TABLEOFCONTENTS
TOC\o
1. INTRODUCTION.
1
1.1. DefinitionsAndInterpretations.
1
1.2. Distribution.
1
1.3. ProjectPhilosophy.
1
1.4. BriefDescriptionofProjectScope.
2
2. CONTRACTOR’SORGANIZATION.
5
2.1. Contractor’sOverallOrganizationChart.
5
2.2. ProjectTeamOrganizationChart.
5
2.3. EngineeringPlan.
5
2.4. Attachments.
5
3. DETAILEDWORKSCHEDULE.
6
3.1. Attachments.
6
4. CORRESPONDENCEPROCEDURE.
7
4.1. CorrespondenceNumbering.
7
4.1.1. CompanytoContractor
7
4.1.2. ContractortoCompany.
7
4.1.3. ContractortoSupervisingCompanyor“Jianli”.
7
4.2. ContactAddresses&Numbers.
8
4.2.1. Owner’sAddress&ContactNo.
8
4.2.2. OffshoreContractor’sAddress&ContactNo.
8
4.2.3. OnshoreContractor’sAddress&ContactNo.
8
4.2.4. Contractor’sTentativeContactParticular:
9
4.2.5. SupervisingCompanyAddress&ContactNo.
9
5. PROJECTDOCUMENTCONTROLPROCEDURE.
10
5.1. EngineeringDocuments.
10
5.1.1. OutgoingDocuments.
10
5.1.2. IncomingVendor’sDocuments.
10
5.1.3. ReturnOfVendor’sDocuments.
10
5.2. OtherDocuments.
10
5.3. Filing.
10
5.4. ControlofRevisedDocuments.
11
6. DescriptionofOrganizationChartandKeyPersonnel.
12
6.1. ProjectOrganization.
12
6.1.1. PrinciplesofProjectManagementAndExecution.
12
6.2. Implementation.
12
6.3. ProjectCommittee.
12
6.4. ProjectManager.
13
6.5SiteManager.
14
6.6 ConstructionManager.
14
6.7 ConstructionAdvisor
15
6.8 SHEManager.
16
6.8 OtherKeyPersonnel.
16
6.8.1OffshoreOffice.
16
a) EngineeringManager.
16
b) LogisticsManager.
17
c) ProjectEngineer
17
6.8.2 OnshoreOffice.
17
a) AdministrationManager.
17
b) ProcurementandContractsManager.
17
c) QA/QCManager.
