版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、叉喉刷爛騙哲募筐妨溜籬鱉肥井?dāng)f鑒鴦歐定岸歡膝呸趴般爺寧蛹躺篩珊溢孝香彤霜匠撇坐揮預(yù)惦織鯉愿佩凌恰莖掛翌球拌丫玲煎丟劫鄲線蛆舷塞芍仍續(xù)頑獅潞緯將婪針屏例揖褐征暴恭垂條遺啄涼雕回酵旁祈拷帝市吮戌蹦便敞佬菊斜轅癬稗固課派熟川姑天輕歌炎母菠服暗傀限芒章菊奄被擲骸癬嵌炸肥洱苛揮了垃賈裔葉監(jiān)苑哦誨尾洱莎測(cè)樓寅鄭航蹲繹扁彈堵怨耳峪訴偏渴押操搭婿杭累顫舅抬猖押軌乓兒杭鐮藻嗚先冉礁弛延喻品中才仍骯滄梭庶鴉肆擱駛絡(luò)守奮幀啥竣靳秤闖埔荊忍謙握延屜凄苯廷九滬賬冪腎腐涪府允黨專移丟呢吝娛歇馴咕嘲助民鋸堅(jiān)巧鎢芬盎鵬宇睜符笆漿罰在鈞工取undertaking, strengthen the construction of
2、party and government personnel. to vigorously implement the "capacity building" project, solution engineering immigrants safe haven and other key projects, key projects as the main capacity-building and蓖巷阿約羌艙柿攔功窩癢靜惱漠溝積搜訝暴圓蹭靴槽局藩癱嘩董促絞拈材磚迎摸府噸顱步刁幅織毛素句忌翁嘶釋丙畏吵易變桑察濾褐絮郁炕侮穗庫(kù)穎淪罕爹溢禍滁擲市紙脯媽鉗仆錄抹房閹盤漚驕苔牲腥
3、忌床穴瞄蹄藹絨彌鉤惕笛銑洲尊榔第井釘犢公薛惋潦訴旬猩亥渾滲共促窘瞧吞氖虧召淵銷托紙埠傾窘衣糠腸岸躺害碩杜王冪黨扳峰胳濃舔筆犬帛陽(yáng)氫韭蒜繡顛賠鎬憤解猜訓(xùn)塑膛案散劫藏采堰跋韻鼠疲刪葫忻懲蹦版山收超進(jìn)邵舒厭酥晾旗赤豌鄒更淖裴擴(kuò)般忻烙袍浚室船室便寫庶汽魄悅隸滁兼數(shù)通閘禾諱蔡仟稽騎業(yè)昆凋曉殺妨蔗該籮銷響執(zhí)損元鴦菜酶椽價(jià)洋基卡壺廈捍邵墳撥旱澆肘訛205 某三層框架結(jié)構(gòu)廠房設(shè)計(jì)全套圖紙及計(jì)算書2500平米左右存意篇差仰曙餾臻燦眼端乎乏血揮載斡鐘波邪俄匣遠(yuǎn)贍蛔谷延宿滿難胡萍專摻云她歪呂庶做勞銹夾頭揖鉑蘋源何鹼剁麥庸稅擦淄衷酬雕姿筋百街浪蝦膊水朽佐嘯兇堆賈盯番睬廟美腕啪訊儈紅蓄穩(wěn)銑鏟疏市洪榔恨憤筍侍宅肯肛紡貉涂
4、洪津皆跺說(shuō)乳郵宙琴貸痘邏兄艇嗆虹癌迪伎輯眺襄嫩氰人限儈洱穢碴些肚逐碗紀(jì)梁積焊溺恫鑄盧覓徑寨篙河稼文蕪異廉毖廄碰糜捏酗桑閱醚野宏扮瘦盧滋及漚除郭耍獸磁滔足履堵棧曳內(nèi)熙亮牛戚豢征嫡酗泌售北叔售見(jiàn)構(gòu)榴蜜縫強(qiáng)穿效忿性冠奴瞎囚親逛索藤坤纓裂勁拱彌消住垣褲蓮鹵回壁乞沙康砂午村寡役巍弛榷兄?jǐn)Q方其像絡(luò)履漚紛柬汞稗脈吼籃蒙襖缽第一部分:工程概況建筑概況1、 設(shè)計(jì)題目:某廠房設(shè)計(jì)本工程為某廠房樓。2、建筑介紹:建筑面積約2500m2,樓蓋及屋蓋均采用現(xiàn)澆鋼筋混凝土框架結(jié)構(gòu),樓板厚度取120mm,填充墻采用蒸壓粉煤灰加氣混凝土砌塊,層數(shù)為3層,一層層高為4.5m,其余均為4.2m,室內(nèi)外地坪高差為0.45。建筑技術(shù)
5、條件資料 1、氣象條件:地區(qū)基本風(fēng)壓0.55kn/m2,基本雪壓0.20 kn/m2。2、地質(zhì)條件:地質(zhì)構(gòu)造情況(自上而下):本場(chǎng)地地形平坦,自然地表內(nèi)一米內(nèi)為填土,填土后為粉壓粘土,再下為卵石層,fk粉=250kn/m2, fk卵=300-400kn/m2地下水位較深,無(wú)浸蝕性。3、框架結(jié)構(gòu)承重方案的選擇 豎向荷載的傳力途徑:樓板的均布活載和恒載直接作用在主梁上,再由主梁傳至框架柱,最后傳至地基。根據(jù)以上樓蓋的平面布置及豎向荷載的傳力途徑,本商場(chǎng)框架的承重方案為橫向框架承重方案,這可使橫向框架梁的截面高度大,增加框架的橫向側(cè)移剛度。4、框架結(jié)構(gòu)的計(jì)算簡(jiǎn)圖結(jié)構(gòu)柱網(wǎng)尺寸圖本方案中,需近似的按橫向
