1、SCHEDULE OF HULLL PART FOR MOORING TEST AND SEA TRAILJH9105-946-01SY第 37 頁REV.NO.DATEDESCRIPTIONMODIFYCHECKA2014.06.20ISSUED FOR OWNER &CLASS & SHIPYARD APPROVAL高 飛林玉璋 SCHEDULE OF HULLL PART FOR MOORING TEST AND SEA TRAIL船體系泊及航行試驗大綱SIGNATUREDWG.NO.JH9105-946-01SY1/37SCALE重量WEIGHTPAGEDATERev.
2、ASHANGHAI BESTWAY MARINE ENGINEERING DESIGN CO.,LTD111 Cao Bao Road ShangHai, CHINA P.C:200233 Email: luckwayTel:86-21-6436 5500 Fax:86-21-5448 7783 DESIGNED高 飛CHECKED林玉璋VERIFIED胡 敏APPROVED陳雪峰TITLEDETAIL DESIGN5000T SALVAGE CRANE VESSELBUILDERZPMC1052SHANGHAI ZHENHUA HEAVY INDUSTRY CO.,LTDHULL No.OW
3、NERCHINA YANTAI SALVAGECLASS目 錄PART I. MOORING TEST 第一部分 系泊試驗40. General Provisions總則41. Anchor Equipment錨設備52. Mooring Winches系泊絞車63.The pipe handling cranes 管子起重機 40 t 35 m74. Deck Crane 甲板起重機 10t 20 m105. Test of Doors, Windows and Hatch Covers 門窗及艙口蓋密性試驗156. Watertight sliding door 水密移門167. Life
4、 Raft Davit 救生筏吊178. Test of Lowering and Hoisting Rescue Boat 救助艇降落及回收試驗179. Gravity-Hydraulic Luffing Arm Type Davit and Boat 重力液壓倒臂式救生艇裝置1811.Galley and Laundry Equipment 廚房及洗衣間設備2112. Test of Accommodation Ladder and Davit 舷梯及其吊架試驗2113. Test of Elevator 電梯試驗2214. Check and test on signal equipme
5、nt24信號設備的檢查和試驗2415 . Check fire fighting equipment 消防設備的檢查2416. Test of Working Anchor Equipment 工作錨絞車試驗2517. Test of Heavy Lift Crane 重型起重機試驗25PART II. SEA TRIAL 第二部分 航行試驗26GENERAL PROVISIONS總則261. Speed trial 航速試驗272. Inertia test and Crash Astern Test慣性試驗、緊急停車和倒車試驗283. Turning circle test 回轉試驗294
6、. Z-manoeuvre test Z形操縱試驗295. Steering test 操舵試驗306. ATHWARTSHIP THRUSTER TEST側向推進器試驗317. Measurement of vibration振動測試328. Measurement of noise噪聲測試359. Anchor test 拋(起)錨試驗36PART I. MOORING TEST 第一部分 系泊試驗0. General Provisions總則0.1Mooring test shall be carried out with the aim of checking the goodness
7、 of the installation work and running condition of all the systems and equipment to ensure a successful trial.系泊試驗之目的是試驗和校核各系統(tǒng)及設備的安裝質量和運行的可靠性,為試航提供保證。 0.2In accordance with the provisions of the List of Acceptance Items and Certificates, each and every relevant test shall be executed with the partic
8、ipation of the Owners representatives, the Surveyors from the National Authority and the Classification Society or the representatives entrusted by them. Other items not included in the acceptance list shall be tested and recorded by Shipyard itself.按驗收項目明細表規(guī)定,各有關的試驗項目應在船東代表和/或驗船師或他們所委托的人員參加下進行,其余項目
9、工廠自己進行試驗記錄。0.3With the exception of tests covered in the a.m. items of acceptance, if the manufacturers tests have been completed in shop and its results will not be effected during and after installation on board, then such test shall not be carried out again. However the safety valves after mounti
10、ng on board shall be checked again and accepted by the Surveyor.除驗收項目規(guī)定者外,凡業(yè)經制造廠校驗完畢,且上船安裝后不會影響校驗結果者,則可不再作試驗。0.4Prior to the operation test of main engine and generator sets, a check of the relevant alarm and safety points shall be finished.主機、發(fā)電機組在運轉試驗前應將有關的安全報警點校驗結束。1. Anchor Equipment錨設備1.1Aim of
