專用
人人文庫(kù)
NATIONALSTANDARD
OFTHEPEOPLESREPUBLICOFCHINA
CodeforConstructionandAcceptanceof
GroundingConnectionElectricEquipment
InstallationEngineering
GB50169-2016
ChiefDevelopmentDepartment:ChinaElectricityCouncil
ApprovalDepartment:MinistryofHousingandUrbanRuralDevelopment
-
ofthePeoplesRepublicofChina
ImplementationDate:Apr1,2017專用
人人文庫(kù)
ChinaPlanningPress
Beijing2020
ChineseeditionfirstpublishedinthePeoplesRepublicofChinain2017
EnglisheditionfirstpublishedinthePeoplesRepublicofChinain2020專用
byChinaPlanningPress
rd
3Floor,CTower,GuohongBuilding
No.A11,Muxidi-Beili,XichengDistrict
Beijing,100038
PrintedinChinabyBeijingJingyintangGraphicPrintingCenter
?2017byChinaElectricityCouncil
Allrightsreserved.Nopartofthispublicationmaybereproducedortransmittedinanyformor
byanymeans人人文庫(kù),graphic,electronic,ormechanical,includingphotocopying,recording,
oranyinformationstorageandretrievalsystems,withoutwrittenpermissionofthepublisher.
Thisbookissoldsubjecttotheconditionthatitshallnot,bywayoftradeorotherwise,belent,
resold,hiredoutorotherwisecirculatedwithoutthepublisherspriorconsentinanyformof
blindingorcoverotherthanthatinwhichthisispublishedandwithoutasimilarcondition
includingthisconditionbeingimposedonthesubsequentpurchaser.
ISBN978-7-5182-1139-5
AnnouncementoftheMinistryofHousingandUrban-Rural
DevelopmentofthePeoplesRepublicofChina
No.1260
AnnouncementoftheMinistryofHousingandUrbanRuralDevelopmenton
-
PublishingtheNationalStandardofCodeforConstructionandAcceptanceof
GroundingConnectionElectricEquipmentInstallationEngineering
TheCodeforConstructionandAcceptanceofGroundingConnectionElectricEquipment
InstallationEngineeringhasbeenapprovedasanationalstandardwithaserialnumberofGB50169-
2016,andshallbeimplementedfromApril1,2017.Inthisstandard,clauses3.0.4,4.1.8,4.2.9are
mandatoryonesandmustbeimpletmentedstrictly.TheoriginalnationalstandardCodefor
ConstructionandAcceptanceofGroundingConnectionElectricEquipment專用InstallationEngineering
GB50169-2006isabolishedatthesametime.
AuthorizedbytheResearchInstituteofStandardsandNorms,MinistryofhousingandUrban
-
RuralDevelopmentofP.R.China,thisStandardispublishedanddistributedbyChinaPlanningPress.
MinistryofHousingandUrbanRuralDevelopmentofthePeoplesRepublicofChina
-
August18,2016
人人文庫(kù)
中華人民共和國(guó)住房和城鄉(xiāng)建設(shè)部公告
2019年第338號(hào)
住房和城鄉(xiāng)建設(shè)部關(guān)于發(fā)布《電氣裝置安裝工程
接地裝置施工及驗(yàn)收規(guī)范》
等10項(xiàng)工程建設(shè)標(biāo)準(zhǔn)英文版的公告
現(xiàn)批準(zhǔn)《電氣裝置安裝工程接地裝置施工及驗(yàn)收規(guī)范》(GB50169—2016)、《±800kV
直流換流站設(shè)計(jì)規(guī)范》(GB/T50789—2012)、《1000kV系統(tǒng)電氣裝置安裝工程電氣設(shè)備交
接試驗(yàn)標(biāo)準(zhǔn)》(GB/T50832—2013)、《光伏發(fā)電站施工規(guī)范》(GB/T專用50794—2012)、《光伏發(fā)
電站設(shè)計(jì)規(guī)范》(GB/T50797—2012)、《光伏發(fā)電工程驗(yàn)收規(guī)范》(GB/T50796—2012)、《電
氣裝置安裝工程電氣設(shè)備交接試驗(yàn)標(biāo)準(zhǔn)》(GB50150—2016)、《電力設(shè)施抗震設(shè)計(jì)規(guī)范》
(GB50260—2013)、《110kV~750kV架空輸電線路施工及驗(yàn)收規(guī)范》(GB50233—2014)、《電
氣裝置安裝工程串聯(lián)電容器補(bǔ)償裝置施工及驗(yàn)收規(guī)范》(GB51049—2014)英文版。工程建
設(shè)標(biāo)準(zhǔn)英文版與中文版出現(xiàn)異議時(shí),以中文版為準(zhǔn)。
工程建設(shè)標(biāo)準(zhǔn)英文版由住房和城鄉(xiāng)建設(shè)部組織中國(guó)計(jì)劃出版社出版發(fā)行。
中華人民共和國(guó)住房和城鄉(xiāng)建設(shè)部
2019年12月11日
人人文庫(kù)
Foreword
ThiscodeisrevisedbyChinaElectricPowerResearchInstituteandrelevantdepartmentsonthe
basisofGB50169-2006ElectricalEquipmentInstallationEngineeringCodeforConstructionand
AcceptanceofGroundingDevicesaccordingtotherequirementsoftheAnnouncementofPrintingand
DistributionofEstablishmentandRevisionPlansforNationalStandardsinEngineeringConstruction
2013(JIANBIAO〔2013〕No.6)issuedbyMinistryofHousingandUrbanRuralDevelopment.
