1、精選 使用說明書 WINNER THE USERS INTRODUCTION MANUAL GFS系列振動篩THE GFS SERIES OF VIBRATING SCREEN河南威猛振動設(shè)備股份有限公司HENAN WINNER VIBRATOR EQUIPMENT Co., LTDTable of Content 目 錄1 GFS Train High Amplitude Vibration Screen Summary.1GFS系列高幅振動篩概述1.1 Utility and Characteristics.1用途與特點1.2 Mechanism and Operation Princip

2、le.1工作原理及結(jié)構(gòu)特點1.3 Erecting .3安裝1.4 Debugging .4調(diào)試1.5 Operation and Maintenance 4使用與維護1.6 Common Defaults and Handling Methods .5常見故障及處理方法2 WJZ Train Exciter Summary.7WJZ系列激振器概述2.1 The Utility and Characteristics7用途與特點2.2 The Products Mechanism8產(chǎn)品結(jié)構(gòu)2.3 The Erecting and Debugging8安裝與調(diào)試2.4 The Operation

3、 and Maintenance10使用與維護2.5 Storing and Conveying.11存貯與運輸2.6 The Common Defaults and Handling Methods11常見故障及處理方法3 XK Electric Control Principle Summary13電氣把握原理概述3.1 Characteristics13性能描述3.2 The Sketch Map of Electric Cabinet.13電控柜示意圖3.3 Operation Instruction14操作說明3.4The Wiring Diagram of Electric Pri

4、nciple(Fig.1 、Fig.2).16電氣原理圖(圖1、圖2)1 GFS Train High Amplitude Vibration Screen SummaryGFS系列高幅振動篩概述 1 .1 Utility and Characteristics 用途與特點The GFS Train High Amplitude Vibration Screen is an ideal screening equipment, of which is developed by our designers, this equipment can be solved a problem of de

5、ep screening of humid and sticky, especially the aperture less than 10mm of humid and sticky raw coal, it can solve the problem of blocking screen meshes. The equipment has a characteristics of a high screening efficiency、low noise、using economy and so on. This equipment can be applied to the coal i

6、ndustry(particle classification)、the electric industry(CFB boiler of fine size screening)、the metallurgy industry(particle classification) and so on.GFS系列高幅振動篩是我公司為解決濕粘物料深度篩分而研發(fā)的篩分設(shè)備,特殊對于小于10mm濕粘原煤的篩分較好的解決篩網(wǎng)堵孔問題,該設(shè)備具有篩分效率高、噪音低、使用經(jīng)濟等特點。該振動篩適用于煤炭(粒度分級)、電力(CFB鍋爐細顆粒篩分)、冶金(粒度分級)等行業(yè)。 1.2 Mechanism and Ope

7、ration Principle 工作原理及結(jié)構(gòu)特點The Mechanism Sketch of High Amplitude Vibration Screen1. The Seal Cover 2.The Screen Frame 3.The Screen Decks 4.Removing Dust Chute 5.The Exciters 6.The Connecting Devices 7.The Motors 8.The Insulating Springs 9.The Base1.密封罩2.篩箱3.篩板4.除塵口5.激振器6.軟連接裝置7.電動機8.減振彈簧9.底托The GFS

8、High Amplitude Vibration Screen Train is employed the large amplitude、high vibration strength、low vibration frequency and self-clearing screen decks so that it can finish screening humid and sticky materials. Its mechanism is shown as follows:GFS系列高幅振動篩是接受大振幅、大振動強度、較低振頻和自清理篩面來完成濕粘物料的篩分過程,其結(jié)構(gòu)和特點如下:1.

