1、appendixthe verification of kgl400 high-speed capping machineoverviewnanjing the solid extension pharmaceutical equipment co., ltd. to provide kgl400 high-speed capping machine is suitable for a variety of specifications vials, versatility, specifications fewer parts replacement, easy to replace. it
2、 adopts plc control, frequency control or hmi touch screen control technology, stable and reliable operation, compliance with gmp requirements.how it works: after packing, stoppard vials by flat belt fed smoothly into the screw, screw evenly feeding bottle dial; oscillator is fed through the hopper
3、and track the composite lid or aluminum cover to the wear to cover station, dial into the bottle wearing the bottle cap into the capping station; center revolves around the station rolling hirable cam pressure, cover is pressed, the clutch is closed, propping seat with a glass bottle to start high-s
4、peed rotation, the disc rolling cutter fixed in the center of the station easy-to-digest gradually extruded aluminum cover, aluminum cover tightly wrap the bottle mouth; when the rolling the hirable rotation to the position of the highest point of the cam, and glass bottles moving away from dial out
5、 of the bottle, the bottle aside, into the bottles track, so as to complete the capping process.the verify of implementation the purpose of the verification is confirmed by pre-installation check, oq and performance confirmation from the installation and operation of the capping machine performance
6、to meet the design requirements and gmp requirements, and performance to meet the technological requirements.1. design validation / pre-confirmation (dq)content: the technical indicators and their design requirements, including production capacity of equipment, materials, pressure control systems, a
7、ncillary facilities, size requirements; equipment manuals, operating instructions, and maintenance.according to the design and technical parameters of the equipment, design drawings, purchase orders, vendor-supplied technical information equipment with pre-determined evaluation confirmed include: eq
8、uipment performance, quality, and applicability.the aim is to confirm the specifications of the equipment supplied shall conform to the requirements, the device technical information should be complete (operation guide, manufacturing and design standards, etc.).2. installation confirmations (iq)2.1
9、installation verification purposes: check to make sure kyg400 high-speed rolling cover random file and accessories should be consistent with the use and management requirements; also, check and high-speed rolling recognized kyg400 type the capping machine installed in accordance with design requirem
10、ents; confirm the contents of random files and attachments; unpacking inspection and data confirmation of the attachment;basis high-speed kyg400 type capping machine packing list to confirm their standard models, random accessories and documents; according to the product manual, the use of high spee
11、d capping machine confirm kyg400 type with the design requirements; documentation inventory, collection and storage; confirm the test results recorded in the following table and make evaluations.2.2 installation acknowledgment: based on kyg400 type high-speed capping machine outline drawings and ins