18
6.9 OfficeLocations.
18
6.9.1 OffshoreOffice.
18
6.9.2 OnshoreOffice.
19
7 ENGINEERINGPLAN.
20
7.1. General.
20
7.1.1. EngineeringPlan.
20
7.1.2. DisciplineandInterdisciplinaryCheck.
21
7.1.3. TechnicalEvaluationandVendorDocumentsReview.
21
7.1.4. SeamlessTeamCommunication.
21
7.2. BasicEngineering.
21
7.3. DetailedEngineering.
22
7.4. ComputerAidedEngineering.
22
7.5. HAZOPStudy.
22
8. DRAWING&DOCUMENTAPPROVALPROCEDURE.
23
8.1. General.
23
8.2. ApprovalItems.
23
8.3. LocalAuthoritiesApproval.
23
8.4. TimeforApproval.
23
8.5 DocumentFlowControl.
23
8.6 Vendor/SupplierDocument.
23
8.7 Definition.
23
8.7.1 ForApproval.
24
8.7.2 ForInformation.
24
8.7.3 ApprovedForConstruction/Final.
24
8.7.4 Owner’sComment
24
8.8 Indication.
25
8.9 Attachments
26
9 PROCUREMENTPROCEDURE.
31
9.1 SpecificPlansForProcurement.
31
9.2 ProcurementProcedure.
31
9.2.1 PreparationOfVendorList.
31
9.2.2 VendorPre-Qualification.
31
9.2.3 RequestForQuotation.
32
9.2.4 BidAnalysis.
32
9.2.5 PlacingOrders.
32
9.2.6 SpareParts.
32
9.2.7 ProcurementProcessFlow.
33
9.3 ATTACHMENTS
33
10 EXPEDITINGPROCEDURE
34
10.1 ResponsibilityAndDuties.
34
10.2 PrincipleOfExpediting.
34
10.3 Inspection.
35
10.4 Report.
35
10.4.1 ShopVisitReport.
35
10.4.2 Expediting/ShippingStatusReport.
35
10.4.3 ProgressTracking.
35
10.5 ImportandCustomsClearance.
36
10.6 Attachments.
36
11 CONSTRUCTIONWORKPLAN.
40
11.1 WorkPlanOfFieldConstruction.
40
11.1.1 Principles.
40
11.1.1.1 SafePerformanceOfWork.
40
11.1.1.2 CloseCommunicationwithOwner.
40
11.1.2 Subcontracting.
40
11.1.2.1 SelectionofSub-contractors.
40
11.1.2.2 ControlofSub-contractors.
41
11.1.2.3 RecordEvaluation.
41
11.1.3 TemporaryFacilities.
41
11.1.4 ConstructionUtilities.
41
11.2 SHEPlan.
41
11.2.1 General.
41
11.2.2 SHEPolicy.
41
11.2.3 SHEObjective.
42
11.2.4 SHETarget
42
11.2.5 MajorItemsofSHESystem.
42
11.3 Materials.
44
11.3.1 MaterialsPurchased.
44
11.3.2 MaterialsSchedule.
44
11.4 Mobilization.
44
11.4.1 MajorConstructionEquipmentMobilization.
44
11.4.2 ProjectPersonnelPlan.
44
11.4.3 TemporaryFacilityPlan.
44
11.5 Attachments.
44
12 QA/QCPLAN.
45
12.1 QualityObjective.
45
12.2 QualityPolicy.
45
12.3 InspectionandTestingPlan.
45
12.4 GeneralInspectionProcedure
45
13 PROGRESSREPORTINGPROCEDURE.
46
13.1 General.
46
13.2 ProgressReporting.
46
13.3 ContentsofReport.
46
13.4 ProgressReportForm.
47
13.4.1 ProjectProgressReport(Form01)
47
13.4.2 EngineeringProgressReport(Form02).
47
13.4.3 ProcurementProgressReport(Form03).
47
13.4.4 FieldConstructionProgressReport(Form04).
48
13.5 Attachments.
48
14 SCHEDULECONTROLPROCEDURE.
55
14.1 General.
55
14.2 PlanningSoftware.
55
14.3 ControlMethod.
55
14.3.1 StepsOfControl.
55
14.3.2 OverallControl.
55
14.3.3 PlanningandControlFlow.
56
14.4 ProgressReporting.
56
14.5 WeeklySchedule.
56
14.6 Attachments.
56
15 CHANGEINWORKPROCEDURE.
57
15.1 General.
57
15.2 Change.
57
15.3 ChangeProposalFormat.
57
16 TURN-OVERPROCEDURE.
62
16.1 General.
62
16.2 IndividualTurn-Over.
62
16.3 Definitions.
62
16.3.1 Turn-Over.
62
16.3.2 MechanicalCompletion.
62
16.3.3 Unit.
62
16.4 WorkLists.
62
16.4.1 DetailedListOfOutstandingWork.
62
16.4.2 PunchList.
63
16.5 Notices.
63
16.5.1 MechanicalCompletion.
63
16.5.1.1 Contractor’sNotice.
63
16.5.1.2 Owner’sComments.
63
16.5.1.3 RepairWork.
63
16.5.2 CertificateOfMechanicalCompletion.
64
16.6 PreparationForOperation.
64
16.7 CommissioningAndOperationalTest.
64
16.8 FlowOfTurnoverProcedure.
64
16.9 Attachments.
65
INTRODUCTION.
ThisProjectExecutionPlanprescribestheschemetheContractorproposestoemployforexecutingtheWork.Namely,itoutlinestheorganization,andtheprinciples,location,andmannerofperformingtheWorkandgivingdetailedprocedures.
DefinitionsAndInterpretations.
InthisProjectExecutionPlanthefollowingwordsandphrasesshallhavethemeaningsasfollows
“Company”shallbeinterpretedasVopakShanghaiLogisticsCo.,Ltd.
