1、3.5 construction statements for the steel liners erection3.5.1 preparation at the construction site: the embedded items will be installed along with the rising construction platform, complying severely with the requirements of the drawing (see the drawing).3.5.1.1 after the steel formworks have been
2、 promoted, the platform will be applied to carry on the installation of elevator bearers and wires, hanging the steel wires for elevating circular platform, conducting the reinforcement of pulleys through the application of the elevator in the center, and installing of limit device and suspension lo
3、ops and so forth.3.5.1.2 in prior to the removal of promote platform, the 193m platform will be installed through the application of the jumpform of construction platform. after that, a 2t winch will be lifted to the platform in a appropriate distance of 3-4m to the elevator as the fixing position.
4、the 193m platform will also be utilized to install the 180m platform. and similarly it comes to the 140m one.3.5.1.3 after the promote platform removed, the distribution of cables will be conducted by the utilization of human-and-cargo elevator and cage, as well as installing, fixing and debugging f
5、or the winch. meanwhile carry on the installation and welding of suspension points, and steel wire hanging at the 140m platform.3.5.1.4 before the steel liners have been hoisted, a railway rolling chute will be laid in the midst of the preformed hole at the bottom of chimney stack, on which a manpow
6、ered vechicle was installed to take the steel liners in place and carry out the upset transportation from the storage yard to the erection position.3.5.1.5 the winch on the promote platform will be employed to fix the welder, winch, and the side basket as the vertical tranporting tools for platform
7、and hydraulic lifting equipments. and in ahead of lowing-down, the installation and welding of lateral bearer, bearers of suspension points and elevator, and guide pulleys on the top must be completed and in preparation.3.5.1.6 the leveling, setting out and embedded items of the pedestal of steel li
8、ner should be examined and kept with records to prepare for the febrication and installation.3.5.1.7 preparation for hydraulic lifting equipment: it must be tested and in preparation. there will be one 5t two-tube winch, one 5t winch, one 2t winch, two 3t winches installed and in preparation. the hu
9、man-and-cargo elevator can be available after it has been debugged and tested with its net load. 3.5.2 operational procedurethe six layers of platforms, straightened ladders, winding stairs, components and embedded items will be manufactured in advance as well as the steel flues will also be febrica
10、ted at site. the fabrication process is: raw material accessing to the yardverifying the specification and certification of materialcarrying out the stretching , bending, percussion and welding testtemplate-makingfabrication & preparation on the materialalignment of componentsbeing compressed into f
11、ormationcombination and jointinginspection on the processweldingexamination and alignment for deformational partsmaking holesself-inspection and specilized examinationcleaning up the footing coarse of metaldust removel, oil-painting and corrosion protectionpiling-up and numbering of semi-manufacture
12、d products.with the template-making, the sample plates and items must be made, complying with the right shape and dimension and a proportion of 1:1 indicated on the work drawing, and being coodinated with relevant clamping fixture. only after the sample plate has been to transmit to the technical st
13、aff and inspector and given by permittion, it can be carried out with its febrication, of which the drawing number, names of components, certification and specification of material must be signed. and preserve enough amount according to different processing measures. for the large sheet material, it
14、s geometry dimension, side length and diagonal lines must be controlled and verified, as well as accumulated error considered for the item consists of multiple components. both corrosion protection of final product members and footing course treatment need be in accordance with design and specificat
15、ions, and make sure the adhensive strength between the membrane and primer. and the painting thickness and layers must be controlled stricktly as well as the material diluted comply with the mixing proportion. the storage yard for steel members must be flat and with no contamination and accumulated
