




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、. 浙江省舟山市建設(shè)工程竣工規(guī)劃驗(yàn)收測量報(bào)告書舟山市普陀區(qū)魯家峙景瑞·豪布斯卡竣工規(guī)劃驗(yàn)收測量成果表項(xiàng)目名稱:舟山市普陀區(qū)魯家峙景瑞·豪布斯卡竣工測量建筑名稱層 次層面標(biāo)高m3幢地下室1.0113.7426.7439.56412.38515.18617.97720.78823.57926.371029.161131.971234.791337.591440.381543.201646.01計(jì)算者:陳榮華 日1 期:2009.3.30 檢查者:胡磊 日 期:2009.3.30復(fù)查者:李永根 日 期:2009.3.30舟山市普陀區(qū)魯家峙景瑞·豪布斯卡竣工規(guī)劃驗(yàn)收測量成
2、果表項(xiàng)目名稱:舟山市普陀區(qū)魯家峙景瑞·豪布斯卡竣工測量建筑名稱層 次層面標(biāo)高m3幢1748.811851.635幢地下室1.1613.7226.8239.62412.42515.24618.04720.85823.65926.451029.261132.066幢地下室1.1513.7326.78計(jì)算者:陳榮華 日 期:2009.3.30 檢查者:胡磊 日 期:2009.3.30復(fù)查者:李永根 日 期:2009.3.30舟山市普陀區(qū)魯家峙景瑞·豪布斯卡竣工規(guī)劃驗(yàn)收測量成果表項(xiàng)目名稱:舟山市普陀區(qū)魯家峙景瑞·豪布斯卡竣工測量建筑名稱層 次層面標(biāo)高m6幢39.59412
3、.40515.21618.02720.82823.64926.441029.261132.087幢地下室1.1713.9826.8139.61412.42515.22618.02720.81計(jì)算者:陳榮華 日 期:2009.3.30 檢查者:胡磊 日 期:2009.3.30復(fù)查者:李永根 日 期:2009.3.30舟山市普陀區(qū)魯家峙景瑞·豪布斯卡竣工規(guī)劃驗(yàn)收測量成果表項(xiàng)目名稱:舟山市普陀區(qū)魯家峙景瑞·豪布斯卡竣工測量建筑名稱層 次層面標(biāo)高m7幢823.61926.411029.221132.028幢地下室1.1813.9826.7739.56412.36515.17617.
4、97720.77823.57926.371029.181131.979幢地下室1.10計(jì)算者:陳榮華 日 期:2009.3.30 檢查者:胡磊 日 期:2009.3.30復(fù)查者:李永根 日 期:2009.3.30舟山市普陀區(qū)魯家峙景瑞·豪布斯卡竣工規(guī)劃驗(yàn)收測量成果表項(xiàng)目名稱:舟山市普陀區(qū)魯家峙景瑞·豪布斯卡竣工測量建筑名稱層 次層面標(biāo)高m9幢13.8826.6839.47412.27515.07617.89720.69823.51926.311029.111131.9110幢地下室1.0413.8426.6539.45412.25515.06計(jì)算者:陳榮華 日 期:2009
5、.3.30 檢查者:胡磊 日 期:2009.3.30復(fù)查者:李永根 日 期:2009.3.30舟山市普陀區(qū)魯家峙景瑞·豪布斯卡竣工規(guī)劃驗(yàn)收測量成果表項(xiàng)目名稱:舟山市普陀區(qū)魯家峙景瑞·豪布斯卡竣工測量建筑名稱層 次層面標(biāo)高m10幢617.85720.67823.47926.271029.061131.8611幢地下室1.0113.8126.6139.40412.22515.01617.81720.60823.41926.231029.04計(jì)算者:陳榮華 日 期:2009.3.30 檢查者:胡磊 日 期:2009.3.30復(fù)查者:李永根 日 期:2009.3.30舟山市普陀區(qū)魯
6、家峙景瑞·豪布斯卡竣工規(guī)劃驗(yàn)收測量成果表項(xiàng)目名稱:舟山市普陀區(qū)魯家峙景瑞·豪布斯卡竣工測量建筑名稱層 次層面標(biāo)高m11幢1131.8612幢地下室0.9013.7226.5439.34412.15514.96617.75720.56823.36926.151028.961131.7621幢地下室0.8013.8126.8339.82計(jì)算者:陳榮華 日 期:2009.3.30 檢查者:胡磊 日 期:2009.3.30復(fù)查者:李永根 日 期:2009.3.30舟山市普陀區(qū)魯家峙景瑞·豪布斯卡竣工規(guī)劃驗(yàn)收測量成果表項(xiàng)目名稱:舟山市普陀區(qū)魯家峙景瑞·豪布斯卡竣工
7、測量建筑名稱層 次層面標(biāo)高m21幢412.82515.8424幢地下室0.8513.8027.10310.09413.10516.1127幢地下室0.8213.7926.8139.81412.83515.8331幢地下室1.10車庫層(3.50)15.72計(jì)算者:陳榮華 日 期:2009.3.30 檢查者:胡磊 日 期:2009.3.30復(fù)查者:李永根 日 期:2009.3.30舟山市普陀區(qū)魯家峙景瑞·豪布斯卡竣工規(guī)劃驗(yàn)收測量成果表項(xiàng)目名稱:舟山市普陀區(qū)魯家峙景瑞·豪布斯卡竣工測量建筑名稱層 次層面標(biāo)高m31幢28.73311.7232幢地下室1.15車庫層(3.54)15
8、.7328.74311.7433幢地下室1.16車庫層(3.54)15.7528.75311.7537幢地下室1.05車庫層(3.41)15.6228.63311.64計(jì)算者:陳榮華 日 期:2009.3.30 檢查者:胡磊 日 期:2009.3.30復(fù)查者:李永根 日 期:2009.3.30舟山市普陀區(qū)魯家峙景瑞·豪布斯卡竣工規(guī)劃驗(yàn)收測量成果表項(xiàng)目名稱:舟山市普陀區(qū)魯家峙景瑞·豪布斯卡竣工測量建筑名稱層 次層面標(biāo)高m38幢地下室1.01車庫層(3.41)15.6228.643116439幢地下室1.02車庫層(3.42)15.6328.62311.6243幢地下室1.05