“Owner”,wherevermentionedshallhavethesameinterpretationas“Company”andviceversa.
“Contractor”shallbeinterpretedasRotaryEngineeringLimitedandChinaInternationalWater&ElectricCorp.(S)PteLtdConsortium.
“RCC”,wherevermentionedshallhavethesameinterpretationas“Contractor”andviceversa.
“SupervisingCompanyor“Jianli”shallbeinterpretedasAudexPteLtd/ShanghaiCoking&ChemicalProjectConstructionSupervisionCo.Ltd.
“LDI”shallbeinterpretedasZhejiangTITANDesign&EngineeringCo.,Ltd.
Distribution.
ThisProjectExecutionPlanshallbedistributedtothekeypersonnelintheProjectasfollows:
Company’sProjectManager/DeputyProjectManager/SHEManager(2EnglishCopyand2ChineseCopy)
Contractor’sProjectManagerandSiteManager
Contractor’sConstructionManager
SupervisingCommittee’sChiefSupervisorandDeputyChiefSupervisor(1EnglishCopyand1ChineseCopy)
Others(SiteManagerwilldecidethedistributionrequirements)
ProjectPhilosophy.
SafetyFirst
Emphasisonqualityofdesignsmaterialsandworkmanship
Successfulon-scheduleexecutionandperformance
Controlofconstructionandoperationcosts
Easeofoperationandmaintenanceoftheplant
BriefDescriptionofProjectScope.
VopakShanghaiLogisticsCo.,LtdintendstorealizeaproductlogisticsterminalatShanghaiCaojingChemicalPark.
Theterminalwillbecompletedwithtanker,coasterbargeberthingandloadingfacilitiesandwillbeusedforstorageanddistributionofliquidchemicalproductsforthelocaland exportmarket.Eachproductwillhavetheoptionsofbeingtransportedinandouteitherbyship,coasterbarge,truck,railcarordrums.
Theterminalwillbebuiltinphasesoveraperiodtobedecidedbymarketdevelopment.Thisdescriptiononlycoversthefacilitiesasrequiredfortheinitialphase.Theterminallayoutsaswellasthelocationforberthingplacesarearrangedinsuchawaythatsmalladaptationscanbemadetosatisfyalternativerequirementsandfutureextensionscanberealizedoptimallyatminimumcost.
Theoffshorefacilitiesareforreceivingproductsfromoceanvesselsandarealsofordischargingproducttosmallervesselsandbargesfordistribution.Theoffshorefacilitiesshallconsistoftwojettieswhichcanbertha5,000DWTto25,000DWTvessels,twojettieswhichcanbertha1,000DWTto12,000DWTvesselandtwojettieswhichcanbertha1,000DWTto5,000DWTvesselsberthingsimultaneously.
Theonshorefacilitiesconsistofproductstoragefacilities,chemicalspumpingfacilities,drummingandwarehousingfacilities,truckandrailloadingfacilitiesfordedicatedclients.
Theutilityfacilitiesshallconsistofpotablewatersystem,plantairsystem,instrumentairsystem,nitrogensystem,firefightingsystem,wastewatertreatmentandslopsystem,andoffgastreatmentsystemforhazardouschemicalsshallbeprovidedfortheonshoreandoffshorefacilities.Airconditioningandventilationshallbeprovidedforthebuildings.Refrigerationsystemshallbeprovidedforrefrigeratedwarehousesandcontrolledtemperaturewarehouse.
Theterminalshallhaveamainofficebuildingattachedwiththecentralcontrolroom,aworkshop,afoamtruckbuilding,anintegrateddrummingandwarehousebuilding,truckloadingsheds,aircompressorshed,mainsubstationandguardhouse.
VopakShanghaiLogisticsCoLtd.(hereinaftercalledEmployer)shallbethemanagingcompanyandprovidetheknow-howandtechnologyfortheoperationoftheterminal.
Thescopeofworkshallincludeengagingalocaldesigninstituteforallgovernmentauthorityapprovalandliaisonwithgovernmentauthority,detailedengineering,procurementofallequipmentandmaterialandfieldinstallationanderectionaspercontractdocumentrequirement.
