《英文版翻譯標(biāo)準(zhǔn)-鼓形旋轉(zhuǎn)濾》_第1頁
《英文版翻譯標(biāo)準(zhǔn)-鼓形旋轉(zhuǎn)濾》_第2頁
《英文版翻譯標(biāo)準(zhǔn)-鼓形旋轉(zhuǎn)濾》_第3頁
《英文版翻譯標(biāo)準(zhǔn)-鼓形旋轉(zhuǎn)濾》_第4頁
《英文版翻譯標(biāo)準(zhǔn)-鼓形旋轉(zhuǎn)濾》_第5頁
已閱讀5頁,還剩3頁未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡介

ICS27.100

F24

RecordNo.42617-2014

DL

StandardsforElectricPowerIndustryofthePeople’s

RepublicofChina

DL/T1257-2013

Drum-Screen

ReleasedonNovember28,2013ImplementedonApril1,2014

ReleasedbyNationalEnergyAdministration

DL/T1257-2013

II

DL/T1257-2013

Drum-Screen

1.Scope

Thestandardhasstipulatedtheclassification,technicalrequirement,inspectionmethods,and

inspectionrules,etc.fordrum-screens.

Thestandardappliestothedesign,manufacturingandacceptanceofdrum-screensthat

removesuspendedsolidsfromwaterbyrotatingscreen.

2.NormativeReferencesNormativecitationdocuments(缺“文件”一詞

的翻譯)

Thefollowingdocumentsareindispensabletothestandard.Foralldatedreferences,the

versionswithonlythedatespecifiedapplytothestandard.Forallundatedreferences,thelatest

version(includingallmodificationlists)appliestothestandard.

GB/T9439GreyIronCastings

GB/T11352CarbonSteelCastingsforGeneralEngineeringPurpose

GB/T13384GeneralSpecificationsforPackingofMechanicalandElectricalProduct

GB50205CodeforAcceptanceofConstructionQualityofSteelStructures

JB/T4385.1GeneralSpecificationsforOpenDieForgingsonHammer

JB/T8098MethodsofMeasuringandEvaluatingNoiseofPumps

3.BasicRequirementforProductClassification

3.1Classification

Drum-screenshallbeclassifiedbasedonthedesignandmethodofwaterintake,whichshall

beasfollows:

a)Lightdesignlightdesigncategory(缺“類別”一詞的翻譯):theextreme

designwaterleveldifferencebetweentheinsideandoutsideofdrum-screenshallnotbemorethan

1.0m.

b)Mediumdesign:theextremedesignwaterleveldifferencebetweentheinsideandoutside

ofdrum-screenshallnotbemorethan1.5m.

c)Heavydesign:theextremedesignwaterleveldifferencebetweentheinsideandoutsideof

drum-screenshallnotbemorethan2.0m.

d)Singlesidedwaterintake:watershallflowintothedrum-screenfromonesideofit.

e)Doublesidedwaterintake:watershallflowintothedrum-screenfrombothsidesofit.

f)Waterintakefrominsidethescreen:watershallflowinfrominsidethedrum-screenand

flowoutwardafterbeingfilteredthroughmeshes.

g)Waterintakefromoutsidethescreen:watershallflowinfromoutsidethedrum-screenand

flowinwardafterbeingfilteredthroughmeshes.

3.2ModelLabeling

SeeFig.1forthemodellabelingandconnotationofdrum-screen.

1

DL/T1257-2013

ScreenNominalDiameter(m)xNominalWidth(m)

Single(Double)SidedWaterIntakeorDischarge

WaterIntakefromInside(Outside)

Initialletterof“screen”inChinesePinyin

Initialletterof“drum”inChinesePinyin

Fig.1Drum-ScreenModelLabeling

3.3StructuralForm

SeeFig.2fortheschematicdiagramofstructuralformofdrum-screen(GWNSmodelas

example).

