已閱讀5頁,還剩7頁未讀, 繼續(xù)免費閱讀
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認(rèn)領(lǐng)
文檔簡介
1 Can you tell something about your last ship? What types (brands) of main engine have you ever experienced?On my last ship, I mainly focus such details as the type of engine DOOSAN MAN B&W 8K90MC-C, 36560 KW, gross tonnage is 39906/net tonnage is 24504, sailing from India Sea to EuropeI have experience with several different types of main engine, such as Sulzer, MAN B&W, and UEC etc. 2. What abilities should a Chief Engineer possess? Fist, I think it is very important for a Chief Engineer to be skillful and proficient at work. Second, he should maintain good management in the engine department. Third, he should be able to try to motivate every person under his management by assigning jobs fairly among them. Fourth, he needs to be good in English and language communication. Last, it is very important for a Chief Engineer to have work spirit and to maintain good relationship with the Master, the technical superintendent and other personnel from company, First Engineer and the Chief Officer. Above all, he should listen to orders or instructions from the Master in most cases. 上面的答案僅供參考。3 What were the consumption volume of cylinder lube oil and fuel oil in your previous ship?For your reference: The main engine consumption volume of fuel oil about 80-95 tons per day and cylinder oil about 300-400 liters per day depending on the RPM and the sea condition. Normally speaking, the consumption rate of cylinder lube oil for main engine is 0.8-1.2 gram/hour/horse powers, while the fuel oil consumption rate can be roughly about 120-140 gram/hour/horse power. 4. Can you please describe in detail the bunkering procedures? I should make a bunkering plan firstly according to the ship owners instructions and then report the plan to the Master for approval. Secondly, a bunkering meeting should be held to specify the responsibilities of crew during the procedure. Thirdly, preparations of the following like plugs, extinguishers, drum, alarms, communication means,fuel oil system graphics (drawing) should be made. Fourthly, I should order the Third Engineer to measure the oil volume in the suppliers tanks and record the flow meter figures. Bunkering starts after all is ready. I should order the duty engineer to take sounding all the time, especially at the beginning and at the end of bunkering each tank. My duty engineers should pay attention to the oil pressure, the temperature and the oil sample to be taken and used as evidence in the future. By the way, the engineer in charge should note that one more bottle of sample oil needs to be taken that will be stored in the vessel for three years to meet MARPOL VI requirement. Lastly, I should not sign the receipts, regardless of any delay, until quantities of the bunkered oil are confirmed. I should also note down any dispute over the quantity or adverse specifications of bunkers taken on the receipt and advise the company. I should bear the following precautions in my mind during bunkering. Before bunkering, I need to make sure that all scuppers are plugged and cemented. I should stop ballasting, de-ballasting and taking fresh water on board whilst bunkering, if possible. If I have to do all the jobs together, I should take all care to prevent an overflow of water and fuel oil. If the decks become awash due to such water overflow or rain, then bunkering should be stopped whilst the scuppers are being drained. 5. Please tell me the minimum safe oxygen percentage for the safety of the workers in an enclosed space. Please describe the procedures of entry into and work in enclosed spaces. More than 18% and no more than 23% of oxygen in an enclosed space will be OK for the safety of the workers. The procedures are as follows: First, I should prepare an entry permit to be signed by the Master. Second, before entry is allowed, all the relevant manholes should be opened for ventilation. Third, the air and surrounding of the enclosed space should be tested to see whether it is safe. Fourth, necessary equipment like the fire extinguisher, lights, communication equipments should be carried by the crew when entering. Fifth, before entry into an enclosed space, a meeting regarding the work procedure should be held. Lastly, when someone is working in an enclosed space, good communication between the crew inside and the crew outside should be maintained and the emergency rescue team should stand by for any rescue work. When entering, at least one of the crew inside is to do the lookout job. During the crews stay in the space, ventilation should be continuously on to provide enough oxygen. 