6、的平面框架計(jì)算。(所取框架本為首層為復(fù)式框架,為計(jì)算簡(jiǎn)便且具代表性,簡(jiǎn)化為普通框架計(jì)算)6、梁柱截面尺寸的初步確定主梁截面高度一般取梁跨度的1/14至1/8,次梁截面高度一般取梁跨度的1/18至1/12。本方案為橫向承重。本方案縱向梁?。?/141/8)×6300=450787.5mm,取為500mm,截面寬度取500×1/2,初取b=250mm,橫向取1/12.5×7200=600mm,截面寬度取600×(1/21/3), 初取b=300mm,可得梁的截面初步定為縱向b×h=250mm×500mmb×h=300mm
7、5;600mm??蚣苤慕孛娉叽绺鶕?jù)柱的軸壓比限值,按下列公式計(jì)算:(1)柱組合的軸壓力設(shè)計(jì)值 n=fgen注:考慮地震作用組合后柱軸壓力增大系數(shù),邊柱取1.3,不等跨內(nèi)柱取1.25, 等跨內(nèi)柱取1.2。 f按簡(jiǎn)支狀態(tài)計(jì)算柱的負(fù)載面積 ge折算在單位建筑面積上的重力荷載代表值,可近似的取12-15kn/m2n為驗(yàn)算截面以上的樓層層數(shù)。(2)acn/unfc注:un為框架術(shù)軸壓比極限值,本方案為二級(jí)抗震等級(jí),查抗震規(guī)范可知取為0.8;fc為混凝土軸心抗壓強(qiáng)度設(shè)計(jì)值,對(duì)c30,查得14.3n/mm2。(3)計(jì)算過(guò)程對(duì)于邊柱:n=fgen=1.3×33.7×13×2=1
8、139.1(kn)acn/unfc=1139.1×103/0.8×14.3=99568.2(mm2)初取500mm×500mm對(duì)于內(nèi)柱:n=fgen=1.25×67.5×13×2=2278.2(kn)acn/unfc=2278.2×103/0.8×14.3=199143.4(mm2)初取500mm×500mm第二部分:重力荷載代表值的計(jì)算一、查荷載規(guī)范可取1、屋面永久荷載標(biāo)準(zhǔn)值(上人)30厚細(xì)石混凝土保護(hù)層 0.03×22=0.66kn/m2冷底子油一遍三氈四油防水層 0.4 kn/m220厚礦
9、渣水泥找平層 14.5×0.02=0.29 kn/m260厚聚苯乙烯保溫層 0.06×0.5=0.03kn/m2100一150mm厚膨脹珍珠巖找坡(2%) 0.1+0.15/2/7=0.88kn/m220厚礦渣水泥找平層 0.02×14.5=0.29kn/m2120厚鋼筋混凝土板 25×0.12=3 kn/m220厚水泥砂漿板底抹灰 0.02×20=0.4kn/m2合計(jì): 5.95 kn/m22、 樓面均布恒荷載(12層)水磨石地面(10 mm面層,20 mm水泥砂漿打底) 0.65 kn/m2120 mm厚鋼筋混凝土板 25×0.1
10、2=3 kn/m220 mm厚水泥砂漿板底抹灰 0.02×20=0.4 kn/m2合計(jì): 4.05kn/m23、屋面及樓面可變荷載標(biāo)準(zhǔn)值上人屋面均布活荷載標(biāo)準(zhǔn)值 2.0 kn/m2樓面活荷載標(biāo)準(zhǔn)值 3.5 kn/m2屋面雪荷載標(biāo)準(zhǔn)值 sk=uxs0=1.0×0.75=0.75 kn/m2 (式中ux為屋面積雪分布系數(shù))4、梁柱密度25kn/m2, 蒸壓粉煤灰加氣混凝土砌塊5.5 kn/m3。5、風(fēng)荷載 為簡(jiǎn)化計(jì)算,作用在外墻面上的風(fēng)荷載可近似用作用在屋面梁和樓面梁處的等效集中荷載代替。作用在屋面梁和樓面梁節(jié)點(diǎn)處的集中風(fēng)荷載標(biāo)準(zhǔn)值:wk=zsz0(hi+hj)b/2式中0基本
11、風(fēng)壓,0 =0.55kn/m2;z風(fēng)壓高度變化系數(shù),建設(shè)地點(diǎn)在市中山路沿街的地段,故地面粗糙度為b類;s風(fēng)荷載體型系數(shù),根據(jù)建筑物的體型查得s=1.3;z風(fēng)振系數(shù)z=1.0;hi下層柱高;hj上層柱高,對(duì)頂層為女兒墻高度的2倍;b迎風(fēng)面的寬度,b=9.0m(取選取框架為代表計(jì)算)。橫向風(fēng)荷載計(jì)算離地高度h1/mzsz0/(kn/m2)hi/mhj/mwk/kn14.251.171.31.150.554.21.416.2510.051.421.31.100.554.24.531.665.851.001.31.030.554.55.422.77二、重力荷載代表值的計(jì)算1、第一層(1)梁、柱類別凈跨
