XX大酒店18m大跨度梁專項施工方案_第1頁
XX大酒店18m大跨度梁專項施工方案_第2頁
XX大酒店18m大跨度梁專項施工方案_第3頁
XX大酒店18m大跨度梁專項施工方案_第4頁
XX大酒店18m大跨度梁專項施工方案_第5頁
已閱讀5頁,還剩41頁未讀, 繼續(xù)免費閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)

文檔簡介

1、Good is good, but better carries it.精益求精,善益求善。XX大酒店18m大跨度梁專項施工方案XX大酒店18m大跨度梁專項施工方案秭歸縣金城大酒店擴(kuò)建工程 18m大跨度梁施工專項方案編制人: 職務(wù)(職稱):工程師 審核人: 職務(wù)(職稱):工程師 批準(zhǔn)人: 職務(wù)(職稱):高級工程師 編制單位: 秭歸縣騰達(dá)建筑有限責(zé)任公司 編制時間: 2012年5月30日 目 錄18M大跨度梁施工1專項方案1一、工程概況11.1、基本建設(shè)情況11.2、18m大跨度梁概況11.3、主要技術(shù)參數(shù)取值2二、編制依據(jù)2三、設(shè)計計算33.1梁側(cè)模板布置及計算書33.2梁模板扣件鋼管高支撐架

2、布置及計算書10四、構(gòu)造要求204.1架體總體要求204.2架體支撐204.3架體水平桿204.4剪刀撐214.5周邊拉接21五、施工準(zhǔn)備225.1材料管理225.2驗收管理225.3使用管理23六、混凝土澆筑及施工順序安排246.1澆筑總體部署246.2混凝土的澆搗技術(shù)措施256.3混凝土澆搗質(zhì)量保證措施技術(shù)措施266.4混凝土養(yǎng)護(hù)27七、拆除管理27八、安全管理288.1高支模安全技術(shù)措施288.2安全交底制度308.3安全檢查制度31九、應(yīng)急預(yù)案319.1應(yīng)急領(lǐng)導(dǎo)機(jī)構(gòu)319.2應(yīng)急計劃329.4保障措施339.5防止高空墜落及墜物安全施工措施35十、施工圖414necessitar pe

3、r a llogar mobles la següent préstec temporal de despesa de capital. -En cas de despeses de cost tal com viatge a la ciutat, les despeses, costos de manteniment aprovats pel negoci encarregant-se de lloc de lideratge. -Préstec hauria generalment en els tràmits de devolució s

4、erà no ser en Mora i de ja no per defecte 3 complir estrictament econòmic disciplina, aquells que pertanyen a una de les següents condicions, com avançat els salaris, les despeses d'obligacions personals, propòsit clar, tràmits d'aprovació no són pr

5、33;stecs no són congruents. (3) en préstecs comercials:-estrictament cal estrènyer control de negocis, viatges costos especificats per l'aprovació del Director, les peticions es realitzaran per gent ompli el formulari de sollicitud, indicant els noms, localització, tema,

6、 durada prevista, responsable de la revisió de lideratge signat després d'aprovació del Director de negoci de viatges. -Taxi despeses del la ciutat no estrictament Hotel, nivell de control. -Anar a través de procediments de reintegrament en els set dies després del viatg

7、e a Nanjing, un assentament serà no ser en Mora, sense justificació, caducat sense reemborsament, no contribucions, (incloent-hi altres préstecs), la Tresoreria té dret a deduir de la seva nòmina clarament. 122th procediments de reintegrament: 1, totes les reclamacions per o

8、mplir el formulari, l'aplicació desaiguaments es maniobraran per separat en l'emmagatzematge, forma d'aprovació d'acceptació són obligatoris, receptor de personatges recta, l'atenció, de quantitat de capitalització, que persones han signat l'orig

9、inal document ha de ser completa, el procediment ha de ser completa. 2, material adquisicions de béns per a tots els departaments d'aprovació. 3, despeses i altres despeses, segons les oficines, àrees de responsabilitat, les despeses de les despeses aprovades. 4, on persones pagad