Thefollowingaregeneraldescriptionsoftheworkelements.Theseworkelementsdescriptionisjustaguidelineandthedetailedscopeofworksshallbeaspercontractrequirement:
a.Projectmanagement
-- LiaisonwithEmployer
-- Projectcontrolandreporting
-- Schedulecontrolforengineering,procurementandconstruction
b.Engagedesigninstitute
-- EndorsementofalldrawingforsubmissiontoGovernmentAuthority
-- LiaisonwithallGovernmentAuthority
c.Detailedengineering
-- PreparationofP&IDiagram,plotplan,areaclassificationdrawingandsinglelinediagram.
-- Preparealldesigncalculationsforallfunctionalengineeringofonshorefacilities
-- Preparealldesigncalculationsforstructure(i.e.operatingplatform,piperack,pipesupport),mechanicalequipment,piping,electricalandinstrumentationengineeringofoffshorefacilities
-- Prepareallconstructiondrawingsforallfunctionalengineeringofonshorefacilities
-- Prepareallconstructiondrawingsforstructure(i.e.operatingplatform,piperack,pipesupport),embeddedsteel,mechanicalequipment,piping,electricalandinstrumentationengineeringofoffshorefacilities.
-- Preparematerialspecificationandrequisitionofallmaterials,equipmentandotheritemstobesuppliedforonshoreandoffshorefacilities
-- Reviewandapproveofvendors'documents.
-- Prepareasbuiltdrawingsanddocument
-- Preparemechanicalcatalogandoperationmanual
-- Co-ordinationwithmarinestructuredesigninstitute
d.Procurement
-- Procurementofallfunctionalengineeringbulkmaterial
-- Procurementofallequipment
-- Recommendedsparepartsforoneyearoperation
-- Packing
-- Shippingandtransportation
-- Portclearanceandhandlingcharge
-- Loadingandunloading
e.Construction
-- Alltemporaryfacilitiessuchassiteoffice,utilities,storagefacilities,laborcamp,accessroad,drainageandfencing
-- Sitesecurityservices
-- Constructionmanagement
-- Constructionlabor
-- Constructionequipment
-- Temporarymaterials
-- Consumables
-- Handtools
-- Safetyequipmentandpersonalprotectivewear
-- Landandmarinetransportation
-- Pre-commissioning
-- Constructionspares
CONTRACTOR’SORGANIZATION.
UnderContractor’spermanentorganization,theContractorshallorganizetheProjectTeam,whichwillco-ordinatebetweentheOwner,SupervisingCompanyandtheContractor’spermanentorganization.
Contractor’sOverallOrganizationChart.
OverallOrganizationChartofRotaryEngineeringLimitedisattachedasAttachment2.1.
OverallOrganizationChartofChinaInternationalWater&ElectricCorp.(S)PteLtdisattachedasAttachment2.2.
ProjectTeamOrganizationChart.
InordertoexecutetheWorkeffectivelyandsmoothly,theContractorwillorganizetheProjectTeamshownintheProjectTeamOrganizationChartattachedasAttachment2.3.
TheProjectTeamshallbeamatrixorganization.
EngineeringPlan.
DedicatedEngineeringTeamstoexecutebasicanddetailedengineeringactivities:
BasicdesignandengineeringinRELSingaporeOffice.
DetaildesignandengineeringwillbecarriedoutatLocalDesignInstitute(LDI)inHangzhou,China.
AlldetaildrawingswillbeendorsedbythelocalauthorityorqualifiedAccreditChecker.
Attachments.
Attachment2.1
OverallOrganizationChartofRotaryEngineeringLimited(REL)
Attachment2.2
OverallOrganizationChartofChinaInternationalWater&ElectricCorp.(S)PteLtd(CIWE)
Attachment2.3
ConsortiumProjectTeamOrganizationChart
DETAILEDWORKSCHEDULE.
TheProjectScheduleemployingGanttcharttechniqueisshownonAttachment3.1
Attachments.
Attachment3.1
PreliminaryMasterSchedule
CORRESPONDENCEPROCEDURE.
