1、水利分部工程驗收鑒定書編號:01-03O o o o水庫大壩樞紐工程左岸非溢流壩段分部工程驗收鑒定書單位工程名稱:O o。埋石混凝土重力壩左岸非溢流壩段分部工程驗收工作組2014年12月25日instrument equipment of procurement, and test and rate set according to this technology terms provides, and construction drawings requirements and supervision Department indicates, completed monitoring in
2、strument equipment (including cable, and accessories) of procurement, and transport, and test, and custody, and Assembly, and rate set, work (2) monitoring equipment installation, Embedment and the associated civil works construetion drawings under this contract requirements and supervision instruct
3、ions, complete the installation of monitoring equipment at the site and lay, as well as the necessary for installation, Embedment drilling, drilling, backfill, concrete pouring work And monitoring equipment installation and laying of related civil engineering work, including (but not limited to): 1)
4、 drill: including monitoring hole drilling, borehole flushing, opening protection all drilling operations 2) drill backfill: cement mortaror grout 3) concrete: including concrete work at the Observatory. (3) monitoring contract monitoring equipment installed and buried timely recordsafter the initia
5、l reading, and according to the technical terms and the technical requirements to monitor contract work前H。位于龍溪河下游左岸小支流斷石河中游,是一座以農業(yè)灌溉和場鎮(zhèn)供水 為 主,兼顧灌區(qū)農村人、畜飲水的綜合利用中型水利工程。水庫大壩樞紐位 于。村的 河壩灣處,壩址距。鎮(zhèn)約2. 9km,距坪。約11.0km,距縣城41km,距。主城約 150km。水庫灌區(qū)涉及鶴游、坪山、硯臺及包家4個鄉(xiāng)鎮(zhèn),同時兼顧鶴游、坪山場鎮(zhèn)供 水。23o o o址以上集雨面積52. 71kmo水庫正常蓄水位419. 5
6、0m,相應庫容869萬m; 設3計洪水位(P二2%)42019m,相應庫容960萬m;校核洪水位(P二0. 2%)420. 91m, 相應333庫容1065萬m;死水位409. 50m,相應庫容123萬m,調節(jié)庫容746萬m。1、驗收依據(1) 水利水電建設工程驗收規(guī)程SL223-2008;(2) 水利水電工程施工質量檢驗與評定規(guī)程SL176-2007;(3) 水利水電工程單元工程施工質量驗收評定標準SL632-2012;(4) 設計圖紙、設計變更通知及施工技術要求;(5) 施工合同。2、組織機構建設單位:O O O設計單位:O O O監(jiān)理單位:。o O施工單位:。運行管理單位:3、驗收過程2
7、014年12月25日。委托重慶市弘禹水利咨詢有限公司主持對。埋石 混凝土重力壩工程左岸非溢流壩段分部工程進行驗收,分部丄程驗收匸作組通過察看現 場、查閱資料,(聽取施工、設計、監(jiān)理等單位的工作報告)討論并通過該 分部工程驗 收鑒定書。一、分部工程開工完工日期:本分部工程于2012年5月23日開工,至2013年8月26日完工。二、分部工程建設內容本分部工程建設內容為:防滲面板栓、壩體埋石栓、墊層栓及換填栓澆筑、(壩內 預埋鋼筋栓管集水道、PVC排水管核實有無此部工程量)瀝青杉木板制安等。三、施工過程及完成的主要工程量:1、施工過程:本分部工程于2012年5月23日開始(澆筑)18號壩段、2012
8、年12月7日開始 9號壩段換填栓(9號壩段無換填栓)、墊層栓、防滲栓及壩體埋石磴施工,于2013年 8月26日全部完成。施工前及過程中對建筑物輪廓線及線型變化點進行了施丄放樣, 并將相關成果報監(jiān)理工程師復核。外露面模板使用定型鋼模加拉筋固定,沉降縫模板使 用木模拼裝而成,同時按照設計要求設置瀝青杉木板沉降縫及上游防滲面板的銅片和橡 膠止水。在模板安裝及基礎面或施丄縫處理等工序驗收合格并經監(jiān)理工程師簽署栓開倉 許可證后進行栓澆筑,栓及埋石采用塔機吊運入倉。栓 澆筑嚴格執(zhí)行“三檢制”及監(jiān)理 “旁站制”,做到每個施工工療;經監(jiān)理工程師驗收 合格后方進行下一工序的施工。在施匸過程中按照設訃及規(guī)范要求對
9、基礎面或施工縫、模板安裝、預埋件制作 及安 裝、栓澆筑、埋石及栓外觀質量等工序進行檢查、控制,同時加強了(碗試配)原材料 及中間產品的檢測取樣檢測工作。通過對施工工序及原材料、中間產品的有 效控制,本 分部工程質量滿足設計及規(guī)范要求。2、完成的主要工程量:壩基C15換填栓約3800m?, C15W4墊層栓約5100m?, C20W6防滲栓約7500m?, C15 埋石碗約31100m?,預制栓管、PVC管。四、質量事故及缺陷處理:無。五、擬驗工程質量評定:1、單元工程劃分根據重慶市水利工程質量監(jiān)督中心站以渝水質監(jiān)。號文件對。工程單 位、分部工程批復,施工單位對單元工程進行細化,監(jiān)理審核,業(yè)主認
10、可。該分 部工程 共劃分351個單元工程,其中C15栓基礎換填17個,C15W4 ft墊層18個,C20W6磴防 滲層163個,C15埋石栓壩身153個。2、工程質量檢測ing to the technical terms and the technical requirements to monitorcontract workatory. (3) monitoring contract monitoring equipment instailed and buried timely records after the initial reading, and accordObservg p
