1、舵機(jī)環(huán)氧樹(shù)脂墊澆注工藝規(guī)程The S/G epoxy resin chock pouring technology procedure1. 參考資料:Reference drawingsl 舵機(jī)安裝圖: DNS507-232-16001Installation of steering gearl 環(huán)氧樹(shù)脂資料 Epoxy resin specification2. 澆注用材料和工具M(jìn)aterial and tools for pouring1) 內(nèi)、外擋板用扁鋼 尺寸:22000mm×3mm 材料:Q235-A 內(nèi)擋板的高度=墊厚-10mm;外擋板的高度=墊厚+40mm(扁鋼的具體高
2、度由車間工藝人員根據(jù)實(shí)際墊的厚度給出)。 The inner and outer steel bar should be prepared for pouring the epoxy resin (the height of steel bar will be determined on spot).2) 尺、小刀、剪刀、丙酮、干凈的抹布、砂布、鋼鋸條、巴氏硬度計(jì)、電加熱器(供氣溫低時(shí)使用)、手提攪拌器。The following tools should be prepared: ruler, knife, scissors, acetone, rag, heater ect.3. 澆注前的
3、準(zhǔn)備工作:The preparation work before pouring1) 舵機(jī)安裝前,按附圖1所示,將澆注環(huán)氧樹(shù)脂墊塊用的內(nèi)擋板點(diǎn)焊于舵機(jī)座面板上(在焊接內(nèi)擋板時(shí),一定要注意內(nèi)擋板的定位尺寸)參考附圖1和舵機(jī)安裝圖。內(nèi)擋板選用厚3mm、高度等于對(duì)應(yīng)部位上舵機(jī)墊的厚度減去10mm的扁鋼。扁鋼的長(zhǎng)度應(yīng)保證其兩端至少長(zhǎng)出最外端的墊塊25mm。墊塊的厚度由車間工藝人員給出。具體的每側(cè)扁鋼的長(zhǎng)度尺寸和焊接位置以及海綿條的設(shè)置位置由環(huán)氧樹(shù)脂的廠家服務(wù)商現(xiàn)場(chǎng)指導(dǎo)。Before installing the steering gear, spot welding the inner steel b
4、ar to the foundation of steering gear, the height of inner steel bar should be chock height 10mm. The position of each side steel bar and damming foam stripes will be determined by service engineer.2) 舵機(jī)的止推裝置的焊接以及其他主要的焊接工作應(yīng)該完成。The welding work of stopper should be completely.3) 必須將舵機(jī)基座墊塊區(qū)域內(nèi)的所有的油污、銹斑
5、、油漆、鱗皮等雜物清除,并且涂上一層保養(yǎng)油。Removing grease, mill scale and rust, smearing the protection oil in pouring chock area.4) 舵機(jī)吊裝到位。Lifting the steering gear in its position.5) 使用臨時(shí)頂絲將舵機(jī)頂起,設(shè)置臨時(shí)頂絲時(shí),應(yīng)考慮到澆注口的位置,方便于設(shè)置外擋板。根據(jù)“舵機(jī)安裝工藝規(guī)程DNS507-400-16024GY”進(jìn)行舵機(jī)的找正工作。Adjusting the steering gear by using jacking screw acco
6、rding to the requirement in Steering Gear Installation Technology Procedure DNS 507-400-16024GY.6) 清除舵機(jī)墊塊區(qū)域內(nèi)的所有雜物和保養(yǎng)油,并用丙酮清洗與墊塊接觸的上下表面,必須保證所有油污全部被清洗干凈。Removing all the protection oil, and flushing the up and down surface contacted with chock by acetone.7) 根據(jù)服務(wù)商的指導(dǎo),按各墊的尺寸制作環(huán)氧樹(shù)脂墊澆注??颉aking the epoxy
7、resin chock mould based on the chocks size.8) 環(huán)氧樹(shù)脂墊澆注時(shí)應(yīng)注意,環(huán)氧樹(shù)脂墊的最小厚度尺寸不能小于25mm。The height of the chock should not be less than 25mm.4. 混合與澆注Mixing and pouring1) 在混合與澆注時(shí),舵機(jī)室應(yīng)禁止打磨、切割、電焊等有可能污染環(huán)境的作業(yè)。When mixing and pouring, the work of grinding, cutting and welding should be prohibited. 2) 根據(jù)對(duì)固化劑加入量的要求,