-
Thiscodecomprises5chapterswiththemaincontentsasfollows:General;Terms;Basic
Requirements;Groundingofelectricequipment;Engineeringhandoverandacceptance.
Comparedwiththeoriginalcode,thiscodeaddsthefollowingcontents:1.BasicRequirements;
2.Resistancereductionofgroundingconnection;3.GroundingofWTGSsandphotovoltaicpower
station;4.Groundingofrelayingprotectionandautomaticsafetyequipment;5.Groundingagainst
lightninginductionandstaticelectricity.
Theprovisionsprintedinboldtypeinthiscodearemandatoryonesandmustbeimpletmented
strictly.
TheMinistryofHousingandUrbanRuralDevelopmentofthePeople專用sRepublicofChinaisin
-
chargeoftheadministrationofthiscodeandtheexplanationofthemandatoryprovisions.China
ElectricityCouncilisresponsiblefortheroutinemanagement.ChinaElectricPowerResearchInstitute
isresponsiblefortheexplanationofspecifictechnicalcontents.
Allrelevantorganizationsarekindlyrequestedtosumupandaccumulateyourexperienceinactual
practicesduringtheprocessofimplementingthiscode.Therelevantopinionsandadvice,whenever
necessary,canbepostedorpassedontoChinaElectricPowerResearchInstitute(Address:No.33,
SouthBinheRoad,XichengDistrict,BeijingCity,Postalcode:100055)forreferenceinfuturerevision.
ThefollowingaretheChiefDevelopmentOrganization,ParticipatingDevelopmentOrganizations,
ChiefDraftingStaffandChiefReviewStaffofthiscoderespectively:
ChiefDevelopmentOrganization:
ChinaElectricPowerResearchInstitute
ParticipatingDevelopmentOrganizations:
StateGridSmartPowerGridResearchInstitute
人人文庫(kù)ChinaSouthernPowerGridGuangdongProvinceTransmissionandTransformation
EngineeringCompany
StateGridShaanxiElectricPowerCompanyElectricPowerResearchInstitute
AnhuiElectricPowerConstructionEngineeringQualitySupervisionCenterStation
GezhoubaGroupsElectricPowerCompanyLtd.
CEECTianjinElectricPowerConstructionCo.,Ltd.
BeijingShuangyuanEngineeringConsultingandSupervisionCo.,Ltd.
NorthChinaPowerDesignInstituteEngineeringCo.,Ltd.
BeijingAlldayScienceandTechnologyCo.,Ltd.
JiangsuJinheyiCompositeNewMaterialCo.,Ltd.
