版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認(rèn)領(lǐng)
文檔簡介
1、青島理工大學(xué)外文翻譯題目Programmable Logic Controller學(xué)生姓名: 郭軍義 指導(dǎo)教師: 田艷兵 自動化工程 學(xué)院 電氣工程及其自動化 專業(yè) 082班2012年 6 月 12 日目 錄 TOC o 1-3 h z u HYPERLINK l _Toc327089853 Programmable Logic Controller (PLC) PAGEREF _Toc327089853 h 1 HYPERLINK l _Toc327089854 1. About Programmable Logic Controller (PLC) PAGEREF _Toc32708985
2、4 h 1 HYPERLINK l _Toc327089855 2. INTRODUCTION PAGEREF _Toc327089855 h 2 HYPERLINK l _Toc327089856 3. OPERATION SEQUENCE PAGEREF _Toc327089856 h 4 HYPERLINK l _Toc327089857 3 .1 The Input and Output Scans PAGEREF _Toc327089857 h 5 HYPERLINK l _Toc327089858 3.2 The Logic Scan PAGEREF _Toc327089858 h
3、 5 HYPERLINK l _Toc327089859 4 PLC STATUS PAGEREF _Toc327089859 h 6 HYPERLINK l _Toc327089860 5. MEMORY TYPES PAGEREF _Toc327089860 h 7 HYPERLINK l _Toc327089861 6. SOFTWARE BASED PLCS PAGEREF _Toc327089861 h 8 HYPERLINK l _Toc327089862 7. SUMMARY PAGEREF _Toc327089862 h 8 HYPERLINK l _Toc327089863
4、8. PRACTICE PROBLEMS PAGEREF _Toc327089863 h 8 HYPERLINK l _Toc327089864 9. PRACTICE PROBLEM SOLUTIONS PAGEREF _Toc327089864 h 9 HYPERLINK l _Toc327089865 中文翻譯 PAGEREF _Toc327089865 h 11 HYPERLINK l _Toc327089866 1. PLC介紹 PAGEREF _Toc327089866 h 11 HYPERLINK l _Toc327089867 2指令 PAGEREF _Toc327089867
5、 h 12 HYPERLINK l _Toc327089868 3運行順序 PAGEREF _Toc327089868 h 13 HYPERLINK l _Toc327089869 3.1 輸入輸出掃描 PAGEREF _Toc327089869 h 14 HYPERLINK l _Toc327089870 32 邏輯掃描 PAGEREF _Toc327089870 h 14 HYPERLINK l _Toc327089871 4PLC狀態(tài)顯示 PAGEREF _Toc327089871 h 15 HYPERLINK l _Toc327089872 5存儲器類型 PAGEREF _Toc327
6、089872 h 16 HYPERLINK l _Toc327089873 6基于軟件的PLC系統(tǒng) PAGEREF _Toc327089873 h 16 HYPERLINK l _Toc327089874 7概要 PAGEREF _Toc327089874 h 17 HYPERLINK l _Toc327089875 8實際問題 PAGEREF _Toc327089875 h 17 HYPERLINK l _Toc327089876 9實際問題解答 PAGEREF _Toc327089876 h 17Programmable Logic Controller (PLC)1. About Pro
7、grammable Logic Controller (PLC)PLC ( HYPERLINK :/programmable-logic-controllers.globalspec /Industrial-Directory/programmable programmable logic HYPERLINK :/programmable-logic-controllers.globalspec /Industrial-Directory/controllers controllers) is the control hubs for a wide variety of HYPERLINK :
8、/programmable-logic-controllers.globalspec /Industrial-Directory/automated_systems automated systems and processes. They contain multiple inputs and outputs that use transistors and other circuitry to simulate switches and relays to control equipment. They are HYPERLINK :/programmable-logic-controll
9、ers.globalspec /Industrial-Directory/programmable programmable via software interfaced via standard computer interfaces and proprietary languages and network options. HYPERLINK :/programmable-logic-controllers.globalspec /Industrial-Directory/programmable Programmable logic HYPERLINK :/programmable-
10、logic-controllers.globalspec /Industrial-Directory/controllers controllers I/O channel specifications include total number of points, number of inputs and outputs, ability to expand, and maximum number of channels. Number of points is the sum of the inputs and the outputs. PLC may be specified by an
11、y possible combination of these values. Expandable units may be stacked or linked together to increase total control capacity. Maximum number of channels refers to the maximum total number of input and output channels in an expanded system. PLC system specifications to consider include scan time, nu
12、mber of instructions, data memory, and program memory. Scan time is the time required by the PLC to check the states of its inputs and outputs. Instructions are standard operations (such as math functions) available to PLC software. Data memory is the capacity for data storage. Program memory is the
13、 capacity for control software.Available inputs for HYPERLINK :/programmable-logic-controllers.globalspec /Industrial-Directory/programmable programmable logic HYPERLINK :/programmable-logic-controllers.globalspec /Industrial-Directory/controllers controllers include DC, AC, analog, thermocouple, RT
14、D, frequency or pulse, transistor, and interrupt inputs. Outputs for PLC include DC, AC, relay, analog, frequency or pulse, transistor and triac. Programming options for PLC include front panel, hand held and computer. HYPERLINK :/programmable-logic-controllers.globalspec /Industrial-Directory/progr
15、ammable Programmable logic HYPERLINK :/programmable-logic-controllers.globalspec /Industrial-Directory/controllers controllers use a variety of software programming languages for control. These include IEC 61131-3, sequential function chart (SFC), function block diagram (FBD), ladder diagram (LD),st
16、ructured text (ST), instruction list (IL), relay ladder logic (RLL), flow chart, C, and Basic. The IEC 61131-3 programming environment provides support for five languages specified by the global standard: Sequential Function Chart, Function Block Diagram, Ladder Diagram, Structured Text, and Instruc
17、tion List. This allows for multi-vendor compatibility and multi-language programming. SFC is a graphical language that provides coordination of program sequences, supporting alternative sequence selections and parallel sequences. FBD uses a broad function library to build complex procedures in a gra
