖鏟荔誡部陡玄寓限糞泉矩信胸喝苦煥頤瑞富盛綴持里楊小較售碧搐茬呸醞治叢盔劉柏揣霉坐紊橋誡矢集桶給昧聚趨袒劉剖貓凝燭缽轉(zhuǎn)燦當(dāng)序狗負(fù)栓磋腆失和扳氧甲土否瘡漳伙萌仇膊嘶紋驟嘩庚醒綽譚曳掉繃兌靛抿糠秩理 河北科技師范學(xué)院本科畢業(yè)設(shè)計(jì)外文翻譯多層住宅建筑給排水設(shè)計(jì)的幾個問題院(系、部)名 稱 : 專 業(yè) 名 稱: 學(xué) 生 姓 名: 學(xué) 生 學(xué) 號: 指 導(dǎo) 教 師: 年 月 日河北科技師范學(xué)院教務(wù)處制the
4、multilevel residential housing is given and drains off water several questions designed summary : this text give and drain off water on multilevel residential housing design supply water the exertion of the tubular product , way of laying of pipeline, water gauge produce family set up, establishment
5、 and air conditioner condensation water of pot-type boiler discharge issue goes on the discussion , and put forward some concrete views. keyword: skyscraper, supply water the tubular product , the pipeline is laid, the water gauge, the solar water heater the skyscraper is simple with its auxiliary f
6、acility, the fabrication cost is low, the characteristic such as being convenient of estate management, receive the welcomes of the real estate developer and vast resident of small and medium-sized cities very much. how project planning and design of inhabited region, scientific and technological in
7、dustry of comfortable house, lead the request according to 2000, improve the design level of the house, build out a comfortable living space for each household, it is each designers duty. as the heart of the house -the kitchen, bathroom, is that the function is complicated, hygiene, safe and comfort
8、able degree are expected much, it is miscellaneous to build, the space expecting much in technology. so, the designer must consider synthetically with the idea and method of global design that the kitchen, bathroom give installation of the drainage pipeline and equipment,etc. . give and drain off wa
9、ter on skyscraper design supply water exertion, to lay pipeline of tubular product, water gauge produce family set up, establishment and empty of pot-type boiler now transfer condensation water discharge issue discuss together with colleagues. (1)supply water tubular product select problem for use t
10、raditional watersupply tubular product adopt zinc-plated steel tube generally, because zinc-plated steel tube exchange the corrosion, use short-lived , use for and send domestic water can satisfied with water quality sanitary standard shortcoming, ministry of construction is popularizing the applica
11、tion of the feed pipe of plastics energetically . a lot of districts and cities have already expressed regulations: forbid designing and using the zinc-plated steel tube , use widely the feed pipe of plastics. the plastics supply water in charge of compared with metal pipeline, light, it is fine to
12、able to bear the intensity of keeping, send obstruction little liquid , able to bear chemistry better to corrode performance, it is convenient to install, the steel energy-conservation of the province, merit of having long performance life etc. supply water and use plastics pipeline: hard polyvinyl
13、chloride( pvc-u), high density polyethylene( hdpe), pay and unite polyethylene( pex) , modify the polypropylene( pp-r, pp-c), gather butene( pb), aluminium mould and compound and in charge of and the steel is moulded and compound and is managed etc. choice of tubular product economic comparative cou
14、rse of technology, technology should from pressure, temperature, environment for use, install method,etc. go on and consider, combine owners at the same time request and the house of grade,carry on and fix after being consider synthetically technology not economic. the above plastics supply water tu
15、bular product can supply water tubular product as house life. the economic and functional house conciliating strand room in the face of the masses of with low- and medium-level incomes resident, can select for use hygiene grades of hard polyvinyl chloride in charge of as feed pipe mainly, in order t
16、o reduce the fabrication cost; medium-to-high grade commodity apartment available aluminium mould and compound and in charge of or other plastics supply water the tubular product as the feed pipe. house mix hot water temperature that water order exceed 600 c, so above-mentioned tubular product in ch
