1、Day/DateDay/Date天/日期TestTest試驗PurposePurpose ofof Tes6Tes6式驗目的TestTest activitiesactivities試驗活動RemarksRemarks備注Day 1第1天11/08/2006Rotor runin:轉子試 轉:Crank test搖轉試驗1. Listen for rubs or unusual noises聽是臺后摩擦和異常噪音2. Functional test of emergency tripbutton緊急跳閘按鈕的功能試 驗3. Purge speed cranking for rotorvibra
2、tion check以吹掃速度搖 轉,檢查轉子振動情況4. Monitor LCI starting temperatures andoperation監(jiān)視器LCI起動溫度和運行5. Air blowing the purge piping of D5 andPM4 gas fuel during crank搖轉期間給D5和PM4吹 掃管鼓風6. Check operation of lift oil and turninggear檢查頂軸油和盤車 的運行1. Roll up to 50 rpm trip by DCS emergency pushbutton and 200 rpm and
3、trip by GT MK 6 controlemergency stop通 過DCS緊急按鈕逐漸增加到50rpm,通過GT MK6控制緊急停機 跳閘2. Restart, accelerate to go to Purge speed for5min and select normal stop重起, 加速到吹掃速度5分鐘,選擇正常停 止3. Restart, hold at purge speed and air blowingthe piping of D5 and PM4, trip by DCS customertrip (L4CT) after 30 Min crank test重
4、起,保持在吹掃速 度,給D5和PM4管道鼓風,在30分鐘搖轉試驗后通過DCS客戶跳閘(L4CT)跳閘4. Verify coast down to turning gear核實 惰行至盤車5. Monitor vibration levels through out the testperiod監(jiān)視整個試驗期間的振動 級Use auto start-up sequences to prepare the unitfor a-ReSdyrt米用自動走動順序將機組準備好“準備起動Rub checks are performed檢查摩擦ADRE vibration monitor to be con
5、nected連接 ADRE 振動監(jiān)視器AfterAfter Shut-downShut-down停機后Reinstate the piping spool of D5 and PM4 pipe workafter shutdown停機后重新恢 復D5和PM5管子的導管頁次1 /19Day 1第1天11/08/2006Rotor runin:轉子試 轉:False firing,actual firstfiring andFSNL假點火,實際第一 次點火和FSNL1. False fire假點火2. Actual First Fire to FSNL實際第一次點火至FSNL1.Select fi
6、re for false fire and check unitfor gas leaks, and P2 pr. Check選擇假點火的火,檢查機組是否漏 氣,和P2。檢查2.Verify unit trip and coast down to turninggear核實機組跳閘,惰行至 盤車3.Actual first firing and check for gasleaks at firing speed實際第一次點 火,檢查點火速度時是否漏氣4.Acceleration unit up to FSNL andstabilized min 4 hours thermal soak5.S
7、tart up heater commissioning將機 組加速到FSNL,至少穩(wěn)定4小時 熱浸泡6.Normal down unit and keep turning gear onfor natural cooldown.機組正 常停機,保持盤車,自然冷卻7.Monitor vibration levels through out thetest period監(jiān)視整個試驗期間的 振動級頁次2 /19AfterAfter Shut-downShut-down停機后1. Install balance shots if required如果需要, 安 裝平衡粒2. Repair any l
8、eaks / defects identified修復發(fā)現的 泄漏/缺陷3. Replace or clean the strainers of LP Hood spray, CEP,BFP and drains spray and perform any other maintenanceitems as required換或清潔低壓罩 噴嘴、EDP、BFP和疏水噴嘴的濾網,根據需 要執(zhí)行其它維護項4. Inspect and clean start up temporary gas strainers andsealing/cooling air if required to clean檢
9、查 和清潔起動臨時氣體濾網和密封/冷卻空氣如 果需要清潔的話g TheThe scheduleschedule andand detaildetail commissioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機組首次點火至PACPAC時間表及詳細的調試項Day/DateDay/Date天/日期TestTest試驗PurposePurpose ofof TestiTesti式驗目的TestTest activitiesactivities試驗活動RemarksR
10、emarks備注Day 2第2天11/09/2006Rotor runin:轉子試 轉;Start up andFSNL起動和FSNL1. FSNL and heat soak for 4 hoursFSNL和熱浸泡4小時1.Start normally, go to FSNL and stay there ifvibration levels acceptable正 常起動,至FSNL,如果振動級可 以接受,保持2.Electrical test電氣試驗1) Shaft voltage test軸電壓試驗2) AC impedance test交流阻抗試驗3) Main transforme
