1、陽極氧化工藝流程翻譯Process flow and raw materials of aluminum andaluminum alloy anodic oxidation tintingProcedure specification on aluminum and aluminum alloy anodic oxidation tinting1. Procedure specification(line drawing)Substrate Mounted hanging Degreasing Alkaline etching Neutralization Anodic oxidation

2、Electrolytic coloring Sealing Electrophoretic coating Curing Unloading packaging Warehousing2. Mounted hanging :2.1 preparations before mounted hanging.2.1.1 Check the conductive parts like conductive beams and bars. They should be regularly polished, cleaned or repaired.2.1.2 Get ready conductivity

3、 of aluminum and aluminum wire.2.1.3 Check the pneumatic tools and related equipment.2.1.4 Check whether or not requirements like length, count, color, thickness on the flow paper or production task list are consistent with the order drawing and actual materials.2.1.5 Depending on the specifications

4、 (size of circumscribed circle, external surface area, etc.) to determine the count and space. To control the pigment spacing about 1.2 times than the horizontal width of the material shaped, and the white material spacing about 1 time than the width.2.1.6 Choose the appropriate rack, and ensure tha

5、t hook number of negative and positive hangers is the same with the count of materials shaped.2.2 Mounted hanging:2.2.1 When hanging, fix the topside one first, and then the bottom one, and then arrange the remaining sections in the middle, and tighten the screws.2.2.2 Before hanging, placing one al

6、uminum sheet between the material and aluminum screw p so that it can prevent poor conductivity impacting oxidation, coloring and electrophoresis.2.2.3 When hanging, it is not allowed to hang all the materials in the lower or upper rack.2.2.4 The hanged materials should recline more than 14 degrees

7、in order to facilitate air exhausting in electrophoresis or coloring, and reduce the air bubbles.2.2.5 When hanging, considering the facing of the decorative surface and groove to prevent the color shading, bubbles, pitting appearing in the decorative surface.2.2.6 Like some flexible and easily defo

8、rmed materials, put one more rack or aluminum wire in the middle to prevent friction between the materials or touching tank plate, and that may abrade or burn the surface.2.2.7 When selecting vice-bar rack, the plug rod is preferred. When using aluminum banding, they must be evenly spaced, and the o

9、utcrops should be less than 25mm.2.2.8 Materials with great disparity of cross-section size and shape are prohibited to hang in the same row.2.2.9 When hanging and handling equipment, you must wear clean gloves, gently and well protecting the surface.2.2.10 When hanging or handling equipment, worker

10、s should strengthen self-examination and cross-examination, the failure materials are non-mounted, and take appropriate measures to deal with the surface stained with oil or aluminum burrs2.2.11 After eliminating unqualified ones, you must make them up in time by order.2.2.12 In hanging area, materi

11、als should not be stored for too long time, to prevent corrosion of the surface.2.2.13 Filling the hanging record and oxidation process card. Accurately calculating and fill in oxidation of each linked area, checking models, count and color by orders at any time.2.2.14 Do a good job in shift procedu

12、res and keep the work area clean.3. Preparation before oxidized production units:3.1 Checking the level of the liquid in the process tank. According to test report card, to adjust the concentration of the bath solution and ensure that bath solution is always in line with technical requirements. Work

13、ers should frequently sweep the dirt from the bath solution.3.2 Checking the vehicle, freezer, rectifiers, circulating acid pump, water pump, transfer cars, furnace and other equipment, any exception should be immediately solved.3.3 Check PH (or conductivity) and cleanliness in the pure water washin

14、g tank and running water washing tank. If it does not meet the technical requirements, workers should change it and hydrating overflow.3.4 Open the alkaline etching, hot pure water tank, sealing the steam or cooling water tank; open the oxidation tank, coloring tank and cooling system of electrophor

15、esis tank to ensure the uniformity of bath solution and temperature complying with requirements.3.5 Check the Roots blowers, exhaust blowers and exhaust fans. Before the production, they should be opened.3.6 Carefully check the oxidation process card,specifically confirm the production requirements,

16、 and prepare the color palette.4. General requirements for oxidation sets operation:4.1 It is not allowed to hang t more than two hangings every time. And keeping a certain distance between the two hangings to prevent collision between the materials.4.2 When materials hung into and hung out of the b

17、ath solution, they must be inclined to 30 .4.3 Materials falling into the tank must be removed promptly and hung up in rafts, the damage ones must be promptly notified to group-to-order equipment to make them up.4.4 In addition to alkaline etching and coloring, the sections should be hung out after

18、the bath solution drained away to reduce the flow of waste and pollution.ones must4.5 When the hanging materials must cross other sections, the transferring maintain the level of the degree to reduce theflow of liquid and pollute materials and conductive beam.4.6 Each process should be promptly fill