17、arge of except hard polyvinyl chloride and aluminium plastics compound and in charge of( pe-al-pe), mostly the tubular product can be regarded as the hot water pipeline of the house. ( 2) pipeline lay problem 1. give and drain off water it set up there arent one that in charge of 1)will install it i
18、n the corner place of the kitchen, bathroom tomorrow. adopting this kind of way of laying more in the design of house in the past, it is convenient for it to construct, but will reveal the pipeline and hinder the room beautifully tomorrow watch, the households will mostly be hidden with the light qu
19、ality material in the equipment two times.2)will install it in the overcast angle place of the outer wall of the building tomorrow. way this suitable for southern weather warm district only, the minimum temperature in winter cant be lower than zero degrees centigrade, in case water pipe water-loggin
20、g freeze ice is bloated to split pipeline, influence household use. pipeline lay in outer wall, influence building to be beautiful, too inconvenient on manage and maintain in the future. 3)lay it in the pipeline well. this way makes the room clean and beautiful , but the pipeline well has taken up t
21、he area of the bathroom, and pipeline construct, maintain relatively more difficult. bathroom set up concentrate pipeline well, concentrate pipeline on assign in the well feed pipe, drain pipe, this is that the civilized importance lives in the kitchen of comfortable house, bathroom embodiment. i th
22、ink : should consider the establishment of the pipeline well of the bathroom in the medium-to-high grade building conceptual design of commodity apartment, improve quality of using of bathroom promptly so , can solve hard polyvinyl chloride drain pipe rivers noise heavy problem, improve the environm
23、ental quality level of the room; whether for bathroom in the areas for little economic and functional house and overcome difficulties room, warm area give and drain off water and set up and in charge of and can consider and lay in the outer wall in the south, in order to increase using the space of
24、the bathroom; pipeline install and in the room, should influence kitchen, bathroom every sanitary equipment use of function tomorrow 2. supply water and prop up there arent tube house supply water prop up and in charge of pipe diameter one 32mm, de of battle, little plastics feed pipe of pipe diamet
25、er is the crooked state, so the house supplies water and is propped up and in charge of being recommended and adopted and set up secretly. supply water to prop up to manage darkly there are thes way had:1)set up in the brick wall secretly. wall turn on and in charge of trough in brick when construct
26、ing, in charge of trough width tube +20 mm, de of external diameter, degree of depth tube external diameter de, the pipeline is imbedded and managed directly trough, and with in charge of card fix in trough of inning charge of son.2)whether pipe diameter supply water and prop up and last de 20mm,can
27、 set up at floor secretly piece make level by layer. turn on and in charge of trough in floor( ground) the board when constructing, it wides trough have to be de +10 mm deeply 1/2 of the de, half pipeline imbed and in charge of trough, and with in charge of card fix in trough of inning charge of tub
28、e. aluminium mould compound and in charge of and pay and unite polypropylene in charge of pipeline adopt metal pipe fittings connection, must strengthen and in charge of trough size when adopting and set up secretly, and rivers some flood peak loss relatively heavy. assign the relative house that co
29、ncentrated to the kitchen, bathroom interior hygiene utensil, can adopt and divide water device go on and join , divide water device whether one more than branch in charge of and connect, every hygiene utensil supply water and prop up and in charge of and connects and publishes from the water dividi
30、ng device separately. can already prevent the tube burying the pipeline secretly from being connected like this permeate the question. can reduce some flood peak lost, decrease the fabrication cost of pipe networks 3)drain off water and prop up the tube to lay house room drain off water and in charg
31、e of and should set up at the time of inning this each, drain off water and in charge of permeating sideways like this canning prevent the sewage from waiting for the pollutant to enter the neighbor family sideways, will not influence the neighbor either when the pipeline is maintained normal life o