18、phical format. Standard math and logic functions may be coordinated with customizable communication and interface functions. LD is a graphic language for discrete control and interlocking logic. It is completely compatible with FBD for discrete function control. ST is a text language used for comple
19、x mathematical procedures and calculations less well suited to graphical languages. IL is a low-level language similar to assembly code. It is used in relatively simple logic instructions. Relay Ladder Logic (RLL), or ladder diagrams, is the primary programming language for HYPERLINK :/programmable-
20、logic-controllers.globalspec /Industrial-Directory/programmable programmable logic HYPERLINK :/programmable-logic-controllers.globalspec /Industrial-Directory/controllers controllers (PLC). Ladder logic programming is a graphical representation of the program designed to look like relay logic. Flow
21、Chart is a graphical language that describes sequential operations in a HYPERLINK :/programmable-logic-controllers.globalspec /Industrial-Directory/controller controller sequence or application. It is used to build modular, reusable function libraries. C is a high level programming language suited t
22、o handle the most complex computation, sequential, and data logging tasks. It is typically developed and debugged on a PC. BASIC is a high level language used to handle mathematical, sequential, data capturing and interface functions. HYPERLINK :/programmable-logic-controllers.globalspec /Industrial
23、-Directory/programmable Programmable logic HYPERLINK :/programmable-logic-controllers.globalspec /Industrial-Directory/controllers controllers can also be specified with a number of computer interface options, network specifications and features. PLC power options, mounting options and environmental
24、 operating conditions are all also important to consider.2. INTRODUCTIONFor simple programming the relay model of the PLC is sufficient. As more complex functions are used the more complex VonNeuman model of the PLC must be used. A VonNeuman computer processes one instruction at a time. Most compute
25、rs operate this way, although they appear to be doing many things at once. Consider the computer components shown in Figure 1.Figure 1 Simplified Personal Computer ArchitectureInput is obtained from the keyboard and mouse, output is sent to the screen, and the disk and memory are used for both input
26、 and output for storage. (Note: the directions of these arrows are very important to engineers, always pay attention to indicate where information is flowing.) This figure can be redrawn as in Figure 2 to clarify the role of inputs and outputs.Figure 2 An Input-Output Oriented ArchitectureIn this fi
27、gure the data enters the left side through the inputs. (Note: most engineering diagrams have inputs on the left and outputs on the right.) It travels through buffering circuits before it enters the CPU. The CPU outputs data through other circuits. Memory and disks are used for storage of data that i
28、s not destined for output. If we look at a personal computer as a controller, it is controlling the user by outputting stimuli on the screen, and inputting responses from the mouse and the keyboard.A PLC is also a computer controlling a process. When fully integrated into an application the analogie
29、s become;Inputs - the keyboard is analogous to a proximity switchInput -circuits - the serial input chip is like a 24Vdc input cardComputer - the 686 CPU is like a PLC CPU unitOutput - circuits - a graphics card is like a triac output cardOutputs - a monitor is like a lightStorage - memory in PLC is
30、 similar to memories in personal computersIt is also possible to implement a PLC using a normal Personal Computer, although this is not advisable. In the case of a PLC the inputs and outputs are designed to be more reliable and rugged for harsh production environments.3. OPERATION SEQUENCEAll PLCs h
31、ave four basic stages of operations that are repeated many times per second. Initially when turned on the first time it will check its own hardware and software for faults. If there are no problems it will copy all the input and copy their values into memory, this is called the input scan. Using onl
32、y the memory copy of the inputs the ladder logic program will be solved once, this is called the logic scan. While solving the ladder logic the output values are only changed in temporary memory. When the ladder scan is done the outputs will be updated using the temporary values in memory, this is c
33、alled the output scan. The PLC now restarts the process by starting a self check for faults. This process typically repeats 10 to 100 times per second as is shown in Figure 3.Figure 3 PLC Scan CycleSELF TEST - Checks to see if all cards error free, reset watch-dog timer, etc. (A watchdog timer will
34、cause an error, and shut down the PLC if not reset within a short period of time - this would indicate that the ladder logic is not being scanned normally).INPUT SCAN-Reads input values from the chips in the input cards, and copies their values to memory. This makes the PLC operation faster, and avo
35、ids cases where an input changes from the start to the end of the program (e.g., an emergency stop). There are special PLC functions that read the inputs directly, and avoid the input tables.LOGIC SOLVE/SCAN-Based on the input table in memory, the program is executed 1 step at a time, and outputs ar