9、When screening sections, the screen frame does not vibrate, the screen decks vibrate.1.分段篩分、篩機整體不振動,篩網(wǎng)振動2.Clear the screen decks automatically.2.自清理篩面3.The Mechanism is enclosed.3. 封閉結(jié)構(gòu)4.The amplitude is larger and the motion load is less.4. 較大的振幅和較小的動負荷5.The efficiency is less.5. 較小的功率6.The PLC sys

10、tem is special.6. 獨特的PLC把握系統(tǒng)7.The maintenance is easy.7.易維護性8.The operation cost is low.8.低運行成本1.3 Erecting 安裝1.Before erecting, check the assembled drawing and the base on worksite, whether they are uniform or not.1.安裝前應(yīng)檢查安裝圖與現(xiàn)場基礎(chǔ)是否全都。1.Check the appendixes whether they are complete or not as the s

11、hipping order.2.依據(jù)裝箱單清點附件是否齊全。2.Whether the parts are broken or not during the transporting.2.部件是否因運輸有碰壞現(xiàn)象。1.4 Debugging 調(diào)試1. Before debugging, check and fasten all the bolts.1 調(diào)試前檢查并緊固各部件間緊固螺栓。2. Check it whether it is abnormal.2.檢查有無其它特別3. Starting orders: start this equipment in the adverse curre

12、nt materials, stop the equipment in the downstream material; avoid starting the equipment with the materials, stop the equipment when all the materials passed through the screen decks.3.起動挨次:逆料流方向啟動,順料流方向停車,應(yīng)避開帶料啟動,篩面上物料全部篩完再停車。4. After regulate the equipment, then run the equipment for 1-2 hours, w

13、hen it is not abnormal, then you can put materials into operating.。4調(diào)整后運轉(zhuǎn)1-2小時無特別現(xiàn)象方可投入使用。 1.5 Operation and Maintenance 使用與維護1. Check all the fastened parts frequently whether they are loose or not.1經(jīng)常檢查緊固件有無松動。2. Check all the wearing parts frequently whether they are worn or not.2經(jīng)常檢查易損件有無損壞現(xiàn)象。3.

14、 Stop to check them during the operating if there is an abnormal or the noise is larger.3工作中如有特別現(xiàn)象或噪聲過大應(yīng)準(zhǔn)時停機檢查。4. During operating the exciters, pay attention to the lubrication of bearings, inject the lubrication grease(You had better refer to the exciter instruction manual).4激振器運行過程中,應(yīng)留意軸承的潤滑,定期注入

15、潤滑劑。(參照激振器說明書) 1.6 Common Defaults and Handling Methods 常見故障及處理方法The Common Defaults and Handling Methods常見故障及處理方法Serial No.序號The Common Defaults常見故障The leading to causes形成緣由The handlingMethods處理方法1After switching on, this equipment cannot start接通電源篩機不啟動1.The circuit is not a closed loop;1電源線路不通2.Th

16、e motor is blocked;2電機卡阻3.The load is over heavy;3負荷過重1.Check the 3-phase power source whether it is short of the phase;1檢查三相電源是否缺相2.Clear off the blocking;2消退卡阻3.Start it in a light load;3輕負荷起動2The sizes passed the screen meshes are larger than the common size,篩下物料大于正常粒度1.Wear the screen meshes bad

17、ly1篩網(wǎng)磨損嚴峻2.The connecting sections of screen decks had been worn badly2篩框連接部位磨損Change them更換3The abnormal noise is louder and louder特別噪聲漸漸明顯1.The bolts are loose1緊固螺栓松動2.The bearings are short of grease or worn out2軸承缺脂或損壞3.The screen decks are broken3篩板骨架斷裂1.Screw the bolts again;1緊固螺栓2.Add the lub

18、rication grease or change them;2軸承加脂或更換3.Repair the screen decks or change them;3篩板修復(fù)或更換4The vibration screen vibrates abnormally篩機振動特別The insulating springs are fatigued or broken減振彈簧疲憊或損壞Change the insulating springs更換減振彈簧2 The WJZ Train Exciter SummaryWJZ系列激振器概述2.1 The Utility and Characteristics

19、用途與特點Our company is a factory of professional producing vibration equipments of mechanical and electrical department, which produce various situation vibration equipments and necessary products- the vibration source。The WJZ Train Exciter is a new improved product. The exciters match with the motors,