11、 testThe test of anchor equipment shall be carried out in order to examine the quality of installation and the working performance including the flushing system in the hawse pipe.試驗目的檢驗錨設備系統(tǒng)安裝質量及錨鏈筒沖水裝置的功能。1.2Test condition試驗條件1.2.1Check quantity, weight, the length and diameter of anchor chain, qua
12、ntity of provision like anchor shackle, connection shackle and connection chain ring, and brand sign;核對錨的數(shù)量、重量、錨鏈長度和直徑、錨卸扣和連接卸扣或連接鏈環(huán)等的備品數(shù)量、鋼印標志;1.2.2Check correction and reliability of the installation relative position of anchor windlass and the system, and check the brand sign of anchor windlass;
13、檢查錨機裝置及其系統(tǒng)安裝相對位置的正確性和可靠性,并核對錨機的鋼??;1.2.3Check the reliability of shackle connection among each anchor chain;檢查各節(jié)錨鏈之間卸扣連接的可靠性;1.2.4Check the tightness test record of hydraulic pressure system after the shipment of hydraulic pressure anchor windlass. And the checkout of safety valve, overflow valve, pr
14、essure reducing valve and so on;檢查液壓錨機裝船后的液壓系統(tǒng)密性試驗記錄,安全閥、溢流閥和減壓閥等校驗合格;1.2.5Meshing and releasing the machine clutch three times and checking the agile of the clutch and the use of band brake. 將機械離合器嚙合及脫開各三次,檢查離合器工作的靈便性和剎車的效用。1.3Test items試驗內容1.3.1After visual inspection of the windlass, non-load ope
15、ration test shall be carried out, meanwhile a hoisting and lowering running trial is to be conducted at 15 minutes. One ahead and astern running trial is to be conducted at 510minutes intervals in order to observe the drive system and each operating part of windlass if unconventionally heating and k
16、nocking. Record starting-and running current as well as voltage of electric motors. After running test, measure insulation resistance of motor and control box (not to be less than 1MW).錨機進行正、倒車空載運轉各15分鐘,試驗時每隔510min正、倒車變換一次,觀察錨機傳動裝置及各運轉部件有無異常發(fā)熱及敲擊現(xiàn)象。記錄啟動及運轉電流以及馬達電壓。運轉試驗結束后測量馬達及控制箱的絕緣電阻(不小于1M)1.3.2Low
17、 down each anchor separately, meanwhile use a brake-stopper to brake it 2-3 times, and then heave up the anchor by means of windlass. During the course of lifting, stop lifting 2-3 times to check convenience of clutch operation, reliability of brake equipment. 將左、右錨分別拋出,下拋過程中用制動器剎車2-3次,然后用錨機將錨絞起,升起過
18、程中作2-3次停止作檢查離合器操縱的方便性性剎車裝置工作的可靠性性。There is no jumping chain when passing through the chain cable stopper and chain cable wheel. 錨鏈通過掣鏈器和鏈輪的情況,有無跳鏈和扭曲現(xiàn)象。Heave the anchor back to the hawse pipe, and check the fitness between anchor and shell plate/rest structure.將錨收進錨鏈筒,檢查錨與結構的貼和情況。The working conditi
19、on of the flushing system of the hawse pipe to be normal檢查錨鏈筒沖水裝置的工作情況。The working condition of the cable releaser to be safe and reliable.檢查棄錨器的棄錨動作應安全可靠。2. Mooring Winches系泊絞車2.1Check up the correct installation and completeness of all parts of the mooring winches.觀察系泊絞車的各部分是否安裝正確完整。2.2Hoisting an
20、d lowering running to be carried out at no load for 30 minutes respectively. The ahead and astern running switch once per 3minutes. Check it as bellow at test: 空載正、倒車各約30分鐘,試驗時正、倒車每隔3min變換一次。試驗時應進行如下檢查:Check whether each moving compartment has exceptional heating and knock phenomena. 檢查各運動部件是否有異常發(fā)熱、
