1、Good is good, but better carries it.精益求精,善益求善。n某鋼筋混凝土蓋板涵(片石混凝土墻身)施工方案_secret鋼筋混凝土蓋板涵(砼墻身)施工方案XXXX工程X合同段鋼筋混凝土蓋板涵(片石砼墻身)施工方案XX工程公司XXXX工程X合同段項(xiàng)目經(jīng)理部二八年九月十日22' wages in arrears. 2.5 organization a group of high quality excellent construction team, responsible for construction. Project optimization, ch
2、oose in the main technicians from company employees. 2.6 in the course of construction, maintain close contacts with Labor departments, according to the project plan in full and on time, quality of labour provided. 2.7 the operator entry, admission to education and technology to give the low-down th
3、e project, make it clear the quality of projects and various operational requirements, and sign a labour agreement, defining their responsibilities and rights. 2.8 project to formulate a detailed service assessment methods and approach evaluation in a timely manner, unsatisfactory services exit in a
4、 timely manner, notify the Labor Department added to reward the good services to ensure project quality and progress. 2.9 in the labor Primary materials, components dosage name unit number notes drainage project security plan materials cast iron manhole cover 161 on October 1-November 20 cast iron r
5、ainwater grate level of 420 October 1 November 20 reinforced 10 t 12.96 coarse clean sand M3 155 September 11-October 1 November 20 November 20 m3 453 NET sand gravel 40mm M3 113 on September 11 in the September 11 to December 20-November 2 0 days thousand machine brick block 541 P.C32.5 t 185.4 on
6、September 8, 2010-January 30, 2011 October 1 November 20 cement reinforced concrete pipes 1200 m 925 on September 11 to November 20 reinforced concrete pipe of 1800 1500 m 325 on September 11 to November 20 reinforced concrete pipe reinforced concrete pipes m 107 on September 11 to November 20 2000
7、m 96 on September 11 to November 20 bars Concrete pipe diameter of 2200 m 46 on September 11 to November 20 HDPE pipe DN400 m 540 on September 11 to November 20 DN300 m 1399 on September 11 to November 20 HDPE HDPE pipe tube DN600 m 950 on September 11 to November 20 DN800 m 1692 on September 11 to
8、November 20 HDPE HDPE pipe tube DN1000 m 290 on September 11 to November 20 pumped commercial concrete impermeability P6C25 (corrosion-resistant) M3 279 September 11-November 20, pump-delivery commodity concrete C15 M3 1797 September 11-November 20, pump-delivery commodity concrete C25 (corrosion-re
9、sistant) M3 80 on September 11 to November 20 road projects in coarse clean sand M3 688 November 1 December 30 clean sand M3 105 5-80mm M3 16206 November 2 August-December 17th of November 1 to December 30 gravel, gravel 40m M M3 5799 November 2 August-December 17th, rock fragment 15mm M3 8139 Decem
10、ber 15 November 26 25-40mm M3 17876 December 15 November 26 gravel 60mm cement P.C32.5 t m3 18902 December 15 November 26 55.48 on September 8, 2010-January 30, 2011 Xiangfu East Road, Changsha, Wuhan-Guangzhou high-speed railway station construction project, Yuhua district, as well as the municipal