19、 in the oxidation process cards, and sign them.5. Degreasing:5.1 Process ParametersComposition of bath solution: acidic degreasing agent 2 to 3% Temperature: room temperature Degreasing time: 1 3min5.2 Operating requirements:productionthe sameor similar5.2.1 Check process card, make requirements cle

20、ar. Materials with color, same model and same orderfacilitate theoperation thespecification should be suspended into the degreasing tank simultaneously or preferentially, so that it canpost-procedure.5.2.2 When thefinished, the of the tank,degreasing isbe hung outpreventing the sand from the surface

21、.5.2.3 After degreasing, the surface should bematerials shouldwell-distributed and wet, and the materials should be washed by Level 2 water then turned into the alkaline etching process.6. Alkaline etching:6.1 Process parameters:Composition of bath solution: plain-surface alkaline etching, sand-surf

22、ace alkaline etching NaOH: 40 50g / l 45 60g / lAdditives (NaOH): 1 / 12 1 / 15 1 / 6 1 / 8 Temperature: 40 45 45 55 Alkaline etching time: 1 3min 10 30min6.2 Operating requirements:6.2.1 When alkaline etching, the forced draught blowers and exhaust fans should be opened.6.2.2 When alkaline etching

23、is finished, materials should be hung out as soon as possible, finishing shedding immediately and transferring to the tank washing, so that it can prevent straying marking from the surface.6.2.3 Strictly control alkaline etching process parameters, to ensure uniform quality of the surface after alka

24、line etching.6.2.4 Post-alkaline-etching materials must be washed by Level 2 overflow. The remaining alkaline liquid should be fully cleared away, so that the raffinate can t pollute other tanks.7. Neutralization:7.1 Process parameters:Composition of bath solution: HNO3: 120 150g / lTank temperature

25、: room temperature Neutralizing time: 2 5min7.2 Operating requirements:7.2.1. When neutralizing, the materials should be moved up and down and anti-tilt, fully neutralizing exhaust liquor in the hole and remove appearing dust.7.2.2 Post- neutralizing materials must be washed by Level 2 overflow, and

26、 turn to the anodizing tank.7.2.3 The surface quality inspection should be strengthened to check the surface of the sand surface conditions, mottling, burrs, welding lines and other surface defects, for timely processing, reworking.7.2.4 Regularly check screws are loose or not, to ensure good electr

27、ical conductivity.8. Anodic oxidation:8.1 process parameters:Tank composition: H2SO4:150 180 g/l AL ion:5 to 15 g/lTank temperature: 20 1 o COxidation voltage: 14 and 18 VCurrent density: 130 150 A / The oxidized time: according to requirements film thickness calculation.8.2 Operating requirements:8

28、.2.1 Anodic oxidation must be open before:(a) Rectifier cooling water.(b) Bath circulation cooling system (cooling unit).(c) Send the exhaust fan.8.2.2 Anodic oxidation must be checked in advance: conductive copper conducting copper aluminum piece, hanging fixture and conductive beam in contact, and

29、 the situation of the conductive, should be often burnished.8.2.3 Anodic oxidation must be opened before a conductive copper cooling water, check and conductive beam bending, whether the conductive bending beam must be replaced, in case of burn out the conductive and impacts anodic oxidation.8.2.4 B

30、efore electricity oxidation, profile must be placed in middle of oxidation tank, ensure that with both side distances are the same.8.2.5 Before electricity oxidation link up, driving hook must be taken off conductive beam hook, when the power and oxidation end, driving hook can hang conductive beam

31、hook, in order to avoid short circuit, damage the equipment.8.2.6 Anodic oxidation set the current density, oxidation method should accord to the oxidation area of profiles multiplied with the current density. Shading materials for the current density of oxidation must be controlled in 130 A/ .8.2.7

32、 When Anodic oxidation, should often visited the voltage, current, temperature, etc. Various kinds of instrument, any abnormal should be promptly eliminated.8.2.8 After Oxidation of profiles, should detect the film thickness, and make records, if film thickness can not reach the requirements, must b

33、e to prolong the oxidized time to film thickness to meet requirements.9, Electrolytic coloring:9.1 process parameters:Bronze is golden brown departmentBath composition: SnSO4: seven to 10 g/l GD: 35 to 45 g/lNiSO4 ? 6 H2O: 20 30 g/l SeO2:8 10 g/l Additives: Same amount with SnSO4 CuSO4:2 3.5 g/lH2SO

34、4:15 20 g/l 12 to 17 g/l PH: 0.6 1.0 PH: 0.7 1.025 temperature: 15 20 25 Voltage: 14 to 18 V 14 to 16 VShading time: 20 S 15 min 2 6 min9.2 Operating requirements:9.2.1 Maintain bigger slope when putting anodic oxidated profiles into color cell, and placed at the middle of poles, ensure equal polar