12、tallation requirements, check the installation location and space can meet the needs of production and ease of maintenance; based on kyg400 type high-speed capping machine installation requirements, check the external public portion of the match and meet the requirements; based on kyg400 high-speed
13、capping machine technical requirements, check the external power supply; based on kyg400 high-speed capping machine technical requirements, check the main parts of the material; appearance of the machine and drawings based on the kyg400 high-speed capping machine, check the integrity of the machine
14、and other issues; installation confirm the test results recorded in the following table and make evaluations.the 3.3 installation sure conclusions3, operational qualification (oq)3.1 run confirm the purpose of: run the technical parameters of inspection and test equipment to confirm high-speed kyg40
15、0 type capping machine line with the antibiotic bottle capping requirements, the rubber plug is not loose and have a good seal; run according to the following table, and the test results recorded in the following table, and make evaluations.3.2 verify that the confirmation of test instrumentation us
16、ed to validate the test instrumentation should be recognized, and to confirm the results recorded in the following table and make evaluations.3.3 run the project confirmedequipment operation confirmationdevice control confirmationequipment safety performance qualificationequipment the technical indi
17、cators confirmdevice operation confirmation:basis high-speed kyg400 type capping machine manual, 4 hours continuous operation at normal operating speed, the equipment operation inspection results recorded in the following table, and make evaluations. based on kyg400 type high-speed capping machine m
18、anual, the equipment of the technical indicators test results recorded in the following table and make evaluations.4 performance qualifications (pq)4.1 inspection and test equipment operation results confirm high-speed kyg400 type capping machine operates in accordance with antibiotics bottle cappin
19、g requirements, the rubber plug is not loose and have a good seal.4.2 performance qualification projectactual production capacity of the device under load operationthe safety of the equipment in the load operationthe control accuracy of the equipment in the load operationcapping the rate of qualifie
20、d productstightness testactual production capacity under load operation:based on kyg400 type high-speed capping machine manual, the actual production capacity of the equipment under load operation test results recorded in the following table and make evaluations. load operating conditions, according
21、 to high-speed kyg400 type capping machine manual, the equipment load operation under the control accuracy of the test results recorded in the following table, and make evaluations.test method: an appropriate volume of 3% try tone soy broth dispensed into sterile 2r glass bottle cap stoppers, sealed
22、 aluminum cap, 121 c for 15 min sterilization.preparation of a certain amount of 3% try tone soy broth, this medium into a enough to accommodate 150 bottles for the sample container, then this culture inoculated with e. coli based on 35 and 30 35 cultured for 48 h, when the medium turbidity, determi