11、 level of the network's main road, construction of society and the concern of the public, according to the characteristics of the project,of backbone backbone role; to full strengthening members youth work, full play youth employees in company development in the of force role; to improve indepen
12、dent Commission against corruption work level, strengthening on enterprise business key link of effectiveness monitored. , And maintain stability. To further strengthen publicity and education, improve the overall legal system. We must strengthen safety management, establish and improve the educatio
13、n, supervision, and evaluation as one of the traffic safety management mechanism. To conscientiously sum up the Olympic security controls, promoting integrated management to a higher level, higher standards, a higher level of development. Employees, today is lunar calendar on December 24, the ox Bel
14、l is about to ring, at this time of year, we clearly feel the pulse of the XX power generation company to flourish, to more clearly hear XX power generation companies mature and symmetry breathing. Recalling past one another across a railing, we are enthusiastic and full of confidence. Future develo
15、pment opportunities, we more exciting fight more spirited. Employees, let us together across 2013 full of challenges and opportunities, to create a green, low-cost operation, full of humane care of a world-class power generation company and work hard! The occasion of the Spring Festival, my sincere
16、wish that you and the families of the staff in the new year, good health, happy, happy22目錄一、 編制依據(jù)二、 工程概況三、 施工準(zhǔn)備四、 工程內(nèi)容五、 詳細(xì)施工方法和施工程序六、 施工機(jī)構(gòu)組織及人員安排七、 質(zhì)量保證措施八、 安全生產(chǎn)保證措施九、 臨時(shí)工程十、 文明施工及環(huán)境保護(hù)一、編制依據(jù)1、XXXX工程X合同段涵洞施工圖設(shè)計(jì)、鋼筋砼蓋板涵通用圖、工程量清單及XXX號(hào)文件。2、國(guó)家現(xiàn)行的公路、橋涵施工及驗(yàn)收規(guī)范有效版本。3、施工現(xiàn)場(chǎng)的地形、地貌及現(xiàn)有條件。二、工程概況我合同段在接到XXX號(hào)文件時(shí)已按原設(shè)
17、計(jì)施工4道涵洞,我合同段共13道鋼筋砼蓋板涵,剩余9道。(見(jiàn)下表)序號(hào)中心樁號(hào)交角(度)涵長(zhǎng)(米)孔數(shù)跨徑(孔-米)備注19033.001-1.529064.001-2.039066.001-4.049045.001-4.059037.001-1.569072.71-4.079045.001-1.589011.501-1.596019.001-2.0涵洞洞身臺(tái)身按XXXXX文件由原設(shè)計(jì)M7.5砂漿砌Mu40塊石變更為C20片石砼,幾何尺寸不變。涵洞洞身基礎(chǔ),洞口翼墻均為M7.5砂漿砌Mu40塊石;洞身鋪底,洞口隔水墻鋪底、跌水井沉砂池、溝渠均為M7.5砂漿砌Mu40片石;帽石采用C20混凝土;
18、涵洞蓋板為預(yù)制C30鋼筋混凝土。三、施工準(zhǔn)備本工程投入的施工管理人員、施工機(jī)械設(shè)備、周轉(zhuǎn)材料已完成組織進(jìn)場(chǎng),蓋板預(yù)制場(chǎng)地已組建,各種設(shè)備均已完成檢修、檢校,能滿足施工需要。施工用材料水泥、鋼筋、碎石、砂、片(塊)石等已完成備料,經(jīng)進(jìn)場(chǎng)驗(yàn)證,各種進(jìn)場(chǎng)材料產(chǎn)品合格證齊全,工地實(shí)驗(yàn)室已負(fù)責(zé)完成各種材料抽檢試驗(yàn),試驗(yàn)結(jié)果合格;并完成了砼、砂漿配合比試驗(yàn)。材料產(chǎn)品合格證、抽檢試驗(yàn)報(bào)告、砼砂漿配合比報(bào)告已送監(jiān)理工程師審核。后勤保障及臨時(shí)設(shè)施已準(zhǔn)備就緒,施工管理人員、施工機(jī)械及測(cè)量設(shè)備、勞動(dòng)力等已按計(jì)劃到位,具備開(kāi)工條件。四、工程內(nèi)容測(cè)量放樣基坑開(kāi)挖基坑清理、驗(yàn)收基礎(chǔ)砌筑臺(tái)身澆筑蓋板預(yù)制及安裝防水層及沉降縫
19、處理進(jìn)出口鋪砌臺(tái)背回填及其它附屬工程。五、詳細(xì)施工方法和工作程序該分部工程開(kāi)工前項(xiàng)目部組織人員認(rèn)真復(fù)核設(shè)計(jì)圖紙、熟悉技術(shù)文件及規(guī)范,做好技術(shù)交底工作,明確分工,將責(zé)任具體落實(shí)到人,避免管理混亂影響施工。嚴(yán)格材料進(jìn)場(chǎng)制度,不合格品不得用于施工。施工過(guò)程中認(rèn)真做好各項(xiàng)隱蔽工程原始數(shù)據(jù)資料及隱蔽工程照片資料,真實(shí)反應(yīng)施工質(zhì)量。A、基坑開(kāi)挖1.涵洞挖基前,首先要作好改移溝渠,地面臨時(shí)排水措施,防止流水流入基坑,浸泡基底。根據(jù)施工圖紙,核實(shí)原溝底或通道標(biāo)高與新建涵洞出入口流水標(biāo)高是否相符,并將計(jì)算與測(cè)量標(biāo)高上報(bào)主管工程師,保證建成的涵洞通暢,不積水。2.基坑開(kāi)挖的位置、深度、基底尺寸必須符合設(shè)計(jì)的要求。