11、r Short circuit test with theconnection of Generator by EX2100 power通過EX2100電力連接發(fā) 電機做主變壓器短路試驗4) Open circuit test by EX2100, The test voltagewill be variable from 0V to 20.52KV(1.08PU of19KV)通過EX2100做開路試驗,試驗電壓從0V至20.52KV(19KV的1.08PU/)5)Megger check for seal casing and bearing (T8)at collector end si
12、de用邁格表檢 查收集器端側密封缸和軸承(T8)3. Check HRSG expansion檢查HRSG的膨脹4. Shutdown unit and keep turning gear on fornatural cool down.讓機組停機, 保持盤車,自然冷卻5. Monitor vibration levels through out the testperiod監(jiān)視整個試驗期間的振 動級6. By pass valve commissioning旁路閥 點挑14/ 19AfterAfter Shut-downShut-down停機后1. Install balance shots
13、 if required如果需要, 安裝平衡粒2. Repair any leaks / defects identified修復發(fā) 現的泄漏/缺陷3. Replace or clean the strainer of LP Hood spray, anddrains spray and perform any other maintenance itemsas required換或清潔低 壓罩噴嘴和疏水噴嘴,根據需要執(zhí)行其它 維護項4. Inspect and clean start up temporary gas strainersand sealing/cooling air if r
14、equired to clean檢查和清潔起動臨時氣體濾網和密封/冷卻空氣(如果需要清潔的話)2006年11月6日- - 版次0g TheThe scheduleschedule andand detaildetail commissioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機組首次點火至PACPAC時間表及詳細的調試項2006年11月6日版次0頁次5 / 19Day/DateDay/Date天/日期TestTest試驗PurposePurpose ofof
15、Tes6Tes6式驗目的UnitUnit activitiesactivities機組活動RemarksRemarks備注g TheThe scheduleschedule andand detaildetail commissioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機組首次點火至PACPAC時間表及詳細的調試項2006年11月6日版次0g TheThe scheduleschedule andand detaildetail commissioningco
16、mmissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機組首次點火至PACPAC時間表及詳細的調試項2006年11月6日版次0Day 3第3天11/10/2006RotorRun-in:;轉了試 轉;FSNL1. Run up to FSNL運行至FSNL2. Perform off line electrical tests執(zhí) 行脫機電氣試驗3. Dummy synchronization test偽同 步試驗4. Protection test保護試驗5. Synch check同步
17、檢查6. EX2100 on-line test EX2100聯機 試驗1.Unit restart to FSNL機組重新起動至FSNL2.EX2100 Offline test EX2100脫機試驗1) Manual high and low limit,手動上下極 限2) Offline OEL limit test脫機OEL極限 試驗3) Offline OEL trip test.脫機OEL跳閘 試驗4)Voltage high trip test.電壓局跳閘試驗5) V/HZ straight time/ Reverse time trip.V/HZ正向/反向時間跳閘6) Auto
18、 High and low limit test.自動上下 極證試驗7)PT failure Test. PT故障試驗8) Auto/Manual transfer test.自動/手動傳 輸試驗9)M1/M2 transfer test.M1/M2傳輸試驗3.Dummy Synch test偽同步試驗4.Perform synchronize to grid and reverse power52G trip test if vibration levelsAcceptable如果振動級可以接受,與電網并網,倒送電52G跳閘試驗5.EX2100 on-line test (25% load)
19、EX2100聯機試驗(25%負荷)6.Monitor vibration levels through out the testperiod.監(jiān)視整個試驗期間的振動級7. By pass valve commissionin 西路閥 門調試AfterAfter Shut-downShut-down停機后1. Install balance shots if required如果需要, 安裝平衡粒2. Repair any leaks / defects identified修復發(fā) 現的泄漏/缺陷3. Replace or clean the strainers of LP Hood spray
20、,CEP, BFP and drains spray and perform any othermaintenance items as requirecMR或清潔低壓罩噴嘴、EDP、BFP和疏水噴 嘴的濾網,根據需要執(zhí)行其它維護項4. Inspect and clean start up temporary gas strainersand sealing/cooling air if required to clean檢查和清潔起動臨時氣體濾網和密封/冷卻空氣(如果需要清潔的話)6 / 19g TheThe scheduleschedule andand detaildetail comm