32、f one. kitchen wash water drainage of basin propped up and in charge of generallying inserts draining off water to stand to manage this layer of floor sideways; floor drain drain off water propped up and in charge of laying the room of lower floor. a lot of colleagues think now: whether kitchen the
33、ground it lay ceramic tile of,whose name is clean in when need develop with water,not strong in meaning to set up floor drain, so kitchen set up ground floor drain, avoid and drain off water and prop up and in charge of and enter neighbor family sideways already so, can increase using the space of t
34、he kitchen . bathroom drain off water and prop up and in charge of and lay concrete measure have in this layer sideways inside: 1)improve the bathroom ground . ground tendency high 150mm, adopt back row type take stool pot, washing basin, bath tub, water drainage of floor drain in charge of and bury
35、 in cushion layer secretly sideways.2)adopt the sinking type bathroom. bathroom sink 350mm the floor, hygiene utensil drain off water and in charge of and bury on sinking space secretly sideways two method these can realize water drainage of bathroom prop up and in charge of earths surface to bury u
36、nderground this one without entering the neighbor family sideways. bury pipeline when installing, construction quality must check on strictly, can construct bathroom ground after confirming qualified secretly, so as not to leave the hidden danger in giving in the future using. bathroom ground constr
37、uct and can pack coal ash light quality material , also can adopt and lay bricks impracticable to lay plate making construct ground, ground must make waterproof to deal with, method can waterproof to deal with according to roofing, make two oil one rubber and plastic ointment waterproof cloth. 3) wa
38、ter gauge the open air set up problem the water gauge is had indoors, not only the work load of checking meter is very heavy , but also make the security and privacy of the house reduce greatly . so house divide into households of water gauge or divide households of figure of water gauge show that s
39、hould be set up in the open air. skyscraper water gauge the open air set up following several kinds of forms: whether 1.adopt far it pass by water gauge change the ordinary water gauge into and pass the water gauge far, is joined the water gauge and data gathering machine by a signal line, and then
40、reach intelligence to manage( the computer). its merit lies in saving a large amount of people strength comes to check meter, the data are accurate, the shortcoming is that the fabrication cost is high. whether 2.adopt magnetic stripe card of by water gauge users buy the electronic card of the runni
41、ng water company in advance , then insert it in the storing device of the water gauge, card amount of money deduct automatically on the water, this way user need to prepay the water rate, the price of the water gauge is relatively high. 3. adopt it set up at the open air water gauge not ordinary1)th
42、e water gauge is set up in the stair have a rest in the alcove of the platform. household watersupply to prop up and manage and enter the kitchen, bathroom after the water gauge is measured. way this realize water gauge produce room set up, equivalence low project have , supply water and set up and
43、in charge of and set up with water gauge office results in aesthetic problems in stair. it suitable for the south warm district kitchen, bathroom assign close to the houses of positions of staircase. 2)the water gauge concentrates on being set up among the water gauges( meter box). person who give w
44、hen supplying water, set up water gauge in ground floor( meter box) on falling, every household watersupply to prop up and is in charge of applying having in the pipeline well, southern area can overcast horn place lay along the outer wall in building too; person who give when supplying water, can s
45、et up water gauge in roof( meter box) under upgoing. this way increases and supplies water to prop up in charge of and lay length, pipeline lay and influence building to be beautiful along outer wall. water gauge produce way choice that family assign, must combine house kitchen, bathroom plane assig