20、開(kāi)挖中如發(fā)現(xiàn)水文、地質(zhì)與圖紙不符時(shí),根據(jù)開(kāi)挖的實(shí)際情況,及時(shí)請(qǐng)現(xiàn)場(chǎng)工程師及監(jiān)理提出處理措施?;娱_(kāi)挖時(shí),做好涵洞中線定位控制樁以及高程控制樁,土方開(kāi)挖采用機(jī)械、人工配合開(kāi)挖,邊坡視實(shí)際土質(zhì)按1:0.331:0.75放坡,挖出的土石方及時(shí)運(yùn)離基坑5米以外。對(duì)于邊坡穩(wěn)定性差或陡峭地段采用鋼管木板臨時(shí)防護(hù),保證施工安全。機(jī)械開(kāi)挖接近涵洞基底設(shè)計(jì)標(biāo)高時(shí)采用人工清理,避免超挖、擾動(dòng)基底土質(zhì);涵洞基坑斷面、涵底高程應(yīng)滿足設(shè)計(jì)文件、規(guī)范要求。開(kāi)挖土方應(yīng)及時(shí)運(yùn)離涵洞邊緣,不得在基坑邊緣過(guò)高堆土,廢方應(yīng)及時(shí)運(yùn)到指定棄土場(chǎng),測(cè)量人員應(yīng)隨時(shí)掌握及控制開(kāi)挖寬度及深度。3.基礎(chǔ)軸線位置,應(yīng)經(jīng)校核無(wú)誤后再進(jìn)行挖,為了便于
21、校核,軸線控制樁延長(zhǎng)至基坑以外加以固定。在開(kāi)挖過(guò)程中,要經(jīng)常復(fù)核軸線及基坑尺寸,保證施工準(zhǔn)確。4.挖基時(shí)基底不得擾動(dòng)或被水浸泡。挖至接近基底標(biāo)高時(shí),保留2030cm厚原狀土,在基礎(chǔ)施工前突擊挖除,并進(jìn)行夯實(shí),承載力檢測(cè)合格后,隨即進(jìn)行基礎(chǔ)砌筑。5.在基坑內(nèi)及基坑范圍外3m(根據(jù)實(shí)際情況)設(shè)置積水坑及截水溝,保證基底不積水。6.基坑挖至設(shè)計(jì)標(biāo)高后,應(yīng)立即進(jìn)行地基承載力試驗(yàn),如果地基承載力達(dá)不到設(shè)計(jì)要求,根據(jù)設(shè)計(jì)單位、業(yè)主、監(jiān)理單位意見(jiàn)進(jìn)行換土或其它加固措施等變更處理?;灼秸?、密實(shí)、無(wú)雜物、無(wú)積水,經(jīng)監(jiān)理工程師檢驗(yàn)簽認(rèn)后,方可進(jìn)行基礎(chǔ)圬工施工?;A(chǔ)位于填筑路基時(shí),基礎(chǔ)施工前必須將基底充分壓實(shí),為
22、避免涵身因不均勻沉降產(chǎn)生裂縫。檢驗(yàn)基底平面位置、尺寸、基底標(biāo)高,其允許偏差及檢查法如下表:項(xiàng)次檢查項(xiàng)目規(guī)定允許偏差(mm)檢查方法和頻率1基底平面尺寸長(zhǎng)不小于設(shè)計(jì)尺量,長(zhǎng)、寬各3處寬不小于設(shè)計(jì)1軸線偏位25用經(jīng)緯儀縱橫各2點(diǎn)2基底高程土質(zhì)±50水準(zhǔn)儀測(cè)58點(diǎn)石質(zhì)+50、-200檢查基底地址情況和承載力是否與圖紙相符。檢查基底處理和排水情況是否符合規(guī)范要求。檢查施工日志及有關(guān)試驗(yàn)資料等。經(jīng)過(guò)檢驗(yàn)不符合圖紙要求時(shí),應(yīng)按監(jiān)理工程師的指示處理,直至檢查符合要求后方可進(jìn)行下道施工。B、基礎(chǔ)砌筑在監(jiān)理工程師對(duì)基槽中線、高程、幾何尺寸、地基承載力等驗(yàn)收合格后方可進(jìn)行涵洞基礎(chǔ)及臺(tái)墻施工。由施工測(cè)量人
23、員做好斷面控制樁以及高程控制樁,做好施工技術(shù)交底。涵洞基礎(chǔ)為漿砌塊石,做好砂漿施工配合比和拌合料計(jì)量工作,報(bào)監(jiān)理工程師批準(zhǔn)后實(shí)施。施工過(guò)程中應(yīng)嚴(yán)格控制砂漿配合比,不得使用人工拌和砂漿,砂漿拌和料應(yīng)當(dāng)天拌和當(dāng)天使用。漿砌塊石時(shí),應(yīng)利用塊石的自然形狀,相互交錯(cuò)銜接在一起。施工時(shí),最下一層石塊大面必須朝下,做成犬牙交錯(cuò)且搭接緊密,同時(shí)在砌下面石塊時(shí)考慮上面石塊如何接砌;注意到砌石分層錯(cuò)縫、咬扣緊密;嵌縫飽滿、密實(shí),不得有空洞;在砌角石、面石時(shí)應(yīng)選取比較方正石塊。砌腹石時(shí)可供應(yīng)不規(guī)則但形狀尺寸適宜的石塊。角石、面石應(yīng)首先選取備用。砌體下層應(yīng)選用較大的石塊,向上逐漸用較小尺寸石塊;一天中完成的砌石高度不
24、宜超過(guò)1.2m。氣溫較低時(shí)當(dāng)天的砌筑高度還應(yīng)減少;不準(zhǔn)在已砌好的砌體上拋擲、滾動(dòng)、翻轉(zhuǎn)或敲擊石塊。在砌筑過(guò)程中嚴(yán)禁振動(dòng)下一層砌石。砌體每層砌完在砂漿初凝后馬上進(jìn)行覆蓋灑水養(yǎng)護(hù)。養(yǎng)護(hù)期不少于7天。C、墻身片石砼澆筑在基礎(chǔ)砌體砂漿強(qiáng)度達(dá)到一定強(qiáng)度后進(jìn)行砼墻身施工。1、墻身模板支設(shè)墻身模板采用標(biāo)準(zhǔn)鋼模板拼裝,利用銷(xiāo)釘在現(xiàn)場(chǎng)連接并用48鋼管架做拉桿及加勁支撐。組成的墻身模板,應(yīng)嚴(yán)格按墻身結(jié)構(gòu)尺寸立模。模板應(yīng)支撐牢固、板面平整、接縫嚴(yán)密不漏漿,并應(yīng)防止因跑模引起結(jié)構(gòu)砼外形缺陷。涵洞墻身砼為1層,因此支模時(shí)根據(jù)墻身高度,分層支設(shè),為防止跑模,一次支設(shè)不超過(guò)2米,采用雙排48鋼管架作為模板支撐。為保證第一層
25、砼幾何尺寸,采用在基礎(chǔ)打孔埋置腳手架和在基礎(chǔ)內(nèi)插筋,用于加固模板,保證模板不爆模,在澆筑第一層砼完時(shí),在其砼上插入25短鋼筋,用于第二層砼模板的加固處理,模板的自身要具備足夠的強(qiáng)度、剛度及整體性,模板的支撐應(yīng)具備穩(wěn)定性,模板的內(nèi)表面應(yīng)光潔平整,并應(yīng)涂刷脫模劑,模板的支架應(yīng)置于平整堅(jiān)實(shí)穩(wěn)定的地基支撐點(diǎn)上,模板的整體穩(wěn)定性是由支架來(lái)保證的,模板支架與操作支架及管道輸送支架應(yīng)分開(kāi)各自形成不同的體系。模板安裝在施工中應(yīng)注意以下幾個(gè)問(wèn)題:(1)模板采用拼裝式整體鋼模板,每塊模板的面積不小于1.0m2。(2)模板正式安裝前,在現(xiàn)場(chǎng)組拼好,并保證模板的局部和整體強(qiáng)度與剛度。(3)在現(xiàn)場(chǎng)組合好大塊鋼模后,檢查