21、issioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機組首次點火至PACPAC時間表及詳細的調試項2006年11月6日版次0g TheThe scheduleschedule andand detaildetail commissioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機組首次點火至PACPAC時間表及詳細的調試項頁次9 / 1
22、92006年11月6日版次0Day 4第4天11/11/2006Load test負荷試驗Combinedcycle聯 合循環(huán)1. Start up and Synch to grid起動 和并網2. Steam cleaning蒸汽清洗3. Line up of chemical sampling, dosingand CPPiMI整化學取樣、加藥和CPP4. Steam to turbine if steam qualityacceptable如果蒸汽質量可以接受,給汽機送蒸汽5. Over speed trip test超速跳閘試 驗1. Restart unit to FSNL and
23、 synch to grid重新起動機組至FSNL,并網2. Steam cleaning and steam to turbine if steamquality acceptable如果蒸汽質量 可以接受,蒸汽清洗,給汽機送蒸汽3. Steam temperature matching tes蒸汽 溫度匹配試驗4. ST 25% load and min 4 hours soak蒸汽 輪機25%負荷,至少浸泡4小時5. 52G breaker off and over speed trip test 52G斷路器斷開,超速跳閘試驗6. Monitor vibration levels th
24、rough out the testperiod監(jiān)視整個試驗期間的振動 級AfterAfter Shut-downShut-down停機后1. Install balance shots if required如果需要, 安裝平衡粒2. Repair any leaks / defects identified修復發(fā) 現的泄漏/缺陷3. Replace or clean the strainer of LP Hood spray, anddrains spray and perform any other maintenance itemsas required!換或清潔低 壓罩噴嘴和疏水噴嘴
25、,根據需要執(zhí)行其它 維護項4. Inspect and clean start up temporary gas strainersand sealing/cooling air if required to clean檢查和清潔起動臨時氣體濾網和密封/冷卻空氣如果需要清潔的話Day/DateDay/Date天/日期TestTest試驗PurposePurpose ofof Tes6Tes6式驗目的UnitUnit activitiesactivities機組活動RemarksRemarks備注g TheThe scheduleschedule andand detaildetail comm
26、issioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機組首次點火至PACPAC時間表及詳細的調試項頁次10 / 192006年11月6日版次0Day 5第5天11/12/2006DLN tuningPPM mode tobase LoadDLN調整PPM模式全基 本負荷1. Combined cycle base load (PPM)operation聯合循環(huán)根本負荷(PPM)運行2. Preliminary DLN tuning up base loadwith
27、 strainer (PPM)帶濾網 初步DLN調整根本負荷1. Restart unit and load to combined cycle baseload with PPM重新起動機組,加 載至聯合循環(huán)根本負荷PPM2. Perform DLN tuning執(zhí)行DLN調整3. Performance heater commissioning執(zhí) 行加熱器調試3. EX2100 step response test (25%, 50%, 75% and100%).EX2100階躍響應試驗(25%, 50%, 75%和100%)4. PT failure test at on-line co
28、ndition (25% only)聯機狀態(tài)下PT障試馬繪(僅25%)5. HRSG safety valve test if any HRSG安 全閥門試驗(如果有的話)6. Perform normal shutdown afterwards and monitorflame out at correct speed during unit coast down執(zhí)行正常停機,監(jiān)視 機組惰行期間正確速度時的熄火情況7. Monitor vibration levels through out the testperiod監(jiān)視整個試驗期間的振動級8. Check HRSG expansion檢
29、查HRSG的 膨脹AfterAfter Shut-downShut-down停機后1. Install balance shots if required如果需要, 安裝平衡粒2. Repair any leaks / defects identified修復發(fā) 現的泄漏/缺陷3. Replace or clean the strainer of LP Hood spray, anddrains spray and perform any other maintenance itemsas required!(換或清潔低 壓罩噴嘴和疏水噴嘴,根據需要執(zhí)行其它 維護項4. Inspect and
30、 clean start up temporary gas strainersand sealing/cooling air if required to clean檢查和清潔起動臨時氣體濾網和密封/冷卻空氣(如果需要清潔的話)g TheThe scheduleschedule andand detaildetail commissioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機組首次點火至PACPAC時間表及詳細的調試項2006年11月6日版次0頁次11 / 1
