1、1. 在分段EB02上安裝前的條件Condition before mounting on the subsection EB02.i. 壓載泵的基座按基座圖(圖號:H012-101-02)安裝到位. Seat for ballast pump must be installed completely, according to pump seat drawing (H012-101-03).ii. 將泵安裝到基座上,并且墊塊拂配結束。Put the pump on the seat and the chock must be finished.iii. 墊塊交船東認可,按圖紙鉆孔達到圖紙規(guī)定
2、尺寸。Application inspection the chock to owner and surveyor. Boring the holes according to the drawing.iv. 緊固壓載泵聯(lián)接螺栓.Tighten ballast oil pump bolts.2. 在船臺上安裝前的條件Condition before mounting on the slipway.1) 機艙EG43,EG41及EG42分段所有工作全部完工。 Welding work for block EG43, EG41 and EG42 must all be finished.3. 電動
3、機基座的安裝步驟Installation process of the foundation for motor.1) 泵艙頂平臺的透平安裝位置開200孔。不能開到實際大小,開小孔以便于安裝時調節(jié)整體誤差。Hole for ballast pump on pump room top platform first should be cut 200 in order to easy to adjust. 2) 電動機基座放置到位,點焊。高度誤差不超過±5mm。The seat for motor only need be touched welding. The permissible
4、 error of height no more than±5mm.3) 用鉛垂從泵艙頂開孔處放下,按照壓載泵輸出軸中心位置以確定泵艙頂平臺開孔圓心位置。According the center of the output shaft of ballast with a plumb from the hole on pump room top, and then find the real center point of the hole. 4) 根據已確定的圓心位置開580孔。 Cut 580 hole according to the center of the hole tha
5、t just found. 5) 根據已確定的圓心位置確定電動機透平基座位置,并將透平基座安裝到位。高度誤差不超過±5mm。Install the foundation of the motor completely according the center of the hole that just found. The permissible error of height no more than±5mm.4. 壓載泵的安裝步驟Installation process of ballast pump 1) 按圖所示加工一臨時軸,確保兩端法蘭的同軸度不超過0.05。Ma
6、chining a temporary shaft refer to the figure ,keep the same axial angle not more than 0.05mm.2) 將通艙聯(lián)軸節(jié)與6420平臺焊接,焊接過程中注意對稱焊接,以防止不銹鋼波紋管的變形。Welding the intermediate shafting of penetration with the 6420 platform, to be prevent deformation give to the stainless bellow by welding must be keep symmetry w
7、elding.3) 將電動機機組按圖初步布置到位,同時用調整螺釘支承,將臨時軸與貨油泵固定并用聯(lián)接螺栓固定,按照壓載泵的輸出軸來校正。 Installing the motor and support by adjusting bolts, and fitting temporary shaft with ballast pump tightly by bolts,shaft alignment according to the output shaft of ballast pump.4) 根據圖所示將通艙件安裝到位,確保聯(lián)軸節(jié)的兩端的平面距離距6420平臺上表面的距離達到如圖所示的要求,在
8、安裝過程中要確保通艙聯(lián)軸節(jié)的不銹鋼波形管保持自由安裝狀態(tài)。 Installing the penetration stuffing box refer to drawing . Keep the distance from the both end surface to the 6420 platform as figure shown. And keep the stainless free in the install process.5) 通過調整通艙件與壓載泵的相對位置達到如圖所示的要求,確保中心偏移誤差,法蘭間開口誤差0.4mm。 Adjusting the intermediate
9、 shaft according to figure . Keep the coupling parallel misalignment and angular misalignment less than 0.4 mm. 6) 將電動機機組的輸出軸的法蘭安裝到位,同時用調節(jié)螺釘調整渦輪機組,確保輸出軸與中間軸法蘭偏差0.2mm,見圖所示。 Fitting the coupling for motor and support by adjusting bolts, keep the permissible error between the output shaft and intermedi
