1、投標(biāo)資料表H -投標(biāo)計劃H1.編制原那么H1.1依據(jù)工程的規(guī)模、建筑物的結(jié)構(gòu)形式和施工特性配置施工資源,在滿足總工期 要求的前提下,使工程的各項施工資源均衡地發(fā)揮效率。H1.2依據(jù)施工方案所采用的施工方法,編制施工總進度計劃。H1.3在滿足總工期要求的前提下,在工程實施的過程中,繼續(xù)優(yōu)化施工工藝、方法, 及時協(xié)調(diào)施工資源,確保工程高效、按期完成。H2.施工規(guī)劃根據(jù)本工程實際情況,本工程共設(shè)5個主要施工作業(yè)區(qū),另設(shè)辦公管理區(qū)、生活 區(qū)。5個主要施工作業(yè)區(qū)包括:大壩施工作業(yè)區(qū):主要完成大壩、進水口、沉淀池等部位的施工。Bhaise施工支洞施工作業(yè)區(qū):bhaise施工支洞、bhaise斜井及引水、進

2、水口部 分、引水隧洞等部位的施工。壓力鋼管施工支洞施工作業(yè)區(qū):主要完成壓力鋼管施工支洞、引水隧洞、調(diào)壓豎 井、調(diào)壓室、調(diào)壓支洞、壓力鋼管豎井等部位施工廠房施工作業(yè)區(qū):廠房、主變室、主交通洞、次交通洞、母線洞、引水岔管、尾 水岔管、壓力鋼管、尾水施工支洞等部位的施工。尾水施工作業(yè)區(qū):尾水隧洞、出水口的施工。五個施工作業(yè)區(qū)相對獨立作業(yè),施工資源依據(jù)施工進度計劃,按整個工程統(tǒng)一調(diào) 配,使施工資源配置最優(yōu)。H3.施工準(zhǔn)備工程開工日期暫定為2010年4月15日,在接到進場通知后,組織設(shè)備人員立即 進場開展施工準(zhǔn)備工作,完成深化、細化施工措施。依據(jù)設(shè)計和進度的安排,組織前 期施工人員、機械設(shè)備進場,初步形

3、成施工營地、基礎(chǔ)設(shè)施,展開施工道路的修建。 施工準(zhǔn)備期初步安排為3個月。從2010的4月16日開始,至2010年7月16日結(jié)束。開工及施工準(zhǔn)備時間表表H3-1序號項 目控制日期工程面貌1工程開工時間工程開工2施工準(zhǔn)備施工營地及生產(chǎn)輔助設(shè)施完成H4.施工強度H4. 1本工程月施工高峰強度及發(fā)生時段見表H4-1:施工強度及發(fā)生時段表表H4T序號工程單位工程量發(fā)生時間1土方明挖萬m330500 m3/月2010年11月2011年2月2石方洞挖m3290002011年2月3混凝土澆筑m317100 n?/月2011年1月3月H4. 2主要部位施工強度H4. 2. 1開挖開挖強度表表H4-2部位施工時段

4、強度米/天方/天Bhaise施工支洞2.966.4壓力鋼管施工支洞4.396.4引水隧洞4.0131.6調(diào)壓豎井導(dǎo)井2012.03.25203.55.4調(diào)壓豎井?dāng)U挖2.444.2調(diào)壓室1.338.6調(diào)壓豎井施工支洞3.372.9壓力鋼管豎井導(dǎo)井8.613.23壓力鋼管豎井?dāng)U挖2.736.8主交通洞2.089廠房施工支洞3.884.8引水岔管3.313.2尾水岔管2.275.6廠房216.7主變室269.2尾水施工支洞2.144.7尾水隧洞3.885.1H4. 2. 2 混凝土混凝土施工強度表H4-3序號部位施工強度m3/day1溢流壩3722沉淀池底板1503沉淀池墻體584進水口管涵47.5