21、敲擊現(xiàn)象;Check if hydraulic pressure system has leak phenomena.檢查液壓系統(tǒng)是否有泄漏現(xiàn)象;Check work condition of motor. 檢查電動機的工作情況;Check electric control equipment and each speed adjustment and work condition of electromagnetic implement. 檢查電氣控制設備及各檔調速和電磁器的工作情況;Check and adjust over-load protecting setting, and adj
22、ust the startup pressure of the safety valve of hydraulic pressure system and steam system. 檢查和調整過載保護裝置,按技術要求調整液壓系統(tǒng)和蒸汽系統(tǒng)的安全閥的開啟壓力;Detailedly check each compartment pressed after test. 試驗后,詳細檢查各受力部件。2.3Meantime record the work pressure of oil pump, rotate speed of oil pump and oil motor, start up cur
23、rent, work current, voltage and rotate speed of motor, the value of hot insulation resistance of motor and control equipment, power and hauling speed of winch at test.試驗時同時記錄油泵工作壓力、油泵和油馬達的轉速;電動機啟動電流、工作電流、電壓及轉速;電動機,控制設備的熱態(tài)絕緣電阻值;絞車試驗時的功率和收纜速度。3.The pipe handling cranes 管子起重機 40 t 35 mDetail to be acco
24、rding to the suppliers requirement.具體按照設備商的試驗要求進行。3.1Check that all ropes are mounted onto the drum properly and all fixed points are mounted correctly.檢查所有的鋼絲繩的固緊點是否安裝正確,包括卷筒的固緊點。The bolts from the pedestal to the slewing column must be tightened up correctly with the required tensioning force.檢查所有
25、的連接螺栓,尤其是回轉軸承處的螺栓是否安裝正確,是否已預緊。The proper assembly of the pivot pins has to be checked.檢查各鉸點的銷軸是否安裝正確。All greasing points and oil filled items must be checked for proper lubrication.檢查各潤滑點是否都充分潤滑。3.2No-load test of main hook & Auxiliary hook 主、輔鉤空載試驗Do hoist、luff and slew at max. work range.起升、變幅
26、、回轉機構分別在最大工作范圍內動作。Verify hooks lifting speed:Main hook. 25 m/minAuxiliary hook: 50 m/min檢驗吊鉤起升速度主鉤: 25 m/min輔鉤: 50 m/minCheck the oil pressure、current、voltage、power and do the limited test.檢測各動作的油壓、電流、電壓、功率。Limited stop function test.安全限位功能試驗。Check every limited stop in security of not.檢查各限位裝置是否可靠。V
27、erification of the slewing speed 0.8 RPM.檢驗回轉速度0.8RPMAll indications on the Control Panel are checked檢驗控制板指示Emergency Stops Test緊急停機試驗3.3Nominal load test 額定負載試驗 Check the lifting speed and the exactness of all movements.檢查起升速度和所有動作的精確度。Main lifting 主鉤Nominal Load (40 tonnes) applied to the hook blo
28、ck.主鉤額定負載40t。Verification of the hook lifting speed 25 m/min.檢驗主鉤起升速度25 m/min。Verification of rotation speed 0.8 rpm.檢驗轉速0.8 rpm。Auxiliary lifting 副鉤Nominal Load (10 tonnes) applied to the hook block副鉤額定負載10t。Verification of the hook lifting speed 10 m/min.檢驗副鉤起升速度10 m/min。Verification of rotation s
29、peed 0.8 rpm檢驗轉速0.8 rpm。3.4Over-load test of main hook 主鉤超載試驗 Proof load = 5tonnes + VL = 5t + 0.75x 2.5x 41.4t = 79.1682.63 t shall be applied to the main hook block at a distance of 35.0 m.主鉤吊距35m時,試驗載荷為:5tonnes + VL = 5t + 0.75x 2.5x 41.4t = 82.63t5t + 0.75x 2.52x 41.2t = 82.868 tKeep the hang at