26、接縫及平整度。 (4)在基礎(chǔ)頂面外邊線處鉆孔,預(yù)埋鋼筋,以便在側(cè)模安裝時(shí),側(cè)模內(nèi)邊底邊緣靠緊該鋼筋,便于固定基礎(chǔ)的側(cè)模底線。 (5)通過(guò)對(duì)拉螺桿或鋼管架固定鋼模外背楞。同時(shí)在外側(cè)加枋木或鋼管斜支撐。(6)模板安裝完成后,在頂標(biāo)高處標(biāo)注。 2、片石砼澆筑開(kāi)工前,根據(jù)設(shè)計(jì)文件,按照普通混凝土配合比設(shè)計(jì)規(guī)程(GBJ55-2000)要求完成混凝土配合比設(shè)計(jì)并報(bào)監(jiān)理工程師批準(zhǔn)。(1) 水泥、集料、水:制拌前按照公路工程水泥混凝土試驗(yàn)規(guī)程(JTJ053-94)、公路工程集料試驗(yàn)規(guī)程(JTJ058-2000)和公路工程水質(zhì)分析操作規(guī)程(JTJ056-84)對(duì)組成混凝土的水泥、粗細(xì)集料、水等進(jìn)行試驗(yàn),并把結(jié)果
27、報(bào)送監(jiān)理工程師;不使用不合格材料。(2)混凝土的拌合、運(yùn)輸:混凝土在拌合站集中制拌,然后運(yùn)輸至施工現(xiàn)場(chǎng)。(3)混凝土澆筑:運(yùn)至現(xiàn)場(chǎng)的混凝土立即進(jìn)行澆筑施工,入倉(cāng)高度超過(guò)2m的部位采用溜槽或者導(dǎo)管等輔助設(shè)施,避免離析;入倉(cāng)采用平鋪法,人工平倉(cāng),涵臺(tái)兩側(cè)同時(shí)對(duì)稱(chēng)進(jìn)料,分層澆筑;混凝土澆注過(guò)程中,將選好的片石放入模板之中,均勻擺放,片石含量不超過(guò)30%,采用軟軸插入式振搗器振搗密實(shí),間距不得大于振搗器振動(dòng)半徑,避免漏振;混凝土連續(xù)澆筑,避免間斷,若因故必須間斷,間斷時(shí)間不得大于混凝土初凝時(shí)間,否則按照施工冷縫處理。(4) 拆模、養(yǎng)護(hù):待混凝土強(qiáng)度達(dá)到0.20.5MPX后方可拆模,脫模后立即對(duì)表面的缺
28、陷予以修補(bǔ),之后用草簾或麻袋覆蓋,灑水進(jìn)行養(yǎng)護(hù),養(yǎng)護(hù)天數(shù)一般為714d。3、涵洞基礎(chǔ)以及臺(tái)墻位置、斷面尺寸、高程、沉降縫位置等均應(yīng)滿足設(shè)計(jì)文件、規(guī)范要求,洞身每隔46米設(shè)置一道沉降縫,縫內(nèi)填以瀝青麻絮或不透水材料。并經(jīng)監(jiān)理工程師驗(yàn)收合格。注意在施工過(guò)程中準(zhǔn)確掌握天氣情況,合理計(jì)劃控制每天砼、砂漿需要量,以免由于天氣影響施工質(zhì)量達(dá)不到設(shè)計(jì)、規(guī)范要求。4、臺(tái)帽及帽石施工時(shí)應(yīng)注意其高度、坡度、斷面尺寸及準(zhǔn)確位置,避免影響蓋板的準(zhǔn)確安裝。鋼筋砼蓋板預(yù)制時(shí),應(yīng)認(rèn)真復(fù)核其斷面幾何尺寸、鋼筋種類(lèi)及安裝位置,砼強(qiáng)度達(dá)到70以上時(shí)才能進(jìn)行蓋板的安裝。鋼筋、砼施工及構(gòu)件安裝均應(yīng)符合設(shè)計(jì)、規(guī)范要求并經(jīng)監(jiān)理工程師驗(yàn)收
29、合格。5、涵洞洞口建筑及附屬結(jié)構(gòu)包括一字墻、洞口鋪砌、錐坡、截水墻、鋪底等。在進(jìn)行洞口建筑及附屬結(jié)構(gòu)施工時(shí)測(cè)量人員應(yīng)準(zhǔn)確控制其位置、高程、斷面及細(xì)部尺寸,質(zhì)檢人員應(yīng)認(rèn)真復(fù)查、復(fù)核,加強(qiáng)監(jiān)督管理職能。各項(xiàng)檢查指標(biāo)以及外觀質(zhì)量應(yīng)符合設(shè)計(jì)、規(guī)范要求,自檢合格后及時(shí)報(bào)檢監(jiān)理工程師,經(jīng)監(jiān)理工程師檢驗(yàn)合格后方可進(jìn)行下一步施工。D、蓋板預(yù)制及安裝1、預(yù)制場(chǎng)設(shè)在K10+560左側(cè)道路紅線外,共400平方米。場(chǎng)地夯實(shí)、平整后澆筑一層10砼,表面利用水準(zhǔn)儀精確放點(diǎn)找平并收光。2、直接利用場(chǎng)地水泥面作為預(yù)制板的底模。側(cè)模采用木模,模板厚度不小于5cm,采用活動(dòng)金屬拉桿。已制作好或已清理、修理好的模板,在立模前涂刷好
30、脫模劑。在鋼筋制作、埋件埋設(shè)完成后,進(jìn)行模板安裝。模板之間的接縫平整嚴(yán)密。側(cè)模在砼強(qiáng)度達(dá)到2.5MpX以上,以及砼表面及棱角不因拆模而損壞時(shí)拆除。模板的拆除小心謹(jǐn)慎,避免砼表面損壞,在模板與砼難以分開(kāi)的地方只能用木楔塊施加外力輔助拆模,不能使用金屬楔塊、鋼筋或類(lèi)似工具。砼拆模后,及時(shí)對(duì)埋件進(jìn)行復(fù)測(cè),并做好記錄。3、蓋板鋼筋加工前應(yīng)按設(shè)計(jì)圖紙放樣,鋼筋切斷時(shí)將同規(guī)格鋼筋根據(jù)不同長(zhǎng)度長(zhǎng)短搭配,統(tǒng)籌下料,一般應(yīng)先斷長(zhǎng)料,后斷短料,減少短頭,減少損耗。斷料時(shí)應(yīng)避免用短尺量長(zhǎng)料,應(yīng)防止在量料中產(chǎn)生累計(jì)誤差。為此,宜在工作臺(tái)上標(biāo)出尺寸刻度線并設(shè)置控制斷料尺寸用的擋板。安裝刀片時(shí),螺絲要緊固,刀口要密合(間
31、隙不大于0.5mm),固定刀片與沖切刀片刀口的距離;對(duì)直徑20mm的鋼筋宜重疊12mm,對(duì)直徑20mm的鋼筋宜留5mm左右。 在切斷過(guò)程中,如發(fā)現(xiàn)鋼筋有劈裂、縮頭或嚴(yán)重的彎頭等必須切除;如發(fā)現(xiàn)鋼筋的硬度與該鋼種有較大的出入,應(yīng)及時(shí)向有關(guān)人員反映,查明情況。鋼筋的斷口不得有馬蹄形或起彎等現(xiàn)象。鋼筋的長(zhǎng)度應(yīng)力求準(zhǔn)確。當(dāng)級(jí)鋼筋末端需作1800彎鉤時(shí),其圓弧彎曲直徑不應(yīng)小于鋼筋直徑的2.5倍,平直部分長(zhǎng)度不應(yīng)小于鋼筋直徑的3倍。用于輕骨料混凝土結(jié)構(gòu)時(shí),其彎曲直徑不應(yīng)小于鋼筋直徑的3.5倍。當(dāng)級(jí)鋼筋按設(shè)計(jì)要求彎轉(zhuǎn)900時(shí),其最小彎曲直徑應(yīng)符合下列要求: a.鋼筋直徑小于16mm時(shí),最小彎曲直徑為5倍鋼筋