10、es, incloent-hi salari, bonificació, pícnic, hores extraordinàries, transport al registre d'unitat, expedit després de l'aprovació per l'autoritat pertinent, el beneficiari ha de ser signada, signat després del justificant de pagament del que el seu autopay

11、dia cau del Departament de finances. 5, poblat entre unitats, ha de complir el principi d'intercanvi d'equivalent, seran no assignar i lliure de regals, cap permuta, cancel. lació no es permet sense permís. 6, on un conjunt de comptabilitat, caixers per obrir comptes bancaris, tote

12、s les sumes, la unitat formal és responsable del tractament, però ha de ser reportat als comptes de tresoreria i acceptar la inspecció financera i orientació. 7, sense l'aprovació de la unitat, no manegen rebuts, cap unitat pot amunt "petit Cofre", cap persona

13、haurà d'utilitzar fons públics en un estalvi de forta capacitat personal, no hi ha unitats o persones no estan autoritzats a violar la disciplina financera, de malversació de fons. 8, pertanyent a la shehuijituangoumaili material, cal mantenir sota un control rigorós,precipit

14、acions mensuals a 184.5-245mm, dia plujós uns 158 dies l'any la Tramuntana a l'hivern i primavera, estiu, el vent de Sud; sol durada mitjana hores 1726, un període de temps-24, mitjana anuals 279.3 dies. (B) Enginyeria Geologia (1) de les condicions geològiques(2) anàlisi

15、 d'Enginyeria Geotècnica i l'avaluació basada en investigació resultats mostren que els efectes de profunditat d'investigació s'han trobat a l'estabilitat de lloc de construcció del lloc despreniments, collapses, falles i processos geològics, és

16、 estable, adequat per a la construcció de la carretera proposat. Planta d'aigua superficial, aigua alça i porus aigua sense efectes de corrosió en estructura de formigó, amb baixa corrosió de barres d'acer en l'estructura de formigó, amb baixa corrosió

17、de l'estructura d'acer. 1.2 disseny carregar el disseny del projecte amb estàndards de desdoblament de l'urbà, disseny velocitat V = 50 Km/h, manera de control amplada de 70m, el disseny per carretera que classe. (1) grafisme xiangfu East Road, el primer tram d'aquesta gamm

18、a de disseny, oest de Wan Jia Li Lu (K0 + 000), Beijing-Zhuhai autopista d'intercanvi a l'est (K2 + 180) i Wan Jia Lai Road, Sha Wan Road pas a nivell. Primer tram de 2180m. Camins a través del punt d'inflexió conjunt 3, radi mínim de gamma completa de 1500m de corba horit

19、zontal de linealitat, especificacions de disseny de via urbana. (2) disseny de secció vertical carretera de la secció primera de punts de control de l'apartat 3: Wan Jia Lai Road, Sandy Bay Road, Pequín-Zhuhai autopista d'intercanvi. Principals punts que firma 52.95 m, Beijing

20、-Zhuhai Expressway planta elevació 51,2 m, alta a través de alçada lliure d'alta velocitat de Beijing-Zhuhai de no menys de 5.5 M. Pendent màxim longitudinal és del 3%, corresponent a 230.53 m, queda seccions de pendent és suau. (3) secció disseny Hunan casa ca

21、rretera (milions casa Li Road est de) planificació carretera lloc pel control de 70m; seccions generals Road lloc per a 61m, composició de secció transversal de 4,5 m (control verd) + 4 m (persones) + 8.0M (carril mixta) +3.0 (verd amb) +11.5 (màquina) + 8 M (centre verd amb) +11

22、.5 (màquina) +3.0 (verd amb) + 8.0M (barrejat Lane) + 4 m (persones) 4,5 m (control verd) = 61 m + 9 m = 70 m, quatre bloc Consell; Seccions especials de canvis de calçada, però eren 70m àmplia gamma. (4) disseny a. paviment elevació de disseny per a l'elevació de p