23、nation of the concentration of e. coli in the medium hungry.for the test product upside down into a horizontal immersed in the broth, and then cultured for 14 days at this temperature, then elevated for the sample from the broth, water and disinfectant leaching can be visually, in which. coli concen
24、tration in the culture medium at the same time should be measured again.test standard: check for the sample medium appears turbid, muddy vial is broken and should be examined, in addition to broken bottle can make an exception, the test sample shall bacteria.positive control: will be available for t
25、he test sample bottle of access about 50 e. coli cultured for 48 h at 35 , should be observed significantly longer bacteria, otherwise the test is invalid.附錄kgl400型高速軋蓋機(jī)的驗(yàn)證由南京固延制藥設(shè)備有限公司提供的kgl400型高速軋蓋機(jī)適用于多種規(guī)格的西林瓶,通用性強(qiáng),規(guī)格件更換少,更換方便。該機(jī)采用plc總控制、變頻調(diào)速或人機(jī)界面觸摸屏控制技術(shù),運(yùn)行穩(wěn)定可靠,符合gmp要求。工作原理:經(jīng)過分裝、加塞的西林瓶由平帶平穩(wěn)地送入螺桿,被
26、螺桿均勻地分給進(jìn)瓶撥盤;震蕩器通過料斗和軌道把復(fù)合蓋或鋁蓋送到戴蓋工位,進(jìn)瓶撥盤把瓶子戴蓋后送入軋蓋工位;繞工位中心公轉(zhuǎn)的軋蓋頭被凸輪壓下,把蓋壓緊,同時(shí)離合器合上,托瓶座帶著玻璃瓶開始高速自轉(zhuǎn),固定在工位中心的圓盤軋刀由淺入深的逐漸擠壓鋁蓋,使鋁蓋緊緊地包住瓶口;當(dāng)軋蓋頭旋轉(zhuǎn)至凸輪最高點(diǎn)位置時(shí),與玻璃瓶逐漸脫離,瓶子由出瓶撥盤撥出,進(jìn)入出瓶軌道,從而完成整個(gè)軋蓋工序。驗(yàn)證實(shí)施驗(yàn)證的目的是通過預(yù)確認(rèn)、安裝確認(rèn)、運(yùn)行確認(rèn)和性能確認(rèn),證明軋蓋機(jī)的安裝運(yùn)行性能符合設(shè)計(jì)要求及gmp要求,且性能滿足產(chǎn)品工藝要求。設(shè)計(jì)確認(rèn)/預(yù)確認(rèn)(dq)內(nèi)容:設(shè)備的技術(shù)指標(biāo)及其設(shè)計(jì)要求,包括設(shè)備的生產(chǎn)能力、材質(zhì)、壓力、控
27、制系統(tǒng)、附屬設(shè)施、尺寸要求;設(shè)備的說明書、操作指南、維護(hù)保養(yǎng)等。根據(jù)設(shè)備的設(shè)計(jì)方案及技術(shù)參數(shù)、設(shè)計(jì)圖紙、采購訂單、供應(yīng)商提供的技術(shù)資料等進(jìn)行設(shè)備的預(yù)確認(rèn),評價(jià)確認(rèn)內(nèi)容包括:設(shè)備性能、質(zhì)量、適用性。目的是證實(shí)所供應(yīng)的設(shè)備規(guī)格應(yīng)符合要求,設(shè)備技術(shù)資料應(yīng)齊全(操作指南、制造和設(shè)計(jì)標(biāo)準(zhǔn)等)。1、 安裝確認(rèn)(iq)1.1安裝確認(rèn)目的:檢查并確認(rèn)kyg400型高速軋蓋機(jī)的隨機(jī)文件以及附件應(yīng)符合使用和管理要求;同時(shí),檢查并確認(rèn)kyg400型高速軋蓋機(jī)的安裝符合設(shè)計(jì)要求;隨機(jī)文件以及附件確認(rèn)內(nèi)容;開箱檢查和資料附件的確認(rèn);依據(jù)kyg400型高速軋蓋機(jī)的裝箱單確認(rèn)其規(guī)格型號(hào)、隨機(jī)附件及文件資料;根據(jù)產(chǎn)品使用說明書,確認(rèn)kyg400型高速軋蓋機(jī)的使用范圍是否符合2.2安裝確認(rèn)內(nèi)容:依據(jù)kyg400型高速軋蓋機(jī)外形圖和安裝要求,檢查其安裝位置和空間能否滿足生產(chǎn)和方便維修的需要;依據(jù)kyg400型高速軋蓋機(jī)安裝要求,檢查外接公共部分是否符合匹配和滿足要求;依據(jù)kyg400型高速軋蓋機(jī)的技術(shù)要求,檢查外接電源;依據(jù)kyg400型高速軋蓋機(jī)的技術(shù)要求,檢查主要零件的材質(zhì);依據(jù)kyg400型高速軋蓋
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 二零二五版人工智能技術(shù)研發(fā)與應(yīng)用合同15篇
- 常州2025版二手房過戶稅費(fèi)處理與過戶手續(xù)辦理合同2篇
- 二零二五版智慧城市建設(shè)合作合同范本2篇
- 二零二五版在線教育管理系統(tǒng)定制開發(fā)合同3篇
- 二零二五版ISO9001質(zhì)量管理體系認(rèn)證與質(zhì)量管理體系審核與監(jiān)督合同3篇
- 水電工程2025年度施工安全評估合同2篇
- 二零二五版LED顯示屏戶外廣告位租賃合同協(xié)議3篇
- 二零二五年海鮮餐飲業(yè)特色菜品開發(fā)與銷售合同3篇
- 二零二五年度虛擬現(xiàn)實(shí)游戲開發(fā)電子合同承諾3篇
- 二零二五版智能零售企業(yè)兼職銷售員勞動(dòng)合同3篇
- 福建省地方標(biāo)準(zhǔn)《先張法預(yù)應(yīng)力混凝土管樁基礎(chǔ)技術(shù)規(guī)程》DBJ13-2023
- 危險(xiǎn)作業(yè)監(jiān)護(hù)人員培訓(xùn)
- 職業(yè)病防治企業(yè)臺(tái)賬樣本
- 充電樁驗(yàn)收表
- 城市水環(huán)境新型污染物的去除新技術(shù)課件
- 中長期貸款按實(shí)際投向統(tǒng)計(jì)統(tǒng)計(jì)制度
- 新媒體營銷完整版教學(xué)課件最全ppt整套教程電子講義(最新)
- 鍋爐專業(yè)2020年防非停措施
- 鼻炎營銷模式策劃書課件(PPT 40頁)
- 中國鐵塔股份有限公司通信鐵塔、機(jī)房施工及驗(yàn)收規(guī)范(試行)
- 線路綜合檢修施工方案
評論
0/150
提交評論