35、distances.9.2.2 When shading, driving hook must be taken off conductive beam hook, and rest for 0.5 1 minutes to color.9.2.3 Shading voltage for the same kinds of color must be equal.9.2.4 When bronze cell shading over, must be lifted immediately as soon as possible, flow bath, transfer to sink quic

36、kly, fully clean the acid water in the hole of profiles, use coloring board to compare, when color is too light, put it into coloring tank to electricity complementary color, when color is too deep, put it into coloring tank (no electricity) or acidic water behind of oxidation tank to fade (bronze s

37、eries).9.2.5 Because golden not fade, and shading time should not be too long.9.2.6 The shaded profiles shall be washed adequately by level 2 water, then go on electrophoresis or hole sealing.10, Sealing:10.1 Process parameters:Bath composition: Ni ion: 0.8 1.2 g/l, F ion: 0.35 0.6 g/l, PH: 5.6 6.5,

38、 pure dampening solution temperature: 20 30 Hole sealing time: oxidation film thickness (um) x 1.2 min around (subject to quality standards).10.2 Operating requirements:10.2.1 Profiles should be washed by pure water before sealing, in case the pollution of electrophoresis and sealing slots.10.2.2 Wh

39、en profiles enter into sealing slots, should prevent hole sealing water from splashing into electrophoresis recycling tank.10.2.3 Hole sealed profile after must be dried after being washed.10.2.4 Sealed profile should be strictly prohibited to contact with oil, electrolyte and bare hands.10.2.5 Afte

40、r sealing, should sport check the hole sealing quality, timely adjust hole sealing time, ensure that hole sealing quality to achieve the requirements, and prevent the over-sealing powder.11, electrophoresis11.1 process parameters:Tank composition:Solids: 5 8%Solvent: 1 5%Conductivity: 550 900 S/cmPH

41、: 7.6 8.0Electrophoresis Voltage: 90 120V Temperature: 23 3 Electrophoresis time: 1 2min11.2 operating requirements:11.2.1 Before electrophoresis, the ones must be gone through one pure water, two hot water, three cold water washing, fully washing the acidic water and dirt in the material surface, h

42、ole and film hole.11.2.2 Always check PH, conductivity and cleanliness in the three water, keeping PH 5.5 in the water tank, the first pure water conductivity 120 S/cm, the second and the third water conductivity 60 S/ cm, and often change the water.11.2.3 Temperature of hot pure water tank should b

43、e controlled between 60 80 .11.2.4 Articles in hot water tanks time between3 5min, after the hot water wash, should be fully dried and fully wiped to get conductive beam rid of oil and acid-base water. Keep special attention on cleaning and cooling of thick-walled tubular.11.2.5 Temperature of Cold

44、pure water washing tank should be maintained below 30 . Articles that are washed in cold water should not be dried, preventing extra wave when electrophoresis.11.2.6 Maintain the largest tilt when profiles are in the electrophoresis tank to facilitate the exclusion of air.11.2.7 After put into the e

45、lectrophoresis tank,articles should be placed in the centralelectrode, and ensure equal distance on both sides of the plate, and stand for one minute before electrophoresis.11.2.8 When electrophoresis, circulating pump and electrophoresis recycling equipment must be turned on. The two pure water tan

46、ks should meet the following technical requirements: The first pure water, the second one Solids: 1.0% 0.3%PH: 8.0 8.3 8.0 8.5Conductivity: 100S/cm 50 S/cm11.2.9 Electrophoresis solution should open refined purification system at fixed period as for the increase of PH and conductivity to ensure the

47、electrophoresis bath meet process requirements.11.2.10 After electrophoresis, articles must be passed by two pure water.11.2.11 Post-electrophoresis articles should be placed in the pre-dried area.11.2.12 keep electrophoresis area clean, non-oil, no dust, no acid mist to pollute profiles and electro

48、phoresis tank.12, Curing:12.1 process parameters:Curing temperature: 180 200 Curing time:30 45min12.2 operating requirements:12.2.1 Before curing, check oven and curing temperature measurement system, and regularly clean the curing oven.12.2.2 When finished curing and cooled to room temperature, wor

49、kers check the quality of the electrophoresis film.13, unloading, packaging13.1 Preparation for discharge13.1.1 Check the storage rack, transport trolley, film machine, packaging machine13.1.2 Check the model, length, count, color on the card are consistent with the material object or not. Make pack

50、aging requirements clear; prepare protective film, tape, wrapping paper and other packaging materials.13.1.3 Test oxidation thickness, composite thickness, sealing quality, the film hardness, film adhesion, color, color variation, appearance quality. All of them adhere to requirements, then they can

51、 be discharged, and fill oxidation product inspection records.13.2 unloading, packaging13.2.1 Water sealing material is not allowed to unload with water, electrophoresis materials must be cooled to room temperature before unloading.13.2.2 Profiles must be unloaded by teams, non-impacted, non-beat, and prohibited to be directly contacted with the

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

最新文檔

評論

0/150

提交評論