5、5引水隧洞40.76尾水隧洞337壓力鋼管豎井18.4H5.主要施工程序H5. 1大壩區(qū)大壩區(qū)施工共分4期,圍繞雨季和旱季進行。尼泊爾的雨季為每年的6月9月, 持續(xù)4個月,其他月份皆為旱季,全年的降雨量大局部都集中在雨季進行,易發(fā)生洪 水。所以,圍堰在雨季時要撤除。大壩施工一期圍堰在進水口上部,由于進水口不在主河道上,所以此處圍堰可以 度汛。在圍堰完成后,進行沉淀池和進水口的開挖、排水及基礎(chǔ)工程,沉淀池底板混 凝土在開挖兩個月之后進行,進水口底板混凝土在開挖三個月之后進行,沉淀池底板 連續(xù)施工,括約兩個旱季。一期圍堰在雨季結(jié)束之前撤除。二期圍堰:雨季結(jié)束后在大壩上游修建圍堰,此時水經(jīng)過進水口的

6、沉沙閘流出。 圍繞沉淀池做圍堰,防止水進入沉淀池施工場地。二期主要施工消力池和溢流壩的開 挖、排水及基礎(chǔ)工程,并完成消力池混凝土和溢流壩段的底板混凝土。同時繼續(xù)進行 沉淀池混凝土的施工,在此期間,要完成沉淀池底板混凝土。雨季來臨前撤除圍堰。三期圍堰繼續(xù)在大壩上游進行,此時由于沉淀池底板混凝土完成,河水可以經(jīng)過 沉淀池排出,沉淀池施工墻體混凝土,可正常施工。沉淀池的墻體在到達設(shè)計強度之 后,回填立即開始。壩區(qū)主要施工溢流壩段的混凝土,在2012年2月14日到達可以 安裝弧形閘門的目標(biāo),然后其他承包商在汛期來臨之前將弧形閘門安裝完畢。在三期 施工結(jié)束的時候,溢流壩的混凝土要到達1987,以便在下一

7、期的施工中,不影響施 工作業(yè)。和二期一樣,在汛期來臨前,將三期圍堰撤除。四期在進水口上游做圍堰,河水經(jīng)溢流壩段的弧形閘門流過。溢流壩段開始施工 1987以上的建筑物。沉淀池的混凝土護坡、護腳開始施工,土方回填隨著四期的開 始而進行。進水口的引水涵洞,引水隧洞的混凝土管涵都是在此期進行施工,在2013 的1月29日,要具備進水口攔污柵、閘門的安裝條件。汛期來臨前,大壩所有的施 工都要結(jié)束,同時,撤除圍堰。大壩施工全部完成。H5.2引水隧洞引水隧洞共長7920m,開挖斷面32.14 m2,共分2段,入口bhaise 2914m, bhaise 壓力鋼管豎井5006m。開挖從兩個地方開始,分別為bh

8、aise施工支洞和壓力鋼管施 工支洞,入口段在沉淀池開挖結(jié)束之后,開挖入口處的30m,然后預(yù)留30m巖塞。 H5. 2. 1. Ibhaise施工支洞的開挖。中間從bhaise施工支洞開始開挖,在bhaise施工支洞開挖結(jié)束后,從bhaise 分別向兩個方向進行開挖,即bhaise入口、bhaise壓力鋼管豎井; H5. 2. 2壓力鋼管支洞開始的開挖另一側(cè)從壓力鋼管施工支洞開始,在壓力鋼管施工支洞結(jié)束后,先開挖壓力鋼管 施工支洞壓力鋼管豎井的一段,結(jié)束后向bhaise方向開挖這樣,引水隧洞開挖行成了三個工作面,所有的開挖在2013年2月23日結(jié)束。 H5. 3混凝土工程引水隧洞混凝土工程主要

9、為混凝土底板,在開挖完成之后進行,底板混凝土在 2013年7月11日完成。H5. 2. 4 bhaise取水工程Bhaise取水工程包含一 45度的斜井,一進水平洞以及bhaise山谷里的一個進水 口。在所有工程完成后,bhaise施工支洞要進行封堵。H5. 2. 5巖塞移除在封堵段混凝土完成后,開始施工引水隧洞入口預(yù)留的巖塞,巖塞撤除后,開始 注水,整個引水隧洞完成。H5. 3豎井段115. 3. 1調(diào)壓豎井調(diào)壓豎井下部有一條施工支洞,在豎井導(dǎo)井完成之前開挖到位。豎井施工采用反 井鉆機施工導(dǎo)井,導(dǎo)井直徑為1.4m。導(dǎo)井開挖完成后,再進行擴挖至設(shè)計孔徑。調(diào) 壓豎井?dāng)U挖完成后,進行兩個調(diào)壓室的開