23、aviment en la línia de la calçada subgrade construcció disseny elevació altitud menys el gruix de les capes d'estructura de paviment。 Pendent de b. subgrade. Elevació de terraplè és a menys de 8M, vessant omplir és 1:1. 5, quan més gran que o igual a

24、8 M, 1:1.75, omplir pendent pendent conjunt Canaletes; sòl de talla pendent de 1:1. 5, pendent de roca amb 1:1. Si la terra o pedra excavat, van establir fins al vessant peu 1m àmplia plataforma dalt de 6m 2m s'estableix quan altres plataformes, plataformes equipades amb costat rasa. S

25、ubgrade c. grau de compactacióactivities, comprehensive and tamping Safety Foundation . Troubleshooting, management mechanism, give full play to role of technical supervision and realization of troubleshooting, management, improved process management. This year completed the boiler lower header

26、 leakage, boiler pressure, a major risk management, completed 29 of great risks and 3 General problems of governance. Complete chemistry lab construction, thermal control, and complete the boiler scale integrated management, host shafting vibration of 10 scientific and technological projects, such a

27、s. Complete supercritical 630MW on-line simulation system development and application of circulating water MCC standby power transformation, the transformation of desulfurization waste water, the unit water supply system of comprehensive treatment and discharge valve modification of coal mill 5 key

28、technological transformation projects, group health is improved. -Science and technology innovation is further increased. Strengthen the characteristics of supercritical unit major issues, gradually clearing the particularity of supercritical unit and regularity. Developed motor oil time management,

29、 switch action times, statistics, coal-aided measurement software, improves the production level of lean management. Increased investment in science and technology, reporting science and technology projects and 14 technical project total cost percentage of the total annual production output of 0.25%

30、. "Large-scale coal-fired power plant flue gas desulfurization, denitrification complete development and application of key technologies" project, won the national science and technology progress second prize. 630MW supercritical units optimized control strategies and the 630MW development

31、 and application of on-line simulation system for supercritical units, supercritical 600MW units of turbine driven boiler feed pump set of comprehensive treatment of defects Datang technology respectively one or two and third. Meanwhile, information technology achievements, the company was named &qu

32、ot;China power information technology benchmarking enterprises." -Repair and maintenance has improved further. Modify the inspection standards and standards on a regular basis, standardizing work procedures, checking and inspection project. Deepening the BFS+ system, and implements maintenance

33、information shared. Reorganizing RB logic again, and ensure the success of the RB. Innovating the mechanism of maintenance management, implemented a project manager system. Successful completion of two autonomous maintenance, reliability improved steadily. Implementing two c-level maintenance, proje

34、ct themselves 48.7% and 42.3%, respectively. Accomplish two circulating pumps repair and overhaul of four Mills, maintenance teams to get exercise. Promote the work of energy saving and consumption reducing, complete the unit energy consumption diagnosis, plant water balance test, 10 energy-saving p

35、rojects. Second, we should adhere to "three" on the economic benefits of improving, outreach一、工程概況1.1、基本建設(shè)情況工程名稱:秭歸縣金城大酒店擴(kuò)建工程地址:秭歸縣長寧大道25號結(jié)構(gòu)類型:框架結(jié)構(gòu)計劃工期:2012.04-2012.09施工面積:3160.8m2總高度:22.6m層數(shù):6層,地下一層,地上五層。標(biāo)準(zhǔn)層高:3.6m1.2、18m大跨度梁概況本工程三樓屋面-/-軸設(shè)計了4道截面400mm*1500mm的鋼筋混凝土梁,跨度為18000mm,端柱截面600*800mm,