AllcorrespondenceinexecutionofWorksundertheProjectshallbebetweenCompany’sProjectManagerorhisRepresentative(ifCompany’sProjectManagerdirectsso)andContractor’sProjectManager.TheContractorProjectManagerorhisRepresentativeshallalsocorrespondwithSupervisingCompany(SC)orJianli’sRepresentative.
DocumentsinvolvingdesigndrawingshallbesubmittedtoOwnerandcctoSCwhileanydocumentsdealingwithconstructionshallbesubmittedtoSCandcctoOwner.
CorrespondenceNumbering.
Correspondencenumberingshallbeasfollows:
CompanytoContractor
ContractNo. :
Corresp.No. :
Attention :Mr.KhinMM
ContractortoCompany.
ProjectNo. :
Corresp.No. :RCC/CL-xxx/301P0688/FC
Attention :Mr.LeeHoiChuen
WhereRCCstandsforREL/CIWEConsortium
e.g.
L
=
Letter
F
=
Facsimile
T
=
DocumentTransmittal
MM
=
Memorandum
MOM
MinutesofMeeting
xxx
=
SerialNumber
FC
=
FilingCode
ContractortoSupervisingCompanyor“Jianli”.
ProjectNo. :
Corresp.No. :RCC/SL-xxx/301P0688/FC
Attention :Mr.SongYangGeun
WhereRCCstandsforREL/CIWEConsortium
e.g.
L
=
Letter
F
=
Facsimile
T
=
DocumentTransmittal
MM
=
Memorandum
MOM
=
MinutesofMeeting
xxx
=
SerialNumber
FC
=
FilingCode
ContactAddresses&Numbers.
Owner’sAddress&ContactNo.
TownOffice
VopakShanghaiLogisticsCo.,Ltd
Room7004,NovelBuilding
887,HuaihaiZhongLu
Shanghai20
P.R.China
Tel: (86)2164315002
Fax: (86)2164747409
SiteOffice
ShanghaiChemicalIndustrialParkC1-2-1
FengxianDistrict,Shanghai07,
P.R.China
Tel: (86)21
Fax: (86)21
OffshoreContractor’sAddress&ContactNo.
RotaryEngineeringLimited
No.17,TuasAve20.
Singapore638828
Tel: (65)68611155
Fax: (65)68623306
OnshoreContractor’sAddress&ContactNo.
ChinaInternationalWater&ElectricCorporation(s)PteLtd
80,MarineParadeRoad,
09-09ParkwayParade
Singapore449269
Tel:(65)64405186
Fax:(65)64407959
Contractor’sTentativeContactParticular:
Mr.KhinM.M
ProjectManagerofCaojingProject
Unit2802B,No800DongfangRoadBaoAnBuilding
PudongShanghai,P.R.China22
Tel:(86)58204466CellPhone:
Fax:(86)68752850
TheabovecontactnumberandaddressaresubjecttochangeswhenthesiteofficeisreadybymidOct.
SupervisingCompanyAddress&ContactNo.
AudexPteLtd/ShanghaiCoking&ChemicalProjectConstructionSupervisionCo.Ltd.
No.4319LongWuRoad
Shanghai41,PRC
Tel: (86)02164345011
Fax: (86)02164340535
PROJECTDOCUMENTCONTROLPROCEDURE.
Allincomingandoutgoingprojectdocumentsshallbecontrolledanddistributedaccordingtothisprocedure.
EngineeringDocuments.
OutgoingDocuments.
AllengineeringdocumentsgeneratedbyLDIshallbeissuedtoCompanyforreviewandapprovalbytheRCC.nagementTeam(PMT).AcopyofthedocumenttransmittalwithouttheattachmentsshallbedistributedtoContractor’sEngineeringDepartmentforinformation.
IncomingVendor’sDocuments.
OffshorePurchaseItems:
IncomingVendor’stechnicalandengineeringdocumentsforapprovalshallbereceivedbyContractor’sProcurementDepartment.ProjectEngineerorbuyerwillrecordtheVendor’sincomingdocumentsanddistributeonecopytoSeniorPM/PMandonecopytotheleadengineeronsite.Afterreviewbythedisciplineengineer,acopyofthecommenteddocumentsshallbehandedtoSeniorPM/PMwhowillreviewandinputfurthercommentsifnecessary.TwocopiesofthecommenteddocumentsshallbesubmittedtoCompanyforreview/approval.