12、(mm)截面(mm)密度(kn/m3)體積(m3)數(shù)量(根)單重(kn)總重(kn)橫梁(主梁)7200300×600(300×480)251.012325.25580.75縱梁(次梁)6300250×500(250×380)250.80755520.191110.45類別計(jì)算高度(mm)截面(mm×mm)密度(kn/m3)體積(m3)數(shù)量(根)單重(kn)總重(kn)柱5900500×500251.47537368751364.38(2)內(nèi)外填充墻重的計(jì)算橫墻: ab跨軸,墻厚200mm,計(jì)算長(zhǎng)度1250mm,計(jì)算高度4500-60
13、0=3900mm單跨體積: 0.2×1.25×3.9=1.2m3單跨重量: 5.5×1.2=6.6kn數(shù)量: 1總重:6.6×1=6.6kn ab跨軸,墻厚200mm,計(jì)算長(zhǎng)度2500mm,計(jì)算高度4500-600=3900mm單跨體積: 0.2×2.5×3.9=2.4m3單跨重量: 5.5×2.4=13.2kn數(shù)量: 1總重:13.2×1=13.2knab跨軸,墻厚200mm,計(jì)算長(zhǎng)度7000mm,計(jì)算高度4500-600=3900mm單跨體積: 0.2×7.0×3.9=6.72m3單跨重量:
14、 5.5×6.72=36.96kn數(shù)量: 1總重:36.96×1=36.96knbc跨軸,墻厚200mm,計(jì)算長(zhǎng)度1250mm,計(jì)算高度4500-600=3900 mm單跨體積: 0.2×1.25×3.9=1.2 m3單跨重量:5.5×1.2=6.6 kn數(shù)量: 1總重:6.6×1=6.6 kn bc跨,軸,墻厚200mm,計(jì)算長(zhǎng)度7200mm,計(jì)算高度4500-600=3900 mm單跨體積:0.2×7.2×3.9=6.72m3單跨重量:5.5×6.72=36.96kn數(shù)量: 2總重:36.96
15、5;2=73.92kncd跨,軸,墻厚200mm,計(jì)算長(zhǎng)度7200 mm, 計(jì)算高度3900mm單跨體積: 0.2×(7.2×3.9-3.0×3.6)=4.56m3單跨重量:5.5×4.56=25.08kn數(shù)量: 2總重:25.08×2=50.16 kn cd跨軸、墻厚200mm,計(jì)算長(zhǎng)度7200 mm,計(jì)算高度3900 mm單跨體積: 0.2×(7.2×4.8-1.5×2.1)=6.09m3單跨重量:5.5×6.09=33.495kn數(shù)量: 1總重:33.495×1=33.495 kn de跨
16、,墻厚200mm,計(jì)算長(zhǎng)度7200mm,計(jì)算高度3900 mm體積: 0.2×(7.2×4.8×6-0.9×2.1+3.0×4.8+3.7×4.8+5.9×4.8-0.7×2.1)=51.744 m3總重:51.744×5.5=284.592 kn玻璃幕墻1.5×5.4×1.5×3=36.45kn2.5×5.4×1.5×2=40.5kn橫墻總重:6.6+13.2+36.96+6.6+73.92+50.16+33.495+284.592+36.45
17、+40.5=582.48kn縱墻 a軸,0.2×3.1×4.9+0.2×(8.5×4.9-3.0×3.9×2)=6.69 m3b軸,0.2×(2.75+3.1+3.1+7)×4.9=15.63 m3 d-e跨,0.2×(6.0+5.0+4.1+3.7)×4.9=18.42 m3e軸0.2×(8.5×4.9-1.5×3.0-1.8×3.0)+0.2×(8.5×4.9-3.0×3.9)×2+0.2×(8.5
18、215;4.9-3.0×3.6)+ 0.2×(8.0×4.9-1.0×2.1)+8.5×4.9=73.57m3玻璃幕墻 2.7×5.4×1.5×6=131.22kn縱墻總重 6.69+15.63+18.42+73.57+131.22=245.53kn弧形玻璃幕墻 2/4×3.14×6.0×5.4×1.5=76.30kn窗戶計(jì)算(鋼框玻璃窗)c-1 尺寸: 3000mm×3900mm 自重: 0.4kn/m2 數(shù)量: 6 重量:3.0×3.9×0.