1··
ChiefDrafters:
ChenXinHanYuJingJinHeGuanhengChenChangcaiWangSen
LiuShihuaGeZhanyuZhouWeixinXuChunliMaGuangWangWei
SunYongchunZhuZhixiang
ChiefReviewers:
ChenFayuXuJunDuShuchunLiQianFangJingYanGuozeng
LiaoGuanghongWeiGuozhuWangYumingLongQingzhiWangGuomin
ChengYuntangGuWei
ChiefTranslators:
JingJinTianXiaoChenXinHanYuMaGuangHaoWenkui
ChengYangchunXuJunGeZhanyuZengGuangyuGuWeiLiKaizhou
ZhuHongHeFei
專用
人人文庫(kù)
2··
Contents
1GeneralProvisions……………(1)
2Terms…………………………(2)
3BasicRequirements……………(4)
4GroundingofElectricEquipment………………(6)
4.1SelectionofGroundingConnection………………(6)
4.2LayingofGroundingConnection…………………(8)
4.3ConnectionofGroundingConductorandGroundingElectrode………(10)
4.4ResistanceReductionofGroundingConnection……………………(12)
4.5GroundingofWindTurbineGeneratorSystem(WTGS)andPhotovoltaicPowerStation………………(13)
4.6GroundingofAirterminationSystem……………(14)
-
4.7GroundingofTransmissionTowers………………(15)
4.8GroundingofMainControlBuilding,DispatchingBuildingandCommunicationStation……(16)
4.9GroundingofRelayProtectionandAutomaticSafetyEquipment……(17)
4.10GroundingofMetalSheathofPowerCable………(19)
4.11GroundingofDistributionElectricEquipment……………………專用(19)
4.12GroundingofElectricEquipmentinBuildings……………………(20)
4.13GroundingofPortableandMobileElectricEquipment………………(21)
4.14GroundingagainstLightningInductionandStaticElectricity…………(21)
5EngineeringHandoverandAcceptance………(23)
-
ExplanationofWordinginThisCode……………(24)
ListofQuotedStandards…………(25)
人人文庫(kù)
1GeneralProvisions
Thiscodeisformulatedtoensurethequalityoftheelectricequipmentinstallationengineering
1.0.1
aboutgroundingconnection,facilitatetheimprovementofengineeringconstructiontechnologyand
guaranteethesafeoperationofgroundingconnection.
Thiscodeisapplicabletotheconstructionandacceptanceofgroundingconnectionoftheelectric
1.0.2
equipmentininstallationengineeringbutnottotheconstructionandacceptanceoftheDChighvoltage
-
transmissiongroundingelectrode.
Constructionandacceptanceofgroundingconnectionshallnotonlymeettherequirements
1.0.3
stipulatedinthiscode(standard),butalsothoseinthecurrentrelevantonesofthenation.
專用
人人文庫(kù)
·1·
2Terms
Groundingelectrode
2.0.1
Itmeansthemetalconductorsburiedintheground,whichdirectlycontactstheearth.Itincludes
horizontalandverticalgroundingelectrodes.
Naturalgroundingelectrode
2.0.2
Naturalgroundingelectrodereferstothosedirectlycontacttheearthandcanbeservedas
grounding,suchasmetalstructures,metalwellpipes,foundationsofRCCbuilding,metalpipelineand
equipment,etc.
Airterminationsystem
2.0.3-
Itisthegeneraltermofdevicesreceivinglightningstrike,includinglightningrod,lightningstrip,
lightningline,lightninggrid,metalroofandmetalstructure.
Groundingconductor
2.0.4
Itmeansthemetalconductorthatconnectsgroundterminalsofelectricequipmentorair
-
terminationsystemwithgroundingelectrode.Ithasnocurrentloadundernormalcircumstances.
Groundingconnection專用
2.0.5
Itisthegeneraltermofgroundingelectrodeandgroundingline.
Grounding
2.0.6
Itmeanstheconnectionofgroundingelectrodewiththeelectricequipment,facilitiesandover
-
voltageprotectiondevicesofthepowersystemorbuildingsthroughgroundingline.
Groundingimpedance
2.0.7
Itreferstotheimpedancebetweenthesetpointandthereferencepointofthesystem,deviceor
equipmentatagivenfrequency.
Groundresistance
2.0.8
Itmeanstherealpartofgroundingimpedance.Groundresistancevalueunderthepowerfrequency
isthepowerfrequencygroundresistance.
Neutralline
2.0.9
Itreferstotheconductorelectricallyconnectswithneutralpointandcanbeusedforpower
distribution.
Protectiveground
2.0.10人人文庫(kù)
Itreferstogroundingsetformetalshellofelectricequipment,theframeworkofpowerdistribution
equipmentandpolesandtowersoftransmissionlinestopreventthepersonnelandequipmentfrom
possibleelectrificationduetoinsulationdamage.
