![文本教程說明1_第1頁](http://file4.renrendoc.com/view/0d175211c29a07e507bc25ca15a501e4/0d175211c29a07e507bc25ca15a501e41.gif)
![文本教程說明1_第2頁](http://file4.renrendoc.com/view/0d175211c29a07e507bc25ca15a501e4/0d175211c29a07e507bc25ca15a501e42.gif)
![文本教程說明1_第3頁](http://file4.renrendoc.com/view/0d175211c29a07e507bc25ca15a501e4/0d175211c29a07e507bc25ca15a501e43.gif)
版權說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權,請進行舉報或認領
文檔簡介
1、文件種類S Drafted Checked Reviewed Approved Modification-BCHENGGANG NUCLEARPLANT PHASE I (21000MW)DOC文件種類S Drafted Checked Reviewed Approved Modification-BCHENGGANG NUCLEARPLANT PHASE I (21000MW)DOCLNC-220V ACMANUAL CHAPTER 5 OPERATING Project文件類Sub-ItemEngineering SBA:LNC-220V AC B: C:工國家甲級 工咨甲中廣核工程設Na
2、tionalAgradeengineeringCertificationNO:CHINA ERDESIGNNationalAgradeengineeringCertificationNO:編ernalCP0905-DE-GN-is the property of CNPDC It must not be used、reproduced、transmitted or disclosed without the prior written permis of CNPDC 本文件之 屬于中廣核工程設計 。未獲本公司 ,任何人不得擅自使用、 、傳遞或 該文件。B版版日狀編Drafted校Checked
3、審Reviewed批Approved修改說Modification-AB版版日狀編Drafted校Checked審Reviewed批Approved修改說Modification-AB版CHENGGANGPLANTPHASEIB版CHENGGANGPLANTPHASEILNC-220V ERSYSTEMMANUALCHAPTER5 OPERATING PARAMETERSCHINA ERDESIGNBB文件修版日章頁修改范圍及依AB2010-2011-8-LNC-220V AC ER SUPPLY SYSTEM LNC-220V AC ER SUPPLY SYSTEM MANUAL CHAPT
4、ER 5 Rev5OPERATINGNORMALPARTICULARSTEADY STARTUPANDNORMALOTHERCONTROLLNC-220V AC ER SUPPLY SYSTEM 5B5OPERATINGLNC-220V AC ER SUPPLY SYSTEM 5B5OPERATING5.1Normal5.2Particularsteady5.3Particulartransient5.3.1LossofACchargerinputheautomaticmode,chargeroperationisasAfter loss of ACer forriod of time les
5、snaswitchsetting(3-6-12min.), the charger is automatically restored to the pre-transient operating mode i.e. float or recharge/equalize. The switch is mountedhe charger enclosure (switch set to 6 Operationwith faultemergency 380V er er id to the inverter from the charged battery withouterruptionfor
6、one hour.Operation faulty In case of loss the 110V DC voltage or anernaldefectoftheinverter,ifthebypass er is present and notolerance, theer supply is automatically providedthrough a transformowered form the sic switch circuit with 140ms delay. In case of loss the 380V AC voltage and inverter failur
7、e, the sicswitchdoesnt need change over.Inverter In case of loss the inverter not available or during maenance, theer supply is manuallyswitchedovertothe380VACswitchboardthoughamanualbypassswitch.Under normal operation, the charger fed from the emergency-d 380V AC switchboard, provides the inverter
8、and floats the battery or recharges it as neThe charger starts automatic with charger mode. The charger is operatedhe float mode and voltage is maained constanfloat voltage setting. Following, theowersthedistributionunit.Thisis shownattheDisplayOperationUnit.inverterisoperatedLNC-220V AC 5B5.4Startu
9、pandnormalUPS-systemsLNC-220V AC 5B5.4StartupandnormalUPS-systemsarestart-upfortheplanoperationandshutdownwhiletheplanisnot ForparticularoperationsoftheUPS-systems,seechapterAfter loss of ACer forriod of lime greatern the switch setting, the charger resumes operationherecharge/equalizemodeforadurati
10、ondeterminedby atimer(alsomountedinchargerenclosure) adjustablefrom0to60hours(timersetto 15 hours). The charger then switches to float service.ChargerShortcircuit erformanceandcharacteristicsarenot affectedbyashort Selective tripis provided by time-delayed magnetic releasehebattery ing breaker.Charg
11、erovercurrentprotectioncircuitryactuatesafterabout10ms. Short-circuit on the The batterying fuse trips. Short-circuitonACsideofchargerThechargerAC(380V)busbreakerisCharger TheACbusbreakers(101JA)arcautomaticallyopened.Thechargerswitchesoff Suddenvariationsorlossof110Vvoltagefor inverterDuring sodden
12、 variations inthe invertower supply voltage (from 96.3V to 121V), the instantaneous variationheswitchboardvoltagedoesnotexceed15%of 220V Should the voltage drelow 96.3V DC or rise above 121V DC the inverter will trip and a transfer to the standby supply will be initiated.Load variations on theinverterFor instantaneous variations of load rise from 0 to 100%, and return to 0, the
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 常州正衡小升初數(shù)學試卷
- 2025至2030年中國4-(二乙氨基)-水楊醛數(shù)據(jù)監(jiān)測研究報告
- 2025年中國高強度自攻螺絲市場調(diào)查研究報告
- 濱州陽信中考數(shù)學試卷
- 2025年中國蒸發(fā)器與電控柜滑架市場調(diào)查研究報告
- 2025年中國證券交易卡市場調(diào)查研究報告
- 2025年中國粘膠機市場調(diào)查研究報告
- 2025年中國碘代丙炔基氨基甲酸酯市場調(diào)查研究報告
- 2025年中國男裝針織衫市場調(diào)查研究報告
- 2025年中國無塵天花板市場調(diào)查研究報告
- GMP附錄計算機化系統(tǒng)整體及條款解讀
- 村光伏發(fā)電申請書
- 腰椎間盤突出癥中醫(yī)特色療法課件
- 施工現(xiàn)場專項消防安全檢查表
- 如何當好學校的中層干部
- 2022-2023學年廣東省佛山市順德區(qū)高三(下)模擬英語試卷
- 鋼結構廠房吊裝安裝監(jiān)理控制要點演示文稿
- 無權代理與表見代理
- 創(chuàng)傷的現(xiàn)場檢傷分類法傷情程的快速評估方法
- Topic+1+Personal+information(個人情況)-2023年中考英語話題復習精美課件
- 2023年高考數(shù)學大招9蒙日圓及其證明
評論
0/150
提交評論