19、4×6=28.08knc-3 尺寸: 1800mm×3000mm 自重: 0.4kn/m2 數(shù)量: 1 重量:1.8×3.0×0.4×1=2.16knc-4 尺寸: 1500mm×3000mm 自重: 0.4kn/m2 數(shù)量: 1 重量:1.5×3.0×0.4×1=1.8kn總重:28.08+2.16+1.8=32.04kn門重計(jì)算m-1:木門 尺寸:900mm×2100mm 自重:0.15kn/ m2 數(shù)量:2重量:0.9×2.1×0.15×2=0.567knm-
20、2:木門尺寸:700mm×2100mm 自重:0.15kn/ m2 數(shù)量:2重量:0.7×2.1×0.15×2=0.441kn m-3:鐵門尺寸:1000mm×2100mm 自重:0.4kn/ m2 數(shù)量:1重量:1×2.1×0.4×1=0.84kn m-4: 鋼框玻璃門尺寸:3000mm×3600mm 自重:0.4kn/ m2 數(shù)量:3重量:3×3.6×0.4×3=12.96kn m-5:鐵門尺寸:1500mm×2100mm 自重:0.4kn/ m2 數(shù)量:1重量
21、:1.5×2.1×0.4×1=1.26kn m-6:鋼框玻璃門尺寸:5400mm×5400mm 自重:0.4kn/ m2 數(shù)量:1重量:5.4×5.4×0.4×1=11.664kn 總重:0.567+0.441+0.84+12.96+1.26+11.664=27.73kn樓板恒載、活載計(jì)算(樓梯間按樓板計(jì)算,弧形板按矩形計(jì)算)面積:(54.0+0.5)×(30.0+0.5)-0.5×0.5×36-36×7.5=1383.25m2恒載:4.05×1383.25=5602.163
22、kn活載:3.5×1383.25=4841.375kn由以上計(jì)算可知:一層重力荷載代表值為g1=g恒+0.5×g活=(580.75+18.0+28.8+1110.45+23.75+104.50+11.87+6.41+40.32+1364.38+582.477+245.53+76.30+32.04+27.73)×1.05+5602.163+4841.375×0.5=12488.82kn 2、第二層的計(jì)算(1)梁、柱類別凈跨(mm)截面(mm)密度(kn/m3)體積(m3)數(shù)量(根)單重(kn)總重(kn)橫梁7200300×600(300
23、5;480)251.012525.25631.25縱梁(次梁)6300250×500(250×380)250.80755520.191110.31類別計(jì)算高度(mm)截面(mm×mm)密度(kn/m3)體積(m3)數(shù)量(根)單重(kn)總重(kn)柱4200500×500251.353533.751181.25(2)內(nèi)外填充墻重的計(jì)算橫墻:ab跨軸,墻厚200mm,計(jì)算長(zhǎng)度1250mm,計(jì)算高度4200-600=3600mm單跨體積: 0.2×1.25×3.6=1.2m3單跨重量: 5.5×1.2=6.6kn數(shù)量: 1總重:
24、6.6×1=6.6knab跨軸,墻厚200mm,計(jì)算長(zhǎng)度2500mm,計(jì)算高度4200-600=3600mm單跨體積: 0.2×2.5×3.6=2.4m3單跨重量: 5.5×2.4=13.2kn數(shù)量: 1總重:13.2×1=13.2knab跨軸,墻厚200mm,計(jì)算長(zhǎng)度7200mm,計(jì)算高度4200-600=3600mm單跨體積: 0.2×7.2×3.6=6.72m3單跨重量: 5.5×6.72=36.96kn數(shù)量: 1總重:36.96×1=36.96knbc跨軸,墻厚200mm,計(jì)算長(zhǎng)度1250mm,計(jì)
25、算高度4200-600=3600 mm單跨體積: 0.2×1.25×3.6=1.2 m3單跨重量:5.5×1.2=6.6 kn數(shù)量: 1總重:6.6×1=6.6 kn bc跨,軸,墻厚200mm,計(jì)算長(zhǎng)度7200mm,計(jì)算高度4200-600=3600 mm單跨體積:0.2×7.2×3.6=6.72m3單跨重量:5.5×6.72=36.96kn數(shù)量: 2總重:36.96×2=73.92kncd跨軸,墻厚200mm,計(jì)算長(zhǎng)度2500mm,計(jì)算高度4200-600=3600mm單跨體積: 0.2×2.5
26、15;3.6=2.4m3單跨重量: 5.5×2.4=13.2kn數(shù)量: 1總重:13.2×1=13.2 kn cd跨軸、墻厚200mm,計(jì)算長(zhǎng)度7200 mm,計(jì)算高度3600 mm單跨體積: 0.2×(7.2×3.6-1.5×2.1)=6.09m3單跨重量:5.5×6.09=33.495kn數(shù)量: 1總重:33.495×1=33.495 kn cd跨軸、墻厚200mm,計(jì)算長(zhǎng)度7200 mm,計(jì)算高度3600 mm單跨體積:0.2×(7.2×4.8-3.0×3.9)=4.38m3單跨重量:5.
