1、Highway engineering change reasonanalysis and cost of the project of influenceAbstract: in the implementation stage because of highway engineering design factors, environmental factors, the influence of various engineering changes happened is more common, combining with engineering practice, this pa
2、per discusses the causes and engineering change of project cost.Keywords: engineering change, Reason, CostDue to the highway project period, long, long line, so broad in construction of various causes by the engineering change is inevitable. Engineering change could lead to increase of construction
3、cost or time limit of the owner and the contractor, between the claim will claim and the cost of the project.Owner of change and the causes of the costAnd when the owner change engineering bidding of construction conditions of commitment. "SanTongYiPing" referred to in the preceding paragr
4、aph, the engineering tight finish, delay purpose will increase the contractor's settlement fee, but little impact on total cost, the owner or project quantity change projects. Increase the project content or quantity, will increase the cost, Project content or cancel or reduce the number will re
5、duce cost, but may affect the use function of engineering, because the owner with agreements for the existence of incomplete, or in the contract when division, can increase content of missing the contract cost, and the owners' requirements, and shorten delivery of finished ahead of the original
6、contract period, invest more in construction unit cost of manpower and material resources, to increase, and improve the design standard requirement owner, beautiful Angle from security requirements of engineering structure change type, elevation, baseline, location, size and strength, make cost incr
7、ease, and the owner to change in the construction organization design has approved the construction plan, cost increase, and the owner of the contract with the owner of the materials or equipment supply for the category and quantity, cause cost increase or decrease, and the owner of the contract spe
8、cifies unreasonable, canword 文檔 可自由復(fù)制編輯make the cost is increasedThe design of change and the causes of the costThe design adopts the new standard, new technology, new technology, to replace the original design of the project, and put to use more favorable for owner reduce project cost, the depth of
9、 the design documents, cannot satisfy the relevant provisions of the relevant design phase of engineering change and requirements, cost increase or decrease, and when designing units in the preliminary design to fully consider the network planning, and in local government and related departments (e.
10、g., environmental protection, water conservancy, electricity, gas, communication, navigation, etc.) and the requirements of the project, the main structure change shape and size change etc, make the cost increase, and design personnel errors or omissions caused engineering change. Due to the "t
11、wo SanShen school system to implement the change that cost is increased, Unit, uncoordinated cooperation between designers, or the highway facilities with the principal part of the project design, cause sync job change, make cost increase, and the design drawing not timely delivery time delay, provi