16、water, and the workpieces must be supported firmly with no displacement or sedimentation permitted. numbering must be conducted, and give clear indication of the setting-out line and center line at the same time. for those special ones , their schematic points , names and elevation should be symblol
17、ized to facilitate for the verification and transportation. 3.5.2.1 manufacture of steel platform, windingstairs, restraining points and streightened ladders:3.5.2.2 according to the work drawing , the appearance, arc of processing, dimension, and sign number of members accessing to the site must be
18、 dealed with examination and acceptance, for which the unqualified ones cannot be put into operation. as a result of special condition, the 193m, 180m, 140m platforms will be elevated and installed in prior to the other three platforms.3.5.2.3 in the reason that all the platforms, steel stairs, fenc
19、es are final products, there wouldnt be instructions on the manufacturing procedure in these statements.3.5.2.4 each member of the platforms, steel stairs and fences must be marked with the platform and supporting number, and meanwhile the manufacturer should also provide numbered drawings in detail
20、, which was kept to prevent an unnecessary waste of human resources. for instance, the 180m platform should be marked with 180-1, 180-2180-8.3.5.2.5 the hole-making between installation position on the beam and relevant connectors must be conducted by one time. standard joints should be adopted for
21、all the circular and main beams, which cannot be distributed on the center of arc or node. and the structural corrosion protection must be practiced segmentally. for the hiden area, it must be carried out firstly, and the supplemental action must be implemented after welding. welding material and el
22、etrodes must be in accordance with given conditions on quality. for example, e43 series of eletrodes were adopted for a3 steel.3.5.2.6 the fabrication of restraining circular plate should be done comply with the external radius of different tubes.3.5.2.7 for the configuration of pedestal plate, it w
23、ill be cut on average in accordance with different material. the weld bonds will be staggered as well as foundation bolts compressed. three pieces will be assembled, for which a few weld bonds are preserved to be on the pedestal. the setting-out of holes must be configured strictly with the bolts. t
24、he weld bonds of pedestal are single groove, others are double groove, which makes double formation. and before the steel flue was erected, the pedestal must be in position and compressed, numbered with stiffners at support.3.5.2.8 breeching opening and box structure fabrication and assembling: seti
25、ng out will be carried out previously comply with the dimensions at the opening with signs marked in order to cut-off the opening after the steel flue has been installed.the breeching opening will be made into semi-manufactured product after the template-making has been conducted comply with the dra
26、wing. all the plate stiffeners will be distributed around the finished arc reinforcement plates. spot welding will be adopted solely for the plate stiffeners and opening of the box structure. to prevent an influence on the arc deviation, the steel flue can be cut down after it has been laid steadily
27、 upon the circular base. install the breeching opening, and later the plate stiffeners will be carried out with the jump welding, with the arc plates welded. in consequence of template-making and batching completed, it will be made into four pieces around the four sides. all the flanges will be fixe
28、d with bolts, following the assembly and installation of breeching opening. the base plate will be assembled firstly(spot welding), and later comes to the side plates. and only if making sure that there wasnt something wrong with them, the top plate can be assembled(both side plates has been added w
29、ith plate stiffeners). for all, attention must be paid that the horizenal seams need be staggered. for the batching of flanges, interfaces of large ones must be assembled in pairs with the hole-making, for which it will be numbered and stored later. to prevent the deformation from the welding, the s
30、pot welding will be conducted additionally at the opening, and the adjustment can be carried out after it has been cooled. setting-out of breeching opening and box structure must be implemented and marked to facilitate for the cutting. the box structure will be cut in sections and installed on site.