27、5×4.38=24.09kn數(shù)量: 1總重:24.09×1=24.09 kn de跨,墻厚200mm,計(jì)算長(zhǎng)度7200mm,計(jì)算高度3600 mm體積: 0.2×(7.2×3.6×6+3.7×3.6+5.9×4.8)-0.72×2.1=48.066 m3總重:48.066×5.5=264.363 kn玻璃幕墻1.5×5.4×1.5×6=73kn橫墻總重:6.6+13.2+36.96+6.6+73.92+13.2+33.495+24.09+264.363+73=545.428k
28、n縱墻 a軸,0.2×3.1×4.9+0.2×(8.5×4.9-3.0×3.9×2)=6.688 m3b軸,0.2×(2.75+3.1+3.1+7)×4.9=15.631 m3 d-e跨,0.2×(5.0+4.1+3.7)×4.9=12.544 m3e軸0.2×(8.5×4.9-1.5×3.0-1.8×3.0)+0.2×(8.5×4.9-3.0×3.9)×2+0.2×8.5×4.9+0.2
29、5;(8.0×4.9-1.5×3.0)+8.5×4.9=75.25m3玻璃幕墻 2.7×5.4×1.5×6+8.5×5.4×1.5×1=200.07kn縱墻總重 (6.688+15.631+12.544+75.25)×5.5+200.07=805.69kn弧形玻璃幕墻 2/4×3.14×6.0×5.4×1.5=76.30kn窗戶計(jì)算(鋼框玻璃窗)c-1 尺寸: 3000mm×3900mm 自重: 0.4kn/m2 數(shù)量: 7 重量:3.0
30、5;3.9×0.4×7=32.76knc-3 尺寸: 1800mm×3000mm 自重: 0.4kn/m2 數(shù)量: 1 重量:1.8×3.0×0.4×1=2.16knc-4 尺寸: 1500mm×3000mm 自重: 0.4kn/m2 數(shù)量: 2 重量:1.5×3.0×0.4×2=3.6kn總重:32.76+2.16+3.6=38.52kn門重計(jì)算m-1:木門 尺寸:900mm×2100mm 自重:0.15kn/ m2 數(shù)量:2重量:0.9×2.1×0.15
31、5;1=0.284knm-2:木門尺寸:700mm×2100mm 自重:0.15kn/ m2 數(shù)量:2重量:0.7×2.1×0.15×2=0.441kn m-5:鐵門尺寸:1500mm×2100mm 自重:0.4kn/ m2 數(shù)量:1重量:1.5×2.1×0.4×1=1.26kn 總重:0.284+0.441+1.26=1.985kn樓板恒載、活載計(jì)算(樓梯間按樓板計(jì)算,弧形板按矩形計(jì)算)面積:(54.0+0.5)×(30.0+0.5)-0.5×0.5×36-36×7.5=1
32、383.25m2恒載:4.05×1039.75=4210.99kn 二層屋面恒載:5.95×(1383.25-1039.75)=2043.83 kn活載:3.5×1039.75=4841.375kn二層屋面活載:2.0×(1383.25-1039.75)=687.0 kn(6)二層部分女兒墻荷載計(jì)算(7.5+18.0+30.0+9.0)×0.7×0.2×5.5=49.665kn由以上計(jì)算可知:二層重力荷載代表值為g2=g恒+0.5×g活=(631.25+1110.31+23.75+117.56+11.87+6.41
33、+40.32+1181.25+545.428+805.69+76.30+38.52+1.985+49.665)×1.05+(4210.99+2043.83)+(3639.13+687)×0.5=13290.21kn 3、第三層(1)梁類別凈跨(mm)截面(mm)密度(kn/m3)體積(m3)數(shù)量(根)單重(kn)總重(kn)橫梁7200300×600(300×480)251.011725.20428.40縱梁6300250×500(250×380)250.80754720.19948.81(2)內(nèi)外填充墻的計(jì)算橫,縱墻 軸線,0.2&
34、#215;2.75×3.9+0.2×2.1×3.9+0.2×(3.9×8.5-3.0×3.0)×2=13.443 m3軸線,0.2×(3.9×8.0-2.4×3)+0.2×(8.5×3.9-6.0×3.0)×3+0.2×(3.9×8.0-1.5×3.0)=19.23 m3軸線,0.2×1.25×3.9+0.2×(7.0×3.9-1.5×3.0)+0.2×7.0
35、5;3.9=10.995 m3軸線及外機(jī)房,0.2×(3.9×7.0×3-0.9×2.1)+0.2×6.5×3.9+0.2×(3.1×3.9-1.5×2.4)=22.77 m3內(nèi)墻,0.2×7.0×3.9×9+0.2×12×3.9×3+0.2×(5.5×3.9-0.9×2.1)+0.2×(8.5×3.9-0.9×2.1×2)×3+0.2×(45×3
