版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、the right way to control period expensemanagement accounting; sep 1990; 72, 3; abi/inform complete pg. 55-59by donald a. j. byrumyear in and year out, the greatest challenge facing industry is cost control. no manager in his right mind would try to control direct material costs by stopping the purch
2、ase of direct material. such an action obviously soon would bring production to a stop, i which would bring sales to a stop, which would bring the business to an end. managers are smarter than that. they will have their engineering staff design out the most costly components and then have their purc
3、hasing staff find the least costly suppliers for the remaining components.in the same way, no manager in his right mind would try to control direct labor costs by firing his direct workers. the result would be exactly the same as not buying direct material. instead, design engineers would be asked t
4、o simplify the construction specifications, and manufacturing engineers would be asked to provide tools and equipment that would maximize worker efficiency.in both these instances management recognizes, perhaps only subconsciously, that the cost is a symptom, not a disease, and that it is the diseas
5、e that must be attacked. to continue the medical metaphor, the disease is like an active cancer that will grow continuously unless it is attacked continuously.but consider how management has handled salaried expense, where the "normal" method of cost control is decimation, that is, elimina
6、tion of a percentage of the head count in expectation of a equal percentage reduction of salaried expense. it never happens. in fact, such actions have been known to result in an increase in total period cost expense.the question is, "what is the most effective way of controlling period costs?&
7、quot; the answer is through exactly the same techniques as are used for direct material and direct labor, that is, changing the design specifications of the job description to eliminate inefficient, redundant, and unnecessary work elements. the difference is that cost analysts and administrators mak
8、e the design changes rather than engineers and buyers.the design changes must be completed and implemented before you can expect to see a cost reduction flow through to the p&l. the design changes require an application of manpower resources to create, so it is best to undertake them when times
9、eire good rather than wait until things are tough. put simply, if you want to save period costs next year, you must do the design work this year.as with direct costs, the first step in reducing period costs is identifying those conditions, practices, and procedures that cause the costs (not the peop
10、le who are the result). everything must be open to question; there can be no sacred cows. for this reason it is usually best for outsiders such as administrators and cost analysts to do the actual design change work rather than having functional managers do it.outsiders are far less likely to have a
11、ny ingrained bias, and it is a fact ofhuman nature that one can see inefficiencies in another's operation much more easily than in one's own. conversely, one's own employees are generally better than outside consultants because they already have a working knowledge of the existing state
12、of affairs and usually will start with a pretty good idea of where some, at least, of the bodies are buried. this could mean a two- to three- man-month head start. in addition, each project worked on invariably will expose other areas that should be investigated. effective period cost control and re
13、duction should be a continuous process.too many copiesonce upon a time, before the advent of mainframe computers and office copiers, reports were short, few in number, and had limited distribution. unfortunately, that is no longer the case. for all of the benefits accruing from them, it is neverthel
14、ess true that computers and copiers are the greatest wasters of manpower in modern industry. this situation arises because management always is pressing for more, new, or different information and reports but rarely, if ever, considers purging old reports.a case in point was a fair-sized manufacturi
15、ng operation of about 2,000 people. each month data processing produced 41 reportseight weekly reports and nine monthly summaries. a total of 321 copies was produced. the copies contained 140,000 pages and were distributed to 63 persons. it took about two man-months to interview all 63 persons and f
16、ind out what was happening to the 321 copies. eventually, it was determined that the weekly reports were totally unneeded. it was further decided to produce only two copies of the monthly reports, one of which was filed in an office at the north end of the building and the other in an office at the
17、south end.it took several months for all of the results of this change to show up, and some came in unexpected places. manufacturing removed more than 300 used filing cabinets from the shop floor and sold them. this removal freed up more than 3,000 sq. ft. of floor space, which then was used to stor
18、e materials that had been kept in an outside warehouse (rental cost $30,000 per year). giving up the warehouse, in turn, eliminated the need for a driver and truck (operating costs about $4,000 per year) used exclusively for moving goods to and from the warehouse. in addition, two file clerk positio
19、ns were eliminated, and a printer operator in data processing was eliminated. finally, open purchase orders for 42 new file cabinets were cancelled, as was a $20,000 appropriation for an additional printer and burster and an $18,000 appropriation for an additional truck. no one ever bothered to figu
20、re out how much was saved in computer paper or report folders.finally, from a human standpoint, no one got fired. because the changes were planned and orderly and took place over several months, all four people in eliminated positions were able to move into other, similar jobs that had become open t
21、hrough natural attrition. in addition, because the cause was excised, a permanent cost reduction in excess of $100,000 per year was realized. not a bad payback for about two man-months of effort.even less conspicuous than computers are office copiers. in fact, the cost of individual copies has becom