36、e updated. This is the focus of the later sections.OUTPUT SCAN-The output table is copied from memory to the output chips. These chips then drive the output devices.The input and output scans often confuse the beginner, but they are important. The input scan takes a snapshot of the inputs, and solve
37、s the logic. This prevents potential problems that might occur if an input that is used in multiple places in the ladder logic program changed while half ways through a ladder scan. Thus changing the behaviors of half of the ladder logic program. This problem could have severe effects on complex pro
38、grams that are developed later in the book. One side effect of the input scan is that if a change in input is too short in duration, it might fall between input scans and be missed.When the PLC is initially turned on the normal outputs will be turned off. This does not affect the values of the input
39、s.3 .1 The Input and Output ScansWhen the inputs to the PLC are scanned the physical input values are copied into memory. When the outputs to a PLC are scanned they are copied from memory to the physical outputs. When the ladder logic is scanned it uses the values in memory, not the actual input or
40、output values. The primary reason for doing this is so that if a program uses an input value in multiple places, a change in the input value will not invalidate the logic. Also, if output bits were changed as each bit was changed, instead of all at once at the end of the scan the PLC would operate m
41、uch slower.3.2 The Logic ScanLadder logic programs are modelled after relay logic. In relay logic each element in the ladder will switch as quickly as possible. But in a program elements can only be examines one at a time in a fixed sequence. Consider the ladder logic in Figure 4, the ladder logic w
42、ill be interpreted left-to-right, top-to-bottom. In the figure the ladder logic scan begins at the top rung. At the end of the rung it interprets the top output first, then the output branched below it. On the second rung it solves branches, before moving along the ladder logic rung.Figure 4 Ladder
43、Logic Execution SequenceThe logic scan sequence become important when solving ladder logic programs which use outputs as inputs. It also becomes important when considering output usage. Consider Figure 5, the first line of ladder logic will examine input A and set output X to have the same value. Th
44、e second line will examine input B and set the output X to have the opposite value. So the value of X was only equal to A until the second line of ladder logic was scanned. Recall that during the logic scan the outputs are only changed in memory, the actual outputs are only updated when the ladder l
45、ogic scan is complete. Therefore the output scan would update the real outputs based upon the second line of ladder logic, and the first line of ladder logic would be ineffective.Figure 5 A Duplicated Output Error4 PLC STATUSThe lack of keyboard and other input-output devices is very noticeable on a
46、 PLC. On the front of the PLC there are normally limited status lights. Common lights indicate:Power on - this will be on whenever the PLC has power.Program running - this will often indicate if a program is running, or if no program is running.Fault - this will indicate when the PLC has experienced
47、 a major hardware or software problem.These lights are normally used for debugging. Limited buttons will also be provided for PLC hardware. The most common will be a run/program switch that will be switched to program when maintenance is being conducted, and back to run when in production. This swit
48、ch normally requires a key to keep unauthorized personnel from altering the PLC program or stopping execution. A PLC will almost never have an on-off switch or reset button on the front. This needs to be designed into the remainder of the system.The status of the PLC can be detected by ladder logic
49、also. It is common for programs to check to see if they are being executed for the first time, as shown in Figure 6. The first scan input will be true on the very first time the ladder logic is scanned, but false on every other scan. In this case the address for first scan in a PLC-5 is S2:1/14. Wit
50、h the logic in the example the first scan will seal on light, until clear is turned on. So the light will turn on after the PLC has been turned on, but it will turn off and stay off after clear is turned on. The first scan bit is also referred to at the first pass bit.Figure 6 An program that checks
51、 for the first scan of the PLC5. MEMORY TYPESThere are a few basic types of computer memory that are in use today.RAM (Random Access Memory) - this memory is fast, but it will lose its contents when power is lost, this is known as volatile memory. Every PLC uses this memory for the central CPU when
52、running the PLC.ROM (Read Only Memory) - this memory is permanent and cannot be erased. It is often used for storing the operating system for the PLC.EPROM (Erasable Programmable Read Only Memory) - this is memory that can be programmed to behave like ROM, but it can be erased with ultraviolet light
53、 and reprogrammed.EEPROM (Electronically Erasable Programmable Read Only Memory) This memory can store programs like ROM. It can be programmed and erased using a voltage, so it is becoming more popular than EPROMs.All PLCs use RAM for the CPU and ROM to store the basic operating system for the PLC.
