35-220kv變電站設(shè)計(jì)外文翻譯_第1頁(yè)
35-220kv變電站設(shè)計(jì)外文翻譯_第2頁(yè)
35-220kv變電站設(shè)計(jì)外文翻譯_第3頁(yè)
35-220kv變電站設(shè)計(jì)外文翻譯_第4頁(yè)
35-220kv變電站設(shè)計(jì)外文翻譯_第5頁(yè)
已閱讀5頁(yè),還剩2頁(yè)未讀 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、精選優(yōu)質(zhì)文檔-傾情為你奉上 本科畢業(yè)設(shè)計(jì)(論文)  中英文對(duì)照翻譯    院(系部)       信息        專業(yè)名稱     電氣工程及其自動(dòng)化    學(xué)生姓名     李翰成    

2、60;   generally larger capacity filter capacitance, the transient over-voltage shock absorption of a certain extent, the station Low-voltage transformer side go to feed between

3、0;the screen using a shielded cable and equipment have a good grounding, the use of modern technology to analyze mine, we must increase the circuit's segregation meas

4、ures, because its grounding, protection and other electrical grounding all Grounding devices using the same equipment, and equipment are in a LPZOB, the relative strength of&#

5、160;strong electromagnetic pulse, the station changed to prevent low-pressure side although there are lines intrusive wave arrester, but the residual pressure high, in the substati

6、on of lightning, through the line Coupling and the potential rise caused by over-voltage counterattack still exist, and high-pressure side of the residual pressure as high

7、0;as several thousand volts, it is necessary to these scheduling automation equipment for the power supply over-voltage circuit protection. Lightning Protection in accordance with 

8、the principle of regional division, substation equipment in the secondary power supply system over-voltage sensors lightning protection may be two (B, C level) for the protect

9、ion of segregation. B-mine use is generally greater flow capacity of the mine installations, the Lightning could be more casual Liuxie people, to achieve the objective of

10、 current limit, over-voltage at the same time will reduce to a certain extent, c-mine use With lower residual pressure of the mine installations, you can loop in

11、0;the remaining scattered lightning Liuxie people, to limit the purpose of over-voltage, over-voltage equipment can be reduced to the level of tolerance.  The main power 

12、supply system is inhibited lightning protection and operation of the power back to the road and over-voltage surge. According to the substation status of the substation o

13、f the second mine-sensing system and the operation and use of two over-voltage protection. As build more substations in the region more open, relatively strong electromagnetic

14、 strength, power lines and communication cables are very vulnerable to lightning attacks sensors, sensors along the over-voltage power lines and communication lines into one d

15、evice, which will damage equipment,    Therefore, the exchange of first-class bus to install the power protection (B level) is to ensure the safety of the entire

16、0;control room, and 80 percent of the over-voltage China, scattered to the earth, play a primary role in the protection, but are still in the exchange of feeder 

17、;Some of the B-level power supply voltage and mine the residual pressure increases on-line and must therefore be important in the exchange of feeder lines (DC charging

18、60;screen, UPS, etc.) c-level power protection, which would curb over-voltage electrical equipment to back-end To the level of tolerance. Protective location: It is 1 EC1312 (

19、LEMP protection "in the region of lightning protection principles. Arrester installation should be in different locations at the junction of protected areas, this network, the

20、 first-class protection should be located in the bus exchange. In Two on the bus with the installation of a B-class models of a three-phase power supply voltage 

21、;surge protector.  Install Location: AC bus (cabinet).    3.2 second-class protection measures to deal with   charge screen, the installation of c-level three-phase 

22、power arrester. As DC charging screen is two-way exchange of electricity supply, so the screen in the DC charge with the installation of two models of c-level three-

23、phase power supply over-voltage surge protector. Installation location should choose the DC charge screen open exchange of air power.    3.3 integrated automation system 

24、over-voltage protection   Protective position: Computer-based integrated automation system's ability to bear a very low voltage, several hundred volts of over-voltage is enough 

25、;to damage the equipment, so must the high side arrester the residual pressure (thousands of volts) to further curb to meet equipment Insulation level of need, and b

26、ecause of the potential rise to power and the induction loop is also over-voltage line up on KV, to be used in the exchange of integrated automation system to&#

27、160;the exchange on the    c-level single-phase installation of a surge Voltage protection. Location should choose to install automated-ping in the Composite Air switch the

28、60;AC power.  3.4 did not ask off power supplies (UPS) over-voltage protection  Protection here: because of the internal computer systems, hubs, monitoring equipment, electric

29、 energy billing systems and so on through the UPS power supply protection, in order to protect the safety of these micro-electronics equipment, the UPS power supply 