31、9Day 6第6天11/13/2006PPM base loadfor 30 hoursPPM負 荷30小 時CombinedCycle BaseLoad聯 合循環(huán)基 本負荷1. Combined cycle base load (PPM)operation聯合循環(huán)根本負荷(PPM)運行2. Continue to run 30 hours at PPM base 10ad繼續(xù)以PPM根本負荷 運行30小時1. Restart unit and load to combined cycle baseload (PPM正新起動機組,加載 到聯合循環(huán)根本負荷(PPM)2. Monitor vibr
32、ation levels監(jiān)視振動級Inspect and clean start up temporary gas strainers andsealing/cooling air if required to clean檢查和清潔起動臨時氣體濾網和密封/冷卻空氣(如果需要清潔的話)Day 7第7天11/14/2006PPM base loadfor 30 hoursPPM基 本負荷30小時CombinedCycle BaseLoad聯 合循環(huán)基 本負荷1. Combined cycle base load (PPM) Operation聯合循環(huán)根本負荷(PPM)運行2. Continue t
33、o run 30 hours at PPM base 10ad繼續(xù)以PPM根本負荷運行30小時1.Continue to run combined cycle base load (PPM)繼續(xù)運行聯合循環(huán)根本負荷(PPM)2. Monitor vibration levels監(jiān)視振動級3.Perform normal shutdown afterwards and monitorflame out at correct speed during unit coast down執(zhí)行正常停機,監(jiān)視 機組惰行期間正常速度時的熄火Inspect and clean start up temporar
34、y gas strainers andsealing/cooling air if required to clean檢查和清潔起動臨時氣體濾網和密封/冷卻空氣(如果需要清潔的話)Day/DateDay/Date天/日期TestTest試驗PurposePurpose ofof TestiTesti式驗目的UnitUnit activitiesactivities機組活動RemarksRemarks備注Day 8第8天Cooling down冷Cooling down to remove all of strainers冷卻后撤除所有濾網Cooling down to remove all o
35、f strainers冷卻后撤除所有濾網Remove all of strainers for gas fuel, sealing andcooling air, steam strainers after comple-g TheThe scheduleschedule andand detaildetail commissioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機組首次點火至PACPAC時間表及詳細的調試項頁次12 / 192006年11月6日版次011
36、/15/2006卻tion of 30 hours operation運行30小時結束 后撤除氣體燃料、密封空氣和冷卻空氣的所 有濾網及蒸汽濾網Day 09第9天11/16/2006Cooling down冷卻Cooling down to remove all of strainers冷卻后撤除所有濾網Cooling down to remove all of strainers冷卻后撤除所有濾網Inspect inlet air and exhaust area檢查進氣和排氣區(qū)域Remove all of strainers for gas fuel, sealing andcooling
37、 air, steam strainer after completion of 30hours operation運彳330小時結束后拆 除氣體燃料、密封空氣和冷卻空氣的所有濾 網及蒸汽濾網Day 10第10天11/17/2006Cooling down冷卻Cooling down to remove all of strainers冷卻后撤除所有濾網Cooling down to remove all of strainers冷卻后撤除所有濾網Inspect inlet air and exhaust area檢查進氣和排氣區(qū)域Remove all of strainers for gas
38、 fuel, sealing andcooling air, steam strainer after completion of 30hours operation運彳330小時結束后拆 除氣體燃料、密封空氣和冷卻空氣的所有濾 網及蒸汽濾網Day 11第11天11/18/2006DLN tuningPremixed modeto base LoadDLN調 整預混合 模式全基 本負荷DLN1. Combined cycle base load (PM) operation聯合循環(huán)根本負荷(PM)運行2. DLN tuning without strainer for Premixedmode
39、預混合模式無濾網DLN調整3. Load reject test for 50% and 100%50%和100%的甩負荷試驗1.Restart unit and load to combined cycle baseload with PM重新起動機組,加載 到聯合循環(huán)根本負荷PM2. Perform DLN tuning執(zhí)行DLN調整3.Load reject test for 50% and 100% 50%和100%的甩負荷試驗4.Re-Synch to gird and base loacfi新并 網和根本負荷5.Prepare 168 hours reliability test
40、run準 備168小時可靠性試運CEMS ready to DLN tuningCEMS準備DLN調整Day 12第12天11/19/2006Reliabilityrun 168hrs, 11. Combined cycle base load (PM) operation聯合循環(huán)根本負荷(PM)運行1. Combined cycle base load (PM) opera- tion聯合循環(huán)北本負荷(PM)運行CEMS ready to PM base loadCEMS準備PM根本負荷g TheThe scheduleschedule andand detaildetail commiss