36、混凝土強(qiáng)度等級為C35。采用商品混凝土澆筑,先澆筑四周立柱,待其強(qiáng)度達(dá)到70%以上(即C25以上),時間約5天,使其形成外部支撐體系,然后澆筑梁板混凝土。該大梁施工特點是結(jié)構(gòu)自重大,梁及梁柱節(jié)點處鋼筋密集,混凝土振搗難度大,主梁體積大,水化熱高,內(nèi)外溫差控制、養(yǎng)護(hù)保溫措施要求高,容易出現(xiàn)溫度裂縫。在施工前特編制此專項施工方案以指導(dǎo)施工,在此根據(jù)已有的資料簡述我單位對該大梁施工的構(gòu)思。該大梁的支撐落在120mm的混凝土一層樓板上,高度為兩個標(biāo)準(zhǔn)層即7.2m高。且一層板的支撐體系未拆除,有足夠的強(qiáng)度以承受上部大梁的自重及施工產(chǎn)生的一切其他荷載,故在腳手架支撐體系受力驗算時候只須對架體本身的桿件強(qiáng)度

37、及穩(wěn)定性進(jìn)行驗算,無須復(fù)核架體支撐面的強(qiáng)度。1.3、主要技術(shù)參數(shù)取值梁寬400mm,梁高1500mm,跨度18000mm;梁兩側(cè)樓板厚度120mm,主梁間距8400mm;模板面板采用18mm厚九夾板。內(nèi)龍骨布置5道,內(nèi)龍骨采用方木50mm×100mm ,外龍骨間距300mm,外龍骨采用48×3.0雙鋼管對拉螺栓布置3道,16,豎向間距300,400,400(mm),斷面跨度方向的間距300mm。承重架采用2根承重立桿,木方垂直梁截面支設(shè)方式,梁底2根承重立桿,承重桿間距533,133,533;沿梁跨度方向間距500mm。梁底采用3根50mm×100mm的木方,頂托

38、內(nèi)托梁材料選擇木方: 100×100mm。梁底支撐小橫桿間距500mm。沿梁跨度方向起拱高度40mm。梁兩側(cè)立桿間距1200mm,立桿上端伸出至模板支撐點的長度200mm。板底采用木方支撐形式,木方間距300mm,木方尺寸:50mm×100mm。腳手架搭設(shè)高度7.2m,步距1.50m,排距1.00m,縱向間距1.20m。二、編制依據(jù)1、建筑施工扣件式鋼管腳手架安全技術(shù)規(guī)范(JGJ130-2011)2、建筑施工模板安全技術(shù)規(guī)范(JGJ162-2008)3、建筑施工扣件式鋼管模板支架技術(shù)規(guī)程(DB33/1035-2006)4、混凝土模板用膠合板(GB/T17656-2008)5

39、、建筑結(jié)構(gòu)荷載規(guī)范(GB50009-2006)6、直縫電焊鋼管(GB/T13793、低壓流體輸送甲焊接鋼管(GB/T3092)、碳素結(jié)構(gòu)鋼(GB/T700)7、鋼管腳手架扣件(GB/5831-2006)8、木結(jié)構(gòu)設(shè)計規(guī)范(GB50005-2003)9、混凝土結(jié)構(gòu)工程施工質(zhì)量驗收規(guī)范(GB50204-2011)、鋼結(jié)構(gòu)工程施工質(zhì)量驗收規(guī)范(GB50205-2001)9、建筑施工安全檢查標(biāo)準(zhǔn)(JGJ59-2011)10、危險性較大的分部分項工程安全管理辦法建質(zhì)200987號文11、工程施工圖紙,圖審文件,現(xiàn)場地質(zhì)情況三、設(shè)計計算3.1梁側(cè)模板布置及計算書一、梁側(cè)模板基本參數(shù)計算斷面寬度400mm,

