PFEMA-中文格式_第1頁(yè)
PFEMA-中文格式_第2頁(yè)
PFEMA-中文格式_第3頁(yè)
PFEMA-中文格式_第4頁(yè)
PFEMA-中文格式_第5頁(yè)
已閱讀5頁(yè),還剩5頁(yè)未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、 東風(fēng)汽車公司商用車鑄造一廠DFM foundry #1. 潛在失效模式及影響分析(PFMEA) PPAP-3Page 10 of 10Supplier Part No.供應(yīng)商零件號(hào):3970955-00Part Name零件名稱:CAP, MAIN BEARINGFMEA & Rev FMEA編號(hào)及版本:S8Z0622-2005 00Part No. & Rev.零件號(hào)和級(jí)別:3970955-00Key Date 關(guān)鍵日期:2005/6/22Prepared By 編制人:楊士周 Yang shi zhouCore Team 核心小組: Product Development

2、 team for CAP,MAIN BEARINGProcess Responsibility 過(guò)程責(zé)任部門: Technique departmentDate(Orig.) 編制日期:2005/6/22Date(Rev) 修改日期:Part/Process Function產(chǎn)品/過(guò)程功能PCID/描述Potential FailureMode潛在失效模式Potential Effects Of Failure潛在失效影響Sev嚴(yán)重度Class級(jí)別Potential Causes Of Failure潛在的失效原因Occu頻度數(shù)CurrentProcessControls現(xiàn)行控制方法Dete

3、c不可探測(cè)數(shù)RPN風(fēng)險(xiǎn)序數(shù)Recommend-Ed Corrective Actions建議采取措施responsibility & Target Completion Date責(zé)任和目標(biāo)完成日期Actions Taken采取的措施Occu頻度數(shù)Sev.嚴(yán)重度Detec不可探測(cè)數(shù)RPN風(fēng)險(xiǎn)序數(shù)10A金屬材料進(jìn)廠驗(yàn)收Acceptance Inspection Of Metal MaterialG1:分供方質(zhì)保書Quality Guarantee From Sub-Supplier無(wú)質(zhì)保書No Quality warrant拒收Rejection6分供方質(zhì)量體系不完善Imperfect S

4、ub-Suppliers Quality System1檢查Inspection16G2:進(jìn)廠檢驗(yàn)合格單Qualification Sheet Of Acceptance Inspection無(wú)檢驗(yàn)單No Check Sheet混料Materials mixed6檢驗(yàn)滯后Inspection Delay2檢驗(yàn)報(bào)告Inspection report11210B非金屬材料進(jìn)廠驗(yàn)收Acceptance Inspection Of Nonmetal MaterialG1: 分供方質(zhì)保書Sub-Suppliers Quality Guarantee無(wú)質(zhì)保書No Quality Warrant拒收Reje

5、ction6分供方質(zhì)量體系不完善imperfect Sub-suppliersquality system1檢查Inspection16G2:進(jìn)廠檢驗(yàn)合格單Qualification Sheet Of Acceptance Inspection無(wú)檢驗(yàn)單No Check Sheet混料Materials mixed6檢驗(yàn)滯后Inspection Delay2檢驗(yàn)報(bào)告Inspection report11220A室內(nèi)存放Ware-House StoringG3:存放時(shí)間Storing Time過(guò)長(zhǎng)Too Long品質(zhì)變差Quality Variation6庫(kù)存周期長(zhǎng)Too LongStock Cy

6、cle1先進(jìn)先出First in , first out21220A室內(nèi)存放Ware-House StoringG4:存放標(biāo)識(shí)Storing Identification錯(cuò)誤標(biāo)識(shí)Wrong identification無(wú)標(biāo)識(shí)No identification用錯(cuò)料Material Used Wrongly6失誤miscarriage1定期檢查check termly21220B室外存放Outdoor StoringG3:存放時(shí)間Storing Time過(guò)長(zhǎng)Too Long品質(zhì)變差Quality Variation6庫(kù)存周期長(zhǎng)Too Long Stock Cycle2先進(jìn)先出First in ,

7、 first out224G4:存放標(biāo)識(shí)Storing Identification錯(cuò)誤標(biāo)識(shí)Wrong identification無(wú)標(biāo)識(shí)No identification用錯(cuò)料Material Wrongly Used6失誤miscarriage1定期檢查check termly21230A配型砂prepara-tion Of Molding SandP1:濕壓強(qiáng)度Green Compressive Strength過(guò)低Too Low型廢多Too Many Scrap Moulds5粘土量低Low Clay Content21次/小時(shí)測(cè)定Determining Once/h SPC110P2