30、 least 5 min.保持懸掛時間不少于5分鐘。No abnormal evidence of every parts.檢查起重機各結構有無異常變化。Verification of the winch brake capacity to sustain the load without compromising crave and winch integrity.檢驗剎車力可靠性。During this test the crane is to lift, to slew and to luff the proof load at slow speed.在此試驗負荷下,緩慢做旋轉和變幅動作
31、。3.5副鉤超載試驗 over-load test of whip hook Proof load = 1.25 x VL = 1.25 x 0.75 x 3.422.95 x 10.4 t = 33.34528.762t shall be applied to the auxiliaary hook block at a distance of 36.5 m.副鉤吊距36.5m時,試驗載荷為:Proof load = 1.25 x VL = 1.25 x 0.75 x 2.95 x 10.4 t = 28.762t1.25 x 0.75 x 3.35 x 10.4 t = 32662 kgK
32、eep the hang at least 5 min.保持懸掛時間不少于5分鐘。No abnormal evidence of every parts.檢查起重機各結構有無異常變化。Verification of the winch brake capacity to sustain the load without compromising crave and winch integrity.檢驗剎車力可靠性。During this test the crane is to lift, to slew and to luff the proof load at slow speed.在此試
33、驗負荷下,緩慢做旋轉和變幅動作。4. Deck Crane 甲板起重機 10t 20 mDetail to be according to the suppliers requirement.具體按照設備商的試驗要求進行。4.1No-load test 空載試驗4.1.1Safe limiter adjusting test安全限位裝置的調整試驗Carry out this unload test, check whether all safe limiters are at correct position and reliable, and control box signal are e
34、xact when safe limiters are working.該試驗在空載狀態(tài)下進行,運轉調試各種安全限位裝置的位置是否正確,工作是否正??煽?。各安全限位裝置動作時,控制箱上的信號應動作可靠。4.1.1.1Hoisting upper limit 起升上限位Adjust the distance between hoisting gear and sheave center, and make sure drum rope storage slot number shouldnt be less than 1 ring調試吊具到滑輪中心的距離及升降卷筒上繩槽的剩留槽數(shù)應不小于1圈4.
35、1.1.2Hoisting down limit(OPTIONAL ITEM) 起升下限位Adjust crane to Max.hoisting height, make sure drum rope storage slot number shouldnt be less than thrice (allow to carry out simulated test if without relevant test condition). 調試最大揚程及升降卷筒上的鋼絲繩剩留圈數(shù)應不小于3圈。(若因工廠試驗條件的限制,該試驗可用模擬試驗來代替)4.2NO-load test 空負載試驗No-
36、load operate hoisting, luffing and turning mechanism to Max. working range, check whether they are normal, and measure oil pressure, current, voltage and power of each action.在空負載狀態(tài)下,升降、變幅、回轉機構分別在最大工作范圍內動作,觀察有無常現(xiàn)象,檢測各動作的油壓、電流、電壓、功率等。4.3Light load test 輕負載試驗Test load is 2025 SWL, measure oil pressure
37、, current and voltage of hoisting & lowering.試驗負荷為安全工作負荷的2025,檢測上升、下降動作的速度、油壓、電流、電壓等。4.4Half load test 半負載試驗Test load is 5060 SWL, measure speed, oil pressure, current and voltage of hoisting & lowering.試驗負荷為安全工作負荷的5060,檢測上升、下降動作的速度、油壓、電流、電壓等4.5Safe working load test 安全工作負載試驗4.5.1Measure spe
38、ed, oil pressure, current, voltage and power of hoisting & lowering when Jib up to 60°吊臂在60°位置時,檢測上升、下降動作的速度、油壓、電流、電壓、功率等4.5.2Measure speed, oil pressure, current, voltage and power of luffing when Jib up to 4060°在吊臂通過4060°位置處,檢測上下變幅動作的速度、油壓、電流、電壓、功率4.5.3Measure speed, oil pr
39、essure, current, voltage and power of turning when Jib up to Max. working range.在最大工作幅度處,檢測左右回轉動作的速度、油壓、電流、電壓、功率等。4.5.4The measurement method, hoisting & lowering speed can be shown by drum rotating speed; luffing time can be shown by luffing angle time; turning time can be shown by turning set