12、de, construction, make the cost compensation shutdown caused by increased.Tthe contractor to change and cause the influence. CostThe contractor is unable to perform the contract or can't completely, the contractor shall take remedial measures proposed change, this kind of change of engineering c
13、ost, can increase by contractor burden loss,the contractor has beenapproved changes when bidding of construction project, this kind of change of cost, but almost no effect for the contractor may save construction cost, and the contractor for construction is convenient, or to shorten the construction
14、 period, or to reduce the investment of construction, and puts forward such reasons, and more economical and reasonable, optimizing design scheme, this kind of change if owner recognized, can reduce the construction cost, also can reduce the cost of the owner and the contractor, mutually beneficial,
15、 According to the contract, the contractor couldn't finish, engineering construction contract extension, the owner may terminate the contract terms, according to the content of construction contract inword 文檔 可自由復(fù)制編輯 whole or in part, by the contractor, this kind of other changes generally does
16、not make owner cost increase, but will make the contractor under loss, due to the contractor technology or management of the error caused by engineering change, this kind of change to the contractor, the owner may claim generally do not increase the cost, stipulated in the contract, the contractor c
17、hange by owner procurement materials, using other kinds of materials, and therefore model brand damage by contractor, unless the owner to approbate, generally do not add costthe supervisor of change and the causes of the costSupervision by the owner, commissioned by the cause of the change of the ow
18、ner or expenses directly influence the cost. 1 and supervision engineer in order to coordinate the contractor's operation, or section of this project contractors to coordinate with relevant departments or units where the relationsof production,easy cause engineering change caused by increased co
19、st. the site supervision engineers in actual situation in the contract and the technical specification for the design, according to local modification and perfect or by design, this kind of change unit may cause increased cost. and supervision engineers work and coordination ability damage caused by
20、 lack of rework, engineering cost change work. and supervision engineer proposed optimization design or construction, the design optimization or contractor agree, can reduce engineering changes caused by the project cost.The environment factors and impact on the cost of changeEngineering geology unk
21、nown or insufficiency in design, engineering cost increased to. and highway engineering construction projects from the construction, project feasibility study, design and construction drawing design to construction, due to various reasons, the project in the declaration and approval process, some pr
22、oblems existing in the construction stage, these problems caused by exposure to change, and engineering cost increase. and national policies, laws and regulations and standard, the change of change, resulting in increased cost. Four, the local government of the people's production and life conve
23、nient scheme adopted by engineering change after that cost increase. whose house is caused by delay, the work of engineering change, could lead to increased cost.word 文檔 可自由復(fù)制編輯Highway engineering change of a variety of reasons, this means that the appraisal work for engineering changes are complex
