![ABB-Substation-Condition-Monitoring-Schedule_第1頁](http://file2.renrendoc.com/fileroot_temp3/2021-11/19/d736be88-f394-46b2-8c4e-d9f275ed4a98/d736be88-f394-46b2-8c4e-d9f275ed4a981.gif)
![ABB-Substation-Condition-Monitoring-Schedule_第2頁](http://file2.renrendoc.com/fileroot_temp3/2021-11/19/d736be88-f394-46b2-8c4e-d9f275ed4a98/d736be88-f394-46b2-8c4e-d9f275ed4a982.gif)
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認(rèn)領(lǐng)
文檔簡介
1、abb-substation-condition-monitoring-schedule pss t d substation quality managementabb ltd. 1) introduction this guideline is prepared in view of the requirements for switchyard service inspection (visual) and condition based maintenance of substation equipments, structures and other miscellaneous it
2、ems in substations. these guidelines are necessarily general. it is recommended to carry out maintenance of equipment as per manual supplied by manufacturer. all inspections and test procedures should also be performed in accordance with applicable codes and standards. the aim of this guideline is t
3、o provide in general visual inspection check points for the structures, grounding systems, lt switchboards, etc. for which as such there is no readymade guidelines available. also to provide the visual inspection and condition based maintenance of major equipments like transformer, circuit breakers,
4、 cts, cvts, pts, disconnectors and las etc. to verify the health of the equipments. service visual inspection is the necessary activity to identify any visible abnormality or failure and require to be performed at specified interval. whereas condition based monitoring checks (on line/ off line) are
5、necessary to identify internal defects or abnormality, so that necessary preventive action can be taken up. 2) service inspection condition monitoring guideline the substation in total and the individual items of equipment contained therein should be periodically inspected. binoculars should be used
6、 to view buses and other equipment located on structures. painting and galvanizing (applicable to all equipments and systems)depending on geographical location, local environmental condition, periodic inspection of painting and galvanizing condition of structures, panels, equipments etc. is required
7、. inspect for paint condition, damage paint, chalking effect, rusting etc. if any damage observed, do necessary repaint or repair work. grounding system check for loose connections of all ground connections at equipments, structures, panels, other equipments etc. check for any sparking marks at term
8、ination or joint. observe the condition of any flexible braid type connections for damage. tighten the connections, clean the joints and replaced if found damage. earth pits should be kept wet so as to have low resistance. measure overall ground grid resistance. the value obtained should be comparab
9、le with initially measured values or designed values.structure inspect all the structures for loose or missing bolts or nuts. observe any damage paint/ galvanizing or signs of corrosion. inspect for deterioration, bending, buckling and cracking. civil work-foundation and control room inspect for sin
10、gs of settlement, cracks, spalling, honeycombing, exposed reinforcing steel, and anchor bolt corrosion. check for break/ missed cable trench cover. inspect for any crack/ leakages in control room and water tank. check for proper functioning of sump pump and drainage system. buses and shield wire ins
11、pect for loose clamps or connections. inspect for bending of alu-tube bending. observe the condition of flexible buses and shield wires for any damages. porcelain insulators and bushings (for bus post / suspension / circuit breaker / ct / cvt / pt transformer bushings) inspect all insulators and equ
12、ipment bushings for chipped petticoats and fractured or cracked porcelain. flashover in the past may have damaged a portion of the glazing on the porcelain. make this inspection at close range. replaced damage bushings. remove dust and dirt from porcelain insulators with suitable methods. cable insp
13、ect exposed sections of cable for physical damage. inspect the insulation or jacket for signs of deterioration. check for loose connections, lugs, tightness, cracking of lugs etc. inspect shield grounding (where applicable), cable support and termination. check for any sparking marks at termination
14、or joint. clean sparking marks if any and make proper joint with proper tightening and lugging. lt cable metal clad switchgear (control-metering, relay panel, outdoor and indoor panel) examine meters, relays and instruments externally to check for loose connections and damage to cases and covers. ch
15、eck whether the instruments are reading or registering. check the functioning of annunciator panels. inspect for damage to enclosures, doors, latching mechanisms, locks etc. check out for burned-out lamps. battery and battery chargercheck for any physical damage, loose connections. check for low lev
16、el or low specific gravity of the electrolyte. record the electrolyte temperature. verify vent cap and flame arresters are in place. check electrolyte appearance. check working of exhaust fan.check for cleaning and corrosion.observe temperature (by touch). if temperature is found high, check and att