32、直徑。 b.鋼筋直徑大于16mm時(shí),最小彎曲直徑為7倍鋼筋直徑。 c.彎曲鋼筋彎折處圓弧內(nèi)半徑應(yīng)大于12.5倍鋼筋直徑。將鋼筋按先后安裝的順序,在施工現(xiàn)場(chǎng)清理點(diǎn)數(shù)。然后交給負(fù)責(zé)運(yùn)輸和安裝的人員,送到工作面。擔(dān)負(fù)運(yùn)輸工作的人員要按先后次序運(yùn)鐵?,F(xiàn)場(chǎng)操作人員按鋼筋配料單校對(duì)鋼筋編號(hào)、數(shù)量、規(guī)格及尺寸,作好安裝準(zhǔn)備工作。依據(jù)測(cè)量點(diǎn)和施工圖中鋼筋位置放出鋼筋實(shí)際位置線和高程,定出縱向和水平鋼筋的位置,放線可利用已有鋼筋或模板劃線,也可在混凝土面上劃線。按照放線結(jié)果,選擇合適的幾組鋼筋作為樣架鋼筋,先把樣架筋綁扎好并校對(duì)無(wú)誤后固定,樣架應(yīng)滿足所有鋼筋綁扎后不易變形和穩(wěn)定性要求。鋼筋綁扎安裝完畢之后,必須
33、根據(jù)設(shè)計(jì)圖認(rèn)真檢查鋼筋的鋼號(hào)、直徑、根數(shù)、間距等是否正確,特別要檢查鋼筋的位置是否正確,然后檢查鋼筋的搭接長(zhǎng)度與接頭位置是否符合有關(guān)規(guī)定,鋼筋綁扎有無(wú)松動(dòng)、變形,表面是否清潔,有無(wú)鐵銹、油污等。鋼筋安裝的偏差是否在規(guī)范規(guī)定的允許范圍內(nèi)。在檢查中如發(fā)現(xiàn)有任何不符合要求的,必須立即糾正。在混凝土澆筑期間,鋼筋網(wǎng)架上不能集中人群或放置施工重物,防止鋼筋變形而造成質(zhì)量或安全事故。如果出現(xiàn)鋼筋位置移動(dòng)或綁扎點(diǎn)松動(dòng),都必須及時(shí)糾正和修理復(fù)原。鋼筋及埋件安裝完后,首先由操作層進(jìn)行自檢,即對(duì)照?qǐng)D紙逐一檢查,符合要求后報(bào)質(zhì)安料進(jìn)行復(fù)檢,并填寫(xiě)鋼筋制安工序質(zhì)量檢驗(yàn)表(見(jiàn)表4),報(bào)請(qǐng)監(jiān)理來(lái)進(jìn)行終檢,最后由監(jiān)理簽證后
34、方可進(jìn)行砼澆筑。4、砼采用砼攪拌機(jī)拌制砼,嚴(yán)格按批準(zhǔn)的配合比拌制,專(zhuān)人負(fù)責(zé)砼取樣,檢查原材料、砼拌制情況。砼運(yùn)輸采用斗車(chē)在出料口接料,水平運(yùn)至澆筑地點(diǎn)。砼澆筑所用機(jī)具、設(shè)備準(zhǔn)備充足,并考慮修理時(shí)間。材料準(zhǔn)備充足,避免停工待料。人員配備齊全。在所有鋼筋、埋件已綁扎、安裝準(zhǔn)確,模板已安裝牢固后,班組先自檢、后質(zhì)檢人員終檢,填寫(xiě)鋼筋、模板質(zhì)量檢驗(yàn)評(píng)定表,并報(bào)請(qǐng)監(jiān)理驗(yàn)收;獲得監(jiān)理單位的批準(zhǔn)后,按水工砼施工規(guī)范及國(guó)家頒發(fā)的其他砼施工規(guī)范中有關(guān)規(guī)定進(jìn)行澆筑。砼采用插入式振動(dòng)棒振搗,嚴(yán)格操作避免漏振、過(guò)振。一般每點(diǎn)振搗時(shí)間為20-30s,但應(yīng)視砼表面呈水平不再顯著下沉、不再出現(xiàn)氣泡、表面泛出灰漿為準(zhǔn)。振動(dòng)棒
35、插點(diǎn)要均勻排列,并不宜緊靠模板振動(dòng),且盡量避免碰撞鋼筋、吊環(huán)、預(yù)埋件。澆筑過(guò)程中,控制好砼上升速度,隨時(shí)注意埋件、模板、鋼筋、預(yù)留孔洞等情況,定期檢查砼配合比,發(fā)現(xiàn)問(wèn)題及時(shí)處理。每塊預(yù)制件要盡可能連續(xù)澆筑,如果停倉(cāng)不可避免,要確保在砼初凝前續(xù)澆。5、砼澆筑完后及時(shí)采取灑水養(yǎng)護(hù),砼連續(xù)養(yǎng)護(hù)時(shí)間不少于21天,使砼表面經(jīng)常保持濕潤(rùn)狀態(tài)。對(duì)于砼表面,在砼能抵抗水的破壞之后,立即覆蓋持水材料使砼表面保持潮濕狀態(tài)。砼在最終驗(yàn)收之前,除按規(guī)定進(jìn)行養(yǎng)護(hù)外,同時(shí)加以維護(hù)及保護(hù),以防損壞。對(duì)澆筑塊的凌角和突出部分加強(qiáng)保護(hù)。6、構(gòu)件拆模后,從外觀上檢查其表面有無(wú)麻面、露筋、裂縫、蜂窩等缺陷情況,預(yù)留孔道是否通暢無(wú)堵
36、塞。有缺陷的砼修復(fù)在拆模后盡早完成。砼的缺陷在監(jiān)理單位檢查后進(jìn)行修整、修復(fù)。其修整方法采用表面抹漿修補(bǔ)、細(xì)石砼填補(bǔ)等;修復(fù)的砼確保沒(méi)有干縮裂紋,養(yǎng)護(hù)后其顏色與周?chē)诺念伾恢?。?duì)于砼突出部分用鑿石錘和研磨的方法加以整平。對(duì)于發(fā)生嚴(yán)重影響質(zhì)量無(wú)法修復(fù)的缺陷,該預(yù)制件作廢,并對(duì)責(zé)任人進(jìn)行懲罰。7、驗(yàn)收合格后的預(yù)制件,吊裝時(shí)嚴(yán)格按吊裝規(guī)程及有關(guān)規(guī)定進(jìn)行,杜絕違章作業(yè)。合理選擇鋼絲繩、鋼絲繩附件。仔細(xì)檢查、保養(yǎng)鋼絲繩,鋼絲繩的接頭要牢固。合理選擇吊車(chē),一般吊車(chē)起吊負(fù)荷不超過(guò)允許負(fù)荷的80。選擇兩點(diǎn)或多點(diǎn)起吊法。根據(jù)構(gòu)件重量及結(jié)構(gòu)選擇運(yùn)輸車(chē)輛。準(zhǔn)備撬杠、卡環(huán)等吊裝工具。選擇熟練的吊車(chē)駕駛員,熟悉起重機(jī)技
37、術(shù)性能,吊裝前對(duì)吊車(chē)進(jìn)行檢查,并注意各種儀表指示,認(rèn)為正常后開(kāi)始工作。開(kāi)始前試運(yùn)轉(zhuǎn)一次,檢查各機(jī)構(gòu)的工作是否正常,制動(dòng)器是否靈敏可靠,并注意起重臂回轉(zhuǎn)范圍內(nèi)無(wú)障礙物。起重機(jī)吊起滿載荷重物時(shí),先吊起20-50,檢查起重機(jī)的穩(wěn)定性、制動(dòng)器的可靠性和綁扎的牢固性等,確認(rèn)可靠后,才能繼續(xù)起吊。起重臂最大仰角不超過(guò)規(guī)定值,一般不超過(guò)78°。勿使起重吊鉤到達(dá)頂點(diǎn)。吊車(chē)不能斜吊。起吊時(shí)以緩慢速度進(jìn)行,并嚴(yán)禁同時(shí)進(jìn)行兩種動(dòng)作。對(duì)于汽車(chē)吊,不得載荷行駛或不放下支腿就起吊。根據(jù)工期、運(yùn)距、構(gòu)件重量、尺寸和類(lèi)型以及工地具體情況選擇合理的運(yùn)輸車(chē)輛,根據(jù)其安裝方向確定裝車(chē)方向。必要時(shí),在加工場(chǎng)地生產(chǎn)時(shí),就進(jìn)行