Concentratedgroundingconnection
2.0.11
Concentratedgroundingconnectionistheadditionalgroundingconnectiontoenhancediffusingof
lightningcurrentandreducethepotential.Forexample,theverticalgroundingelectrodeisequipped
nearthelightningrod.
Groundinggrid
2.0.12
Itreferstothenettedgroundingdevice,whichiscomprisedofverticalandhorizontalgrounding
·2·
electrodesandhasthefunctionsofcurrentdischargeandvoltagesharing.
-
Exothermicwelding
2.0.13
Itisaweldingmethodinwhichworkpieceisheatedandmoltendirectlyorindirectlythroughthe
chemicalreactionbetweenmetaloxideandaluminumpowder.
Equipotentialgroundinggrid
2.0.14
Itreferstothegridwhichcomprisesofhorizontalconductorsandinwhicheachnodeis
equipotential.Itisfinallyconnectedwiththegroundinggridinthesoil.
專用
人人文庫(kù)
·3·
3BasicRequirements
Thegroundingconnectionshallbeinstalledbytheconstructioncompanyaccordingtothe
3.0.1
approveddesigndocuments.Specialpersonnelfromprojectmanagementcompanyandsupervision
companyshallberesponsibleforsupervision.
Thenewtechnology,newprocessandnewmaterialsshallbetestedandsubjecttonational
3.0.2
qualifiedverificationandvalidationtomeettherequirementofdesignandsafeuse.
Theinstallationofgroundingconnectionshallbeincoordinationwithcivilworks.Theconcealed
3.0.3
partshallbechecked,acceptedandrecordedbyrelevantdepartmentsbeforebeingcoveredup.
3.0.4Thefollowingmetalpartsintheelectricequipmentmustbegrounded:
1Metalbase,frame,shell,drivingdeviceofelectricequipment;
2Metalbaseandshellofportableormobileelectricapparatus;
3Metalboxofcubiclesubstation;
4SecondarywindingsofCTandPT;
5Metalframeandbaseofpanel(cabinet,box)fordistribution,controlandrelayprotection
;專用
andconsole
6Metalsheath,jointbox,terminalsandmetalprotectiontubeofpowercablesaswellas
shieldinglayerofsecondarycable;
7Cabletray,bracketandsupportstructureofcablewell;
8Framesandequipmentsupportsinsubstation(converterstation);
9Powerlinetowersequippedwithoverheadgroundwireorelectricequipment;
10Metalfencingofpowerdistributionunit;
11Metalshellofelectricalheatingequipment.
DCsystemneedstobegroundedshallbeinaccordancewiththefollowingrequirements
3.0.5
Thegroundingconductorthatcanformloopcircuitwiththegroundandthroughwhichthe
1
currentnormallyflowsshallbelaidalongtheinsulatingpaddingplateandshallnotbeconnectedwith
metalpipes,buildingsorequipmentcomponentsthroughmetal;
Thegroundingconnectionshouldnotbelaidinsoilwherethecorrosivesubstancecanbe
2
producedbyelectrolyzing.Theexternalgroundingconnectionorsoilimprovementmaybeadoptedif
necessary;人人文庫(kù)
TheDCpositivegroundingconductorandgroundingelectrodeshallnotbeconnectedwith
3
naturalgroundingelectrodethroughmetal;thedistancebetweenthemshallnotbelessthan1mwhen
thereisnoinsulation.
Theelectricequipmentshallbereliablyconnectedwiththegroundinggrid.Intheexpansion
3.0.6
project,theconnectionofgroundinggridwiththeexistingoneshallmeetthedesignrequirementsand
shallbeatleastattwopoints.
Thegroundingconnectionacceptancetests,includingconductiontest,shallbecarriedoutafter
3.0.7
thegroundingconnectionisconstructedassoonaspossible.Thegroundresistancevalueshallmeetthe
requirementsofdesign.
·4·
Thegroundingconnectionintheregionwithhighsoilresistivitymaybeputintooperationafter
3.0.8
thecorrespondingmeasuresaredeterminedbythedesigndepartmentifthegroundresistancecannot
meettherequirements.