6. What is a “Bunkering Plan”? A bunkering plan is made according to the owner or charterers order, voyage plan, and capacity of the tank, oil ROB, and so on. A bunkering plan is made by the Chief Engineer and approved by the Master and the company. Generally, the volume of the bunkered oil shouldnt exceed 85% of tank capacity. 7. What will you do if the oil supplied by the oil company is less than the agreed amount after bunkering? Receipts should not be signed, regardless of any delay, until quantities are confirmed by all parties concerned. Any dispute over the quantity or adverse specifications of bunkers taken shall be noted on the fuel receipt and the company should be advised accordingly. 因為該問題涉及到船東的切身利益,所以他們提問較多。 8. Did you ever encounter any mechanic problem on board your previous vessels? How did you handle them? (It is suggested to answer this question frankly and honestly.)The last vessel I worked on is even a new vessel, but some problems will happened. One time, before entering SUEZ canal at SUEZ anchorage, the main engine can not be started, after checking, found the pilot valve 33# sticking. Another time, No.1 G/E unit 5 crankcase door exploding and after checking, found unit 5 piston head bolts broken and sticking in the cylinder liner.9. The ISM Code requires preventive maintenance schedules. How do you make your maintenance schedules?According to the ISM Code, the preventive maintenance plan is made based on the ships “Planed Maintenance System” and the machinery running hour records. This plan should be made on an annual basis (or a five-year basis). Usually, the monthly maintenance schedule is made based on the annual preventive maintenance plan and the basic occasional maintenance work.10. Have you ever been to the US ports? Are you familiar with the USCG inspections?(Some of the useful words you may use when you answer the question:US ports: New York, New Orleans, San Francisco, Tampa, Houston, Mississippi River, etc.USCG: refer to the US coast guards.The most important thing in US is the sanitation (hygiene). Besides, fire fighting equipments (FFE) and life saving apparatus (LSA) and training drills must be well prepared for check.)美國對防污染非常重視,對油類記錄簿的檢查相當(dāng)嚴(yán)格,若發(fā)現(xiàn)做假,罰款非常重。11. What do you know about “SOPEP”?SOPEP means Shipboard Oil Pollution Emergency Plan. The SOPEP should contain (but not limited to) the following contents.(1) Procedures to be followed by the Master or other crew in case of oil pollution.(2) Pollution reporting system and the authority or persons to be contacted in the event of pollution including the telephone numbers etc.(3) Detailed description of actions to be taken immediately by persons on board to reduce or control the discharge of oil after the incident. (4) List of oil spill response equipment to be maintained and prepared on board. (Removers, sprayer, oil absorbent, saw dust, sand, waste rags, scoop, shovels, buckets, bamboo brooms, portable pump, protective clothing, portable containers,). The essence of the Plan is to avoid any possible oil leakage and oil pollution.Simply speaking, SOPEP should include such things as the emergency contacts (telephone and other communication means, address etc), the equipment used in dealing with oil pollution, the muster list for oil pollution, the report procedure when the accident happens etc.SOPEP is compulsory on board most of the ships according to the ISM code. IOPP is the certificate for the vessel that is qualified for the requirement issued by the Class on oil pollution prevention.12. What are the possible causes of crankshaft failure?Too big or too small clearance between bush and shaft is one of the most possible reasons. Other reason includes material problem, dirtiness of the lube oil, uneven loading in each cylinder, bad lubricating, and deformation of frame and bedplate.13. What actions should be taken when there is oil overflow on deck during bunkering?The following procedures should be taken:(1) Stop pumping and other operation first;(2) Ring the alarm immediately;(3) Crew should come to their respective position and take actions immediately according to the SOPEP;(4) If there is a possibility of fire, the Muster list for fire should be followed;(5) After finishing all the actions, records should be made on what has happened;(6) Draw lessons from the incident to avoid future reoccurrence of the same kind of incident. 14. Explain the important things when you take over from the previous Chief Engineer. 在和前任輪機長交接工作時需要注意什么? I shall familiarize myself with the following when I take over the job from the previous C/E。