38、合理安排。構(gòu)件在轉(zhuǎn)運(yùn)過(guò)程中,盡可能避免二次轉(zhuǎn)運(yùn)。鋼筋砼構(gòu)件的墊點(diǎn)和吊裝時(shí)的吊點(diǎn),要按有關(guān)要求進(jìn)行,并要求與構(gòu)件設(shè)計(jì)的受力特點(diǎn)一致。構(gòu)件之間的墊木要在同一條垂直線上,且厚度相等。選擇運(yùn)輸?shù)缆?,根?jù)路面情況調(diào)整行車(chē)速度,要確保平穩(wěn)駕駛。構(gòu)件在運(yùn)輸時(shí)要固定牢靠,以防在運(yùn)輸中途傾倒。E、涵背回填經(jīng)監(jiān)理工程師檢驗(yàn)涵洞蓋板安裝符合要求、砌體或砼強(qiáng)度達(dá)到設(shè)計(jì)強(qiáng)度75,方可進(jìn)行涵背回填作業(yè),回填土按相關(guān)技術(shù)規(guī)范規(guī)定進(jìn)行,涵洞處路堤缺口填土應(yīng)從涵洞洞身兩側(cè)不小于兩倍跨徑范圍內(nèi),且臺(tái)背回填下口寬度為0.5米,同時(shí)按水平分層,對(duì)稱(chēng)地按照要求的壓實(shí)度填筑、夯實(shí)?;靥盍蠟槠槭?。F、基礎(chǔ)回填當(dāng)基礎(chǔ)砌筑完成后,馬上進(jìn)行基
39、礎(chǔ)回填。分層人工配合小型機(jī)械進(jìn)行夯實(shí),分層厚度2030cm。G、涵頂回填涵頂填土分層夯實(shí),填筑高度達(dá)0.51m以上后才能通行。H、施工注意事項(xiàng)1、為保證土石方工程的順利進(jìn)行,涵洞應(yīng)先施工。涵洞采用人工配合挖掘機(jī)挖基,蓋板采用預(yù)制板進(jìn)行施工。2、施工時(shí)應(yīng)注意地基承載力必須達(dá)到設(shè)計(jì)要求,達(dá)不到設(shè)計(jì)要求時(shí)應(yīng)做地基處理,在地基承載力發(fā)生明顯變化處設(shè)置沉降縫,地基承載力不明顯時(shí),按設(shè)計(jì)設(shè)置沉降縫。接縫寬度及填料以及進(jìn)出口接縫必須嚴(yán)格按規(guī)范要求辦理并做好防水處理。 3、蓋板涵洞采用全站儀放出中線及基坑開(kāi)挖邊線,用挖掘機(jī)挖基,嚴(yán)格控制開(kāi)挖標(biāo)高,人工清理基礎(chǔ)及邊坡,詳細(xì)放出基礎(chǔ)線,并請(qǐng)駐地監(jiān)理檢查,做好地基承
40、載力實(shí)驗(yàn),符合要求方可砌筑。4、砌塊石基礎(chǔ)和片石砼墻身,要求橫平豎直,灰漿飽滿,砼表面無(wú)蜂窩麻面,每隔46米留一上下貫通的沉降縫,端頭處露面要細(xì)致加工,沉降縫與墻身基礎(chǔ)一致。5、待墻身砼強(qiáng)度達(dá)到設(shè)計(jì)標(biāo)號(hào)的80%時(shí),清理洞底,鋪砌基礎(chǔ)。當(dāng)蓋板養(yǎng)生強(qiáng)度達(dá)到設(shè)計(jì)標(biāo)號(hào)的80%才進(jìn)行土石方回填,回填先用細(xì)料。6、清理進(jìn)出口,放一字墻尺寸,用片石砌筑基礎(chǔ)和墻身。7、臺(tái)背回填應(yīng)均勻?qū)ΨQ(chēng)進(jìn)行,填料采用透水性好的材料填筑,填筑厚度<0.15m人工或小型機(jī)械夯實(shí),臺(tái)墻和翼墻后一米內(nèi)嚴(yán)禁用重型機(jī)械振動(dòng)壓實(shí),墻背回填應(yīng)分層壓實(shí),其單層厚度不超過(guò)15cm。 8、按要求勾縫抹面,對(duì)于砌體和砼要按時(shí)養(yǎng)生,保持濕潤(rùn)。
41、六、施工組織機(jī)構(gòu)及人員安排 一、施工組織機(jī)構(gòu)設(shè)置項(xiàng)目部由施工管理部門(mén)和施工作業(yè)隊(duì)組成,管理部門(mén)包括工程技術(shù)組、施工內(nèi)業(yè)組、測(cè)量組、質(zhì)量安全組和后勤供應(yīng)組組成,施工作業(yè)隊(duì)下設(shè)4 個(gè)施工作業(yè)班組,如下圖所示:項(xiàng)目經(jīng)理工程技術(shù)組施工內(nèi)業(yè)組質(zhì)量安全組材料供應(yīng)組設(shè)備調(diào)度組施工作業(yè)班組材料班組蓋板預(yù)制班組砌筑班組回填碾壓班組二、項(xiàng)目部的管理職責(zé)及管理人員配備1、管理職責(zé)項(xiàng)目經(jīng)理部的主要職責(zé)是對(duì)具體的施工項(xiàng)目在施工進(jìn)度、技術(shù)、質(zhì)量、安全文明施工方面進(jìn)行全方位的管理。各施工作業(yè)隊(duì)負(fù)責(zé)在總體工期部署和項(xiàng)目部施工進(jìn)度計(jì)劃網(wǎng)絡(luò)安排下,對(duì)分項(xiàng)工程的施工時(shí)間、人員、設(shè)備、材料進(jìn)行安排,對(duì)施工過(guò)程中的安全、文明措施進(jìn)行落
42、實(shí)。2、管理人員配備序號(hào)職 務(wù)姓 名備 注1項(xiàng)目經(jīng)理2項(xiàng)目總工程師3現(xiàn)場(chǎng)負(fù)責(zé)人4道路工程師5測(cè)量工程師6計(jì)量工程師7質(zhì)檢工程師8試驗(yàn)工程師9施工員10安全員11質(zhì)檢員12試驗(yàn)員13資料員14材料員七、質(zhì)量保證措施 1、做好施工前的技術(shù)準(zhǔn)備工作 、組織技術(shù)人員認(rèn)真進(jìn)行設(shè)計(jì)文件審核,領(lǐng)會(huì)設(shè)計(jì)意圖,正確指導(dǎo)施工。 、組織技術(shù)人員認(rèn)真學(xué)習(xí)有關(guān)施工技術(shù)規(guī)范、質(zhì)量檢驗(yàn)評(píng)定標(biāo)準(zhǔn)及業(yè)主、質(zhì)檢站、監(jiān)理部門(mén)下發(fā)的有關(guān)質(zhì)量方面的文件。 、認(rèn)真復(fù)核設(shè)計(jì)單位提供的導(dǎo)線點(diǎn)及水準(zhǔn)點(diǎn),并將復(fù)測(cè)結(jié)果報(bào)監(jiān)理工程師審批后,方可使用。對(duì)設(shè)計(jì)院提供的測(cè)量標(biāo)志及自行測(cè)定的導(dǎo)線控制樁等要加強(qiáng)保護(hù),避免破壞。 、加強(qiáng)原材料特別是地材的采購(gòu)和