9、車庫層(3.42)15.6328.64311.6544幢地下室1.03車庫層(3.42)計(jì)算者:陳榮華 日 期:2009.3.30 檢查者:胡磊 日 期:2009.3.30復(fù)查者:李永根 日 期:2009.3.30舟山市普陀區(qū)魯家峙景瑞·豪布斯卡竣工規(guī)劃驗(yàn)收測量成果表項(xiàng)目名稱:舟山市普陀區(qū)魯家峙景瑞·豪布斯卡竣工測量建筑名稱層 次層面標(biāo)高m44幢15.6328.65311.6545幢地下室1.03車庫層(3.44)15.6328.64311.66計(jì)算者:陳榮華 日 期:2009.3.30 檢查者:胡磊 日 期:2009.3.30復(fù)查者:李永根 日 期:2009.3.30*;
10、should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of galvanized steel pipe, tube ends without burrs, smooth. 7
11、.7.2 pipe does not allow bending, bending the bend radius should be 4 times times the outer diameter of the tube in. 7.7.3 ellipticity of a bent tube, pipe diameter 60mm, not >8%, diameter >760mm, not >6%. 7.7.4 making cables buried piping application root production, growing where interfac
12、e is required, only straight pipe, only the wire port connections, welded connections are not allowed. 7.7.5 service sleeve should have a good grounding. 7.7.6 cable trays installation, burrs and dirt and corrosion treatment should be carried out, install the bridge . 7.8.1.7 piping and piping, equi
13、pment and equipment or piping and other equipment shall have sufficient expansion gap in hot situations. 7.8.1.8 metal temperature of the insulating layer (hot) = shell-wall temperature of environment temperature 40 ° c. 7.8.2 paint 7.8.2.l paint of equipment and pipelines should have at least
14、a primer (red paint) and finish. 7.8.2.2 paint appearance color uniform, without paint, rust, flaking, wrinkles, flow marks, scum, paint particles and visible brush marks. 7.8.2.3 interlayer should be tight and without stratification. 7.8.2.4 pipelines asphalt, fiber glass fabric corrosion, external
15、 appearance should never show surrounded by glass fiber cloth uniform, dense, painted pitch inspection should be no delamination, cavitation, homogeneity of asphalt coating, brushing each layer thickness in accordance with design requirements. Standard 7.9 7.9 structure placement process. 1 fair-faced concrete is a concrete surface without any decoration, structure appearance quality of concret
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 四川達(dá)州山體噴漿施工方案
- 變壓器現(xiàn)場吊芯施工方案
- 重慶地鐵5號線施工方案
- 《大數(shù)據(jù)技術(shù)導(dǎo)論》-教學(xué)大綱
- 高埗寫字樓殺蟲施工方案
- 鐵制容器防腐措施方案
- 八下南充數(shù)學(xué)試卷
- 太陽能發(fā)電安裝 施工方案
- 熔鹽爐拼接爐拱施工方案
- 黑龍江城鎮(zhèn)亮化施工方案
- 工業(yè)機(jī)器人操作與安全防護(hù)培訓(xùn)
- 2024年新奧集團(tuán)股份有限公司招聘筆試參考題庫含答案解析
- 人格心理學(xué)導(dǎo)論- 課件全套 第1-8章-人格心理學(xué)概述-人格研究方法與應(yīng)用
- 養(yǎng)成好習(xí)慣完整版PPT
- 《國歌法》、《國旗法》主題班會
- 中藥材的規(guī)范化生產(chǎn)的概況課件
- 首診負(fù)責(zé)制度課件
- 知識庫構(gòu)建與應(yīng)用PPT
- 模具部危險(xiǎn)源辨識評價(jià)
- 部編版道德與法治四年級下冊第四單元《感受家鄉(xiāng)文化關(guān)心家鄉(xiāng)發(fā)展》大單元作業(yè)設(shè)計(jì)
評論
0/150
提交評論