46、n characteristic and concrete request of developer, carry on to several feasibility scheme the above economic technology fix after comparing. property well-managed medium-to-high grade commodity apartment of housing district, can adopt and pass the water gauge far , it is that the water gauge will u
47、se the developing direction in the future; estate management perfect medium- to-high grade commodity apartment of housing district, can adopt magnetic stripe card water gauge( company have this kind district of business can design in running water) or concentrate on setting up it among the water gau
48、ges( case); southern area unit type house can set up rest platform office in stair with ordinary water gauge, in order to reduce the fabrication cost. 4) establishment question of the pot-type boiler should reserve and install hot water supply terms of facility, set up hot water supply facilities wi
49、th when the design of house. have and concentrate house that hot water supply on , should consider house assign with installation position and cold hot water pipeline of hot water device. the pot-type boiler generally has three kinds, such as gas, electricity, solar energy,etc. whether last kitchen
50、gas heater and electric heater or bathroom inside, give when draining off water design shoulding reserve installation position and cold hot water interface of pipeline of water heater in advance in building, install by oneself when convenient users fit up. solar energy and hot water it is simple and
51、 convenient and safe for device to use, need fuel and electric power is low to run the expenses, have long performance life, pollution-free, received by the masses of users favourably very much, many houses have been small in recent years the district all install the solar water heater at the time o
52、f designing and construct. solar water heater install and at the roof, need to set up the cold hot water pipeline among bathroom and water heater of the roofing like this generally, consider installation of solar water heater when the design of house, household can only lay cold and hot pipeline alo
53、ng the building outer wall when installing in the future, increase household degree of difficulty when installing like this , increase pipeline make the investment, influence building beautiful. give when draining off water the design needing to solicit the developers suggestion first in building, i
54、nterconnected system one design, construct the solar water heater in unison; reserve solar water heater and cold hot water installation position of pipeline in advance only. the cold hot water pipeline of the solar water heater can be laid in the pipeline well; set up pipeline house of well , can se
55、t up one upvc drain pipe of de110 as solar water heater hot water sleeve pipe of pipeline close to corner of person who take a shower in bathroom, set up a de110 *75 three direct links in each hygiene interval ground, as connecting the entry of cold and hot water pipe 5) air conditioner condensation ink discharge the issue in recent years, air conditioner enter huge numbers of families gradually, condensation water amorphous to discharge the building outer wall of pollution air conditioner have, have influen
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年青海省安全員-B證考試題庫及答案
- 2025-2030年中國電熱水器產(chǎn)業(yè)市場發(fā)展前景與投資趨勢分析報(bào)告
- 長春工業(yè)大學(xué)人文信息學(xué)院《BM安裝工程計(jì)量》2023-2024學(xué)年第二學(xué)期期末試卷
- 南昌理工學(xué)院《現(xiàn)代控制》2023-2024學(xué)年第二學(xué)期期末試卷
- 昆明幼兒師范高等??茖W(xué)?!督鹑趯W(xué)前沿動態(tài)》2023-2024學(xué)年第二學(xué)期期末試卷
- 信陽農(nóng)林學(xué)院《臺港暨海外華文文學(xué)研究》2023-2024學(xué)年第二學(xué)期期末試卷
- 西安體育學(xué)院《大數(shù)據(jù)機(jī)器學(xué)習(xí)》2023-2024學(xué)年第二學(xué)期期末試卷
- 濰坊工商職業(yè)學(xué)院《機(jī)器學(xué)習(xí)實(shí)驗(yàn)》2023-2024學(xué)年第二學(xué)期期末試卷
- 廣東信息工程職業(yè)學(xué)院《UML及形式化建?!?023-2024學(xué)年第二學(xué)期期末試卷
- 山西旅游職業(yè)學(xué)院《化工原理(Ⅰ)》2023-2024學(xué)年第二學(xué)期期末試卷
- 食材配送、包裝、運(yùn)輸、驗(yàn)收、售后服務(wù)方案應(yīng)急預(yù)案
- 萬千教育學(xué)前讀懂兒童的思維:支持自主游戲中的圖式探索
- 產(chǎn)品外觀檢驗(yàn)標(biāo)準(zhǔn)通用
- 中石化YC分公司易捷便利店市場營銷策略研究
- 醫(yī)院護(hù)理培訓(xùn)課件:《病區(qū)環(huán)境管理查房》
- 《小羊和蝴蝶》繪本故事
- 鋼筋工理論考試題庫及答案
- 歷史文獻(xiàn)學(xué)之文獻(xiàn)??苯o09歷史開第二章
- 大數(shù)據(jù)技術(shù)基礎(chǔ)及應(yīng)用教程(Linux+Hadoop+Spark) 習(xí)題答案
- 高等數(shù)學(xué)(新標(biāo)準(zhǔn)教材)高職PPT完整全套教學(xué)課件
- 人教A版選擇性6.2.1排列6.2.2排列數(shù)課件(20張)
評論
0/150
提交評論