10、ate shaft less than 0.2mm, refer to drawing .7) 將渦輪機組的各墊塊安裝到位,同時交船東、船檢認可,按圖紙鉆孔達到圖紙規(guī)定尺寸。Fitting the chocks for turbine with foundation and inspection by owner and surveyor boring the holes according to the drawing.8) 浮動聯(lián)軸節(jié)的安裝The mounting of the floating coupling 浮動聯(lián)軸節(jié)的安裝前首先將通艙件處的聯(lián)軸節(jié)與輸出端的法蘭聯(lián)接好并緊固,浮動軸安
11、裝時應注意浮動聯(lián)軸節(jié)的一端標有“C”應向上與聯(lián)軸節(jié)聯(lián)接,標有“PC”的一端應向下與貨油泵聯(lián)接。參見圖。The coupling in penetration and the flange in output to be continued and tightened correctly before mounted the floating shaft. It is therefore special attention should be paid for that the floating shaft with the coupling marked with “C” is to be f
12、itted up and the other side marked with “PC” fitted down with cargo oil pump. Reference to figure .5. 安裝過程中允許的誤差 Permissible deformation1) 垂直方向的伸長誤差±10mm。 Elongation or contract in vertical direction±10mm。2) 角度偏差5 。(見圖) Angle deviation 5 (See figure ).3) 垂直方向的偏差±8mm(見圖)。 Perpendicular
13、 deviation ±8mm (See figure ).6. 壓載泵外接管路的注意事項 Caution for piping 錯誤的管路布置引起的外力作用導致泵的變形不僅引起振動而且導致泵的故障,因此排出與吸入側的法蘭聯(lián)接必須正確的相配,必須避免如圖所示的聯(lián)接,導致在泵側的不合理的外力,也不必讓泵由于管重量和熱膨脹而產生變形。Deformation given to the pump by outside force due to incorrect piping cause not only vibration but also pump troubles. Therefore
14、, the pipe flanges connecting with the suction and discharge nozzles must be correctly matched. Be sure to avoid the cades shown in fig. Otherwise the pump may receive unreasonable force. Nor must the pump be directly given deformation due to the total weight of piping and thermal expansion.7. 吸入管 S
15、UCTION PIPING 吸入側的管路很大程度上影響泵的效率,為避免故障的出現(xiàn),必須從以下幾個方面考慮。The piping on the suction side affects pump efficiency to a grate degree and to avoid troubles arising there from the following points must be noted.1) 管路中必須沒有氣穴的形成。 No air pocket must be formed in the piping.2) 與管路聯(lián)接的管路附件確保氣密防止氣體進入。 All fittings in the piping must be perfectly tightened to prevent air invasion.3) 防止管路上閥件的填料泄漏。 Care must be taken to prevent air leakage through glands of
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 裝飾階段臨時照明管控
- 明框玻璃墊塊設置規(guī)范
- 心理輔導與成長支持2025年考試試卷及答案
- 2025年新聞傳播學專業(yè)考試試題及答案
- 2025年鄉(xiāng)土文化研究生入學考試試題及答案
- 2025年網站開發(fā)與管理能力考試試題及答案
- 企業(yè)級API管理與系統(tǒng)架構優(yōu)化方案
- 設計制作合同(20篇)
- 市政管網改造中的水力計算與分析
- 浮法玻璃生產線項目可行性研究報告(參考)
- 超市供貨合同補充協(xié)議書
- 2025-2030中國肺癌行業(yè)市場現(xiàn)狀供需分析及投資評估規(guī)劃分析研究報告
- 2025屆貴州省畢節(jié)市高三第四次適應性考試地理試題(原卷版+解析版)
- 自愿倒班協(xié)議書
- 湖北省新華書店(集團)有限公司市(縣)分公司招聘筆試題庫2025
- 高考日語培訓協(xié)議書
- 浙江省強基聯(lián)盟2024-2025學年高一下學期5月月考數(shù)學試題(含答案)
- 2024淮安市專業(yè)技術人員繼續(xù)教育試題參考答案
- 2025年安徽省合肥市(合肥一中)三模(五月)生物試卷及答案
- 新能源汽車行業(yè)的商業(yè)趨勢研究試題及答案
- 貸款居間協(xié)議書范本
評論
0/150
提交評論