20、 which vibrate the vibration screen, however, the motors do not vibrate; the lubrication of bearings is grease lubrication,so prolong the equipment service life and it is economic and easy, and it is an ideal exciting source of vibration equipments.我公司是機電部振動設(shè)備專業(yè)生產(chǎn)廠家,生產(chǎn)各種場合使用的振動設(shè)備及配套產(chǎn)品-振動源。WJZ系列是其中一種

21、更新改進的新型激振器,該激振器與一般電機配套使用,電機不參振,軸承接受脂潤滑,使用壽命長,且經(jīng)濟簡潔,是振動設(shè)備配套使用的抱負激振源。2.2 The Products Mechanism產(chǎn)品結(jié)構(gòu)The WJZ train exciter is made up of the following components:WJZ系列激振器主要有以下部分 The Mechanism Sketch of Exciters1. The Regulative Eccentric Mass 2.The Shaft 3.The Eccentric Mass 4.The Protective Covers 5.Th

22、e Bearing House 6.The Roller Bearings 1.配重塊2.轉(zhuǎn)動軸3.偏心塊4.防護罩5.軸承室6.軸承2.3The Erecting and Debugging安裝與調(diào)試1. During lifting、carrying and erecting, the exciter must not hit other equipments;1.激振器在吊裝、搬運及安裝時切勿碰撞。2. Before erecting, you should check all the connecting bolts whether they meet the requirements

23、.2.安裝前應(yīng)檢查各部件的緊固連接螺栓孔是否相符。3. During erecting, do not take down any part by yourself.3. 安裝時不得任憑拆卸零部件4. After erected, make sure that the exciter should be horizontal crossly.4. 安裝后激振器應(yīng)保證橫向水平.5. The fastening bolts applied loose-proof devices, so as not to loosen the bolts and break the exciters.5. 緊固螺

24、栓接受防松裝置,以防螺栓松動使激振器損壞。6. You can regulate the vibrating force, so as to let various vibration equipments screen all kinds of materials.6.調(diào)整激振力大小,可滿足各種振動設(shè)備不同物料的需要。7.Regulating the vibrating force:7.激振力的調(diào)整:2.3 Take down the protective covers;a) 卸下風(fēng)罩。b) Loosen the bolts of the regulative eccentric mass;

25、2.4 旋松配重塊緊固螺栓;2.5 Regulate the fixed eccentric mass and the regulative eccentric mass at the same phase and the same angle; or add or reduce the regulative eccentric mass ;c) 同相位、同角度調(diào)整激振器的偏心塊和配重塊,或增加、削減配重塊的數(shù)量;2.6 Screw the bolts, assemble the coversd) 旋緊螺栓,裝回風(fēng)罩。2.4 The Operation and Maintenance使用與維護

26、1. After the exciters are assembled and regulated, run them for 2-7 hours, check all the parts whether they are normal or not and screw all the screws again.1. 激振器安裝調(diào)整完畢,運行2-7小時,檢查各部件是否正常,并對各部位螺栓再緊固。2. You should control the temperature at 95oC.Check the lubrication grease volume at a regulative tim

27、e and supplement it in time, so that the volume is 2/3 of bearings vessel. Suggest that you can apply the molybdenum disulfide complex calcium lubricating grease, you had better check it two times every week.2. 正常使用時軸承的溫度應(yīng)把握在95oC.定期檢查軸承腔內(nèi)油量,并按要求準(zhǔn)時補充,以保證潤滑脂為軸承容腔的2/3為宜。建議使用二硫化鉬復(fù)合鋰基潤滑脂,最好每周檢查兩次。3. You

28、should maintain it half year, clear off the dirt and dusts of the surface, clear the bearings and check the lubricating seals whether they are broken or not, and change them in time.3. 每半年應(yīng)維護保養(yǎng)一次,清除機體表面積塵、污垢,清洗軸承,檢查油封等易損件是否損壞,并準(zhǔn)時更換。4. Repair the parts thoroughly every year, check the bearings whethe

29、r they wear or not, and change the lubricating grease.4. 每年大修一次,檢查軸承磨損狀況,并更換內(nèi)腔潤滑油。2.5 Storing and Conveying存貯與運輸1.The exciters must not store out of storehouse or damp place.1.激振器不得存在露天或潮濕的地方。2. During transporting and storing, you must not collide with other equipments.2.在運輸和存貯過程中,不準(zhǔn)有猛烈碰撞。3. Avoid