43、試驗(yàn)檢測(cè)工作,做好砂漿及混凝土配合比的選配工作。 、逐級(jí)進(jìn)行書(shū)面技術(shù)交底。技術(shù)交底要詳細(xì)、準(zhǔn)確、可操作性強(qiáng),確保操作人員掌握各項(xiàng)工程施工工藝及操作要點(diǎn),質(zhì)量標(biāo)準(zhǔn)和注意事項(xiàng)。 2、施工過(guò)程中的質(zhì)量控制 (1)原材料檢驗(yàn)及試驗(yàn) 對(duì)采購(gòu)的工程材料進(jìn)行驗(yàn)證后方可進(jìn)場(chǎng)。進(jìn)場(chǎng)后再按檢驗(yàn)和試驗(yàn)規(guī)程,對(duì)其進(jìn)行檢驗(yàn)和試驗(yàn),合格后方可投入使用。 、水泥、鋼材及其他原材料進(jìn)場(chǎng)時(shí)必須有出廠合格證,并做材質(zhì)試驗(yàn),水泥應(yīng)在有效期內(nèi)用完; 、砂、石料先調(diào)查料源,取樣試驗(yàn),試驗(yàn)合格并經(jīng)監(jiān)理工程師認(rèn)可后方可進(jìn)料; 、現(xiàn)場(chǎng)設(shè)專(zhuān)人收料,不合格的材料拒收。 (2)、建立“五不施工”、“三不交接”制度?!拔宀皇┕ぁ奔次催M(jìn)行技術(shù)交底不施
44、工;圖紙及技術(shù)要求不清楚不施工;測(cè)量樁橛和資料未經(jīng)換手復(fù)核不施工,材料無(wú)合格證或試驗(yàn)不合格者不施工;上道工序不經(jīng)檢查簽證不施工。“三不交接”即無(wú)自檢記錄不交接;未經(jīng)檢查驗(yàn)收合格不交接,施工記錄不全不交接。 (3)嚴(yán)格隱蔽工程簽證制度,凡屬隱蔽工程項(xiàng)目,首先由班組、隊(duì)逐級(jí)進(jìn)行自檢,自檢合格后,會(huì)同項(xiàng)目部質(zhì)量監(jiān)察工程師和監(jiān)理工程師復(fù)檢,復(fù)檢合格并在驗(yàn)收記錄上簽認(rèn)后,方可進(jìn)入下道工序施工。 (4)堅(jiān)持“三檢”、“三工序制度”,“三檢”制度即:自檢、互檢、交接檢?!叭ば颉敝贫燃矗汗で坝薪坏?,工中有檢查、工后有驗(yàn)收。 (5)堅(jiān)持測(cè)量,計(jì)算資料換手復(fù)核制度。 測(cè)量資料必須經(jīng)換手復(fù)核,并交項(xiàng)目總工審核后上
45、報(bào)監(jiān)理工程師批準(zhǔn),說(shuō)明導(dǎo)線控制網(wǎng),水準(zhǔn)點(diǎn)及有關(guān)標(biāo)志必須定期進(jìn)行復(fù)測(cè),測(cè)量?jī)x器要定期進(jìn)行檢定。 ()堅(jiān)持現(xiàn)場(chǎng)考勤制度,加強(qiáng)計(jì)量控制 工程施工過(guò)程中,對(duì)關(guān)鍵工序如鋼筋焊接等施工必須堅(jiān)持質(zhì)檢人員現(xiàn)場(chǎng)旁站,對(duì)工程質(zhì)量進(jìn)行連續(xù)監(jiān)控,并對(duì)施工過(guò)程中的薄弱環(huán)節(jié)如砂漿及混凝土原材料計(jì)量加強(qiáng)控制,確保混凝土配合比準(zhǔn)確。 ()廣泛開(kāi)展小組和“五小”活動(dòng)實(shí)行全過(guò)程、全方位、全員參加的全面質(zhì)量管理是工程創(chuàng)優(yōu)的基礎(chǔ),成立由項(xiàng)目部和施工隊(duì)共同組成的小組,對(duì)工程中一些重點(diǎn)和難點(diǎn)工序?qū)嵭屑夹g(shù)攻關(guān),從而達(dá)到保證質(zhì)量和積累施工經(jīng)驗(yàn)、降耗增效的目的。 (8)實(shí)行獎(jiǎng)優(yōu)罰劣制度 建立健全獎(jiǎng)罰制度,對(duì)施工中好的單位和個(gè)人給予一定的經(jīng)濟(jì)獎(jiǎng)
46、勵(lì),對(duì)于施工中存在問(wèn)題、屢教不改的單位進(jìn)行處罰,并且要加大力度。工程質(zhì)量監(jiān)控程序施工準(zhǔn)備返工每道工序完工后不達(dá)標(biāo)施工對(duì)自檢不達(dá)標(biāo)項(xiàng)目經(jīng)理部質(zhì)檢工程師檢驗(yàn)簽證不達(dá)標(biāo)報(bào)請(qǐng)監(jiān)理工程師檢驗(yàn)簽證返工分項(xiàng)、分部、單位工程完工不達(dá)標(biāo)項(xiàng)目部自檢項(xiàng)目部填寫(xiě)中間交工報(bào)告不達(dá)標(biāo)監(jiān)理工程師檢驗(yàn)簽證監(jiān)理工程師檢驗(yàn)簽認(rèn)中間交工證書(shū)、中期計(jì)量證書(shū)八、安全生產(chǎn)保證措施(一)、各單位在施工中必須貫徹執(zhí)行“安全第一,預(yù)防為主”的方針和堅(jiān)持“管生產(chǎn)必須管安全”的原則,并加強(qiáng)對(duì)全體參戰(zhàn)職工的安全生產(chǎn)專(zhuān)題教育,對(duì)一線職工進(jìn)行安全操作規(guī)程技術(shù)培訓(xùn),使全體職工都能樹(shù)立“安全責(zé)任重于泰山”的思想意識(shí)。(二)、加強(qiáng)安全制度落實(shí)。為加強(qiáng)現(xiàn)場(chǎng)安全
47、管理,項(xiàng)目部結(jié)合工程實(shí)際情況制定各項(xiàng)安全規(guī)章制度。安全領(lǐng)導(dǎo)小組要定期組織檢查,各級(jí)安全員要經(jīng)常檢查,發(fā)現(xiàn)安全隱患及時(shí)糾正,真正把事故消滅在萌芽狀態(tài),狠抓安全不放松。(三)、所有施工設(shè)備和機(jī)具在使用前均必須由專(zhuān)職人員負(fù)責(zé)進(jìn)行檢查、維修、保養(yǎng)、確保狀況良好,對(duì)特殊工種人員如起重工、電工、焊工等必須經(jīng)過(guò)培訓(xùn),并經(jīng)考核合格,持證上崗。(四)、加強(qiáng)與氣象、水文等部門(mén)的聯(lián)系、及時(shí)掌握天氣預(yù)報(bào)情況,做好防范工作。(五)、設(shè)置明顯的安全警示標(biāo)志,做好現(xiàn)場(chǎng)防護(hù)工作,進(jìn)行安全技術(shù)交底,現(xiàn)場(chǎng)安全員加強(qiáng)巡視。 (六)、施工所用的各種機(jī)具設(shè)備和勞動(dòng)保護(hù)用品,定期進(jìn)行檢查和必要的檢驗(yàn),保證其各項(xiàng)性能指標(biāo)符合要求。安全保證
48、體系安全保證體系安全監(jiān)督施工現(xiàn)場(chǎng)技術(shù)安全監(jiān)督崗施工現(xiàn)場(chǎng)安全值勤崗安全目標(biāo)組織體系技術(shù)質(zhì)量科隊(duì)安全員工班安全員班組安全員項(xiàng)目部安全生產(chǎn)委員會(huì)各級(jí)安全領(lǐng)導(dǎo)小組工作保證規(guī) 章 制 度思想政治工作安全教育培訓(xùn)安 全 教 育九、臨時(shí)工程為方便施工,在施工地點(diǎn)附近,設(shè)有材料區(qū)、材料加工區(qū)等,完全滿足施工需要。十、文明施工和環(huán)境保護(hù)為加強(qiáng)我合同段施工現(xiàn)場(chǎng)管理,促進(jìn)安全生產(chǎn)和文明施工,加強(qiáng)環(huán)境保護(hù),實(shí)現(xiàn)科學(xué)、安全和文明的管理目標(biāo),項(xiàng)目部成立了環(huán)保領(lǐng)導(dǎo)小組。真正做到施工與環(huán)保人人有責(zé),分工細(xì)致,責(zé)任明確,形成有力環(huán)保體系。A、環(huán)境保護(hù)方面1、 施工前對(duì)全體員工進(jìn)行環(huán)境保護(hù)法規(guī)和環(huán)衛(wèi)管理教育的學(xué)習(xí),成立領(lǐng)導(dǎo)小組專(zhuān)