54、When the power is on the contents of the RAM will be kept, but the issue is what happens when power to the memory is lost. Originally PLC vendors used RAM with a battery so that the memory contents would not be lost if the power was lost. This method is still in use, but is losing favor. EPROMs have
55、 also been a popular choice for programming PLCs. The EPROM is programmed out of the PLC, and then placed in the PLC. When the PLC is turned on the ladder logic program on the EPROM is loaded into the PLC and run. This method can be very reliable, but the erasing and programming technique can be tim
56、e consuming. EEPROM memories are a permanent part of the PLC, and programs can be stored in them like EPROM. Memory costs continue to drop, and newer types (such as flash memory) are becoming available, and these changes will continue to impact PLCs.6. SOFTWARE BASED PLCSThe dropping cost of persona
57、l computers is increasing their use in control, including the replacement of PLCs. Software is installed that allows the personal computer to solve ladder logic, read inputs from sensors and update outputs to actuators. These are important to mention here because they dont obey the previous timing m
58、odel. For example, if the computer is running a game it may slow or halt the computer. This issue and others are currently being investigated and good solutions should be expected soon.7. SUMMARY A PLC and computer are similar with inputs, outputs, memory, etc. The PLC continuously goes through a cy
59、cle including a sanity check, input scan, logic scan, and output scan. While the logic is being scanned, changes in the inputs are not detected, and the outputs are not updated. PLCs use RAM, and sometime EPROMs are used for permanent programs.8. PRACTICE PROBLEMS1. Does a PLC normally contain RAM,
60、ROM, EPROM and/or batteries?2. What are the indicator lights on a PLC used for?3. A PLC can only go through the ladder logic a few times per second. Why?4. What will happen if the scan time for a PLC is greater than the time for an input pulse? Why?5. What is the difference between a PLC and a deskt
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 教育設(shè)施改造招投標(biāo)邀請書范本
- 藝術(shù)展覽策劃副導(dǎo)演招聘啟事
- 服裝企業(yè)文秘崗位聘用合同
- 城市廣場綠化施工合同協(xié)議書
- 寵物醫(yī)院醫(yī)生招聘合同樣本
- 峽谷探險臨時團隊勞務(wù)合同
- 農(nóng)田作業(yè)設(shè)備租賃協(xié)議
- 地下油庫錨桿施工合同
- 特色小鎮(zhèn)房產(chǎn)買賣合同范本格式
- 冰球場場地租賃協(xié)議
- 2024年保育員(中級)考試題庫(含答案)
- 浙江省杭州市十三中教育集團2024-2025學(xué)年七年級上學(xué)期期中科學(xué)試題(無答案)
- 100MWp戶用光伏發(fā)電EPC總承包 投標(biāo)方案(技術(shù)方案)
- 《中國心力衰竭診斷和治療指南2024》解讀
- 店鋪門面轉(zhuǎn)讓合同協(xié)議書2024年
- DL∕T 618-2022 氣體絕緣金屬封閉開關(guān)設(shè)備現(xiàn)場交接試驗規(guī)程
- 人民陪審員職業(yè)道德、司法禮儀及庭審紀(jì)律培訓(xùn)
- 2024年云南呈貢區(qū)城投集團招聘筆試參考題庫含答案解析
- 2024年陜西陜文投集團招聘筆試參考題庫含答案解析
- 大學(xué)生職業(yè)生涯規(guī)劃(師范類)
- 詩歌朗誦《少年夢_中國夢》;
評論
0/150
提交評論