31、 the assembling clearance will be 46mm with plug welding.3.5.3 steel liner fabrication the raw material should be examined before the members have been processed, and certificate of qualification must be received for steel and eletrodes. the surfacial defects of material must be treated before proce
32、ssing, with no flaws on the edge or surface. and the next procedure can not be carried out until the previous one has been completed.3.5.3.1 sheet material preparation: in accordance with its circumference, it will be divided into three pieces on the platform in front of plate roller , which will be
33、 cut into a rectangle by automatic cutting machine with an accurate length and uniform diagonals to ensure the dimension and vertical error can be allowed within the limitation. and according to the drawing , its required to preserve grooves which needs be finished by polishing machine.3.5.3.2 rolle
34、d plate cutting: two semi-automatic cutting machines will be adopted to carry on the trimming and cutting, in order to avoid the deformation. one will be utilized to cut the straight flange, and another for the groove. two cutting machine must work simultaneously. 3.5.3.3after the cutting has been f
35、inished, the openning must be treated with grading.3.5.3.4the steel plates with no errors identified will be lifted by a gantry crane into the roller to form into a cylinder ,complying with the designed diameter. firstly try ,and then find the arc. when the arc meets the requirement, it needs be rol
36、led up in one time, of which the error of each plate cannot exceed 1mm, and accumulated error of every three plates cannot exceed 3mm. 3.5.3.5 in order to reduce the welding seams and speed up the progress, five clamping frames should be prepared on the site, of which the pedestal must be leveled. t
37、he steel flue sections will be encloured and welded on the second frame(that is the assembly of 1.5m steel flue sections). and for the 3m steel flues, they will be conducted on the other two clamping frames, as well as the last one for the 6m flue. in the process, the longitudinal seam should be sta
38、ggered mutually, which cannot be less than 300mm. to ensure a reliable circumference, it can be collated through the test assembling of plates in batch. and in order to keep the seams of lap joint in quality, the welding can be operated on the scaffolding, for which it should be continuous and no in
39、tervals permitted. for every single flue completed, over-night longitudinal seams were not allowed to left, and over-spot-welding was prohibited. to implement the regulations, the horizental seams were level one, and longitudinal seams were level two. the heaping of welded seams can be within an err
40、or of 1.51.0mm, concave value 0.5mm, as well as staggered distance 1mm. and the heavy hitting must be avoided in the process of assembly.3.5.3.6 to ensure the concentricity of steel flues, the collar extensions with the same circumference must be flat for the assembly, and the staggering error must
41、be controlled strictly within the limitation of specification. to achieve an accurate and reliable erection, the opening must be divided into eight parts equally. the whole process will be initiated from top to buttom, in which the each section must be marked with number, elevation and bisectrixes,
42、to prevent the slap staggering of vertical seams. 3.5.3.7 steel liner sections assembling: for the 1.5m section, make sure that its grooves were downward with the faces outward. with the face of no groove upward, firstly two sections will be combined in one segment, and two segments will be assemble
43、d into one flue. and finally two flues will also be jointed together and meanwhile installed with reinforced rings. the steel liner assembly will be conducted with priliminary centering by a micrometer and then added with the snap-gauges. after that, it will be fixed with spot welding.the angle stee
44、l tripods will be spot-welded on the outside shell to facilitate the assembly. and the planks with thickness of no less than 50mm will be paved on the tripods.3.5.3.8 after the steel flues have been assembled,with no errors examined, it can be started to weld the collar extensions, which must be imp
45、lemented strictly in accordance with the requirements of design and specification. the welders must operate on it with certificates. polishing machine and carbon arc gouging will be adopted for both weld bond cleanning and substrate treatment, and each final product must be numbered according to the
46、 diagram of components.3.5.3.9 when the steel flues were made into the 6m one, its necessary to carry on the grit-blast and corrosition protection treatment, to reduce the working in high and speed up the erection progress. 3.5.3.10 special flue farication: after the first flue has been made on the