10、挖,最后施工調(diào)壓豎井施工支洞的底板混凝 o整個調(diào)壓井工程于2013年9月9日結(jié)束H5. 3. 2壓力鋼管豎井與調(diào)壓豎井一樣,導(dǎo)井貫通前把下部的施工支洞開挖完成。當(dāng)調(diào)壓豎井導(dǎo)井完成 后,反井鉆機轉(zhuǎn)移至壓力鋼管豎井,導(dǎo)井完成之后再擴挖至設(shè)計孔徑。整個豎井開挖支護完成后,金屬結(jié)構(gòu)標(biāo)段開始壓力鋼管的安裝,我們將為其澆筑 混凝土,直至整個壓力鋼管完成。H5. 4地下廠房工程其他承包商將開挖主交通洞洞口的750m,在2010年4月28日將工作面轉(zhuǎn)移給我 方。我們將接著其他承包商的工作面向前開挖。H5. 4. 1廠房開挖主要從廠房施工支洞開始,分層分段進行,在開挖至主機室平面時,進行巖 錨梁混凝土的施工工作

11、,在11年5月13日之前,1#巖錨梁吊車具備安裝條件,其 他承包商開始安裝巖錨梁吊車,我方在隨后的混凝土生產(chǎn)中可以使用巖錨梁吊車進行 廠房一期及二期的混凝土工作。當(dāng)廠房開挖至母線廊道時,進行母線廊道鎖口段的開挖及支護等工作,母線廊道 開挖及支護在變壓器洞開挖完成后進行。同樣,在開挖至尾水岔管、引水岔管平面時, 開始相應(yīng)廊道的施工。在開挖至最底層時,進行廠房一期的混凝土施工,施工中注意各種機電標(biāo)的預(yù)埋 件及預(yù)留孔,及時與其溝通聯(lián)系。在2011年9月11日,分電器安裝條件具備;2012 年5月27日,水輪機安裝條件具備。廠房二期混凝土在一期結(jié)束一個月之后開始, 將持續(xù)到工程的最后。H5. 4. 2

12、主變室主變室開挖通過主變施工支洞開始,分三層進行。主變室混凝土在開挖之后進行, 其中,在2012年2月10日滿足變壓器,開關(guān)裝置的安裝條件。H5. 4. 3電纜廊道避開主變廠房施工的高峰期進行電纜廊道底板混凝土的施工,同時在2013年9 月30日要滿足電纜鋪設(shè)條件。H5. 5尾水隧洞工程尾水開挖通過尾水施工支洞開始進行,開挖中,在出口 35往里預(yù)留30m長巖塞, 巖塞在閘門安裝之后撤除。尾水口的施工需要借助圍堰進行,在尾水口施工時,將會斷開公共道路,影響交 通。所以,在開口施工前,先做一臨時道路,不影響正常通行。圍堰完成后進行出水 口的開挖及混凝土工作。在2012年2月29日,要滿足閘門安裝的

13、條件。尾水隧洞的混凝土襯砌在開挖之后進行,邊墻、底板需要襯砌。H6工程主要節(jié)點控制如下:工程主要節(jié)點表H6-1ItemcontentsData (days)DateSectionpreparation of site establishment areas A-5, C-3-B and two areas within area C-3, including earthworks, landscaping, road works and surfacing, fencing (not required for one area within C-3), supply of services;

14、andconstruction of Engineers Main Office (area C-3), Employers permanent extension office (area C-3), Employers Sub-Office (area A-5), Engineers SubOffice (area A -5), Employers satellite accommodation (area A-5), and Engineers accommodation (C-3-B) buildings; andprovision and installation of all fu

15、rnishings, fittings, office equipment, facilities and services to theEngineers Main Office, the Employers permanent extension office, the Employers Sub-Office, the Engineers Sub-Office, the Employers satelliteaccommodation and the Engineers accommodation ready for occupation and full use by the Empl

16、oyers and Engineers personnel; andprovision of all other equipment, vehicles, support personnel and security systems as specified for the Employer and the Engineer.13628th Agu 2010SectionNO. 1.2Completion of all works for preparation of site establishment area C-3-A, including earthworks and landsca