11、rotection all drilling operations. 2) drill backfill: cement mortar orgrout 3)concrete: including concrete work at the vil engineering work,including(but not limited to): 1) drill: including monitoring holedrilling,borehole flushing, openinted cition, Embedment drilling, drilling,backfill,concrete p
12、ouring work. And monitoring equipment installation andlaying ofrelaon instructions, complete the installation of monitoringequipmentat the site and lay, as well as the necessary forinstallaervisiuipment installation, Embedment and the associated civil worksconstruetion drawings under this contract r
13、equirements and supe, andaccessories) of procurement, and transport, and test, and custody, andAssembly, and rate set, work(2) monitoring eqings requirements andsupervision Department indicates, completed monitoring instrument equipment (including cablinstrument equipment of procurement, and test an
14、d rate set according to this technology terms provides, and construetion draw,施工單位自檢:共完成水泥、砂、碎石、塊石及止水等原材料檢測92組,C15換填 栓28天抗壓強度檢測18組、90天抗壓強度檢測2組,C15W4墊層栓28天抗壓強度檢 測20組、90天抗壓強度檢測8組,C20W6防滲栓28天抗壓強度檢測167組、90天抗壓 強度檢測18組,C15埋石栓28天抗壓強度檢測153組、90天抗壓 強度檢測39組,埋 石栓容重檢測2組,各項檢測指標均滿足設計及規(guī)范要求。業(yè)主(監(jiān)理)單位抽檢:共完成水泥、砂、碎石、塊石及
15、止水等原材料檢測28組,C15抗壓強度檢測34組,C20抗壓強度檢測32組,各項檢測指標均滿足設計 及規(guī)范要求。3、施工單位自評結果本分部工程共351個單元工程,根據水利水電工程施工質量檢驗與評定規(guī)程 SL176-2007,施工單位自評單元工程質量全部合格,合格率100%,其中優(yōu)良單元工程114 個,單元工程優(yōu)良率為32. 5%;自評質量等級:合格。4、監(jiān)理單位復核意見經復核351個單元工程質量全部合格,合格率100%,其中優(yōu)良單元工程114個,單 元工程優(yōu)良率32. 5%;原材料及中間產品質量合格,資料基本齊全。復核質量等級:合 格。5、分部工程質量等級評定意見本分部工程共351個單元工程,
16、原材料及中間產品質量合格,施工中無質量事故、 質量缺陷和安全事故;單元工程經施工單位自評質量等級合格,監(jiān)理單位復核質量等級 合格,項LI法人認定質量等級合格。分部工程質量等級評定意見:合格。六、驗收遺留問題及處理意見:無。七、驗收結論:依據水利水電建設工程驗收規(guī)程(SL223-2008)要求,驗收組通過現場查看、核 查資料后一致認為,該分部工程已按設計及合同約定全部完成施工,施工工 藝符合栓規(guī) 范。施工后的質量符合設計及規(guī)范要求,資料基本齊全,施工中未發(fā)生質量和安全事 故。本分部工程共劃分為351個單元工程,質量全部合格,合格率100%,其中優(yōu)良單元 工程為114個,單元工程優(yōu)良率32. 5%
17、;原材料及中間產品質量合格。根據水利水電工程 施 工質量檢驗與評定規(guī)程(SL176-2007),分部工程質量等級評定為合格,驗收工作組同 意驗收。八、保留意見(保留意見人簽字):無九、分部工程驗收工作組成員簽字表附后ing to the technical terms and the technical requirements to monitor contract workatory. (3) monitoring contract monitoring equipment instailed and buried timely records after the initial read
18、ing, and accordObservg protection all drilling operations. 2) drill backfill: cement mortar or grout. 3) concrete: including concrete work at the vil engineering work, including (but not limited to): 1) drill: including monitoring hole drilling, borehole flushing, openinted cition, Embedment drilling, drilling, backfill, concrete pouring work And monitoring equipment installstion and laying of relaon inst
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 勞務公司補充合同范本
- 汽車維修外協(xié)合同范本
- 兼職合同范本15篇
- 幕墻工程合同范本
- 創(chuàng)客合同范本
- 協(xié)調服務合同范例
- 南京監(jiān)理公司合同范本
- 古宅出售合同范本
- 變壓器試驗合同范本
- 與飯店合作合同范本
- 《全國導游基礎知識》全套培訓課件-295p-完整版
- 2023年菏澤醫(yī)學??茖W校單招綜合素質考試筆試題庫及答案解析
- 玻璃幕墻安全專項施工方案(專家論證版本)
- 教育機構招生合作協(xié)議
- 我的寒假生活課件模板
- ISO37000-2021組織治理-指南(雷澤佳譯2022)
- c語言期末機考(大連理工大學題庫)
- 洞頂回填技術交底
- 貝多芬與《月光奏鳴曲》
- 第18課 罐和壺(一)
- 初二下分式混合計算練習1(附答案)
評論
0/150
提交評論