47、construction platform, carry on the installation and welding of stiffened angle steel and steel flat, and later comes to the installation and welding of the outside stainless steel cover in accordance of the requirements of drawing. please review the diagram for the fabrication of other steel flues
48、which need be installed with ring stiffners or suspension points.3.5.4 erection procedureorder of erection: all platforms of steel stair193m platform 180m platform140m platform140m suspension point operation platformhydraulic elevation hanger frame and equipments installationno. 134 steel flues lift
49、ingrestraining points installation of 140m platform105m platform70m platform and restraining points installation35m platform193m, 180m platforms and restraining points installationelevator installationstainless steel canopy installationborosilicate blocks installation.3.5.4.1 hoisting and installati
50、on of structurea. applying with the circular platform and transit instument at the centeral bottom of chimney, the platform bearers will be positioned by dividen degrees. and a long ruler will be utilized to mark the correct installation elevations of platforms of all layers, as well as a vertical m
51、irror is employed to review the center line, from which the position of main beam can be identitfied. after the elevation of main beam terminal bearers has been verified with no errors, it can be conducted with the earth plate installation, welding, presentational treatment and additional painting.b
52、. first platform erection(+193 m): as the promoting of form completed, all the members will be delivered to the platform by derrick masts being moved vertically and installed one by one. to be in order, the installation of bearers will be prior to lateral beams, as well as horizental beams to the st
53、rutting pieces, and finally comes to the board paving. by catching up with the installation of horizental beams, the elevator support and steel wires will be installed, and hoisting holes will be preformed on the platform.c. install the embedded items in the 195m chimney windshield with specialized
54、scaffoldings, which will be taken as the supporting points to hoist the members. d. due to a special hoisting process, the 193m,180m,140m platforms and hydraulic gantry will be installed previously. after the lifting of steel liners has been completed, the same method will be taken to install the su
55、rplus three platforms by cage. and the platforms of all layers on the steel stairs will be installed along with the jump platform.3.5.4.2.1 lifting equipments a. selection of lifting equipments: as a consideration of current lifting capacity, the lifting method will be taken for the steel liners. in
56、 detail, the chimney flue will be divided into thirty-four setions which will be elevated in one time to complete the installation. four center-hole jacks will be deployed as the main hoisting equipment, with a lifting weight of 200t per one.b. perfomance parameters of hydraulic lifting equipments:a
57、:elevating jack typelsd2000d rated oil pressure28mpa elevating force2000kn area of lifting piston mm2(10-2)7.34 hysteresis piston area mm2(10-2)5.26 center-hole diameter170mm presentational dimension5501200mm stroke300 mm lifting speed3.42m/h jacking pressure92 kn steel strand diameter15.24mm quanti
58、ty of steel strands10 weight850kgb:pump station typetzb2032 rated pressure31.5mpa rated discharge21.48l/minc:steel strands diameter15.24/mm2 strength level1860n distructive load260.7kn quantity of steel strands12 pieces per one quantity of total steel stands48 pieces3.5.4.2.2 principles of lifting: the suspension points will be arranged at the +173m and 123m elevation of steel flue, and four 200t hydraulic jacks will be installed at the 140m windshield, which are connected with steel strands. and in the process of running,the hydraulic jack lifts the steel
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 針對(duì)蘋果種植農(nóng)戶的問(wèn)卷調(diào)查
- 雪松搬遷施工方案
- 固話地坪施工方案
- 筏板基礎(chǔ)專項(xiàng)施工方案
- 6年級(jí)下冊(cè)英語(yǔ)譯林版第二單元小課文
- 6-9歲兒童蛋白質(zhì)的標(biāo)準(zhǔn)
- 低溫下簡(jiǎn)支梁缺口沖擊強(qiáng)度
- 溫州工程拆除施工方案
- c25混凝土受凍臨界強(qiáng)度
- 地上物 苗木補(bǔ)償標(biāo)準(zhǔn)
- 《設(shè)計(jì)師工作經(jīng)歷證明范本》
- 高中生升學(xué)就業(yè)指導(dǎo)模板
- 某某市“鄉(xiāng)村振興”行動(dòng)項(xiàng)目-可行性研究報(bào)告
- 麻風(fēng)病防治知識(shí)課件
- 2024年代持法人股東協(xié)議書模板
- 學(xué)校食堂消毒記錄
- 高中音樂(lè)第二篇:《黃河大合唱》教案
- 企業(yè)天使輪融資商業(yè)方案模板
- 2024太陽(yáng)能光伏組件技術(shù)規(guī)范
- 潮汕英歌舞文化傳承與創(chuàng)新研究
- 2025年高考作文素材積累:17則熱聞(新聞+觀點(diǎn)+運(yùn)用)及人民日?qǐng)?bào)18篇時(shí)評(píng)
評(píng)論
0/150
提交評(píng)論