1—Rinsingsystem;2—Maintenanceplatform;3—Actuator;4—Lubricatingsystem;5—Drum

skeleton;6—Mainshaftassembly;7—Sealingdevice;8—Cathodicproductionprotection

system;9—Controldevice

Fig.2SchematicDiagramofStructuralFormofGWNSDrum-Screen

3.4BasicParameters

2

DL/T1257-2013

a)Diameter:therangeofdiameterofthecircleoutsidetheframeworkofdrum-screenis

2200mm-2800mm.

b)Width:therangeofwidthofwaterchamberofdrum-screenis800mm-7000mm.

c)Meshdiameter:thedimensionsofmesharedeterminedbasedonthesizeofsmallest

contaminanttobefilteredbythedrum-screen,andtherangeincludes0.5mmx0.5mm,1mmx

1mm,2mmx2mm,3mmx3mm,4mmx4mm,6.43mmx6.43mm,φ3mm,φ4.2mm,φ5mm,

φ6mmandφ8mm.

d)Differenceofwaterlevelbetweeninsideandoutsidethescreen(Δh).

Lowspeed:Δhshallbelessthan100mm;

Mediumspeed:Δhshallbelessthan200mmbutnotlessthan100mm;

Highspeed:Δhshallnotbemorethan200mm;

Alarm:Δhshallnotbelessthan300mm.

e)Linearspeedofscreenboard.

1)Doublespeeddrum-screen:

Lowspeed:5m/min(errorbeing±20%);

Highspeed:15m/min(errorbeing±20%).

2)Triplespeeddrum-screen:

Lowspeed:2.5m/min(errorbeing±20%)

Mediumspeed:10m/min(errorbeing±20%)

Highspeed:20m/min(errorbeing±20%)

f)Maximumallowableflowvelocitythroughthescreenis0.6m/s.

g)Rinsinghydraulicpressure:0.17MPa-0.3MPa.

Note:theparametersarerecommendedbasicparameters.Asfornon-standarddesign,user

requirementshallprevail.

4.TechnicalRequirement

4.1Thedrum-screenshallmeetthestandardandbemanufacturedaccordingtothedrawingsand

technicaldocumentsbyestablishedprocedures.

4.2TheironcastingsshallcomplywithGB/T9439.

4.3ThesteelcastingsshallcomplywithGB/T11352.

4.4TheforgingsshallcomplywithJB/T4385.1.

4.5TheweldmentsshallcomplywithGB50205.

4.6Theantisepticpainttreatmentonthedrum-screenshallcomplywiththeprovisionsonsteel

structurepaintinginGB50205.

4.7Partsofthesamespecificationshallbetotallyinterchangeable.

4.8Auto-controlofthedrum-screenisrealizedviathewaterleveldifference.Theregulardesignis

doublespeedortriplespeed:ingeneral,whenthewaterleveldifferenceislessthan100mm,it

runsinlowspeed;whenthewaterleveldifferenceisnotlessthan100mmbutlessthan200mm,it

runsinlowormediumspeed;whenthewaterleveldifferenceisnotlessthan200mm,itrunsin

highspeed;whenthewaterleveldifferencereaches300mm,thealarmgoesoff.

4.9Drum-screenwithadiameterofmorethan3mshallbedetachable.

4.10Materialsusedinseawaterorpoorwaterqualityenvironmentshallbeproperlychosenbased

onthechlorideionconcentration.Whendrum-screenmadeofcarbonsteelisused,antiseptic

3

DL/T1257-2013

paintingshallbemadeandcathodicprotectiontechnologywillbeadopted.

4.11Thedesignclassificationoflight,mediumandheavyandsafetyparametersofthemainbody

aredeterminedbasedonuser’swaterquality,workingsystemandotherrequirements.

4.12Therangeofbackwashwatervolumeforthedrum-screenisdeterminedas22m3/h~245m3/h

andtherangeofhydraulicpressure0.17MPa~0.3MPabasedonuser’swaterquality,working

systemandotherrequirements.

4.13Themotorprotectionclass,insulationclassandotherrequirementsaredeterminedbasedon

whethertheuserequipmentislaidoutindoorsoroutdoors.

4.14Alloilandwaterpipesshallbewashedcleanandkeptunblockedwithoutleakage.

4.15Thetransmissionsshallbeabletorotateflexiblyandconvenientlywithoutjammingafter

assembly.