30、contacting with the acidic or alkaline harmful things.3.避開與酸、堿等有害物質(zhì)接觸。2.6 The Common Defaults and Handling Methods常見故障及處理方法The Common Defaults and Handling Methods常見故障及處理方法The Serial No.序號The Common Defaults故障現(xiàn)象The Leading to Causes形成緣由The Handling Methods處理方法1No.1The sound is abnormal.聲音特別1. The be

31、arings are broken.1.軸承損壞2. The fastening bolts are loose.2.緊固螺栓松動1.Change the bearings.1. 更新軸承2.Fasten the bolts.2. 緊固螺栓2No.2The rising-temperature is high.溫升過高1.The bearings are broken, the lubricating covers chafe the shaft.1.軸承損壞,油蓋與軸摩擦1.The bearings vessel is short of grease or the opposite.2.軸承

32、腔內(nèi)缺脂或油脂過多1.Change or repair them.1.更新修理2.Supplement the grease as the standard.2.按標(biāo)準(zhǔn)注油脂3No.3Leaking the lubricating grease漏油脂The extending shaft is leaking the lubricating grease.軸伸端出油1.The lubricating grease is over, inject the grease as the standard.1. 油量過多,按標(biāo)準(zhǔn)注油2. Change the seals.2.更換密封圈。3 XK El

33、ectric Control Principle Summary電氣把握原理概述3.1 Characteristics性能描述We will tell about the electric control of vibration screen. The electric control box: its composition is easy, and the erecting 、operating and maintaining is convenient, the electric control box has a better protective grade, you can ap

34、ply it in or out of house. The electric control box has both patterns of long-range auto-control and site operating by hand, which is an advanced auto-control vibration equipment at home or abroad. 振動篩電器把握箱,結(jié)構(gòu)簡潔,安裝、操作、修理便利,把握箱外殼選用較高的防護級別,室內(nèi)、室外均可使用。此電控箱具有遠程自動把握和就地手工操作兩種模式,是目前國內(nèi)、外較為先進的振動機械把握設(shè)備。 3.2The

35、 Sketch Map of Electric Cabinet 電控柜示意圖 1. Voltmeter 2. Ammeter(1) 3.Ammeter(2) 4.Ammeter(3) 5. Default Indicator Light 6. Indicator(1) 7.Indicator(2) 8.Indicator(3)9. Selector Switch 10.Starting(1) 11.Stopping(1) 12.Starting(2) 13.Stopping(2) 14.Starting(3) 15.Stopping(3)1電壓表 2.電流表(1) 3. 電流表(2) 4. 電

36、流表(3) 5.故障指示燈 6.指示燈(1) 7. 指示燈(2) 8. 指示燈(3) 9.轉(zhuǎn)換開關(guān) 10.啟動(1) 11.停止(1) 12.啟動(2) 13.停止(2) 14.啟動(3) 15.停止(3)3.3 Operation Instruction操作說明 The connection pattern of electric control box is three-phase four-wire, the supplying power is 220V. If you want to run this equipment, please switch on the power sou

37、rce, switch on the knife-break switch, check the voltmeter whether it works normally or not, or the three-phase voltage normally or not. If the voltmeter shows that the power source is abnormal, please check the power interface; if normal, then you can carry out the next operation sequence; turn the

38、 selector switch on the site pattern, so that you can operate the electric control box by hand. Press the starting key (1), start the No.1 motor when the indicator light (1)is on, then check the current whether it is normal or not; press the starting key (2), start the No.2 motor when the indicator

39、light (2) is on , check the current whether it is normal or not; so does the No.3 motor. However, the stopping sequence is as follows: press the on/off key (3), the No.3 motor stops running when the indicator light (3) is off, so do the No.2 and No.2 motors. If the operating is failure, the motor can not work normally when the failure indicator light is on, stop the equipment to check it, so as to remove the defaults. Turn the selector switch to the long-ra

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論