8、:緊實(shí)率Compactability過(guò)高Too High鑄件氣孔Casting Blow-Hole4*水份含量低Low Moisture Content21次/小時(shí)測(cè)定Determining Once/h SPC18過(guò)低Too Low鑄件砂眼Casting Sand Hole5*水份含量高High Moisture Content21次/小時(shí)測(cè)定Determining Once/h SPC110P3:透氣性Permeability過(guò)低Too Low鑄件氣孔Casting Blow-Hole5有效煤粉含量高High Effective Coal Dust Content21次/班測(cè)定Determ

9、ining Once/shift330粘土量過(guò)高TooHigh Clay Content21次/班測(cè)定Determining Once /shift33030B配芯砂Preparation of Core SandP6:常溫抗拉強(qiáng)度Normal Temperature Tensile Strength過(guò)低Too Low斷芯裂紋Core Rupture or Crack4*過(guò)燒Over Burnt21次/2小時(shí)檢測(cè)Inspection Once/2h324覆膜不均勻Resin-Coated Inhomogenously21次/2小時(shí)檢測(cè)Inspection Once/2h324P7:熔點(diǎn)Fusi

10、on Point過(guò)高Too High結(jié)殼過(guò)薄Too Thin Shell7烏洛托品超量Too Much Urotropine11次/2小時(shí)檢測(cè)Inspection Once/2h321過(guò)低Too Low脫殼Shell Peeling Off6烏洛托品不足Shortage of Urotropine11次/2小時(shí)檢測(cè)Inspection Once/2h31830C化料MeltingR1:含碳量C%過(guò)低Too low縮松porosity8*爐料定量不準(zhǔn)Inexact Furnace Charges Ration1爐前成分分析Pretreatment Chemical Composition Ana

11、lysis21630C化料MeltingR1:含碳量C%過(guò)高Too high強(qiáng)度偏低8*爐料定量不準(zhǔn)Inexact Furnace Charges Ration1爐前成分分析Pretreatment Chemical Composition Analysis216R2:含硅量Si%過(guò)低Too low鑄件白口8*爐料定量不準(zhǔn)Inexact Furnace Charges Ration1爐前成分分析Pretreatment Chemical Composition Analysis216過(guò)高Too High鐵素體量高too much Ferrite8*爐料定量不準(zhǔn)Inexact Furnace C

12、harges Ration1爐前成分分析Pretreatment Chemical Composition Analysis216R3:含錳量Mn%過(guò)低Too Low珠光體量低too much pearlite8*爐料定量不準(zhǔn)Inexact Furnace Charges Ration1爐前成分分析Pretreatment Chemical Composition Analysis216R6:含鉻量Cr%過(guò)低Too Low珠光體量低too much pearlite8*爐料定量不準(zhǔn)Inexact Furnace Charges Ration1爐前成分分析Pretreatment Chemica

13、l Composition Analysis216R8:取樣品質(zhì)Quality Of Samples白口化不足Insufficient White Fracture成分測(cè)量不準(zhǔn)Inaccurate Chemical CompositionAnalysis7光譜樣激冷不足Insufficient Chilling Of Spectographic Specimen3水冷Water Cooling1217碳片質(zhì)量差 Poor Quality Of Carbon Flake3清潔激冷鐵板Cleaning Refrigeration Iron Board12135C爐前處理pre-treatmentC

14、1:出爐溫度Tapping Temperature過(guò)高Too High孕育不良Poor Inoculation6未按時(shí)測(cè)溫temperature measurement not on schedule2每半小時(shí)測(cè) 溫Once / 30 Minutes224過(guò)低Too Low鑄件冷隔或澆不足Coldshut or Misrun7未按時(shí)測(cè)溫temperature measurement not on schedule2每半小時(shí)測(cè) 溫Once / 30 Minutes228C2:孕育劑量Inoculant Quantity過(guò)多Too High終硅超量Last Silicon Content Too

15、Much4臺(tái)秤失準(zhǔn)Inaccurate Bench Scales2稱量weigh216過(guò)少Too Low白口組織White fracture4臺(tái)秤失準(zhǔn)Inaccurate Bench Scales2稱量weigh21640A造型MoldingZ1:鑄造日期標(biāo)識(shí)Casting Identification標(biāo)識(shí)錯(cuò)誤indistinct or wrong identification鑄件報(bào)廢casting be scrapped8操作失誤miscarriage operation2首檢Initial Inspection116Z2:模板加熱溫度Heating Of Pattern Plate過(guò)低To