Thefollowingmetalpartsattachedtothegroundedelectricequipmentandproductionfacilities
3.0.9
maynotbegrounded:
Shellsoftheelectricalmeasuringinstrument,relayandotherlowvoltageapparatusesinstalled
1-
inthedistributionboard,controlpanelandpowerdistributionunits;
Shellsofmotorandelectricapplianceinreliableelectriccontactwiththemachinetoolandbase;
2
Metalsupportinbatteryroomwiththeratedvoltageof220Vandbelow.
3
Groundingconductorshallnotbeusedforotherpurposes.
3.0.10
專用
人人文庫(kù)
·5·
4GroundingofElectricEquipment
4.1SelectionofGroundingConnection
Thegroundingconnectionsshallutilizenaturalgroundingelectrodeburieddirectlyunderground
4.1.1
orunderwater.Thefollowingnaturalgroundingelectrodemaybeused:
Metalpipesburiedunderground,excludingpipesconveyingcombustibleorexplosivematerials;
1
Metalwellpipes;
2
Metalstructureofbuildingreliablyconnectedwiththeground;
3
Metalpipes,pilesandfoundationreinforcingmeshofthehydraulicstructuresandothersimilar
4
structures.
GroundingconductorofACelectricequipmentmaybegroundedthroughthefollowing
4.1.2
groundingelectrodes:
Metalstructure,beamandcolumnofbuildings;
1
Metalstructuresinproduction,suchascranetrack,passageway,platform,frameofcraneand
2
elevator,steelbeamforconveybelt,frameofelectrostaticdustcollectorandsoon.
Thegroundingconnectioninthepowerplantandsubstationshall專用besetwithnotonlynatural
4.1.3
groundingelectrodebutalsoartificialgroundingelectrode,i.e.thegroundinggriddominatedby
horizontalgroundingelectrode.Themeasuringwellseparatingnaturalgroundingelectrodefrom
artificialgroundingelectrodeshallbefurnished.Substationanddistributionsubstationof3kV~10kV
maynotbeartificiallygroundedwhenthereinforcingmeshinthebuildingfoundationisusedasthe
groundingelectrodeandthegroundresistancesatisfiesdefinedvalue.
Selectionofthegroundingconnectionmaterialshallbeinaccordancewiththefollowing
4.1.4
requirements:
Exceptthetemporarygroundingconnection,thegroundingconnectionshallbehotdip
1-
galvanizedifsteelisused.Thehotdipgalvanizedroundsteelandflatsteelshallbeusedforhorizontal
-
laying.Thehotdipgalvanizedanglesteel,steeltubeorroundsteelshallbeusedforverticallaying;
-
Whenflatcopperstrip,copperstrandedwire,copperrod,coppercoatedsteel(roundwireand
2
strandedwire),zinccoatedsteelandothermaterialsareusedasthegroundingconnection,theselection
shallmeettherequirementsofdesign;
Aluminumconductorsshallnotbeusedasthegroundingelectrodeorgroundingconductor.
3人人文庫(kù)
Thecrosssectionareaoftheartificialgroundingelectrodeofthegroundingconnectionshall
4.1.5
meettherequirementsonthermalstability,voltagesharing,mechanicalstrengthandcorrosion
-
resistance.Thecrosssectionareaofthehorizontalgroundingelectrodeshallnotbelessthan75%of
thatofthegroundingconductorconnectedtotheabovementionedgroundingconnection,andshallnot
belessthanthespecificationlistedinTable4.1.51andTable4.1.52.Thecrosssectionareaofthe
--
outgoinglineofthegroundingelectrodeofthepowerlinetowershallnotbelessthan50mm2.
·6·
Table4.1.5-1Minimumspecificationofsteelgroundingelectrodeandgroundingconductor
Type,specificationandunitAbovegroundUnderground
Diameterofroundsteel(mm)88/10
FlatCrosssectionarea(mm2)4848
steelThickness(mm)44
Thicknessofanglesteel(mm)2.54
Wallthicknessofsteelpipe(mm)2.53.5/2.5
Notes:1Thenumeratoranddenominatorofthediameteroftheundergroundroundsteelcorrespondtotheoverheadlineandthe
groundinggridofthepowerplantandsubstationrespectively.
2Thenumeratoranddenominatorofthewallthicknessoftheundergroundsteeltubecorrespondtothegroundembeddedinthe
soilandembeddedinindoorconcreterespectively.
