1、Contract for Decoration ProjectParty A (full name):Party B (full name):This Con tract is con eluded on the basis of the project details by and betwee nthe foresaid Party A and Party B in accorda nee withCon tract Law of People sRepublic of China and Con struct ion Engin eeri ng Con tract Regulati on

2、s1. Overview1.1 Project n ame:1.2 Project site:1.3 Project content:1.4 Means of con tract:1.5 Construction Period is from date of commenee of, to completiondate of .1.6 Quality standard:1.7 Con tract price:2. Party A s Responsibilities2.1 Party A shall provide copy of con firmedcon structi ondraw in

3、gs orin struct ions to Party B Days prior to the date of comme nee, clear up all or partsof the buildings, and remove barriers. Party A will take protective measures for theremaining furniture and furnishings.Party A also needsto provide water,electricity, gas and telecom mun icati ons, and in dicat

4、e matters n eedi ng atte nti on to Party B. Party A will be resp on sible for going through all the applicatio ns and approval procedures related to the project.2.2 Party A assigns to be the representative. He will be responsiblefor the supervision and control over the project, and handle the accept

5、anee, alteratio n, registrati on formalities.2.3 Party A en trusts with the con struct ion supervisi on of this project.The supervision company appoints to be the general supervision engineer,clarifies his resp on sibilities in the supervisi on con tract, andsubmits copy ofthe con tract to Party B.2

6、.4 Party A shall be responsiblefor protectingthe surrounding buildings,equipme nts,pipeli nes,trees and Ian dscap ingfrom being damaged, and bearcorresp onding costs.2.5 If it is really necessary to change the original building structureorpipelines, Party A shall be responsible for going through the

7、 corresponding approval procedures.2.6 Party A will coord in ate with releva nt departme nts to do on-site security,fire protect ion, waste disposal, etc., and bear the corresp onding costs.3. Party B s Responsibilities3.1 Party B must be available to attend meetings organized by Party A and prepare

8、 construction plan and schedule.3.2 Party B assig ns as the site reside nt represe ntative. He will beresp on sible for con struct ion orga ni zati on and completio n of the project with goodquality.3.3 Party B shall strictly impleme nt the con struct ionspecificati ons,safetyoperati on procedures,

9、fire safety regulati ons, and environmen talprotect ionregulati ons. It must strictly execute con struct ion abidi ng bycon struct iondraw ingsor practicein struct ions,and complete the quality in specti on record.Party B must participate in the final completion acceptanee, and prepare the project s

10、ettleme nt.3.4 Party B must abide by the provisions on the managementof thecon struct ion sites by the n ati onal or local gover nment and related departme nts,protect the surrounding buildi ngs, equipme nts, pipeli nes, trees and Ian dscap ing from being damaged. Party B also n eed to do a good job

11、 in such things as the con struct ion site security and garbage disposal, and deal well with the issue of disturb ing reside nts brought about by con struct ion.3.5 Without Party As consent or approval of releva nt departme nts, Party Bshall not make any unauthorized changes to originalbuilding stru

12、cture orpipeli nes.3.6 Party B shall be responsible for protecting all the facilities and finished projects before the project is han ded over to Party A.4. Con struct ion Period4.1 Whe n Party A n eeds to complete the project ahead of the time limit, itshould obtain Party Bs agreement and pay the c

13、ost for the measures that Party Btakes to crash the schedule.4.2 If the project progress is in flue need by the delay of Party As delivery date,the practically impacted cycle exte nds accord in gly.4.3 If the project can not be started on time or shutdownhalfway for noreas on because of Party Bs res

14、p on sibility, the practically impacted cycle can notexte nd accord in gly.4.4 The project duration shall be proIonged when the downtime is over eight hours (accumulated in one week) caused by the power failure, water failure, gas stop and force majeure factors because of desig n cha nges or reas on

15、s not related to Party B.5. Quality Stan dard and Accepta nee In specti onin struct ions,desig n cha ngessuch as Con struct ion,Unified Quality5.1 This projecttakes con struct ion draw ings.and n ati onalcon struct ionand accepta neespecificati onsand Accepta nee Stan dards of Decorati on Engin eeri

16、 ng (JGJ73-91)Inspection and Assessment of ArchitecturalIn stallati onWork (GBJ300-88) asquality assessme nt and accepta nee sta ndards.5.2 Quality of the project should meet the acceptanee criterion of national quality assessme nt. If all or parts of the project reach to the excelle nt sta ndard,Pa

17、rty A will pay to Party B in creased costs.5.3 Party A and Party B shall promptly handle the concealed work inspectionprocedures of pre-acceptaneein the middle of the project. If Party A do notorga nize covert accepta nee in time, Party B can make self- in specti on and Party A shall admit the resul

18、t. If Party A requires the re-i nspecti on, Party B shall be in accorda nee with the requireme nts for the re-i nspect ion. If the re-i nspecti on result is acceptable, Party A shall bear the re-i nspect ion fee and the project durati on canbe exte nded accord in gly;if re-i nspect ionresult is not