22、e so low that their true cost usually is ignored. the true cost is the labor needed to copy, distribute, glance at (and in some cases read), and file. it probably takes an average time of about five minutes to perform all of these operations. multiply all of the copies produced on all machines by fi
23、ve and divide by 120,000 to find the equivalent number of people involved with copies.one relatively small operation (300 persons) was producing 180,000 copies per year. the cost was only slightly more than $2,000, so they weren't concernedthat is, until it was pointed out that copies were the e
24、xclusive preserve of indirect people (100 of the 300) and that 180,000 copies were the equivalent of eight persons. there was a subsequent clampdown on copy making, resulting in about a 33% reduction in the number of copies over the following months. while no jobs actually were eliminated, there was
25、 a small reduction in indirect overtime (about 1.5 points).with work elements this small, it's often impossible to make a direct connection between the cause and effect. one must work almost on faith but with the firm knowledge that there truly is a cause-and-effect relationship and that it ulti
26、mately must be reflected in the p&l.too many bodiesa growing problem in many older organizations is the number of levels of local management. new companies tend to have only two or three levels of functional managers, plus one additional level for the company manager. older organizations often h
27、ave four or five levels of functional managers and up to three more levels to tie the organization together.if you've ever played the party game where a message is passed from one person to another, you'll be aware that it usually is totally garbled by the time it reaches the fourth individu
28、al. this is exactly the same thing that happens in business as information passes up the management pyramid and decisions filter down. the lowest level of management will be fully cognizant of both the form and details of what the workers actually are doing. the second level of management will have
29、a firm idea of what's going on but few details. the third level of management will have only a general idea of what's going on and no details. the fourth-level manager knows only what is supposed to be going on.the second problem with too many layers of management is the delay that each leve
30、l builds into the whole process. it is axiomatic that the greater the number of layers of managers, the longer it takes for decisions to be made and implemented. better managers are usually aware of the weaknesses of the information immediately available to them. consequently, in effect, they reach
31、down two or more levels in the organization to where they can find information of a quality that they can use comfortably to make a decision. thus the delay. if they didn't do so, the probability of a correct decision would be reduced significantly.to overcome this inertia, overly structured org
32、anizations tend to develop an "express" system. this is an individual or group who, in order to handle day-to-day problems, has direct access to the decision level, bypassing the entire chain of command. while this procedure has the short-term effect of keeping the company going, it also h
33、as the adverse effect of putting the intermediate levels of management even more in the dark about what actually is happening in the workplace. under extreme conditions this "express" group even may develop autonomous decisionmaking power, which eventually can lead to a situation in which
34、managers not only are unaware of what is happening but have no way of finding out.identifying overstructure is fairly simple because you need only look at the organization chart. any function with more than four levels of management and any local organization with more than five almost certainly has
35、 a problem. what to do about overstructure is also simple although sometimes painful. the excess levels should be eliminated.extra levels of management usually are created in response to a specific business situation. the problem is that they fail to go away when the situation no longer exists. they
36、 are almost never at the bottom layer. they also tend to have a very small number of direct reports. one-to-one reporting situations invariably indicate an excess manager, and anything less than four direct reports should be suspect.if overstructure is an identified problem, then there surely also w
37、ill be "express" groups, which normally will be at a very low level in the organization. they most often are found in units such as manufacturing and engineering facilities and in manufacturing and design engineering units associated with customizing products. in a properly structured orga
38、nization, "express" groups can cause more problems than they solve, so in a restructuring they must be eliminated.one final point must be made in this area. a great many middle managers are "working" managers. most of their time is spent performing real work and only a small perc
39、entage on supervision and administration. eliminating a management level will not eliminate the requirement for any real work performed at that level and so may not resultdirectly in losing anyone from the payroll. the true benefit is an improvement in the up-and-down flow of information, which will
40、 mean faster and better decisions, leading to an overall improvement in the efficiency of the entire operation. the eventual reduced manpower requirement may show up in an area far removed from the eliminated manager positions.another hangover from the days of yore are personal secretaries and assis
41、tants. a secretary, in the traditional sense, takes dictation, types correspondence, files correspondence, places phone calls, sharpens pencils, makes coffee, and so on. assistants write letters (which the boss then signs), prepare reports and charts (which the boss later presents), and actually mak
42、e phone calls giving or receiving information (which then is passed on to the boss).with the advances that have been made in office equipment, the only remaining need for a secretary in modern industry is as a status symbol. anyone of average intelligence with one good hand and reasonable eyesight c