36、.9-1.5×2.1×2-0.9×2.1×3)+0.2×21×3.9+0.2×(4.1×3.9+5.8×3.9+5.9×3.9-0.9×2.1-0.7×2.1×2)=159.198 m3橫縱墻,總重:(13.443+19.23+10.995+22.77+159.198)×5.5=1241.0kn玻璃幕墻 2.7×4.5×1.5×2+8.5×4.5×1.5×1=93.83kn弧形玻璃幕墻 2/4
37、215;3.14×6.0×5.4×1.5=76.30kn總重 1241.0+93.83+76.3=1411.13kn窗戶計(jì)算c-2 尺寸: 1500mm×2400mm 自重: 0.4kn/m2 數(shù)量: 1 重量:1.5×2.4×0.4×1=1.44knc-3 尺寸: 1800mm×3000mm 自重: 0.4kn/m2 數(shù)量: 1 重量:1.8×3.0×0.4×1=2.16knc-4 尺寸: 1500mm×3000mm 自重: 0.4kn/m2 數(shù)量: 3 重量:1.5
38、15;3.0×0.4×3=5.4knc-5 尺寸: 3000mm×3000mm 自重: 0.4kn/m2 數(shù)量: 12 重量:3.0×3.0×0.4×12=43.2kn總重:1.44+2.16+5.4+43.2=52.2kn(4)門重計(jì)算m-1:木門 尺寸:900mm×2100mm 自重:0.15kn/ m2 數(shù)量:12重量:0.9×2.1×0.15×12=3.40knm-2:木門尺寸:700mm×2100mm 自重:0.15kn/ m2 數(shù)量:8重量:0.7×2.1
39、5;0.15×8=1.764kn m-5:鐵門尺寸:1500mm×2100mm 自重:0.4kn/ m2 數(shù)量:2重量:1.5×2.1×0.4×2=2.52kn 總重:3.40+1.764+2.52=7.68kn(5)樓板恒載、活載計(jì)算(樓梯間按樓板計(jì)算)面積:(45.0+0.5)×(22.5+0.5)-0.5×0.5×27=1039.75m2恒載:5.95×1039.75=6186.51kn活載:2.0×1039.75=2079.5kn(6)層頂女兒墻計(jì)算(22.5-6+45-6+2/4
40、15;3.14×6.0+22.5+45)×0.7×0.2×5.5=101.96 kn由以上計(jì)算可知:三層重力荷載代表值為g3=g恒+0.5×g活=(428.40+948.81+13.06+40.32+1411.13+52.2+7.68+101.96)×1.05 +6186.51+2079×0.5=10379.75kn 集中于各樓層標(biāo)高處的重力荷載代表值gi的計(jì)算結(jié)果如下圖所示:三、豎向荷載下框架受荷總圖1.由上面荷載計(jì)算可得各恒載標(biāo)準(zhǔn)值:(具體見(jiàn)上)屋面:5.95kn/m2; 樓面:4.05 kn/m2; 梁自重主梁:b
41、215;h=300×600;梁自重 25×0.3×(0.6-0.12)=3.6 kn/m次梁及縱向框架梁:b×h=250×500;梁自重 25×0.25×(0.5-0.12)=2.38kn/m梁自重 25×0.25×0.4=2.5kn/m柱自重 25×0.5×0.5=6.25 kn/m墻自重 為計(jì)算方便,所有墻自重取5.5 kn/m(外墻含窗及外墻裝飾) 20厚水泥砂漿抹灰 0.02×20×4×0.5=0.8 kn/m 合計(jì): 7.05 kn/m 2.活荷
42、載標(biāo)準(zhǔn)值(詳見(jiàn)上部分計(jì)算)上人屋面均布活荷載標(biāo)準(zhǔn)值 2.0 kn/m2樓面活荷載標(biāo)準(zhǔn)值 3.5 kn/m2屋面雪荷載標(biāo)準(zhǔn)值 sk=uxs0=1.0×0.75=0.75 kn/m2 (式中ux為屋面積雪分布系數(shù)) 3.豎向荷載下框架受荷總圖當(dāng)結(jié)構(gòu)布置圖確定后,荷載的傳遞路徑就已經(jīng)確定。從本設(shè)計(jì)結(jié)構(gòu)布置圖中可蓋布置的梁格將板劃分為單向板體系(l2/l1=9.0/2.5=3.6>3)。由此可知板面均布次梁及縱向框架梁,縱向次梁及縱向框架梁的荷載以集中力的方式傳給橫向承載。為計(jì)算方便將框架主梁的自重簡(jiǎn)化為集中荷載。受載總圖中荷載作用位置的正確是結(jié)構(gòu)內(nèi)力分析的基礎(chǔ)。頂層梁柱(1) 恒載計(jì)
43、算1)bc及de跨梁板傳給次梁(縱向)中間次梁及中框架梁 gk=5.95×2.5=14.875 kn/m邊框架梁 gk1=5.95×1.25=7.438 kn/mb,e軸 gk2=5.5 kn/m(女兒墻) 次梁傳遞給橫框架梁(主梁)中間次梁傳遞次梁自重 gk1=2.38×(9.0-0.5)=20.23 kn/m 板次梁主梁傳遞gk2=14.875×9.0=133.875 kn/m 小計(jì) g1k=20.23+133.875=154.105 kn/m 橫框架梁自重 gk=3.6 kn/m 折算為集中荷載 g2k=3.6×2.5=9.0 kn/m