41、ioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機組首次點火至PACPAC時間表及詳細的調試項頁次13 / 192006年11月6日版次0day可靠 性運行168小 時,第1天Day 13第13天11/20/2006Reliabilityrun 168hrs, 2day可 靠性運行168小 時,第2天1. Combined cycle base load (PM) operation聯合循環(huán)根本負荷(PM)運行1. Combined cycle base load
42、(PM) opera- tion聯合循環(huán)乩本負荷(PM)運行CEMS ready to PM base load CEMS準備PM根本負荷Day/DateDay/Date天/日期TestTest試驗PurposePurpose ofof TestiTesti式驗目的UnitUnit activitiesactivities機組活動RemarksRemarks備注Day 14第14天11/21/2006Reliabilityrun 168hrs, 3day可靠 性運行168小時,第3天1. Combined cycle base load (PM) operation聯合循環(huán)根本負荷(PM)運行
43、1. Combined cycle base load (PM) opera- tion聯合循環(huán)根本負荷(PM)運行CEMS ready to PM base loadCEMS準備PM根本負荷Day 15第15天11/22/2006Reliabilityrun 168hrs, 4day可靠1. Combined cycle base load (PM) operation聯合循環(huán)根本負荷(PM)運行1. Combined cycle base load (PM) opera- tion聯合循環(huán):i本負荷(PM)運行CEMS ready to PM base loadCEMS準備PM根本負荷g
44、TheThe scheduleschedule andand detaildetail commissioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機組首次點火至PACPAC時間表及詳細的調試項頁次14 / 192006年11月6日版次0性運行168小時,第4天Day 16第16天11/23/2006Reliabilityrun 168hrs, 5day可靠 性運行168小時,第5天1. Combined cycle base load (PM) operatio
45、n聯合循環(huán)根本負荷(PM)運行1. Combined cycle base load (PM) opera- tion聯合循環(huán)根本負荷(PM)運行CEMS ready to PM base loadCEMS準備PM根本負荷Day 17第17天11/24/2006Reliabilityrun 168hrs, 6day可靠 性運行168小時,第6天1. Combined cycle base load (PM) operation聯合循環(huán)根本負荷(PM)運行1. Combined cycle base load (PM) opera- tion聯合循環(huán)乩本負荷(PM)運行CEMS ready to
46、 PM base load CEMS準備PM根本負荷g TheThe scheduleschedule andand detaildetail commissioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機組首次點火至PACPAC時間表及詳細的調試項頁次15 / 192006年11月6日版次0Day 18第18天11/25/2006Reliabilityrun 168hrs, 7day可靠 性運行168小時,第7天1. Combined cycle base lo
47、ad (PM) operation聯合循環(huán)根本負荷(PM)運行1. Combined cycle base load (PM) opera- tion聯合循環(huán):i本負荷(PM)運行2. Normal shut down after completion of 168 hoursreliability run test168小時可靠性運行試驗完成后正常停機CEMS ready to PM base loadCEMS準備PM根本負荷g TheThe scheduleschedule andand detaildetail commissioningcommissioning itemsitems
48、ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機組首次點火至PACPAC時間表及詳細的調試項頁次16 / 192006年11月6日版次0Day 19第19天11/26/20068 days startup and shutdown daily,1 day 母天起動 和停機,共 8 天, 第1 天8 days start up and shut down daily每天1起動和停機,共 8 天8 days start up and shut down daily每7動和停機,共 8 天8 days start up and s
49、hut down daily每7動 和停機,共 8 天Day/DateDay/Date天/日期TestTest試驗PurposePurpose ofof TestiTesti式驗目的UnitUnit activitiesactivities機組活動RemarksRemarks備注Day 20第20天11/27/20068 days startup and shutdown daily,2 day1 day每天 起動和停 機,共 8大,第 2天8 days start up and shut down daily每天二起動和停機,共 8 天8 days start up and shut dow
50、n daily每 動和停機,共 8 天8 days start up and shut down daily每動 和停機,共8天Day 21第21天11/28/20068 days startup and shutdown daily,3 day1 day每天 起動和停8 days start up and shut down daily每天1起動和停機,共 8 天8 days start up and shut down daily每7動和停機,共 8 天8 days start up and shut down daily每7動 和停機,共8天g TheThe scheduleschedu