24、and difficult to decrease the cost, the change of the effects are also different. Through the analysis, is looking for engineering changes the various causes, and through the analysis of the cost control are not isolated, control cost, the key is to establish and perfect the scientific management sy
25、stem. Based on control cost, quality assurance and accelerate the progress, the principle of efficiency to determine the necessity and feasibility of engineering change. Only in this way can we truly achieve the effective control of the construction project cost and improve the economic benefit and
26、social benefit.word 文檔 可自由復(fù)制編輯公路工程變更原因分析及其對(duì)工程造價(jià)的影響摘要:公路工程在實(shí)施階段由于設(shè)計(jì)因素、環(huán)境因素等多方面的影響,發(fā)生工程變更 是較常見(jiàn)的,文章結(jié)合工程實(shí)踐,探討工程變更的原因及其對(duì)工程造價(jià)的影響。關(guān)鍵詞:工程變更;原因;造價(jià)影響由于公路工程項(xiàng)目路線長(zhǎng)、工期長(zhǎng)、涉及面廣,因此在施工中由各種原因引起的 工程變更也不可避免。 工程變更可能導(dǎo)致建設(shè)費(fèi)用的增減或工期的延長(zhǎng), 在業(yè)主和承 包商之間會(huì)出現(xiàn)索賠和反索賠,使工程的造價(jià)發(fā)生變化。一、業(yè)主原因引起變更及其對(duì)造價(jià)的影響1、業(yè)主改變工程招標(biāo)時(shí)承諾的施工條件。如 “三通一平 ”條件,本工程緊前項(xiàng)目 的延遲
27、完成等,會(huì)增加承包方的結(jié)算費(fèi)用,但對(duì)總造價(jià)影響很??;2、業(yè)主變更項(xiàng)目?jī)?nèi)容或項(xiàng)目數(shù)量。增加項(xiàng)目?jī)?nèi)容或者數(shù)量,會(huì)增加造價(jià);減少或取消項(xiàng)目?jī)?nèi)容或數(shù)量 會(huì)降低造價(jià),但可能影響工程的使用功能; 3、因業(yè)主原 因同承包方簽訂的協(xié)議存在 不完整之外,或在標(biāo)段劃分時(shí)出現(xiàn)遺漏內(nèi)容,會(huì)增加合同外造價(jià);4、業(yè)主要求提前竣工交付,縮短原合同工期, 導(dǎo)致施工單位投入更多 的人力和物力, 使造價(jià)增加; 5、 業(yè)主要求提高原設(shè)計(jì)標(biāo)準(zhǔn), 從安全美觀等角度要求改變工程結(jié)構(gòu)的型式、 標(biāo)高、基線、 位置、尺寸、強(qiáng)度等,使造價(jià)增加; 6、業(yè) 主要求改變已在施工組織設(shè)計(jì)中被批準(zhǔn)的 施工方案,使造價(jià)增加; 7、業(yè)主對(duì)原合同中約定同業(yè)主供
28、應(yīng)的材料或設(shè)備的種類或 數(shù)量進(jìn)行增減,引起造價(jià)增加或減 少; 8、業(yè)主的指定發(fā)包不合理,會(huì)使造價(jià)增加。二、設(shè)計(jì)原因引起變更及其對(duì)造價(jià)的影響1、設(shè)計(jì)采用新標(biāo)準(zhǔn)、新工藝、新技術(shù)來(lái)替代原有設(shè)計(jì),使項(xiàng)目的投入使用更加 有利,并為業(yè)主減少工程造價(jià); 2、設(shè)計(jì)文件的深度不能滿足相應(yīng)設(shè)計(jì) 階段的有關(guān)規(guī) 定要求而引起的工程變更,導(dǎo)致造價(jià)增加或減少; 3、設(shè)計(jì)單位在初步設(shè)計(jì)時(shí)未能充 分考慮原地面的路網(wǎng)規(guī)劃和地方政府及相關(guān)部門(如環(huán)境保護(hù)、供 電、供氣、水利、 通訊、航道等)的要求而引起的工程變更,主要表現(xiàn)結(jié)構(gòu)形式和尺寸的改變等方面, 使造價(jià)增加; 4、設(shè)計(jì)人員的錯(cuò)誤或疏漏引起工程變更。由于 “二校三審 ”制度落
29、實(shí)不 夠?qū)е伦兏乖靸r(jià)增加; 5、設(shè)計(jì)單位設(shè)計(jì)人員之間配合不協(xié)調(diào),或公路的附屬設(shè)施 同主體工程的設(shè)計(jì)不同步,引起工作變更,使造價(jià)增 加;6 、分期交付的設(shè)計(jì)圖紙不 能及時(shí)提供,工期延誤,造成施工方停工引起索賠,使造價(jià)增加。word 文檔 可自由復(fù)制編輯三、承包人原因引起變更及其對(duì)造價(jià)的影響1、承包人無(wú)法履行或不能完全履行合同,承包人提出采取補(bǔ)救措施的變更,這 類變更不能增加工程造價(jià),由承包人負(fù)擔(dān)損失費(fèi)用; 2、承包人變更投 標(biāo)時(shí)已被批準(zhǔn) 的施工方案,這類變更對(duì)造價(jià)幾乎不會(huì)產(chǎn)生影響,但可能為承包人節(jié)省施工費(fèi)用;3、承包人為了施工方便,或?yàn)榭s短工期,或?yàn)闇p少投入等原因,提 出對(duì)施工有利,且 更加經(jīng)濟(jì)、合理、優(yōu)化的設(shè)計(jì)方案,這類變更如果業(yè)主認(rèn)可,可減少施工成本,也可 降低造價(jià),
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 下學(xué)期教皇的奶牛-課件
- 《證券投資相關(guān)》課件
- 《湖泊的水文特征》課件
- 《語(yǔ)文下冊(cè)《雪》魯迅》課件
- 七年級(jí)英語(yǔ)上冊(cè)期末復(fù)習(xí)課件
- 單位管理制度集粹選集人力資源管理
- 單位管理制度匯編大全人力資源管理篇
- 單位管理制度合并匯編【人事管理篇】
- 單位管理制度范文大合集員工管理篇
- 單位管理制度范例匯編人事管理篇
- 中國(guó)特色大國(guó)外交和推動(dòng)構(gòu)建人類命運(yùn)共同體
- 《風(fēng)電場(chǎng)項(xiàng)目經(jīng)濟(jì)評(píng)價(jià)規(guī)范》(NB-T 31085-2016)
- 粗粒土和巨粒土最大干密度記錄表及報(bào)告
- 愛(ài)麗絲夢(mèng)游仙境話劇中英文劇本(共6頁(yè))
- 書(shū)法少年宮活動(dòng)記錄
- 表冷器性能計(jì)算書(shū)
- 走遍德國(guó) A1(課堂PPT)
- 照明公司個(gè)人工作總結(jié)范文
- 熱控專業(yè)施工質(zhì)量驗(yàn)收范圍劃分表
- 2022年sppb簡(jiǎn)易體能狀況量表
- 各類傳染病個(gè)案調(diào)查表集
評(píng)論
0/150
提交評(píng)論