OnshorePurchaseItems:
(Theaboveprocedurealsoappliesinprincipletotheonshorepurchaseitems).
ReturnOfVendor’sDocuments.
Vendor’sdocumentsreturnedfromCompanywithorwithoutcommentsshallbenotedandsentbacktotheRespectiveVendorsforre-submissionorincorporationwithin14calendardaysafterreceivingofthedocumentsasperITBrequirements.
OtherDocuments.
IncomingdocumentsfromCompany,Vendors,Subcontractorsetc.otherthanabovementionedshallbereceivedbyContractor’sSeniorPM/PMandcopiesdistributedtoContractor’srelevantDepartment’sconcernedforactionorforinformation.
Filing.
AlldocumentsrelatedtotheProjectshallbefiledaccordingtotheattachedProjectFileNumberingDocNo.:PRO-FIL-001.
Attachment5.1:PRO-FIL-001ProjectFileNumbering.
ControlofRevisedDocuments.
Anydocumentsordrawingsthathadbeenrevisedandreissuedasapprovedrevisionshallsupersedethepreviousdocuments.Anysupersededdocumentsshallbeappropriatelyidentifiedandberemovedfromprojectfile.Acopyofsupersededdocumentshallbekeptseparatelyforreferenceorforcontractualpurposes.However,theseshallbeclearlyidentifiedandseparatedfromlatestreviseddocument.
Alldocuments/drawingsusedatsiteshallbeapprovedforconstruction.
DescriptionofOrganizationChartandKeyPersonnel.
ProjectOrganization.
InordertoexecutetheWorkeffectivelyandsmoothlyfromtheviewpointofqualityandschedule,theContractorwillorganizetheProjectTeamshownintheProjectTeamOrganizationChartattachedasAttachment2.3
TheProjectTeamshallbeamatrixorganization.
PrinciplesofProjectManagementAndExecution.
ThefollowingprincipleswillapplytoeachphaseofProcurementandConstructionfortheWork.
Emphasisonqualityofdesignmaterialsandworkmanship.
Onscheduleperformance.
MinimumconstructionandoperationcostsfortheTerminal.
EaseofoperationandmaintenanceoftheTerminal.
Implementation.
Inordertoimplementtheaboveprinciples,theContractorplanstoexecutetheWorkby:
OrganizingaProjectTeamforthesolepurposeofexecutingtheWork.Asufficientnumberoffullyqualifiedpersonnel,especiallythosewithexperienceinterminalprojects,shallbeassigned.
AbsorbingandfullyunderstandingthespecificationsandrequirementsoftheOwnerandtakingadvantageoftheContractor’sfamiliaritywiththecodesandstandardstobeappliedtothisProject.
Makingeffectiveuseoftheinformationtechnologyformaintainingthescheduleandqualityofwork.
ProjectCommittee.
Projectcommitteeistheimplementation’schampions.TheirsupportsareessentialtothesuccessfortheWorks.Membersmeetregularly(monthlyforfirstthreemonth)todiscussimportantissues,reviewprogress,providesolutionsandmakekeydecisions.
ThecommitteemembersarecomposedprimarilyoftopmanagementoftheConsortium.
ProjectManager.
ProjectManagershallbeassignedfromamongstaffpersonnelwithabundantexperienceinmanagementofProject.Heshall:
ProjectManagerwillbeauthorizedandresponsibleforalltheprojectactivitiesagainsttherequirementsoftheEmployerwiththeassistanceandsupportoftheprojectstaffsconsistingofProjectCoordinator,ProjectEngineer,PlanningEngineerandProcurement/Engineering/ConstructionTeam..
ResponsibleandauthorizetodecideallfundamentalmanagementmattersoftheprojectandensurethatProjectExecutionProcedureisdocumented,understoodandimplementedbyallemployees.
CoordinationwithEmployerandEmployer’srepresentativeSupervisingCompany.
