1、第 PAGE9 頁 共 NUMPAGES9 頁134工程風(fēng)險管理模板 風(fēng)險管理模板Risk Management PlanforTable of ContentsTable of Contents iiRevision History iiPurpose 1Roles and Responsibilities 1Risk Documentation 1Activities 2Schedule for Risk Management Activities 3Risk Management Budget 4Risk Management Tools 4Appendi_.Sle Risk Docum
2、entation Form 4Revision HistoryNameDateReason For ChangesVersioninitial draft1.0 draft1PurposeThis document describes how we will perform the job of managing risks for .It defines roles and responsibilities for participants in the risk processes, the risk management activities that will be carried o
3、ut, the schedule and budget for risk management activities, and any tools and techniques that will be used. Roles and ResponsibilitiesProject ManagerThe Project Manager will assign a Risk Officer to the project, and identify this individual on the projects organization chart.The Project Manager and
4、other members of the Project Management team shall meet to review the status of all risk mitigation efforts, review the e_posure assessments for any new risk items, and redefine the project#_27;s Top Ten Risk List.Risk OfficerThe Risk Officer has the following responsibilities and authority:Project
5、Member Assigned a RiskThe Risk Officer will assign each newly identified risk to a project member, who will assess the e_posure and probability for the risk factor and report the results of that analysis back to the Risk Officer.Assigned project members are also responsible for performing the steps
6、of the mitigation plan and reporting progress to the Risk Officer biweekly.Risk DocumentationRisk ListThe risk factors identified and managed for this project will be accumulated in a risk list, which is located .The ten risk items that currently have the highest estimated risk e_posure are referred
7、 to as the projects Top Ten Risk List.Risk Data ItemsThe following information will be stored for each project risk: Closing RisksA risk item can be considered closed when it meets the following criteria:ActivitiesRisk IdentificationTaskParticipantsRisk Analysis and PrioritizationTaskParticipantsThe
8、 Risk Officer will assign each risk factor to an individual project member, who will estimate the probability the risk could bee a problem (scale of 0.1-1.0) and the impact if it does (either relative scale of 1-10, or units of dollars or schedule days, as indicated by the Risk Officer).Assigned Pro
9、ject MemberThe individual analyzed risk factors are collected, reviewed, and adjusted if necessary.The list of risk factors is sorted by descending risk e_posure (probability times impact).Risk OfficerRisk Management PlanningTaskParticipantsThe top ten risks, or those risk factors having an estimate
10、d e_posure greater than are assigned to individual project members for development and e_ecution of a risk mitigation plan.Risk OfficerFor each assigned risk factor, remend actions that will reduce either the probability of the risk materializing into a problem, or the severity of the e_posure if it
11、 does.Return the mitigation plan to the Risk Officer.Project MembersThe mitigation plans for assigned risk items are collated into a single list.The pleted Top Ten Risk List is created and made publicly available on the projects intra web site.Risk OfficerRisk ResolutionTaskParticipantsEach individu
12、al who is responsible for e_ecuting a risk mitigation plan carries out the mitigation activities.Assigned IndividualRisk MonitoringTaskParticipantsRisk OfficerThe status and effectiveness of each mitigation action is reported to the Risk Officer every two weeks. Assigned IndividualThe probability an
13、d impact for each risk item is reevaluated and modified if appropriate.Risk OfficerIf any new risk items have been identified, they are analyzed as were the items on the original risk list and added to the risk list.Risk OfficerThe Top Ten Risk List is regenerated based on the updated probability an
14、d impact for each remaining risk.Risk OfficerAny risk factors for which mitigation actions are not being effectively carried out, or whose risk e_posure is rising, may be escalated to an appropriate level of management for visibility and action.Risk OfficerLessons LearnedTaskParticipantsRisk Officer
15、Schedule for Risk Management ActivitiesRisk IdentificationA risk workshop will be held on appro_imately .Risk ListThe prioritized risk list will be pleted and made available to the project team by appro_imately .Risk Management PlanThe risk management plan, with mitigation, avoidance, or prevention
16、strategies for the top ten risk items, will be pleted by appro_imately .Risk ReviewThe Risk Management Plan and initial Top Ten Risk List will be reviewed and approved by the Project Manager on appro_imately .Risk TrackingThe status of risk management activities and mitigation success will be revisited as part of the gate e_it criteria for each life cycle phase.The risk management plan will be updated at that time. Risk Management Budget.Risk Management ToolsA
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 吉林職業(yè)技術(shù)學(xué)院《文字學(xué)與漢字教育》2023-2024學(xué)年第二學(xué)期期末試卷
- 昆明理工大學(xué)津橋?qū)W院《過程控制系統(tǒng)》2023-2024學(xué)年第二學(xué)期期末試卷
- 陜西中醫(yī)藥大學(xué)《室內(nèi)設(shè)計與實(shí)踐》2023-2024學(xué)年第二學(xué)期期末試卷
- 華中農(nóng)業(yè)大學(xué)《公司金融》2023-2024學(xué)年第二學(xué)期期末試卷
- 湖南吉利汽車職業(yè)技術(shù)學(xué)院《土木工程施工與概預(yù)算原理》2023-2024學(xué)年第二學(xué)期期末試卷
- 廣東云浮中醫(yī)藥職業(yè)學(xué)院《園藝生態(tài)學(xué)》2023-2024學(xué)年第二學(xué)期期末試卷
- 長春建筑學(xué)院《中學(xué)語文微型課訓(xùn)練》2023-2024學(xué)年第二學(xué)期期末試卷
- 東南大學(xué)成賢學(xué)院《果樹栽培學(xué)各論》2023-2024學(xué)年第二學(xué)期期末試卷
- 扎蘭屯職業(yè)學(xué)院《高等化工熱力學(xué)》2023-2024學(xué)年第二學(xué)期期末試卷
- 忻州職業(yè)技術(shù)學(xué)院《地理信息系統(tǒng)原理與方法》2023-2024學(xué)年第二學(xué)期期末試卷
- 網(wǎng)絡(luò)營銷講義網(wǎng)絡(luò)營銷產(chǎn)品策略課件
- 《小型混凝土預(yù)制件標(biāo)準(zhǔn)化生產(chǎn)管理辦法》
- 六年級上冊英語教案-Culture 2 Going Green 第二課時 廣東開心英語
- 警察叔叔是怎樣破案的演示文稿課件
- 青年教師個人成長檔案
- 2021譯林版高中英語選擇性必修三課文翻譯
- 2022年華中科技大學(xué)博士研究生英語入學(xué)考試真題
- 《網(wǎng)店運(yùn)營與管理》整本書電子教案全套教學(xué)教案
- 打印版 《固體物理教程》課后答案王矜奉
- 中考《紅星照耀中國》各篇章練習(xí)題及答案(1-12)
- Q∕GDW 11612.43-2018 低壓電力線高速載波通信互聯(lián)互通技術(shù)規(guī)范 第4-3部分:應(yīng)用層通信協(xié)議
評論
0/150
提交評論