49、人負(fù)責(zé)環(huán)境計(jì)劃和環(huán)衛(wèi)管理的落實(shí)。施工現(xiàn)場(chǎng)劃分責(zé)任區(qū),指定負(fù)責(zé)人,明確責(zé)任區(qū)的管理責(zé)任。2、 開(kāi)挖的棄土、棄渣運(yùn)到指定棄土場(chǎng)堆放,棄土場(chǎng)棄土堆放整齊,邊坡穩(wěn)定平整,做好排水設(shè)施。3、運(yùn)送散料和棄渣的車(chē)輛在道路上行駛要求裝載適量,嚴(yán)禁沿途漏灑。車(chē)輛上路前對(duì)輪胎、車(chē)廂進(jìn)行沖洗,以免污染道路。運(yùn)送易被風(fēng)吹落的粉狀材料(砂等)時(shí),進(jìn)行必要的覆蓋,工地現(xiàn)場(chǎng)設(shè)置足夠的臨時(shí)衛(wèi)生設(shè)施,做好施工現(xiàn)場(chǎng)的衛(wèi)生管理工作,建筑生活垃圾要及時(shí)收集、堆放在臨時(shí)指定地點(diǎn),及時(shí)清理或處理。4、靠近居民區(qū)的工點(diǎn)為了防止噪音,合理安排施工時(shí)間,減少對(duì)居民的干擾 。5、為防止煙塵污染,各種運(yùn)輸車(chē)輛使用裝有符合國(guó)家衛(wèi)生標(biāo)準(zhǔn)的凈化裝置,并
50、符合四川省XXX機(jī)動(dòng)車(chē)尾氣排放量標(biāo)準(zhǔn)。6、對(duì)施工中可能遇到的各種公共設(shè)施,如埋入地下的管線電纜等,制定可靠的防止損壞或移位的實(shí)施措施,并向全體施工人員交底。7、工程施工中如發(fā)現(xiàn)文物或其它有價(jià)值的物品,應(yīng)暫緩施工,保護(hù)好現(xiàn)場(chǎng),及時(shí)向有關(guān)部門(mén)報(bào)告,按有關(guān)規(guī)定處理后方可繼續(xù)施工。B、防止大氣污染方面1、 棄渣必須運(yùn)至棄土場(chǎng),嚴(yán)禁隨意拋撒。施工垃圾及生活垃圾應(yīng)及時(shí)清運(yùn),適量灑水,減少揚(yáng)塵。2、水泥等粉細(xì)散裝材料,盡量采取室內(nèi)(或封閉)存放或嚴(yán)密遮蓋,卸運(yùn)時(shí)要采取有效措施,減少揚(yáng)塵。3、 施工現(xiàn)場(chǎng)臨近道路要經(jīng)常養(yǎng)護(hù)和灑水,防止道路揚(yáng)塵。4、 必須在現(xiàn)場(chǎng)設(shè)置攪拌設(shè)備時(shí),應(yīng)安設(shè)除塵裝置。C、防止水污染方面1、凡施工作業(yè)產(chǎn)生的污水,必須控制污水流向,防止蔓延,并在合理的位置設(shè)置沉淀池,經(jīng)沉淀后方可排入地下污水管線。施工污水嚴(yán)禁流出工地,污染環(huán)境。2、現(xiàn)場(chǎng)存放零星油料的庫(kù)房,必須進(jìn)行防滲處理。儲(chǔ)存和使用都要采取措施,防止跑、冒、滴、漏,污染環(huán)境。3、土石方開(kāi)挖施工是施工防污染的重點(diǎn),應(yīng)采取一切可行措施防止在施工過(guò)程中可能對(duì)環(huán)境造成的污染,保證施工區(qū)域附近道路文明、整潔。4、 施工現(xiàn)場(chǎng)內(nèi)在保持排水管網(wǎng)通暢,防止泥漿、污水、廢水外流污染環(huán)境或堵塞管道。5、 排水、排污(1)施工中安設(shè)計(jì)圖紙要求建設(shè)好施工臨時(shí)排水管和排水明溝,注意排水管、溝
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 【正版授權(quán)】 IEC TR 63424-1:2024 EN Validation of dynamic power control and exposure time-averaging algorithms - Part 1: Cellular network implementations for SAR at frequencies up to 6 G
- 2025-2030年中國(guó)防曬霜產(chǎn)業(yè)競(jìng)爭(zhēng)格局及發(fā)展盈利分析報(bào)告
- 2025-2030年中國(guó)鈹銅合金市場(chǎng)運(yùn)行態(tài)勢(shì)及投資策略分析報(bào)告
- 2025-2030年中國(guó)速凝劑市場(chǎng)運(yùn)行態(tài)勢(shì)規(guī)劃研究報(bào)告
- 2025-2030年中國(guó)茶黃素產(chǎn)業(yè)運(yùn)行趨勢(shì)及發(fā)展前景分析報(bào)告
- 2025遼寧省安全員-B證(項(xiàng)目經(jīng)理)考試題庫(kù)
- 2025-2030年中國(guó)節(jié)水灌溉行業(yè)運(yùn)行現(xiàn)狀及發(fā)展前景分析報(bào)告
- 2025年遼寧省建筑安全員知識(shí)題庫(kù)附答案
- 2025-2030年中國(guó)羥乙基皂莢膠行業(yè)市場(chǎng)運(yùn)行現(xiàn)狀及投資發(fā)展前景預(yù)測(cè)報(bào)告
- 2025-2030年中國(guó)硫酸氧釩行業(yè)發(fā)展趨勢(shì)及投資戰(zhàn)略研究報(bào)告
- 注塑模具基礎(chǔ)知識(shí)
- 2024年單招考試題
- 三年級(jí)數(shù)學(xué)下冊(cè)期末測(cè)試卷及答案【可打印】
- 蘇教版小學(xué)語(yǔ)文上冊(cè)教學(xué)研究論文
- 片狀鋅粉行業(yè)分析!中國(guó)片狀鋅粉行業(yè)市場(chǎng)發(fā)展前景研究報(bào)告(2024版)
- 公鐵兩用牽引車(chē)市場(chǎng)發(fā)展預(yù)測(cè)和趨勢(shì)分析
- 兒童繪本故事《我的情緒小怪獸》
- 部編版六年級(jí)下冊(cè)道德與法治全冊(cè)教案
- 3.1 導(dǎo)數(shù)的概念 課件 《高等數(shù)學(xué)》
- 2024版《供電營(yíng)業(yè)規(guī)則》學(xué)習(xí)考試題庫(kù)500題(含答案)
- 供貨送貨服務(wù)承諾書(shū)
評(píng)論
0/150
提交評(píng)論