4.16Thelengthofparalleldeviationbetweenthecenterlineofmainshaftandthehorizontalplane

shallnotbemorethan0.1mmevery1000mmafterthedrum-screenisinstalled.

4.17Thetoothcrestrunoutofbiggearringshallnotbemorethan1/4ofgearmoduleafterthe

drum-screenisinstalled.

4.18Therunoutonbothend-facesofthedrum-screenshallnotbemorethan0.0005D(D

representsthenominaldiameterofthedrum-screen).

4.19Rawmaterials,purchasedpartsandoutsourcedpartsshallbeaccompaniedbythequality

certificatesfromthemanufacturer.Asforimportedparts,certificateoforiginandinspectionreport

arealsorequired.

4.20Therunningnoiseofthedrum-screen(includingthemotor)shallnotbehigherthan85dB

(A).

5.InspectionMethods

5.1TheironcastingsshallbeinspectedaccordingtoGB/T9439.

5.2ThesteelcastingsshallbeinspectedaccordingtoGB/T11352.

5.3TheforgingsshallbeinspectedaccordingtoJB/T4385.

5.4TheweldmentsshallbeinspectedaccordingtoGB50205.

5.5Theantisepticpaintingtreatmentofdrum-screenshallbeinspectedaccordingtoGB50205.

5.6ThewaterlevelrecorderinArticle4.8ofthestandardshallbeinspectedaccordingtorelevant

standardsofthemanufacturer.

5.7Articles4.16,4.17and4.18ofthestandardhadbetterbeinspectedbytheregularmethodsfor

universalmeasuringinstruments.

5.8Thedrum-screenshallbeassembledandgothroughverticalno-loadtestbeforeleavingfactory.

Thetransmissionsystemshallcomplywiththestandard.Theradialrunoutshallbemeasured

accordingtoArticle4.17ofthestandard.TheaxialrunoutshallbemeasuredaccordingtoArticle

4.18ofthestandard.

5.9ThepurchasedpartsandoutsourcedpartsinArticle4.19ofthestandardincludingautomatic

backwashfilterandwasherpumpshallbeinspectedaccordingtorelevantstandardsofthe

manufacturer.

5.10Themainshaftsealofthedrum-screenshallgothroughtightnesstestinthefactoryandthe

leakageshallnotbemorethan0.2L/day.

5.11Therunningnoiseofthedrum-screen(includingthemotor)shallbemeasuredaccordingto

JB/T8098.

5

DL/T1257-2013

6.InspectionRules

6.1EachproductshallpasstheinspectionconductedbytheQCdepartmentofthemanufacturing

plantandbeaccompaniedbyproductqualitycertificatebeforeleavingfactory.

6.2Productsshallbeassembledinthemanufacturingplantbeforeleavingfactory.Meanwhile,one

productshallbepickedfromeachbatchforverticalno-loadtest.

6.3Productinanyofthefollowingsituationsshallgothroughtypetest:

a)Trialproduction,typeapprovalandidentificationofnewproduct;

b)Majorimprovementofstructure,processandmaterial;

c)Thequalitysupervisionauthoritymakesarequest.

7.Labeling,PackagingandTransportation

7.1Onerustproofnameplateshallbefixatedonnotablelocationofeachdrum-screen,atleast

includingthefollowingcontent:

a)Productnameandmodel;

b)Drum-screendiameterandwidth;

c)Completemachinequality;

d)Screenboardvelocity;

e)Ex-factorynumber;

f)Dateofmanufacture;

g)Nameofmanufacturingplant.

7.2TheproductpackageshallcomplywithGB/T13384.

7.3Accompanyingtechnicaldocumentsinclude:

a)Productqualitycertificate;

b)Packinglist;

c)Generaldrawing;

d)Basicdrawing;

e)Installationdrawing;

f)Installationandoperationmanual.

4

1

2

5

7

-

2

D

0

L

1

/

3

T

People’sRepublicofChina

StandardsforElectricPowerIndustry

Drum-Screen

DL/T1257-2013

*

PublishedandReleasedbyChinaElectricPowerPress

(100005,19BeijingStationWestStreet,DongchengDistrict,Beijinghttp://www.cepp.sgcc.

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

最新文檔

評論

0/150

提交評論