51、le andand detaildetail commissioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機組首次點火至PACPAC時間表及詳細的調試項頁次17 / 192006年11月6日版次0機,共 8 大,第 3天Day 22第22天11/29/20068 days startup and shutdown daily,4 day1 day每關 起動和停 機,共 8大,第 4天8 days start up and shut down daily每天:起動和
52、停機,共 8 天8 days start up and shut down daily每7動和停機,共8天8 days start up and shut down daily每7動 和停機,共 8 天Day 23第23天11/30/20068 days start upand shut downdaily, 5 day1day 每天 起動和停 機,共 8 大,第 5天8 days start up and shut down daily每天:起動和停機,共 8 天8 days start up and shut down daily每天起 動和停機,共8天8 days start up an
53、d shut down daily每天起動 和停機,共 8 天Day/DateDay/Date天/日期TestTest試驗PurposePurpose ofof Tes6Tes6式驗目的UnitUnit activitiesactivities機組活動RemarksRemarks備注g TheThe scheduleschedule andand detaildetail commissioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機組首次點火至PACPAC時間表
54、及詳細的調試項2006年11月6日版次0頁次15 /19Day 24第24天12/01/20068 days startup and shutdown daily, 6day1 day 每天 起動和停機,共 8 大,第 6天8 days start up and shut down daily每天1起動和停機,共 8 天8 days start up and shut down daily每天起 動和停機,共 8 天8 days start up and shut down daily每天起動 和停機,共 8 天Day 25第25天12/02/20068 days startup and sh
55、utdown daily, 7day1 day 每天 起動和停機,共 8 大,第 7天8 days start up and shut down daily每天二起動和停機,共 8 天8 days start up and shut down daily每天起 動和停機,共 8 天8 days start up and shut down daily每天起動 和停機,共8天g TheThe scheduleschedule andand detaildetail commissioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst
56、 firingfiring toto PAPAC C1 1號機組首次點火至PACPAC時間表及詳細的調試項頁次19 / 192006年11月6日版次0Day 26第26天12/03/20068 daysstart up andshut downdaily,8day1 day 每天起 動 和 停機,共 8 大,第 8 大8 days start up and shut down daily每天1起動和停機,共 8 天8 days start up and shut down daily每天起 動和停機,共 8 天8 days start up and shut down daily每天起動 和停
57、機,共 8 天Day 27第27天12/04/2006No Test沒有試驗Cooling冷卻Cooling for water wash冷卻準備水洗Install performance test equipments安裝性能 試驗設備Day 28第28天12/05/2006No Test沒有試驗Cooling冷卻Cooling for water wash冷卻準備水洗Install performance test equipments安裝性能 試驗設備Day/DateDay/Date天/日期TestTest試驗PurposePurpose ofof Tes6Tes6式驗目的UnitUni
58、t activitiesactivities機組活動RemarksRemarks備注Day 29第29天12/06/2006Offlinewaterwash脫 機水洗Off line water wash脫機水洗Off line water wash脫機水洗Off line water wash脫機水洗g TheThe scheduleschedule andand detaildetail commissioningcommissioning itemsitems ofof UnitUnit 1 1 firstfirst firingfiring toto PAPAC C1 1號機組首次點火
59、至PACPAC時間表及詳細的調試項頁次20 / 192006年11月6日版次0Day 30第30天12/07/2006IntegratedDLNTuning整 體DLN調整Integrated DLN Tuning for part load部 分負荷整體DLN調整Integrated DLN Tuning for part load局部負荷 整體DLN調整Collect data收集數據Day 31第31天12/08/2006No Test沒有試驗Cooling冷卻Cooling for water wash冷卻準備水洗Day 32第32天12/09/2006No Test沒有試驗Cooling冷卻Cooling for water
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 做門面招牌合同范本
- 公司鋼材購銷合同范本
- 加裝電梯合伙合同范本
- 出租農場果園合同范本
- 與銀行簽訂合同范本
- 分傭合同范例
- 個人軟件項目合同范本
- 個人演出雇用合同范本
- 加盟合同范本化妝
- 內墻無機涂料合同范本
- 《教育強國建設規(guī)劃綱要(2024-2035年)》解讀講座
- 中小學課件人造衛(wèi)星課件
- 新版冀教版(冀人版)科學五年級下冊全冊教案
- 鋼樓梯計算(自動版)
- 新人教版六年級下冊科學全冊教學設計教案
- 《成本會計學》習題集及答案
- 社區(qū)醫(yī)院建設標準
- 個人所得稅稅率表【自動提取稅率計算】
- 浙美版小學美術五年級下冊課件1畫家故居
- 中國作家協(xié)會入會申請表
- 熒光綠送貨單樣本excel模板
評論
0/150
提交評論