40、高度1500mm,兩側(cè)樓板厚度120mm,主梁間樓板最大跨度8400mm。模板面板采用18mm普通九夾板。內(nèi)龍骨布置5道,內(nèi)龍骨采用50×100mm木方。外龍骨間距300mm,外龍骨采用雙鋼管48.3mm×3.6mm。對拉螺栓布置3道,在斷面內(nèi)水平間距300+400+400mm,斷面跨度方向間距300mm,直徑16mm。面板為18mm厚九夾板,剪切強(qiáng)度1.4N/mm2,抗彎強(qiáng)度15.0N/mm2,彈性模量6000.0N/mm2。木方剪切強(qiáng)度1.3N/mm2,抗彎強(qiáng)度13.0N/mm2,彈性模量9500.0N/mm2。 模板組裝示意圖二、梁側(cè)模板荷載標(biāo)準(zhǔn)值計算強(qiáng)度驗算要考慮新

41、澆混凝土側(cè)壓力和傾倒混凝土?xí)r產(chǎn)生的荷載設(shè)計值;撓度驗算只考慮新澆混凝土側(cè)壓力產(chǎn)生荷載標(biāo)準(zhǔn)值。新澆混凝土側(cè)壓力計算公式為下式中的較小值:F1=0.22ct012V F2=cH 其中 c 混凝土的重力密度,取24.000kN/m3; t0 新澆混凝土的初凝時間,取200/(T+15),取4.44h; T 混凝土的入模溫度,取30.000; V 混凝土的澆筑速度,取9m/h; H 混凝土側(cè)壓力計算位置處至新澆混凝土頂面總高度,取1.200m; 1 外加劑影響修正系數(shù),取1.000; 2 混凝土坍落度影響修正系數(shù),取1.15。根據(jù)公式計算的新澆混凝土側(cè)壓力標(biāo)準(zhǔn)值 F1=0.22*24*4.4*1*1.

42、15*9=80.15 kN/m2考慮結(jié)構(gòu)的重要性系數(shù)0.9,實際計算中采用新澆混凝土側(cè)壓力標(biāo)準(zhǔn)值 F1=0.9×80.15=72.000kN/m2根據(jù)公式計算倒混凝土產(chǎn)生的荷載標(biāo)準(zhǔn)值 F2=24*1.2=28.8kN/m2考慮結(jié)構(gòu)的重要性系數(shù)0.9,倒混凝土?xí)r產(chǎn)生的荷載標(biāo)準(zhǔn)值 F2=0.9×28.8=25.90kN/m2三、梁側(cè)模板面板的計算面板為受彎結(jié)構(gòu),需要驗算其抗彎強(qiáng)度和剛度。模板面板按照簡支梁計算。面板的計算跨度取0.333m。荷載計算值 q = 1.2×72.000×0.333+1.40×25.900×0.333=40.84

43、6kN/m面板的截面慣性矩I和截面抵抗矩W分別為:本算例中,截面慣性矩I和截面抵抗矩W分別為: W = 33.25×1.80×1.80/6 = 17.96cm3; I = 33.25×1.80×1.80×1.80/12 = 16.16cm4; 40.85kN/m 計算簡圖 彎矩圖(kN.m) 剪力圖(kN)變形的計算按照規(guī)范要求采用靜荷載標(biāo)準(zhǔn)值,受力圖與計算結(jié)果如下: 變形計算受力圖 變形圖(mm)經(jīng)過計算得到從左到右各支座力分別為 N1=2.674kN N2=7.778kN N3=6.320kN N4=7.778kN N5=2.674kN最大

44、彎矩 M = 0.242kN.m最大變形 V = 1.197mm(1)抗彎強(qiáng)度計算經(jīng)計算得到面板抗彎強(qiáng)度計算值 f = 0.242×1000×1000/17955=13.478N/mm2面板的抗彎強(qiáng)度設(shè)計值 f,取15.00N/mm2;面板的抗彎強(qiáng)度驗算 f < f,滿足要求!(2)抗剪計算 可以不計算截面抗剪強(qiáng)度計算值 T=3×4132.0/(2×332.500×18.000)=1.036N/mm2截面抗剪強(qiáng)度設(shè)計值 T=1.40N/mm2抗剪強(qiáng)度驗算 T < T,滿足要求!(3)撓度計算面板最大撓度計算值 v = 1.197mm