19、acceptable, there-inspection and reworking costs shall be borne by Party B, and the project durati on shall also be exte nded accord in gly.5.4 If materials provided by Party A for the constructiondo not meet then ecessary requireme nts, Party A shall bear resp on sibility for any result ing delaysi

20、n the completi on of the project.5.5 If the quality of Party Bs work results in any accidents, liability for such accide nts shall be borne by Party B.5.6 When the Project is ready for final acceptanee. Party B shall submit toParty A the full as-built docume ntati ons and completi on accepta nee rep

21、ort. PartyA shall organize the acceptance within 5 day after receiving all the documents.When Party A can not con duct the accepta nce with in the time specified in theCon tract, Party A shall inform Party B without delay and determ ine ano ther datefor the acceptance.Party A, however,shall admit th

22、e completiondate of theDecoratio nProject and be liable for theexpensesfor tak ingcare of thecon struct ion by Party B and other releva nt expe nses.6. Con tract Prices & Settleme nt6.1 The Parties agree to determ inethecon tractpricepursua nttomode below: Fixed price/% risk rate (in cludi ng /)(2)

23、Fixed price, comb ined with(3) Adjustable price: make adjustme nts and settleme nt accord ing to releva nt state regulati ons6.2 Party A shall make payme nts after the Con tract comes into effect. Finalpayme nt will be made after completi on of the project.Timing of PaymentsPayment ProportionAmount6

24、.3 After final accepta nce of con struct ion. Party B will make the engin eeri ng settleme nt and tran sfer the releva nt docume nts to Party A. Party A shall complete reviewing of the documents within / days. Where Party A fails to raise an objection, its consent shall be deemed to have bee n give

25、n. The final payme nt shall be made within / days.7. Material supplies7.1 Party A is in charge of purchas ing the supplied materials and equipme nts(refer to Ann ex).The materials shall be qualified and meet the desig nrequirements, and be delivered to the scene in time. If Party B is responsible fo

26、rpicking up the materials, Party A shall hand over delivery documents to Party Band let Party B bear the tran sportati on expe nse. Party A shall be resp on sible forthe damages to the project caused by quality problems or specificati on differe ncesof the materials and equipme nt supplied by Party

27、A. Party B is resp on sible forstorage of materials provided by Party A, and Party A shall pay /% of thematerial value as the storage fee. Party B shall be resp on siblefor thecompe nsati on associated with the loss caused by improper storage of Party B.7.2 Materials provided by Party B: Any materia

28、ls or equipment supplied by Party B which do not meet the desig n and con structi on requireme nts are prohibited. If the materials have bee n used, the loss caused shall be assumed by Party B.8. Safe Production and Fire Regulations8.1 Con struct ion draw ings provided by Party A or practice that sh

29、ould complywith the fire regulati ons of the Peoples Republic of China and the releva ntfiresafety rules.8.2 Party B should strictly abide byEngineering Safety Technical Regulationsfor Con struct ionand In stallati on , Safety Operati onProcedures , Fire Con trolRegulati on and other releva nt laws

30、and regulati ons.8.3 Party A shall bear all the resultingeconomic losses if the drawingsorin struct ionsviolate the safety operati ng rules, fire con troland fire preve nti ondesign specifications.8.4 Party B shall bear all the result ing econo mic losses if its con struct ion process violates the s

31、afety operati ng rules, fire con trol and fire preve nti on desig nspecificati ons.9. Rewards and Liabilities for Breach of the Con tract9.1 If Party A causes any delays to the completio n of this project, the n Party Amust pay to Party B for each day bey ond the scheduled completi on date.A fine of

32、 will be imposed in respect of each day that the payment is overdue.9.2 If Party B causes any delays to the completion of this project, then Party Bmust pay to Party A for each day beyond the scheduled completion date.If the project n eeds to be completed ahead of the time limit, a reward ofwillbe p

33、rovided by Party A in respect of each daybefore the scheduled completi ondate.9.3 If all or parts of the project reach to the excellent standard, Party A willpayto Party B as a reward.9.4 Party B shall protect the equipments provided by Party A, furniture,furnishings and finished products placed on

34、site. If losses are caused, Party B shall bear the compe nsati on resp on sibility.9.5 If Party A instructs Party B to make any alterations to a load bearing walland Party A has not sought and received permissi on from the buildi ng property man ageme nt, Party A shall be resp on sible for any resul

35、t ing costs and shall indemnify Party B for any additi onal expe nses in curred.9.6 If Party B makes any unauthorized changes to load bearing walls or building pipelines and such changes result in damages or loss, it shall be the resp on sibility of Party B to pay for such loss.Engin eeri ng9.7 Part

36、y A shall be responsible for any extra costs incurred due to his use ofthe property before the final completion meeting and signing of the Quality Accepta nee” docume nt.9.8 If a party suspends its performanee, it shall timely notify the other partyand be liable for all losses thus in curred to the other party.10. Deputes10.1 If there is any dispute betwee n the two parties, the parties should solvethrough n egotiati on or submit a

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論