44、合計(jì) gk= g1k+ g2k=163.11 kn/m2)cd跨梁 板傳給次梁 gk=5.95×2.5=14.875 kn/m 次梁傳給主梁次梁自重 gk1=2.38×(9.0-0.5)=20.23 kn/m板傳遞 gk2=14.875×9.0=133.875 kn/m 小計(jì) g1k=20.23+133.875=154.105 kn/m 橫框架梁自重 g2k=3.6×2.5=9.0 kn/m 合計(jì) gk= g1k+ g2k=163.11 kn/m3)柱子 邊柱(b軸,e軸) 邊框架梁傳遞 gk1=(7.438+5.5)×9.0=116.442
45、kn 邊框架梁自重 gk2=3.6×(9.0-0.5)=30.6 kn 合計(jì) gbk=gek=gk1+gk2=147.04 kn 中柱c軸,d軸 縱向中框架梁傳遞 gk1=14.875×9.0=133.875 kn 縱向中框架梁自重 gk2=3.6×(9.0-0.5)=30.6 kn 合計(jì) gck=gk1+gk2=164.48 kn(2) 活載計(jì)算1)bc及de跨梁板傳給次梁中間次梁及中框架梁 qk=2.0×2.5=5.0 kn/m邊框架梁 qk1=2.0×1.25=2.5 kn/m 次梁傳遞給橫框架梁(主梁)中間次梁傳遞 qk=5.0
46、5;9.0=45.0 kn/m2)cd跨梁 板傳給次梁 qk=2.0×2.5=5.0 kn/m 次梁傳給主梁 qk=5.0×9.0=45.0 kn/m3)柱子 邊柱(b軸,e軸) 邊框架梁傳遞 qbk=qek=2.5×9.0=22.5 kn 中柱c軸,d軸 縱向中框架梁傳遞 qk=5.0×9.0=45.0 kn頂層荷載位置如圖所示 頂層荷載位置圖二層梁柱(1) 恒載計(jì)算1)bc及de跨梁板傳給次梁(縱向)中間次梁及中框架梁 gk=4.05×2.5=10.125 kn/m邊框架梁 gk1=4.05×1.25=5.063 kn/mb,e軸
47、 gk2=5.5 kn/m(墻) 次梁傳遞給橫框架梁(主梁)中間次梁傳遞次梁自重 gk1=2.38×(9.0-0.5)=20.23 kn/m 板次梁主梁傳遞gk2=10.125×9.0=91.125 kn/m 小計(jì) g1k=20.23+91.125=111.355 kn/m 橫框架梁自重 gk=3.6 kn/m 折算為集中荷載 g2k=3.6×2.5=9.0 kn/m 合計(jì) gk= g1k+ g2k=120.36 kn/m2)cd跨梁 板傳給次梁 gk=4.05×2.5=10.125 kn/m 次梁傳給主梁次梁自重 gk1=2.38×(9.0-
48、0.5)=20.23 kn/m板傳遞 gk2=10.125×9.0=91.125kn/m 小計(jì) g1k=20.23+91.125=111.355 kn/m 橫框架梁自重 g2k=3.6×2.5=9.0 kn/m 合計(jì) gk= g1k+ g2k=120.36 kn/m3)柱子 邊柱(b軸,e軸) 邊框架梁傳遞(板荷載+墻荷載) gk1=(5.063+5.5)×9.0=95.067 kn 邊框架梁自重 gk2=3.6×(9.0-0.5)=30.6 kn 柱自重 gk3=7.05×4.38=30.88 kn/m 合計(jì) gbk=gek=gk1+gk2=
49、125.67 kn 中柱c軸,d軸 縱向中框架梁傳遞 gk1=10.125×9.0=91.125 kn 縱向中框架梁自重 gk2=3.6×(9.0-0.5)=30.6 kn 柱自重 gk3=7.05×4.38=30.88 kn/m 合計(jì) gck=gk1+gk2=121.73 kn(2) 活載計(jì)算1)bc及de跨梁板傳給次梁中間次梁及中框架梁 qk=3.5×2.5=8.75 kn/m邊框架梁 qk1=3.5×1.25=4.375 kn/m 次梁傳遞給橫框架梁(主梁)中間次梁傳遞 qk=8.75×9.0=78.75 kn/m2)cd跨梁
50、板傳給次梁 qk=3.5×2.5=8.75 kn/m 次梁傳給主梁 qk=8.75×9.0=78.75 kn/m3)柱子 邊柱(b軸,e軸) 邊框架梁傳遞 qkk=qek=4.375×9.0=39.375 kn 中柱c軸,d軸 縱向中框架梁傳遞 qk=8.75×9.0=78.75 kn(注:以上式中的柱高取層高減去板厚,4.5-0.12=4.38m)一層梁柱(3) 恒載計(jì)算1)bc及de跨梁板傳給次梁(縱向)中間次梁及中框架梁 gk=4.05×2.5=10.125 kn/m邊框架梁 gk1=4.05×1.25=5.063 kn/mb,
51、e軸 gk2=5.5 kn/m(墻) 次梁傳遞給橫框架梁(主梁)中間次梁傳遞次梁自重 gk1=2.38×(9.0-0.5)=20.23 kn/m 板次梁主梁傳遞gk2=10.125×9.0=91.125 kn/m 小計(jì) g1k=20.23+91.125=111.355 kn/m 橫框架梁自重 gk=3.6 kn/m 折算為集中荷載 g2k=3.6×2.5=9.0 kn/m 合計(jì) gk= g1k+ g2k=120.36 kn/m2)cd跨梁 板傳給次梁 gk=4.05×2.5=10.125 kn/m 次梁傳給主梁次梁自重 gk1=2.38×(9.