45、面板的最大撓度小于332.5/250,滿足要求!四、梁側(cè)模板內(nèi)龍骨的計算內(nèi)龍骨直接承受模板傳遞的荷載,通常按照均布荷載連續(xù)梁計算。內(nèi)龍骨強(qiáng)度計算均布荷載q=1.2×0.33×45.00+1.4×0.33×5.40=20.469kN/m撓度計算荷載標(biāo)準(zhǔn)值q=0.33×45.00=14.985kN/m按照三跨連續(xù)梁計算,最大彎矩考慮為靜荷載與活荷載的計算值最不利分配的彎矩和,計算公式如下:均布荷載 q = 6.141/0.300=20.469kN/m最大彎矩 M = 0.1ql2=0.1×20.469×0.30×0.3

46、0=0.184kN.m最大剪力 Q=0.6×0.300×20.469=3.684kN最大支座力 N=1.1×0.300×20.469=6.755kN截面力學(xué)參數(shù)為本算例中,截面慣性矩I和截面抵抗矩W分別為: W = 5.00×10.00×10.00/6 = 83.33cm3; I = 5.00×10.00×10.00×10.00/12 = 416.67cm4;(1)抗彎強(qiáng)度計算抗彎計算強(qiáng)度 f=0.184×106/83333.3=2.21N/mm2抗彎計算強(qiáng)度小于13.0N/mm2,滿足要求!(

47、2)抗剪計算 可以不計算最大剪力的計算公式如下: Q = 0.6ql截面抗剪強(qiáng)度必須滿足: T = 3Q/2bh < T截面抗剪強(qiáng)度計算值 T=3×3684/(2×50×100)=1.105N/mm2截面抗剪強(qiáng)度設(shè)計值 T=1.30N/mm2抗剪強(qiáng)度計算滿足要求!(3)撓度計算最大變形 v =0.677×14.963×300.04/(100×9500.00×4166666.8)=0.021mm最大撓度小于300.0/250,滿足要求!五、梁側(cè)模板外龍骨的計算外龍骨承受內(nèi)龍骨傳遞的荷載,按照集中荷載下連續(xù)梁計算。外龍骨按

48、照集中荷載作用下的連續(xù)梁計算。集中荷載P取橫向支撐鋼管傳遞力。 支撐鋼管計算簡圖 支撐鋼管彎矩圖(kN.m) 支撐鋼管剪力圖(kN)變形的計算按照規(guī)范要求采用靜荷載標(biāo)準(zhǔn)值,受力圖與計算結(jié)果如下: 支撐鋼管變形計算受力圖 支撐鋼管變形圖(mm)經(jīng)過連續(xù)梁的計算得到最大彎矩 Mmax=1.857kN.m最大變形 vmax=0.726mm最大支座力 Qmax=18.955kN抗彎計算強(qiáng)度 f=1.857×106/10160.0=182.78N/mm2支撐鋼管的抗彎計算強(qiáng)度小于205.0N/mm2,滿足要求!支撐鋼管的最大撓度小于400.0/150與10mm,滿足要求!六、對拉螺栓的計算計算

49、公式: N < N = fA 其中 N 對拉螺栓所受的拉力; A 對拉螺栓有效面積 (mm2); f 對拉螺栓的抗拉強(qiáng)度設(shè)計值,取170N/mm2;對拉螺栓的直徑(mm): 16對拉螺栓有效直徑(mm): 14對拉螺栓有效面積(mm2): A = 144.000對拉螺栓最大容許拉力值(kN): N = 24.480對拉螺栓所受的最大拉力(kN): N = 18.955對拉螺栓強(qiáng)度驗算滿足要求!3.2梁模板扣件鋼管高支撐架布置及計算書計算依據(jù)建筑施工模板安全技術(shù)規(guī)范(JGJ162-2008)。計算參數(shù):模板支架搭設(shè)高度為7.2m,梁截面 B×D=400mm×1500mm