OverallProjectBudgeting.
OverallControlandManagementofEngineering,ProcurementandConstructionSchedule.
Engineering.
Planning/SchedulinginengineeringmattersincludingDocumentRegister.
Basic/DetailedDesignandEngineering.
Preparationofrequisitionofequipmentwithpriorityoncriticallongleaddelivery.
TechnicalBidEvaluationofequipmentwithpriorityoncriticallongleaddelivery.
Checkingofdisciplinevendor’sprintsandincorporatingintodesignwithitsresultsfordisciplineworks.
DeliveryofIFA(IssueForApproval),IFC(IssueForConstruction)drawingsanddocuments.
Supervisingoninitialdesignandconversiondesign.
FieldEngineeringSupports.
LocalAuthorityApproval.
As-BuiltDrawings/MechanicalCatalogues.
ManagementandControlofEngineeringSchedule.
g) Procurementservices.
ConfirmationonSpecificationsofEmployer’spreferredVendorsandApproval.
Pre-qualificationofVendorsnotlistedinrecommendedlistbyEmployerandproposeforEmployer’sApproval.
Commercialevaluation,selectionofVendors/Manufacturers.
Releasepurchaseorderofmaterials.
Forwardingandexpeditingofmaterials.
ManagementandControlofProcurementSchedule.
h) Pre-commissioningandCommissioningAssistance.
6.5SiteManager.
SiteManagershallberesponsibleforfollowingactivities:
a) SiteManagerwillbeauthorizedandresponsibleforallconstructionactivitiesagainsttherequirementsoftheEmployerwiththeassistanceandsupportoftheconstructionteam.
b) CoordinationwithEmployer,Employer’srepresentativeSupervisingCompanyandsub-contractors.
c) OverallConstructionScheduleManagementassistedbyPlanningControlEngineers.
PlanningandSchedulingconsistsofConstructionMasterSchedule,ThreeMonthsLook-aheadConstructionSchedule,MonthlyConstructionScheduleandWeeklySchedule.
MonitoringandAnalysis.
StudyofCountermeasuresandReportingwillconfirmtheschedulevarianceincomparisonwiththeoriginaltargetandmaycallsomerequirementsofnecessarycountermeasurestosuccessfullyattaintheoriginalcompletiontargetontime.
ProgressMeasurement.
ControlofSubcontractorPlanningTeams.
Reportingontheconstructionprogress,qualityissueandSHEissuetoProjectManagement,EmployerandSupervisingCompany.
Preparingandcontrollingmanpower,equipmentandmaterialsineachdisciplineinaccordancewithconstructionscheduleandprogress.
ConstructioncostcontrolandBudgeting.
SubcontractSourcingandManagement.
Safety,QA/QC,SHE.
FieldMaterialControl.
ManageSiteConstructionmattersandlocalengineeringactivitiesbysubcontractors.
ManagingLocalProcurement.
CustomsClearanceandonlandtransportationtoSite.
6.6 ConstructionManager.
Immediatelyuponawardofcontract,theConstructionManagerwillbeappointedtotakecontrolofallsiteconstructionactivities.
a)HewillberesponsibletoSiteManager.Refertositeorganizationalchart,histeamconsistsof:(tobeupdatedasrequired)
Civil&StructureTeam
MechanicalTeam
ElectricalTeam
I&CTeam
PaintingandInsulationTeam
ShopFabricationTeam
EachteamisheadedwithaspecialtyteammanagerwhoreportstoConstructionManager.
b)TheConstructionManagerwillworkcloselytocontrolscheduleandqualityofsiteworks.Heshalltakeadjustmentforanydeviationfromkeycompletiondate.
Hewillcoordinatetheworksequenceofeachteammanagerandeachspecialtyengineer.
Hewillbeinchargeintheimplementationofprojectsafetyprocedures.Safetyistheprimaryconcernofhisworks.
HeshallliaisewithQA/QCManagerfordailyconstructioninspections.
