




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、 10.3 ACCEPTANCE TESTSPractical notes on performing a radiation survey:The fast response of the Geiger counter is advantageous in performing a quick initial survey to locate areas of highestradiation leakage through the walls.After location of these “hot-spots” the ionization chamber-type survey met
2、er may be used to quantify the leakage values.10.3 ACCEPTANCE TESTSPractical notes on performing a radiation survey:The first area surveyed should be the control console area where an operator will be located to operate the unit for all subsequentmeasurements.All primary barriers should be surveyed
3、with the largest field size, with the collimator rotated to 45º, and with no phantom in thebeam.All secondary barriers should be surveyed with the collimator set to the largest field size with a phantom in the beam.10.3 ACCEPTANCE TESTSHead leakageThe source on a cobalt-60 unit or the target on
4、 a linear accelerator are surrounded by shielding.Most regulations require this shielding to limit the leakage radiation to no more than 0.1% of the useful beam at one metrefrom the source.Adequacy of this shielding must be verified during acceptance testing.Practical notes on performing a head leak
5、age test: Use of film ionization chamber combinationThe leakage test may be accomplished by closing the collimator jaws and covering the head of the treatment unit with film.The films should be marked to permit the determination of their position on the machine after they are exposed and processed.T
6、he exposure must be long enough to yield an optical density of one on the films.Any hot spots revealed by the film should be quantified by using an ionization chamber-style survey meter.10.3 ACCEPTANCE TESTSMechanical checks include:Collimator axis of rotationPhoton collimator jaw motionCongruence o
7、f light and radiation fieldGantry axis of rotationPatient treatment table axis of rotationRadiation isocenterOptical distance indicatorGantry angle indicatorsCollimator field size indicatorsPatient treatment table motionsThe following mechanical test descriptions arestructured such that for each tes
8、t fourcharacteristics (if appropriate are given:Aim of the testMethod usedPractical suggestionsExpected results.10.3 ACCEPTANCE TESTSAim of the tests:Photon collimator jaws rotate on a circular bearing attached to the gantry.Axis of rotation is an important aspect of any treatment unit and must be c
9、arefully determined.Central axis of the photon, electron, and light fields should be aligned with the axis of rotation of this bearing and the photoncollimator jaws should open symmetrically about this axis.MethodThe collimator rotation axis canbe found with a rigid rodattached to the collimator.Thi
10、s rod should terminate in asharp point and be longenough to reach from where itwill be attached to theapproximate position ofisocenter.The gantry should be positioned to point the collimator axis vertically downward and then the rod is attached to the collimator housing.Millimeter graph paper is attached to the patient treatment couch and the treatment couch is raised to contact the point of the rod.With the rod rigidly mounted, the collimator is rotated through its range of motion. The point of the rod will trace out an arc as the collimator is rotated.10.3 ACCEPTANCE
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 保險(xiǎn)配件采購(gòu)合同范例
- 51投資協(xié)議合同范例
- 共享分成合同范例
- 九西村租房合同樣本
- 《矩陣全球》課件
- 養(yǎng)殖合作回收合同范例
- 職場(chǎng)英語當(dāng)中的非正式與正式場(chǎng)合用語試題及答案
- 音樂作品主題的構(gòu)思樂理考試試題及答案
- 人教版五年級(jí)數(shù)學(xué)第一單元上冊(cè)測(cè)試卷
- 2025年副主任醫(yī)師考試現(xiàn)場(chǎng)審核啟動(dòng):流程解析與科學(xué)備考指南
- 110kV電纜交流耐壓試驗(yàn)方案
- 動(dòng)力源開關(guān)電源說明書-dkd51系統(tǒng)維護(hù)手冊(cè)
- 手弧焊的基本操作
- 新概念英語青少版-2B全單元課件-unit-25(共32張)
- 初中八年級(jí)上冊(cè)信息技術(shù)《用Python編程》教學(xué)設(shè)計(jì)
- 施工項(xiàng)目安全交底確認(rèn)書
- 國(guó)際機(jī)票后端引擎緩存系統(tǒng)架構(gòu)
- 貴州干部履歷表(2023版)
- 消火栓月檢查表
- 高血壓腦病-PPT課件
- 人防工程竣工資料(全套)
評(píng)論
0/150
提交評(píng)論