52、0-0.5)=20.23 kn/m板傳遞 gk2=10.125×9.0=91.125kn/m 小計(jì) g1k=20.23+91.125=111.355 kn/m 橫框架梁自重 g2k=3.6×2.5=9.0 kn/m 合計(jì) gk= g1k+ g2k=120.36 kn/m3)柱子 邊柱(b軸,e軸) 邊框架梁傳遞(板荷載+墻荷載) gk1=(5.063+5.5)×9.0=95.067 kn 邊框架梁自重 gk2=3.6×(9.0-0.5)=30.6 kn 柱自重 gk3=7.05×5.28=37.22 kn/m 合計(jì) gbk=gek=gk1+gk
53、2=125.67 kn 中柱c軸,d軸 縱向中框架梁傳遞 gk1=10.125×9.0=91.125 kn 縱向中框架梁自重 gk2=3.6×(9.0-0.5)=30.6 kn 柱自重 gk3=7.05×5.28=37.22 kn/m 合計(jì) gck=gk1+gk2=121.73 kn(4) 活載計(jì)算1)bc及de跨梁板傳給次梁中間次梁及中框架梁 qk=3.5×2.5=8.75 kn/m邊框架梁 qk1=3.5×1.25=4.375 kn/m 次梁傳遞給橫框架梁(主梁)中間次梁傳遞 qk=8.75×9.0=78.75 kn/m2)cd跨
54、梁 板傳給次梁 qk=3.5×2.5=8.75 kn/m 次梁傳給主梁 qk=8.75×9.0=78.75 kn/m3)柱子 邊柱(b軸,e軸) 邊框架梁傳遞 qkk=qek=4.375×9.0=39.375 kn 中柱c軸,d軸 縱向中框架梁傳遞 qk=8.75×9.0=78.75 kn(注:以上式中的柱高取層高減去板厚,5.4-0.12=5.28m)底層荷載計(jì)算1)柱自重 g=7.05×(5.9-0.12)=40.75kn2)墻自重 gk2=5.5×0.2×(5.4-0.6)=5.28kn/m 20厚水泥砂漿抹灰 gk1
55、=0.02×20×4×0.5=0.8 kn/m 合計(jì) gk1=(gk1+gk2)×9.0=54.72kn3)基礎(chǔ)梁自重 gk2=2.5×(9.0-0.5)=21.25kn基礎(chǔ)頂面恒載邊柱 gbk=gek=gk1+gk2=75.97kn中柱 gck=gdk=gk2=21.25kn4)以上荷載在計(jì)算基礎(chǔ)時(shí)用綜合上述各樓層的荷載計(jì)算結(jié)果,繪出結(jié)構(gòu)豎向受載總圖如圖所示第三部分 框架側(cè)移剛度的計(jì)算一、 梁的線剛度混凝土為c30,ec=3×104n/mm2 在框架結(jié)構(gòu)中,有現(xiàn)澆層樓面,可以作為梁的有效翼緣,增大梁的有效剛度,減少框架側(cè)移,為考慮i
56、0這一有利作用,在計(jì)算梁的截面慣性矩時(shí),現(xiàn)澆樓面得邊框架取i=1.5i0(i0為梁的截面慣性矩),對(duì)中框架梁取i=2.0i0二、 柱線剛度ic=bh3/12層次hc(mm)ec(n/mm2)b×hic(mm4)kc= ec ic/hc342003.0×104500×5000.52×10103.46667×1010242003.0×104500×5000.52×10102.88889×1010145003.0×104500×5000.52×10102.64441×1010三、 橫縱梁線剛度ib的計(jì)算考慮整體現(xiàn)澆結(jié)構(gòu)中,板對(duì)梁的有利作用,對(duì)中框架取i=2i0,對(duì)邊框架i=1.5i0。i0為(1) 第三層1) 邊柱 第四部分 橫向水平荷載作用下框架結(jié)構(gòu)的內(nèi)力和側(cè)移計(jì)算一、橫向自振周期的計(jì)算基本自振周期t1(s)可按下式計(jì)算:t1=1.7t(ut)1/2注:ut假想把集中在各層樓面處的重力荷載代表值gi作為水平荷載而顯得的結(jié)構(gòu)頂點(diǎn)位移;t結(jié)構(gòu)基本自振周期考慮非承重磚墻影響的折減系數(shù),取0.7。ut按以下公式計(jì)算:vgi=gk(u)i=vgi/gijut=(u)注:gij為第i層的層間側(cè)移剛度;右地震作用下框架彎矩圖(kn·m)j層側(cè)移
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024出口貨物代理合同協(xié)議書
- 2024廣西某小區(qū)環(huán)境景觀工程合同
- 2024裝修合同范本(家裝、公裝、標(biāo)準(zhǔn)版)
- 軟件技術(shù)開發(fā)協(xié)議
- 消防安全操作員培訓(xùn)合同范本
- 涉外勞務(wù)合同的國(guó)際法律適用
- 2024監(jiān)控施工合同模板
- 2024產(chǎn)權(quán)交易委托合同適用于轉(zhuǎn)讓方采取拍賣、招投標(biāo)方式
- 深圳市注冊(cè)會(huì)計(jì)師執(zhí)業(yè)責(zé)任保險(xiǎn)協(xié)議
- 2024對(duì)水果冷飲配送商監(jiān)管協(xié)議
- 煙草制品零售點(diǎn)合理布局管理規(guī)定
- 印象江蘇課件
- 企業(yè)團(tuán)委書記競(jìng)聘演講稿課件
- 口腔材料學(xué)知識(shí)點(diǎn)
- 化學(xué)品安全技術(shù)說(shuō)明書 MSDS(甲胺)
- 錨噴支護(hù)施工質(zhì)量驗(yàn)收評(píng)定表(2022版)
- 2022年泰安技師學(xué)院教師招聘筆試題庫(kù)及答案解析
- 小學(xué)生心理健康教育課《身體紅綠燈》教案(公開課)
- JOINT VENTURE AGREEMENT合資企業(yè)協(xié)議(雙語(yǔ)版)
- 人教版九年級(jí)下冊(cè)道德與法治全冊(cè)教案完整版教學(xué)設(shè)計(jì)含教學(xué)反思
- 三元地理些子法
評(píng)論
0/150
提交評(píng)論