17、ping, road works and surfacing, fencing, and supply of services to delivery points, ready for others to construct Employers permanent extension accommodation (area C-3-A).12214th Agu 2010SectionCompletion of all works for preparation of site establishment areas A-l, A-2-2, A-4-1 (part) and B-4, incl

18、uding earthworks41130th Mayand landscaping, road works and surfacing, fencing, supply of services to delivery points, as specified ready for the Employers other contractor for Lot 2 to occupy and establish all his own facilities, in accordance with Volume 4, Section 1, Sub-Clause 1.3.2.1, Table 1.1.

19、2011SectionCompletion of all works for preparation of site establishment areas C-l (part), C-2 (part), C-4-1 (part) and C-4-2 (part), including earthworks and landscaping, road works and surfacing, fencing, supply of services to delivery points, as specified ready for the Employers other contractor

20、for Lot 3 to occupy and establish all his own facilities, in accordance with Volume 4, Section 1, Sub-Clause 1.3.2.1, Table 1.1.24414thDec2010SectionCompletion of all civil works to the dam, ready for the erection of the spillway radial gates.74528th Apr 2012SectionCompletion of all civil works to t

21、he intake structure and settling basins, ready for the erection of the gates and racks at the intake and in the settling basins.109513th Apr 2013SectionCompletion of all excavation and structural works in the main powerhouse cavern required for the mounting of the rails and erection of the first mai

22、n crane, ready to bear the crane loads.46725thJul 2011SectionCompletion of all excavation and any necessary structural works in the main powerhouse cavern ready for erection of the turbine distributor of unit 1.58621thNov2011SectionCompletion of all excavation and any necessary structural works in t

23、he main powerhouse cavern ready for erection of the turbine distributor of unit 2.5961stDec2011SectionCompletion of all excavation and any necessary structural works in the main powerhouse cavern ready for erection of the turbine distributor of unit 3.60611thDec2011SectionCompletion of all excavatio

24、n and any necessary structural works in the main powerhouse cavern ready for erection of the turbine distributor of unit 4.61621thDec2011SectionCompletion of all excavation and any necessary structural works in the main powerhouse cavern ready for erection of the turbine distributor of unit 5.62631t

25、hDec2011SectionCompletion of all excavation and any necessary structural works in the main powerhouse cavern ready for erection of the turbine distributor of unit 6.63711th Jan2012SectionCompletion of all excavation and any necessary structural works in the main powerhouse cavern ready for turbine u

26、nit 1 main erection.8478th Agu 2012SectionCompletion of all excavation and any necessary structural90523thworks in the main powerhouse cavern ready for turbine unit 2 main erection.Oct2012SectionCompletion of all excavation and any necessary structural works in the main powerhouse cavern ready for t

27、urbine unit 3 main erection.95019thNov2012SectionCompletion of all excavation and any necessary structural works in the main powerhouse cavern ready for turbine unit 4 main erection.9953rdJan 2013SectionCompletion of all excavation and any necessary structural works in the main powerhouse cavern rea

28、dy for turbine unit 5 main erection.103916th Feb 2013SectionCompletion of all excavation and any necessary structural works in the main powerhouse cavern ready for turbine unit 6 main erection.10831st Apr 2013SectionCompletion of excavation and all structural works required for the erection of trans

29、formers and electrical equipment in the transformer gallery.67518thFeb 2012SectionCompletion of all works to the busbar tunnels ready for the installation of busbars and all associated cabling.43624th Jun2011SectionCompletion of all excavation and other works necessary in the main access tunnel read

30、y for installation of the high voltage cables.102331th Jan 2013SectionCompletion of all excavation and other works necessary in the penstock shaft and penstock tunnel ready for erection of the steel lining pipe work.11164thMay 2013SectionNO. 10.1Completion of all excavation and structural works nece

31、ssary at the tailrace outlet ready for erection of the outlet gate.76013 th May 2012SectionCompletion of all excavation and other works necessary in the construction adits ready for installation of the bulkheads.12716th Oct 2013SectionCompletion of all works in the intake, headrace tunnel, penstock shaft and tunnels ready for first filling of upstream waterw

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論