(1)The engine department personnel;(2) The SMS manuals and other documents on board;(3) Conditions of the vessel, the engine and equipment to see whether there are any problems left;(4) Any outstanding claim and incident reports in the service period of the previous Chief engineer should be cleared;(5) Engine logbook;(6) The ROB volume of the fuel oil, the diesel oil, lube oil and chemicals;(7) CMS survey items;(8) PMS overdue items and relevant reports.After finishing all the items in the checklist for handover, we two shall sign our names for evidence, one copy of which with the signature of the master shall be sent to the company.15. Please explain what the Chief Engineers Standing Order is? What does Night Order include?請簡要說輪機長常備命令和夜航命令的情況。The chief engineer standing order is basically the Chief Engineers own set of instructions and orders for the operation of the engine department. The orders should include any particular operating procedures that the Chief Engineer wishes to emphasize to the engineers on duty. The set of standing order and procedures must include the following:Operating procedures for main engine;Operating procedures for auxiliary engines;Watch procedures;UMS procedures;When to call the Chief Engineer;Emergency shutdown procedures;Daily monitoring and log;Arrival/Departure procedures;Operation of steering gear and test procedures;Bunkering procedures;Safe procedures in the engine room;Duties of junior engineers and ratings.Different vessels may have different contents concerning the standing order of the Chief Engineer. But basically, the contents above should be covered. The Standing Order should be put in the engine control room and in the cabin of the Chief Engineer.The night order should include such things as the warnings, lookout and when to call the Chief Engineer etc. The C/E needs to prepare night order every night before he goes to sleep.16. What is the UMS? Do you have any experience on UMS? Under what circumstances can the engine room not be operated in UMS way?UMS means Unmanned (unattended) Machinery Space (無人值守機艙). I have experienced UMS on board one ship.Under the following circumstances, the engine room cannot be operated in UMS way:(1) When fire detection and extinguishing system are not fully operational;(2) When main engine monitoring, control and alarm system are not fully operational;(3) When key auxiliary equipment or its controls and alarm system are not fully operational;(4) The instruction from the Master demands that the engine room is to be manned;(5) When arrival/departure in port;(6) During cargo operation, and on other occasions when the Chief Engineer determines that the engine room should remain manned.17. When do you apply emergency shutdown procedures and what do you shut down?什么時候啟用緊急停止?Emergency shutdown includes (1) main engine emergency shutdown, (2) ventilation emergency shutdown, and (3) fuel oil valves (quick-closing valve) emergency shutdown, (4) Sky light quick closing, (5) ventilator quick closing damper. Emergency shutdown are used when emergency situations (e. g. fire etc.) happens.18. What do you the engine room safety procedures include? The safety procedures include the procedures for maintenance work, overhaul and lifting subjects, high-location and multi-layer work (多層和高空作業(yè)),hull side work, hot work, entry into enclosed space, cleaning and painting, using steel bottle and so on.19. Name some critical (important) equipment in the engine room on board your last vessel. According to the SMS manuals of the company on board my last vessel, the following engines and machines are critical equipment: Steering gear, winch and windlass, emergency battery, generator and emergency generator, main engine, life-boat, fire extinguisher pump, oil water separator. Different companies may name different critical equipment on board different ships. Anyway, critical equipment should be given full care in daily work and should be checked and recorded periodically. 20. Under what conditions is hot work not allowed? Hot work is not allowed under the following conditions.(1) During cargo operation when handling flammable cargoes unless the ship has obtained permission from terminal or port authority.(2) During bunkering.(3) In enclosed spaces or where atmosphere is suspicious.(4) On the top of the oil tanks, or any bulkhead or deck bordering on oil tanks;(5) When vessel is alongside;(6) Some other occasions that the Chief Engineer and the Master think it not allowable.