16、o Low起型不良Withdrawing The Pattern Difficulty3斷電Power Supply Failure3加熱Heating118Z3:砂型硬度Sand Mold Hardness過(guò)低Too Low脹箱Swell4壓實(shí)壓力不足Insufficient Squeezing Force2調(diào)整Adjusting21640A造型MoldingZ5:模板銷子銷套Status Of Pin And pin bush of Pattern Plate錯(cuò)型Shift尺寸錯(cuò)誤dimensional errors不能加工will not machine6磨損過(guò)量wear damage2

17、定檢Regular Inspection224量規(guī)special gage下不到位Incorrectly偏芯Core Shift5操作不熟練Poor Skill1目視檢查VisualInspection21050澆注PouringJ1:澆注溫度Pouring Temperature過(guò)低Too Low冷隔澆不足Cold Shut or Misrun7等待時(shí)間過(guò)長(zhǎng)Waiting Time Too Long2每包測(cè)溫Determining Temperatureevery ladle228J2:孕育Inoculation衰退Fading出現(xiàn)碳化物Carbide Appears8*有效時(shí)間短Short

18、 Effective Time2三次孕育Three Batches Of Inoculation being Used232J3:可澆注時(shí)間Pourable Time過(guò)長(zhǎng)Too Long孕育衰退Inoculation Fading6型廢多Too Many Scrap Molds3報(bào)警裝置Alarm device118設(shè)備故障Equipment Breakdown2報(bào)警裝置Alarm device112J4:澆試塊Pouring Test Specimen品質(zhì)不良Poor Quality材質(zhì)判斷不準(zhǔn)Material Deciding Inexactly7取樣時(shí)間不正確Improper Time

19、For Making Sample2結(jié)合破壞性檢查判定Judgement By Destroying inspection11460落砂ShakeoutL1:堆積Heaping過(guò)多Too Many壓壞鑄件Product Damage7鑄件卡住Castings Jammed2隨時(shí)鉤出被卡住的鑄件Taking Out Jammed Castings Timely22870清理CleaningL2:去澆口Remov-ing Gates殘余過(guò)長(zhǎng)Remains Too Much余量過(guò)大 too much stock4失誤miscarriage2100% visual inspection目測(cè)216缺肉I

20、usuffici-ent Metal不被加工will not machine4失誤miscarriage2100% visual inspection目測(cè)216S:表面粗糙度Surface Finish太粗糙Too rough加工問(wèn)題machine problems6鋼丸不足lack of Steel Grit2首檢Initial Inspection112Q5:毛坯清整Casting Finishing缺肉Iusufficient Metal鑄件報(bào)廢casting be scrapped6失誤miscarriage2100% visual inspection目測(cè)112不足Insuffici

21、ency多肉Surplus Metal4失誤miscarriage2100% visual inspection目測(cè)216Q6: 飛邊殘余joint flash remains過(guò)長(zhǎng)too long鑄件不合格Unqualified Products未磨到位grinding not to position100% visual inspection目測(cè)Q7: 定位點(diǎn)pick up point不平整accident-ed影響加工affect machining缺陷或清理?yè)p傷defect or cleaning damage100% visual inspection目測(cè)80鑄件檢查Inspectio

22、nH1:力學(xué)性能Mechanics performance錯(cuò)判Wrong Decision不合格品出廠Unqualified Products8*操作技能差Poor Skill Of Operator2試驗(yàn)報(bào)告experiment report232H7:金相Microstructure錯(cuò)判Wrong Decision不合格品出廠Unqualified Products8*技能差Poor Skill Of Operator2檢驗(yàn)報(bào)告Inspection report232H2:外觀判定Surface Check漏檢Failing To Inspection不合格品出廠Unqualified P

23、roducts8*技能差Poor Skill Of Operator2目視全檢Full Visual Inspection232錯(cuò)判Wrong Decision內(nèi)廢率高High Internal Scrap Rate6技能差Poor Skill Of Operator1目視全檢Full Visual Inspection212H3:標(biāo)識(shí)狀態(tài)Status of Identification標(biāo)識(shí)不清indistinct identification鑄件報(bào)廢casting be scrapped8*起模不良 withdrawing difficult2目視全檢Full Visual Inspection116H6:全尺寸檢查Full dimension inspection超出鑄件尺寸公差overtop castings tolerances鑄件報(bào)廢casting be scrapped8*模具磨損mould abrasion2定檢模具Regular Inspection mould116H8:關(guān)鍵尺寸key dimension超出鑄件尺寸公差overtop castings tolerances鑄件報(bào)廢casting be scrapped8*模具磨損mouldabrasion2定檢模具Regular Inspection mould116H9:壁厚Wall thi

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

最新文檔

評(píng)論

0/150

提交評(píng)論