40、angle time.升降、變幅速度的測量,升降速度,其速度可用卷筒每轉所用時間來表示,變幅可用上下變幅角度-時間來表示,回轉可用回轉-固定角度時間來表示。4.5.5Load test should be satisfied with following requirements:負載試驗時,應達到以下要求:4.5.5.1There are enough clearance between movable parts and fixing parts, preventing friction and mechanical contact.各運動件與固定件之間應有適當?shù)拈g隙,不得發(fā)生碰擦。4.5
41、.5.2Hydraulic pipes and cable shouldnt any vibration and contact friction.油壓管路、電纜等不得有振動和接觸現(xiàn)象。4.5.5.3The operating force of handle shouldnt be beyond set value.操作手柄應靈活,其操作力不得超過規(guī)定值。4.5.6Linkage motion test 聯(lián)合動作試驗Carry out SWL linkage motion test, measure oil pressure, current, voltage and power of two
42、 linkage motion.以安全工作負荷進行聯(lián)合動作試驗,檢測油壓、電流、電壓、功率等,組合方式為兩動作聯(lián)動。4.5.7Temperature rising test 溫升試驗Carry out SWL circulation test, last 2 hours, measure all parts hydraulic oil rising temperature every 30min.以安全工作負荷起重機正常工作循環(huán)試驗,連續(xù)運行2h,每30min測量各機械部分及液壓油的溫升。4.5.8Brake test 剎車試驗Operate crane with SWL and Max. r
43、unning speed, switch handle to middle position, check whether brake mechanism is safe and exact in motion.以安全工作負荷最大速度運行時,操作手柄迅速回到中位,試驗剎車機構是否安全準確的停止其動作。升降、變幅剎車滑移量可以在重物處測量,也可以測量卷筒轉數(shù),回轉動作的滑移量可以測量轉動部分的轉角。4.5.9Emergency test 應急試驗In linkage motion test, switch off power supply suddenly, check whether all
44、parts stop are safe and reliable; in hoisting & lowering motion, switch off power supply suddenly, and loose hoisting &lowering brake by operating hand pump, check whether load lowers safely.聯(lián)合動作試驗時,突然中斷電源,檢查各部分的停止是否可靠。升降動作時,突然中斷電源,用手搖泵松開升降制動器,檢查重物是否安全的落下。4.6Overload test 超負荷試驗4.6.1When jib
45、to Max. working radius, hoisting 1.25times SWL away from ground,lasts time no less than 5min.吊臂在最大幅臂位置時,將1.25倍的安全負荷吊離地面,保持懸掛時間不少于5min。4.6.2Slowly carry out hoisting & lowering, luffing and turning no less than twice, check whether all parts are normal and in good condition.緩慢進行升降、變幅、回轉動作不少于2次,檢查
46、起重機各結構有無異常變化。4.6.3Carry out hoisting & lowering brake test no less than twice, brake position is when load lowers to about 3m; check whether hoisting & lowering brakes are reliable.升降機構應進行剎車試驗不少于2次,剎車試驗應在試驗負載快速下降約3m處進行,檢查升降剎車的可靠性4.6.4After overload test, readjust overload protecting device.超
47、負載試驗后,應調定超負荷保護裝置,應保證其正確可靠。4.6.5After overload, carry out safe application test, the procedures are same as item 5.超負載試驗后應進行安全效用試驗,內容同“5”。4.7超負荷保護試驗Overload protecting test4.7.1After overload, carry out overload protecting test.超負荷試驗后,應進行超負載保護試驗。4.7.2Adjust system safe valve to rated working conditio
48、n.調定系統(tǒng)安全閥至額定工作狀態(tài)。4.7.3Hoisting 1.1times SWL.起吊1.1倍的安全工作負荷。4.7.4The system safe valve should be overflow before load away from ground.吊重應不能被吊離地面,系統(tǒng)安全閥應溢流。4.8Insulation Resistance measurement 絕緣電阻測試4.8.1Before crane running, measure insulation resistance through 500V megger in environmental condition,
49、 the insulation resistance between main power circuit and earth shouldnt be less than 20M;the insulation resistance between control power circuit and earth shouldnt be less than 5M.起重機運轉前,在環(huán)境條件下用500V的兆歐表進行絕緣電阻測試,主電路與地之間的絕緣電阻值應不低于20M,控制電路與地之間的絕緣電阻值應不低于5M。4.8.2After continuous 2 hours running, measure