50、,立桿的縱距(跨度方向) l=1.0m,立桿的步距 h=1.50m,梁底增加2道承重立桿,沿跨度方向間距0.5m。面板厚度18mm,剪切強(qiáng)度1.4N/mm2,抗彎強(qiáng)度15.0N/mm2,彈性模量6000.0N/mm2。木方50×100mm,剪切強(qiáng)度1.3N/mm2,抗彎強(qiáng)度13.0N/mm2,彈性模量9500.0N/mm2。梁兩側(cè)立桿間距 1.20m。梁底按照均勻布置承重桿4根計算。模板自重0.50kN/m2,混凝土鋼筋自重27.80kN/m3,施工活荷載2.00kN/m2??奂嬎阏蹨p系數(shù)取2.00。 圖1 梁模板支撐架立面簡圖 按照規(guī)范4.3.1條規(guī)定確定荷載組合分項系數(shù)如下:

51、由可變荷載效應(yīng)控制的組合S=1.2×(27.80×1.50+0.50)+1.40×2.00=53.440kN/m2 由永久荷載效應(yīng)控制的組合S=1.35×24.00×1.50+0.7×1.40×2.00=50.560kN/m2 由于可變荷載效應(yīng)控制的組合S最大,永久荷載分項系數(shù)取1.2,可變荷載分項系數(shù)取1.40 采用的鋼管類型為48.3×3.6。 一、模板面板計算 面板為受彎結(jié)構(gòu),需要驗算其抗彎強(qiáng)度和剛度。模板面板的按照多跨連續(xù)梁計算。 作用荷載包括梁與模板自重荷載,施工活荷載等。 1.荷載的計算: (1)鋼筋混

52、凝土梁自重(kN/m): q1 = 27.800×1.500×0.500=20.850kN/m (2)模板的自重線荷載(kN/m): q2 = 0.500×0.500×(2×1.500+0.400)/0.400=2.125kN/m (3)活荷載為施工荷載標(biāo)準(zhǔn)值與振搗混凝土?xí)r產(chǎn)生的荷載(kN): 經(jīng)計算得到,活荷載標(biāo)準(zhǔn)值 P1 = (0.000+2.000)×0.400×0.500=0.400kN 考慮0.9的結(jié)構(gòu)重要系數(shù),均布荷載 q = 0.9×(1.20×20.850+1.20×2.125)

53、=24.813kN/m 考慮0.9的結(jié)構(gòu)重要系數(shù),集中荷載 P = 0.9×1.40×0.400=0.504kN 面板的截面慣性矩I和截面抵抗矩W分別為: 本算例中,截面慣性矩I和截面抵抗矩W分別為: W = 50.00×1.80×1.80/6 = 27.00cm3; I = 50.00×1.80×1.80×1.80/12 = 24.30cm4; 計算簡圖 彎矩圖(kN.m) 剪力圖(kN) 變形的計算按照規(guī)范要求采用靜荷載標(biāo)準(zhǔn)值,受力圖與計算結(jié)果如下: 變形計算受力圖 變形圖(mm) 經(jīng)過計算得到從左到右各支座力分別為 N

54、1=1.861kN N2=6.707kN N3=1.861kN 最大彎矩 M = 0.124kN.m 最大變形 V = 0.133mm (1)抗彎強(qiáng)度計算 經(jīng)計算得到面板抗彎強(qiáng)度計算值 f = 0.124×1000×1000/27000=4.593N/mm2 面板的抗彎強(qiáng)度設(shè)計值 f,取15.00N/mm2; 面板的抗彎強(qiáng)度驗算 f < f,滿足要求! (2)抗剪計算 可以不計算 截面抗剪強(qiáng)度計算值 T=3×3101.0/(2×500.000×18.000)=0.517N/mm2 截面抗剪強(qiáng)度設(shè)計值 T=1.40N/mm2 抗剪強(qiáng)度驗算 T < T,滿足要求! (3)撓度計算 面板最大撓度計算值 v =5ql4/(384EI)+PL3/4

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論