8、將固化劑加入到環(huán)氧樹(shù)脂桶中,使用攪拌器以約200轉(zhuǎn)/分鐘的速度對(duì)環(huán)氧樹(shù)脂進(jìn)行攪拌2-3分鐘,使其與固化劑混合均勻。攪拌時(shí)應(yīng)注意不要讓葉片露出液面,以防氣泡帶入。Add hardener and power mix at speed 200rpm for 2-3 minutes to ensure homogenous mixture, for quantity of hardener and temperature guides should based on requirement of supplier. In case the filler has settled on the bott
9、om of the epoxy can, you have to stir the epoxy resin until it is free of streaks. Pour mixed resin without delay and with minimum free fall to avoid air entrapment. Don not scrap remaining resin out the can.3) 在澆注環(huán)氧樹(shù)脂的同時(shí),應(yīng)同時(shí)澆注兩塊樣塊。The test samples are to be cast using the same epoxy resin at same t
10、ime.4) 每個(gè)墊塊澆注完畢后,應(yīng)檢查有無(wú)??蛭幢怀錆M和環(huán)氧樹(shù)脂泄露等現(xiàn)象,如有應(yīng)立即采取補(bǔ)救措施,在所有環(huán)氧樹(shù)脂固化前,必須有專人不間斷地進(jìn)行檢查,以防止上述現(xiàn)象發(fā)生。Until resin hardens, ensure any air heating does not cause local hotspots which may promote excessive exothermic reaction during initial setting process.5) 環(huán)氧樹(shù)脂的完全的固化時(shí)間為24-48小時(shí),固化的時(shí)間取決于當(dāng)時(shí)的環(huán)境溫度。如果由于氣溫過(guò)低(低于13),采用碘鎢燈或
11、者別的更有效的加熱設(shè)備對(duì)墊塊區(qū)域進(jìn)行加熱以確保環(huán)氧樹(shù)脂墊的完全固化。 固化時(shí)間: 13-18 大約48小時(shí) 19-21 大約24小時(shí) 21以上 大約18小時(shí) Normally the epoxy resin cures in 24-48 hours, the curing time will be determined by ambient temperature. If the ambient temperature is very low (below 13), the iodine tungsten lamp or other heating equipment will be use
12、to heat the chock area, to ensure the epoxy resin chock cure totally. Cure time of epoxy resin chock 13-18 approx. 48hours 19-21 approx. 24hours above 21 approx. 18hours6) 用巴氏硬度計(jì)檢測(cè)墊塊的硬度,要求巴氏硬度達(dá)到35以上。Before tightening the holding down bolts, it is absolutely necessary to make a hardness test according to Barcol. Minimum Barcol hardness must be 35, this means that the epoxy resin chocks are fully cured.7) 移走碘鎢燈或者其它的加熱設(shè)備,待墊塊冷卻到環(huán)境溫度后,可以開(kāi)始緊固地腳螺栓。In case that electrical heaters or other heater were used for post curing, that before tightening the holding down bolts, chocks and e
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 工程款支付申請(qǐng)表的填寫(xiě)規(guī)范與標(biāo)準(zhǔn)
- 采暖散熱器施工方案
- 星級(jí)酒店關(guān)系質(zhì)量研究調(diào)查
- 2025年液堿行業(yè)現(xiàn)狀分析:我國(guó)燒堿產(chǎn)量為3980.5萬(wàn)噸
- 江西省部分學(xué)校2024-2025學(xué)年高三上學(xué)期1月期末英語(yǔ)試題【含答案】
- 2024年普通?等學(xué)校招?全國(guó)統(tǒng)?考試上海語(yǔ)?試卷
- 裝修成品保護(hù)施工方案
- 上海市安全員-C3證考試題及答案
- 清除路肩雜草施工方案
- 新風(fēng)機(jī)組施工方案
- 專題02 光現(xiàn)象(5大模塊知識(shí)清單+5個(gè)易混易錯(cuò)+2種方法技巧+典例真題解析)
- 支氣管封堵器在胸科手術(shù)中的應(yīng)用
- 北京市東城區(qū)2021-2022學(xué)年第一學(xué)期四年級(jí)期末考試語(yǔ)文試卷(含答案)
- 《STP市場(chǎng)營(yíng)銷戰(zhàn)略》課件
- 心理健康教育課件教學(xué)
- 河南省勞動(dòng)關(guān)系協(xié)調(diào)員職業(yè)技能大賽技術(shù)工作文件
- 成都實(shí)驗(yàn)中學(xué)2025屆高三最后一模英語(yǔ)試題含解析
- 2024年新《反洗錢法》修訂要點(diǎn)解讀
- 如何變廢為寶課件
- 中華人民共和國(guó)學(xué)前教育法
- 辯論英文課件教學(xué)課件
評(píng)論
0/150
提交評(píng)論