43、an prepare a finished letter or report using a word processor in no more time than it would take first to dictate and later to proofread the same item prepared by a secretary. anyone who knows the alphabet can file five documents per minute. if daily filing takes more than five minutes, then you are
44、 receiving a lot of documents for which you have no real need. on modern phones a call can be placed by pressing a single button, and it takes little effort to push a pencil into the maw of an electric sharpener. this leaves only the coffee.on the other end of the scale are assistants. here the boss
45、 is frequently merely a front for the individual who actually is doing all of the work. in such situations it is not uncommon for the boss to take off for a week and have no one know itwhich is a great "perk" for the boss but a terrible waste of funds for the organization paying him. this
46、situation is not unlike the one-to-one management structure.industry is rife with personal secretaries and assistants. in most cases where such positions exist, one individual is superfluous for requirements of the businesssometimes it will be the secretary or assistant, and" sometimes it will
47、be the boss. each case must be examined individually to determine which.as an example of how easy it is for an outsider to spot problems in organization structure, look at figure 1, an organization chart for the mythical company. indications of the functions involved are omitted intentionally. thus,
48、 this could be an entire company or simply a single function such as manufacturing or engineering. regardless, there are several fairly obvious problems.foremost is the intermediate manager ml, with his secretary and assistant. it is difficult to imagine how the insertion of this extra level of mana
49、gement can contribute to the efficient operation of the organization.next up is the group headed by manager m7. he certainly should be able to handle seven workers by himself. the two line managers appear to be completely superfluous. three secretaries in an organization this small also appears exce
50、ssive.finally, there are three managers, m2, m3, and m4, each of whom has a secretary and at least one assistant. once again, employing three secretaries for this small a group of people appears excessive. in the cases of m3 and m4, it also might be questioned which is needed, the manager or the ass
51、istant.from what has been said, it should not be inferred that these jobs can be eliminated automatically. close examination may reveal that real, important work is being done by all of the persons involved. it is the organization, not the individuals, that is being questioned by this approach.too m
52、any tasksthe number of indirect activities performed in a modern business is staggering. it can range from 100,000 in a relatively simple operation to well over one million in a truly complicated one. the problem here is that a significant number of these activities may be completely unnecessary. th
53、e origins of these tasks are many and varied. some are lost in the mists of time'it has always been done this way." some were brought in by new managers, or even by employees, from their last job"it worked there, so it will work here." some were temporary situations that became pe
54、rmanent"well keep manual records until we're sure that all of the bugs are out of the system." some are overapplication of standards'if it's good enough for nasa, it's good enough for joe's shoe repair." none of these "reasons" holds water.the basic crite
55、ria should be that work is performed only if necessary to the efficient operation of the business or if it is required by law (not necessarily the same thing). any activities that do not jibe with either of these requirements should be eliminated.every work activity should have three elements: input
56、, conversion (added value), and output. if there is no conversion, then the activity is an unnecessary step in the work chain and should be elim-inated. if there is no output and the activity is not a direct response to one of the two basic criteria, it should be eliminated. any time an activity is
57、eliminated, its inputs (the outputs of preceding activities) also should beeliminated right down through the work chain. the snowballing effect of ekminating a single report sometimes can be quite dramatic.for example, consider the measurement of direct labor in a manufacturing operation using some
58、form of time standards. this practice harks back to the days when direct labor was the primary ingredient of cost of operations-sometimes as much as 80%. today it rarely reaches 30%, even in the most labor-intensive operations, and 15% is probably the norm, with extremes as low as 5%.the manpower in
59、 finance, edp, and manufacturing needed to collect, collate, measure, analyze, and review this labor is the equivalent of one and a half persons per 100 direct workers, with a minimum of four equivalent persons being required. for most modern industry, direct labor measurement is an outdated and unn
60、ecessary luxury.the hunt for unnecessary work can be an enlightening experience. in many companies as many as half of all final reports and two-thirds of all interim reports are really unnecessary. therefore, an excellent place to pick up the spoor of unnecessary work is in the file cabinets scattered throughout an operation.all reports should be examined but especially those produced on a regula
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024年醫(yī)院聘用合同格式版(二篇)
- 2024年導(dǎo)游工作計(jì)劃范文(二篇)
- 2024年合伙開(kāi)店合同參考范文(五篇)
- 2024年學(xué)校安全生產(chǎn)月活動(dòng)總結(jié)簡(jiǎn)單版(二篇)
- 2024年國(guó)際貿(mào)易合同參考模板(四篇)
- 2024年圖書(shū)館考勤制度范文(七篇)
- 【《后疫情時(shí)代喜茶營(yíng)銷策略探究(論文)》11000字】
- 2024年安全工作領(lǐng)導(dǎo)小組職責(zé)范文(二篇)
- 2024年單項(xiàng)工程承包合同模板(四篇)
- 2024年實(shí)訓(xùn)總結(jié)參考范文(二篇)
- 消防安全檢查表-
- 叉車服務(wù)搬運(yùn)流程
- 退貨分析報(bào)告
- 二 《學(xué)習(xí)工匠事跡 領(lǐng)略工匠風(fēng)采》(教學(xué)設(shè)計(jì))-【中職專用】高二語(yǔ)文精講課堂(高教版2023·職業(yè)模塊)
- 水電工考試題及答案
- 第14課 推進(jìn)綠色發(fā)展
- 聲樂(lè)基礎(chǔ)課件
- 2023-2024學(xué)年七年級(jí)地理上冊(cè)(人教版)單元精講·速記·巧練 (含答案解析)第一章 地球和地圖【單元測(cè)試·達(dá)標(biāo)卷】
- 部編版五年級(jí)道德與法治上冊(cè)第6課《我們神圣的國(guó)土》教學(xué)課件
- 四川省成都市石室聯(lián)合中學(xué)教育集團(tuán)2023-2024學(xué)年八年級(jí)上學(xué)期期中物理試卷
- 河北農(nóng)業(yè)大學(xué)學(xué)生處分管理規(guī)定
評(píng)論
0/150
提交評(píng)論