HewillbefullyresponsiblefortechnicalcommunicationandcoordinationwiththeProjectManager/SiteManagerandengineer,developingandreviewingthetechnicaldocumentsuchasdrawings,specificationsandprocedures,interpretingandclarifyingallthetechnicaldetailstotheprojectmembers,providingtechnicaldirectionorinstructiontoqualitypersonnelinvolved,proposingandreviewingcorrectiveactions,conductingfieldengineeringsuchastechnicaladaptation.
ConstructionAdvisor
ConstructionAdvisorwillbethechairmanoftheConstructionManagementTeamthatincludestheSiteManager,ConstructionManager,SHEmanagerandQA/QCManager.
a)ConstructionAdvisorshalloverviewtheconstructionstatusandhighlight/adviseonSafety,QualityandDeliveryaspectswhiletheconstructionmanagerandteamwillcarryoutconstructionexecutionundertheguidanceofSiteManager.
b) ConstructionManagerandteamwillcarryoutconstructionexecutionunderguidanceofSiteManager.ConstructionAdvisorwilloverviewtheconstructionstatusandhighlight/adviseonSafety,QualityandDeliveryaspects.
TheconstructionadvisorwillcoordinatewithEmployerandSupervisingCompanyforbetterachievementofoverallproject.
ConstructionAdvisorwillhaveregularmeetingwiththeconstructionteamtoresolveanyissuesthatmighthavecausedhinderingoftheconstructionprogress.
ConstructionAdvisorshallcoverthedutiesofprojectmanagerduringhisabsence.
Heshallalsobeattendingtheweeklymeetingonbehalfoftheprojectmanager,whowillattendonlyifnecessary.
CAshallalsoberesponsibleforcontrolofmaterialusageandwastage(formaterialssuppliedbyREL).
CAshallassistPMinprocurementservices.
SHEManager.
TheSHEManagershallberesponsiblefortheoverallprojectsafety,healthandenvironmentalprotectionobjective.Hewillbeassistedbysafetyengineerand/orsupervisorsandshallberesponsibletoensurethatallsafety,healthandenvironmentalregulationsandproceduresofOwnersarestrictlycompliedwith.TheSHEManagershall
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年全球及中國超微細合金線材行業(yè)頭部企業(yè)市場占有率及排名調(diào)研報告
- 2025年全球及中國低浴比氣液染色機行業(yè)頭部企業(yè)市場占有率及排名調(diào)研報告
- 2025-2030全球汽車油漆測厚儀行業(yè)調(diào)研及趨勢分析報告
- 2025年全球及中國眼內(nèi)液體填充物行業(yè)頭部企業(yè)市場占有率及排名調(diào)研報告
- 2025年全球及中國初創(chuàng)企業(yè)媒體服務(wù)平臺行業(yè)頭部企業(yè)市場占有率及排名調(diào)研報告
- 2025-2030全球知識產(chǎn)權(quán)審計服務(wù)行業(yè)調(diào)研及趨勢分析報告
- 2025-2030全球設(shè)備用墊圈和密封材料行業(yè)調(diào)研及趨勢分析報告
- 2025-2030全球微膠囊脂質(zhì)粉行業(yè)調(diào)研及趨勢分析報告
- 2025年全球及中國車規(guī)級數(shù)字功放電感行業(yè)頭部企業(yè)市場占有率及排名調(diào)研報告
- 2025-2030全球螺旋繞線機行業(yè)調(diào)研及趨勢分析報告
- 第二章《有理數(shù)的運算》單元備課教學實錄2024-2025學年人教版數(shù)學七年級上冊
- DB31-T 596-2021 城市軌道交通合理通風技術(shù)管理要求
- 華為智慧園區(qū)解決方案介紹
- 2022年江西省公務(wù)員錄用考試《申論》真題(縣鄉(xiāng)卷)及答案解析
- 人教版八年級英語上冊期末專項復(fù)習-完形填空和閱讀理解(含答案)
- 一例蛇串瘡患者個案護理課件
- 低壓電工理論考試題庫低壓電工考試題
- 國家電網(wǎng)培訓課件
- 五年級上冊口算練習400題及答案
- 駱駝祥子選擇題100道及答案
- 2024年公務(wù)員考試題庫附答案【完整版】
評論
0/150
提交評論