1、項目治理考前模擬試題二Disclaimer: These questions are intended for study purposes only. Success on these questions is not indicative of success on the Project Management Professional Certification Examination. This download of the Sample Exam Questions is for your personal use and NOT FOR commercial use. Any u
2、nauthorized use or duplication of this document is prohibited!1. Activity duration estimate inputs include all of the following except:A. Resource requirements.B. Basis of estimates.C. Activity lists.D. Constraints. 2. All of the following are contract types except:A. Unit-price.B. Make-or-buy.C. Co
3、st reimbursable.D. Lump sum.3. Initiation inputs for a project include all of the following except:A. Product description.B. Strategic plan.C. Project charter.D. Selection criteria.4. Responses to risk threats include all of the following except:A. Avoidance.B. Acceptance.C. Mitigation.D. Rejection.
4、5. The process of performance reporting includes all of the following except _.A. Status reporting.B. Progress reporting.C. Forecasting.D. Product analysis6. Constrained optimization methods of project selection include:A. Scoring models. B. Benefit-cost ratios. C. Multi-objective programming algori
5、thms.D. Subjective analyses.7. Which of the following statements concerning contract type is correct?A. A fixed price contract contains the most risk for the buyer.B. Cost reimbursable contracts offer sellers the highest profit potential.C. Lump sum contracts offer sellers the greatest profit potent
6、ial.D. Unit price contracts are illegal in many jurisdictions.8. A Work Breakdown Structure (WBS) numbering system should allow project staff to:A. Identify the level at which individual WBS elements are found.B. Identify configuration management milestones.C. Estimate the costs of WBS elements.D. P
7、rovide project justification.9. All of the following are true quality statements except:A. Quality improvement depends upon better definition and increased awareness of the requirements/specifications.B. Project quality management must address both management of the project and the product of the pr
8、oject.C. Recognition of key actions required of each team member is necessary to meet quality objectives.D. Computer-aided design systems can improve quality, but only at the expense of an increase in the cost of design.10. All of the following are examples of tools often used in cost estimating exc
9、ept:A. Parametric modeling.B. Analogous estimating.C. Bottom-up estimating.D. Activity duration estimates.11. At XYZ Inc., the hourly wage for semi-skilled workers is $14.00. The annual audit shows that fringe benefits cost 30% of basic wages, and that overhead costs are 60% of wages plus fringe ben
10、efits. What is the loaded” hourly wage for a semi-skilled worker at XYZ Inc.?A. $27.14.B. $28.96. C. $30.03.D. $29.12.12. Of the following estimates, which most accurately reflect the actual cost of the project?A. Conceptual estimates.B. Order of magnitude estimates.C. Preliminary estimates.D. Botto
11、m-up estimates.13. The most crucial time for project risk assessment is:A. When a problem surfaces.B. During the planning phase.C. During the close-out phase.D. After the project schedule has been published.14. When there is uncertainty associated with one or more aspects of the project, one of the
12、first steps to take is to:A. Revise project plan.B. Conduct a risk-benefit analysis.C. Conduct a needs analysis. D. Increase the estimated cost of the project.15. Including a contingency reserve in the project budget is intended to:A. Reduce the probability of scope changes.B. Increase the probabili
13、ty of scope changes.C. Reduce the probability of a cost overrun.D. Increase the probability of a cost overrun.16. Given the information in the following table, what is the expected value from this risk event?Probability Result A. -10,000.B. - 7,500.C. + 2,500.D. -7,000.17. A contractor is working on
14、 a fixed price contract that calls for a single, lump sum payment upon satisfactory completion of the contract. About halfway through the contract, the contractor project manager informs their contract administrator that financial problems are making it difficult for them to pay their employees and
15、subcontractors. The contractor asks for a partial payment for work accomplished. Which of the following actions by the buyer is most likely to cause problems for the project?A. Starting partial payments for work accomplished.B. Making no payments because it would violate the conditions of the contra
16、ct.C. Paying for work accomplished to date.D. Negotiating a change to the payment conditions in the contract.18. A precise description of a physical item, procedure, or service for implementation of an item or service is called :A. Work package.B. Baseline.C. Product description.D. Work breakdown st
17、ructure (WBS) element.19. A project should be terminated for all of the following reasons except:A. Lack of team synergy.B. The project no longer meets the companys objectives.C. The resources are not available to complete project activities.D. Project funding has been significantly reduced.20. One common way to compute estimated at completion (EAC) is to take the project budgeted-at-completion and:A
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024年度體育產業(yè)招聘員工專業(yè)勞動合同3篇
- 2024年度施工班組裝配式裝修承包服務協(xié)議3篇
- 2024年度河道整治工程擋土墻建造與生態(tài)修復合同2篇
- 2024年度農業(yè)黨支部共建協(xié)議書(農業(yè)現(xiàn)代化合作)3篇
- 2024年度抵押合同格式規(guī)范與解讀2篇
- 2024年度紙漿原料貿易合同范本3篇
- 2024年度石油天然氣管道危險貨物運輸安全管理合同3篇
- 2024年度網(wǎng)絡直播內容制作與傳播服務采購合同3篇
- 2024年時尚服飾代銷傭金合同模板3篇
- 2024年員工加盟企業(yè)股權入股合作協(xié)議3篇
- 防范非法金融宣傳
- 咨詢經理招聘面試題與參考回答(某大型國企)2025年
- 小學語文骨干教師專題講座《自由閱讀-開啟快樂的讀書之門》
- 南京審計大學金審學院《中級財務會計(上)》2022-2023學年第一學期期末試卷
- 2023年電信運營商液冷技術白皮書
- 瓷磚店銷售薪酬方案
- 2022年湖南省公務員錄用考試《申論》真題(縣鄉(xiāng)卷)及答案解析
- 機場航班信息LED顯示屏方案
- 軟件系統(tǒng)運行維護體系方案
- 2024年六年級上冊語文文言文閱讀理解復習專項題
- 2024年首屆全國標準化知識競賽真題題庫導出版-下(判斷題部分)
評論
0/150
提交評論