(7) Under heavy weather conditions.And some other situations where the master or the C/E thinks the hot work can bring about safety problems to the vessel and seaman.21. What is ILO convention147? What is ISGOTT?What is COLREGS 1972? ILO Convention 147 is Merchant Shipping (Minimum Standards) Convention, 1976 (No. 147)(and its Protocol of 1996). This rule is made by the International Labor Organization Conference. In this Convention, the minimum internationally acceptable labor standards for seamen in merchant ships are stipulated. Convention No.147 requires the flag State to adopt minimum standards relating to safety, social security, and shipboard conditions of employment and living arrangements to be observed in merchant shipping registered under any flag. ISGOTT means International safety Guidelines for oil Tankers and Terminals. COLREGS means Convention on international regulations for preventing collisions at sea. These two are normal publications on board the vessel.22. How often did the superintendent of your last vessel come on board for inspection? How will you cooperate with the superintendent of the company in the future? Twice a year. But for other vessels, the superintendent may come on the board more often than this. The superintendent come on board to check the ships maintenance, the crew and management situation on board and put forward some suggestions. I will respect the superintendent and try to make his work easier. Besides, during his stay on board, I will discuss with him on some important matters concerning the maintenance of the machines and the management of the engine crew. 這是一個管理問題。和船公司機務(wù)主管配合好是件很很重要的事情,不管機務(wù)代表的建議是否完全正確,都要虛心傾聽,否則,可能會導(dǎo)致船上高級管理人員的下崗。其實,很多主管都是很有經(jīng)驗的船長和輪機長,他們對公司的管理體系和船況了解非常清楚,往往會從他們那里學(xué)到很多有用的知識。23. During bunkering, what flag should you hoist? The B flag should be hoisted in the daytime and red lights at port sides should be turned on at night.24. What are the possible reasons for the sudden stoppage of the main engine? If the automatic control system (or the safety system) makes the shutdown of the main engine, there may have happened the following problems:(1) Over-speed of the engine;(2) Low lube oil pressure, and;If the stoppage is not because of the automatic system, then the stoppage of main engine could be due to :(3) No electricity;(4) The fact that emergency switch or valve has some problem;(5) The mechanic problem of the main engine. However, if oil mist detector alarm may be on or if the cooling water may have got some problem (most engines have got high temperature alarm only), the main engine may slow down. 25. Are you in favor of regular meetings on board? How will you conduct a management meeting?你覺得船上定期開會必要嗎?你如何來組織管理方面的會議?I think that regular management meeting are very important to the safe operation of the engine room or even the whole ship. We can discuss some important management and technical questions at the meeting. We can also improve our communication with each other through regular meeting. Thus, it is conducive to the cultivation of teamwork spirit and harmonious atmosphere.26. What do you usually talk about in the Safety Meeting on board a ship? The safety meeting is held at least once a month and there should be a minutes for the meeting. The safety meeting is chaired by the Master. At the meeting, the Master shall review the minutes of last meeting and highlight the areas to be improved and rectified. Each department head shall report their overall work at the meeting. The accidents, incidents and non-conformities found in last month will be discussed and checked to see whether the non-conformities have been closed or not. Officers and Engineers are required to deal with the unfinished matters. Matters requiring coordination between the engine and deck department will also be discussed. 27. What ranks should not be allowed to have
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 二零二五年度智能農(nóng)業(yè)農(nóng)藥化肥供應(yīng)及服務(wù)合同3篇
- 2025年度年度城市經(jīng)濟適用房購置合同3篇
- 2025年度股東借款及股權(quán)激勵計劃合同3篇
- 2025年農(nóng)村個人承包土地經(jīng)營權(quán)與農(nóng)村信息化建設(shè)合同3篇
- 二零二五年度農(nóng)業(yè)機械租賃與農(nóng)業(yè)人才培養(yǎng)合作合同3篇
- 二零二五年度醫(yī)療耗材研發(fā)與創(chuàng)新合作合同3篇
- 二零二五年度合伙經(jīng)營中式快餐店合同書2篇
- 個人承包城市照明設(shè)施維護2025年度合同3篇
- 2025年度綠色生態(tài)豬肉直供基地合作協(xié)議合同3篇
- 公墓墓位買賣及墓園墓碑售后服務(wù)保障協(xié)議3篇
- 【個人簡歷】大學(xué)生職業(yè)生涯規(guī)劃書10篇
- 患者滿意度調(diào)查分析
- YS/T 1149.2-2016鋅精礦焙砂化學(xué)分析方法第2部分:酸溶鋅量的測定Na2EDTA滴定法
- GB/T 11017.1-2002額定電壓110kV交聯(lián)聚乙烯絕緣電力電纜及其附件第1部分:試驗方法和要求
- 原料藥FDA現(xiàn)場GMP符合性要求與檢查實踐課件
- 科技創(chuàng)新社團活動教案課程
- 氨堿法純堿生產(chǎn)工藝概述
- 基礎(chǔ)化工行業(yè)深度:電解液新型鋰鹽材料之雙氟磺酰亞胺鋰(LiFSI)市場潛力可觀新型鋰鹽LiFSI國產(chǎn)化進程加速
- 年產(chǎn)10000噸一次性自然降解環(huán)保紙漿模塑餐具自動化生產(chǎn)線技改項目環(huán)境影響報告表
- 實戰(zhàn)銷售培訓(xùn)講座(共98頁).ppt
- 測控電路第7章信號細分與辨向電路
評論
0/150
提交評論