Table4.1.5-2Minimumspecificationofcopperandcoppercoatedsteelgroundingelectrode
Type,specificationandunitAbovegroundUnderground
Horizontalgroundingelectrode8
Diameterofcopperrod(mm)8
Verticalgroundingelectrode15
Crosssectionarea(mm2)/thickness(mm)ofcopperbar50/250/2
Wallthicknessofcopperpipe(mm)23
Crosssectionareaofcopperstrandedconductor(mm2)5050
Diameterofcoppercoatedroundsteel(mm)8專用10
Diameterofcoppercoatedsteelstrandedconductor(mm)810
Crosssectionareaofcoppercoatedflatsteel(mm2)/thickness(mm)48/448/4
Notes:1Thebarecopperstrandedwireshouldnotbeusedasthegroundingelectrodeofsmallgroundingconnection.Whenitisusedas
thegroundingelectrodeofthegroundinggrid,thecrosssectionareashallmeettherequirementsofdesign.
2Thesinglestranddiameterofthecopperstrandedconductorisnotlessthan1.7mm.
3Thecoppercoatedsteelspecificationisthesteelsizeandthecopperlayerthicknessshallnotbelessthan0.25mm.
Thezinclayerthicknessofthehotdipgalvanizedsteelandzinccoatedsteelforconnecting
4.1.6-
electrodeshallmeettherequirementsofdesign.
Theminimumcrosssectionareaoftheexposedgroundingconnectorabovegroundconnectedto
4.1.7
thegroundingelectrodeorprotectiveconductor(PE)onthelowvoltageelectricequipmentshallmeet
-
therequirementsoftheprovisionsinTable4.1.7.
Table4.1.7Minimumcrosssectionareaofexposedcoppergroundingconductor
onlow-voltageelectricequipmentground
Minimumcrosssectionarea
Name
人人文庫(kù)(mm2)
Exposedlaidbareconductor4
Insulatedconductor1.5
Groundingcoreofcableorgroundingcoreofmulticoreconductorwrappedinsidethe
-1
sameprotectiveshellwithphasewire
4.1.8Theflexiblemetaltubing,metalsheathormetalnetofpipelineinsulationlayer,the
conductorleadsheetoflow-voltagelightingnetworkandthemetalsheathofcablemustnotbe
usedasgroundingconductors.
Theselffixedconnectororthehoseconnectorshallbeadoptedatbothendsoftheflexiblemetal
4.1.9-
tubingandtheflexiblemetaltubingshallbeelectricallywellconnectedwiththesteelpipese
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年度科技園區(qū)投資咨詢服務(wù)合同
- 二零二五年度裝修工程資料員勞動(dòng)合同規(guī)范
- 二零二五年度新能源技術(shù)研發(fā)合同履行瑕疵與違約賠償標(biāo)準(zhǔn)
- 二零二五年度廠房裝飾裝修與智能化安防系統(tǒng)建設(shè)合同
- 二零二五年度新型房產(chǎn)開發(fā)與建筑合同風(fēng)險(xiǎn)評(píng)估協(xié)議
- 二零二五年度家居行業(yè)經(jīng)銷商返利合同
- 二零二五年度境外勞務(wù)派遣與知識(shí)產(chǎn)權(quán)保護(hù)合同
- 二零二五年度生態(tài)環(huán)保型建筑包工不包料合同
- 2025年度金融科技代理公司股權(quán)轉(zhuǎn)讓合同書
- 光伏產(chǎn)品分銷業(yè)務(wù)員2025年度銷售業(yè)績(jī)獎(jiǎng)勵(lì)合同
- 新課程標(biāo)準(zhǔn)2022版初中歷史考試題及答案
- 前言 馬克思主義中國(guó)化時(shí)代化的歷史進(jìn)程與理論成果
- 思想道德與法治2023版教學(xué)設(shè)計(jì)第二章 追求遠(yuǎn)大理想 堅(jiān)定崇高信念
- 21ZJ111 變形縫建筑構(gòu)造
- 電子商務(wù)概論目錄
- 裝修返工合同
- 高等數(shù)學(xué)考研輔導(dǎo)課(一)學(xué)習(xí)通超星課后章節(jié)答案期末考試題庫(kù)2023年
- 消力池砼施工工法
- 國(guó)家職業(yè)類別1-6類明細(xì)表
- 中國(guó)文藝美學(xué)要略·論著·《畫學(xué)心法問(wèn)答》
- 如何建立卓越地價(jià)值觀
評(píng)論
0/150
提交評(píng)論