30、device in front of the installation of a c-Surge Voltage protection. Optional models: The (UPS for single-phase power input) C-class single-phase power surge or over-voltage p

31、rotection (UPS for the three-phase power input) of c-level three-phase power supply over-voltage surge protector. Installation should choose the location of UPS into the front 

32、;line.    3.5 communication interface over-voltage protection  Communication Interface over-voltage protection compared with the grid supply system, this over-voltage circuit on th

33、e degree of sensitivity is much higher, and these are over-voltage equipment in the circumstances it is very fragile. Equipment insulation tolerance level is very low. Wi

34、th the equipment connected to a signal line, data lines, measurement and control lines, and these are basically in line LPZOB region, but also through the LVZOA regi

35、on, on the lines of sensors over-voltage relatively strong, according to the IEC test, when the electromagnetic field Strength increased to 0.07 GS, will have a micro-com

36、puter equipment malfunction, loss of data. And the safety of these circuits is directly related to a system of safety equipment, so important to be on the interface&

37、#160;circuit over-voltage protection.    3.5.1 remote computer interface devices over-voltage protection  Protective position: As substation computer remote installations scattered distribut

38、ion structure. From remote modules, intelligent telemetry module, intelligent    remote control module, intelligent remote-module. The modules are installed in different automated-ping, 

39、;through the RS232 interface between the modules or field bus communication. These interfaces are in the indoor circuit, equipment interface circuits shorter the distance, so 

40、there will be no more sensors to the over-voltage, but the automation equipment and other secondary equipment (measurement unit, computer, etc.) have electrical connections, when&#

41、160;Other secondary equipment sensors to a strong over-voltage sensors, will be counter to these automation equipment, communications interface, so that damage to equipment interface

42、60;circuits, it is necessary in these devices RS232 interfaces on the installation of a surge Voltage protection. Installation location should choose the remote computer interface&

43、#160;devices, communications lines.    3.5.2 electric energy billing system signals over-voltage protection  A protective position: a multi-functional electronic power substation table,

44、 energy acquisition, the electronic power meter to bear a very low voltage levels. As Meter and remote computer stations in the communications equipment used RS232 interf

45、aces, the communication line is longer, and in LVZOB region, near the substation or by direct lightning strike at the substation, proximity to the high voltage sensors,&#

46、160;In order to prevent damage to equipment. E-Meter in and around the RS232 port RS232 installation of the over-voltage surge protector. Location should choose to install

47、0;electronic power meter in and around the port, RS232.  The location of protection: electronic power meter through the acquisition of information on the collector's MODEM

48、 (modem) from telephone lines to send data to a remote, since the introduction of telephone lines from the outside, the lines on the sensor to sensor lightning 

49、current relatively strong, easy to Modem interface equipment damage, it is necessary in the telephone line modem interface, the installation of an interface over-voltage surge 

50、;protector. Location should choose to install telephone Chuxian inside and outside phone lines-the-line people.   3.5.3 distance communication interface over-voltage protection   Protec

51、tive position: Since the basic use of unmanned substation. On the first circuit protection, measurement, control, regulation of signal through the optical and data communications&#

52、160;network or carrier to the distance (in tune, and stressed that the centralized control stations, etc.) to transmit data. If the carrier, the carrier and the computer&

53、#160;automation of the signal devices connected relatively long lines, substations in the vicinity of a direct lightning strike or substations.Should be a strong over-voltage senso

54、rs, to be near the computer automation devices to signal I: I-the installation of signal arrester, while in the area and extend to LPZOB LPZOA area of communication&

55、#160;lines (DDN, X.25) very easy Lightning sensors on the over-voltage, must also be the installation of over-voltage surge protector. Installation location should choose the remot

56、e device communication line interface Department.   system over-voltage substation protection issues in recent years by a new task, the above is only related to the 

57、scene of the unit into the actual situation on the Protection of the preliminary measures, it will be in continuing to draw on practical experience of running a 

58、;summary analysis and continuous improvement, Hope that the new substation in the future or the old substation automation of integrated, strengthen the secondary over-voltage prote

59、ction system of planning and design, equipment and ensure the safe and stable operation of power grids.               3.1.2第二級(jí)防護(hù)處理措施     對(duì)于較為重要的交流饋線上的設(shè)備,此處為直流充電屏,加裝c級(jí)三相電源避雷器。由于直流充電屏是兩路交流供電,所以在直流充電屏處加裝兩個(gè)同型號(hào)的c級(jí)三相電源浪涌過(guò)電壓保護(hù)器。安裝位置宜選擇在直流充電屏交流電源空氣開(kāi)關(guān)處。  3.2 綜合自動(dòng)化系統(tǒng)過(guò)電壓防護(hù)     防

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論