17、end the reason for the same. check the charging current and voltage. observe the ground detector lamps for an indication of an undesirable ground on the dc system. compressor check for leakage of air. check air pressure and oil level. substation area- general verify the existence of appropriate dang
18、er and informational warning signs. verify whether they are missing or needs repainting. check for rusting of fasteners check for any hotspots at conductor/ equipment/ stringing termination. check for indoor and outdoor lighting systems for burned-out lamps or other component failures verify that th
19、ere is adequate supply of sparesinspect the fire protection system check for bird/ animal nests or other foreign materials in the vicinity of energized equipment, buses or fans. observe the general condition of the substation yard, overall cleanliness observe the position of all circuit breakers in
20、the auxiliary power system and verify the correctness of this position (indication on breaker). inspect the area for weed growth, trash and unauthorized equipment storage. ensure the fence fabric is intact and there is no rust.ensure the gate latches are operable ensure flexible braid-type connectio
21、ns are intact. _ . _ . _ . _. _ 1. transformer 2. circuit breakers (sf6 air blast) psstdssdepartment: guideline for substations service inspection and condition monitoringprepared: reviewed: status: date: language: page 9 of 16revision: ag nj draft 09/05/25 en nil 1 2 3 4 5 6 check for any gas/ air
22、leakage check for proper gas/ air pressure check for any hot spots at any terminals checking of oil leaks from grading capacitors checking of air compressor for oil level, oil quality, air filter, v-belt tension check for crack in insulators m m m m qy m b) maintenance schedule sr.no. details 1 chec
23、k tightness of all clamps and connectors/ 2 3 4 5 6 7 8 9 terminals check for damage paint condition and corrosion replaced damaged bushings checking of all interlocks checking of pressure settings cleaning of breaker interrupter, support insulators, pirs and grading capacitors checking of close/ tr
24、ip coil currents checking of healthiness of operation counter control cabinet (i) checking of tightness of all cable termination in mb (ii) checking of door sealing gaskets and replacement, if necessary (iii) repainting of metallic surfaces (iv) checking of space heaters checking of tightness of fou
25、ndation bolts maintenance of air dryers in air blast circuit breakers functional checking of auto starting of air compressors and dryers checking of air pressure drop during duty cycle operation overhauling of compressors maintenance of air dryer if provided frequency y y sos y y y y y y y sos y yy
26、y y sosy 10 11 12 13 14 15 psstdssdepartment: guideline for substations service inspection and condition monitoringprepared: reviewed: status: date: language: page 10 of 16revision: ag nj draft 09/05/25 en nil 16 spring operated mechanism (i) oil leakages from close and open dashpots, replace the sa
27、me if leakage observed (ii) greasing/ lubrication of gears and various latches in the operating mechanism (iii) checking of play of gaps in catch gears (iv) maintenance of spring charging motors, cleaning of carbon brushes and contactors (v) replacement of oil in dashpots checking of pole discrepanc
28、y relay functional checks, duty cycle operation including rapid re-closing (o-0.3s-co) checking of air pressure drop during duty cycle operation checking of all operational lock-outs including sf6 density monitor checking tightness of earthing connections cleaning of auxiliary switch contacts with c
29、tc checking of local on/off indicating lamps in breaker, if provided check interlocking of isolators with breaker after maintenance trip the breaker through backup y y y y sos y y u y y y y y y 17 18 19 20 21 22 23 24 25 c) condition monitoring (condition based maintenance) sr.no. 1 2 3 details cb operating timings (main, pir, aux.) static contact resistance measurement dynamic contact resistance measurement (dcrm), contact travel, contact speed, contact wipe, arcing 4 5 contact length capacitance and tan measurement of grad
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 人才市場招聘的未來格局與機遇分析
- 2025至2030年中國小檔后軸數(shù)據(jù)監(jiān)測研究報告
- 2025年中國電導(dǎo)率測控儀市場調(diào)查研究報告
- 2025年中國噴墨PP相紙市場調(diào)查研究報告
- 2025年中國L型彎桿市場調(diào)查研究報告
- 2025至2031年中國汽車接頭行業(yè)投資前景及策略咨詢研究報告
- 2025至2031年中國小型旋耕機行業(yè)投資前景及策略咨詢研究報告
- 2025至2030年中國荷葉絲膜菌數(shù)據(jù)監(jiān)測研究報告
- 2025至2030年中國工業(yè)高純水設(shè)備數(shù)據(jù)監(jiān)測研究報告
- 2025至2030年中國孔雀木苗數(shù)據(jù)監(jiān)測研究報告
- 2024-2025學(xué)年八年級數(shù)學(xué)人教版上冊寒假作業(yè)(綜合復(fù)習(xí)能力提升篇)(含答案)
- 2024年社會工作者(中級)-社會綜合能力考試歷年真題可打印
- 動物檢疫技術(shù)-臨診檢疫技術(shù)(動物防疫與檢疫技術(shù))
- 《華夏幸福房地產(chǎn)公司人才流失現(xiàn)狀、原因及應(yīng)對策略》開題報告(文獻(xiàn)綜述)3400字
- 文化墻、墻體彩繪施工方案
- 小型混凝土攪拌機-畢業(yè)設(shè)計
- 初中化學(xué)校本課程
- 科技文獻(xiàn)檢索
- GB/T 18665-2008地理標(biāo)志產(chǎn)品蒙山茶
- GB/T 17614.1-2015工業(yè)過程控制系統(tǒng)用變送器第1部分:性能評定方法
- 元代文學(xué)緒論
評論
0/150
提交評論