50、 insulation resistance of phases among main power circuit, between phase and earth, whose resistance shouldnt less than 5M,the resistance between control power circuit and earth shouldnt less than 1 M。起重機連續(xù)運轉2h后,緊接著在主電路相與相、相與地之間測試絕緣電阻,其值應不低于5M,控制電路與地之間的絕緣電阻應不低于1 M。4.9Waterproof test 水密防水試驗4.9.1Carry
51、 out watertight test through impression test method.用壓痕法進行水密試驗4.9.2The impression should be continuous and evenness, whose impression width shouldnt less than 2/3 press width.壓痕法的痕跡應連續(xù)均勻,其壓痕寬度不少于壓寬的三份之二。4.10Check after test 試驗結束后檢查4.10.1After test, thoroughly check whether crane parts are abnormal a
52、nd with other defects.試驗后,徹底檢查起重機結構是否有異常變形和其它缺陷。4.10.2Check oil return filter, hook, the fit condition of rotating support and pinion, whether they are normal.檢查回油過濾器、吊鉤、回轉支承與小齒輪的配合狀態(tài)及在運轉中發(fā)現(xiàn)是否有 異常的部位。5. Test of Doors, Windows and Hatch Covers 門窗及艙口蓋密性試驗5.1Aim of testCheckup tightness and firmness an
53、d convenience of doors, windows, hatch covers and flat covers. 試驗目的:檢查各門窗,小窗口蓋的密性,開口關閉裝置的牢靠性和轉動靈活性。5.2Items of test試驗方法1) Chalk and mobility check of all weather-tight doors, windows and watertight doors and hatch covers should be done before test. 2) Man-holes: hydraulic (pneumatic) test to be carr
54、ied out simultaneously with hull tanks.3) Hose test for watertight door, weather-tight door(A,B,C class), side scuttles, rectangle windows and watertight & weather-tight hatch (on weather deck above free-board deck ).4) Spray test for navigation bridge windows and weather-tight door(D class).1)試
55、驗前應對門、窗、艙口蓋進行壓粉及靈活性檢查。2)人孔蓋應與船體艙柜同時進行水(氣)壓試驗。3)水密門、風雨密門(A、B、C級)、舷窗、矩形窗和干舷甲板以上的露天水密及風雨密艙蓋應進行沖水試驗。4)駕駛室窗、風雨密門(D級)應進行淋水試驗。5.2.1Hose test: The nozzle diameter of the jet should be 12.0 mm.The water pressure of the jet should be 0.2MPa.The distance to be kept 1.5m.Water should be jetted vertically agains
56、t the connecting seams up and down.沖水試驗:水槍噴水直徑為12.0mm,水壓為0.2MPa,噴水距離保持為1.5m,檢查內部是否有滲漏現(xiàn)象。5.2.2Spray water to the outside of the test areas, let the water flow over the seams of the doors and windows, then check where it is leaking.淋水試驗:向所試部位外側淋水,使自由降落的水滴淋到門、窗、蓋接縫處,檢查有無滲漏。5.2.3Pressed chalk testIf hose test is impossible for destroying other equipment, maybe using Pressed chalk test under ABS surveyor approved.First paint chalk on door frame, and close the door, keep 1 minute, and then open th
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 屋面防水課件教學課件
- 2024年度大數(shù)據(jù)中心建設與運維合同
- 2024年度供應鏈管理與融資合同
- 2024年度CRM系統(tǒng)升級合同:增強銷售合同管理功能
- 2024年度5G基站建設施工合同
- 2024年建筑工程環(huán)保分包合同
- 2024上海市室內裝修合同協(xié)議書范本
- 2024年度企業(yè)合規(guī)性檢查與咨詢服務合同
- 2024年夫妻財產清算協(xié)議
- 2024天然氣管網運營管理合同
- 文印競標合同范本
- 2024年廣東省深圳市中考歷史試題
- 2024至2030年全球及中國強光手電筒行業(yè)發(fā)展現(xiàn)狀調研及投資前景分析報告
- 2024年秋新教材北師大版一年級數(shù)學上冊全冊課件
- 加氣站質量管理手冊樣本
- 2019版外研社高中英語必選擇性必修一-四單詞
- 古樹名木養(yǎng)護復壯技術規(guī)范
- 2025年日歷英文版縱向排版周一開始
- S7-1200PLC技術及應用 課件 項目17 步進電機控制
- 《生物技術制藥》課程介紹與教學大綱
- 《現(xiàn)代農業(yè)技術推廣》課件-第七組 農民問題專題調研
評論
0/150
提交評論