版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
MEASURESFORSTEELstructuralFABRICATION
category:COKINGPLANTSECTION
Subcategory:J1,j2,j3,j4,J5Beltconveyergallery
PARTI:INTRODUCTION
I。
OVERVIEWABOUTBELTCONVEYERGALLERYSTRUCTURALSYSTEM:
J1,J2,J3,J4,J5beltconveyergallerystructuralsystemistheitemofThaiNguyenSteelandIronCorporation2ndstageexpansionproject.BeltconveyergallerysteelstructureisdesignedbythePrincipalContractorChinaMetallurgicalGroupCorporation(MCC)andassigntothissubcategoryforSubcontractorisThangLongFerrousMetallurgyJointStockCompany。Thissubcategoryincludesthefollowingsections:
1。J1beltconveyergallerysteelstructurelinkingtheJ2transportstationwithJ3transportstation。
J2beltconveyergallerysteelstructurelinkingtheJ3transportstationwithcokecuttingroom.
J3beltconveyergallerysteelstructurelinkingthecokecuttingroomwithJ4transportstation.
J4beltconveyergallerysteelstructurelinkingtheJ4transportstationwiththecokescreeninghouse。
J5beltconveyergallerysteelstructurelinkingthecokescreeninghousewithG2transportstation.
SubcategoryofbeltconveyergallerysteelstructuresystemisdesignedwithsteelcolumnsystemwhicharemanufacturedfromhotrolledsteelgeometricfontsizeH.Structureofrackingplatformisusedtypesofhotrolledanglesteel,steelbeamsystemsupportingroofisusingcombinedsteelgeometricfontsizeI。Sub-beamssystemsupportingthefloorusinghotrolledsteelshapeI,U。。.。PurlinroofsystemusingsteelshapeC.。。Flooringsheetandstairsontheconveyorusing6mmanti—slipreligious。
Thissub—categoryisdesignedtouseplanofstructuralofhotrolledsteelcolumnlinkingstabilitybracingandrackingplatformsystemrunningalongtheconveyorgallerysothecolumnstructuresandtrussareappliedsimilarproductionprocesses.Sointhisconstructionmethod,wejustdiscussthemeasurestoproducesteeltruss’sframestructures.
II。SIZEANDSTRUCTUREOFTHEITEM。
1.Describethesizeofthebeltconveyergallerystructuralsystem(J1-J5):
J1beltconveyergallerysteelstructurehaslengthof10。56m.Trusssystemisarrangedstartingfromcos-0.181m.Andalongthedesignslopeto+2,894m.Thewidthofthesteeltrusssystemis3。4m。Theheightofthetrusssystemis2.5m。
J2beltconveyergallerysteelstructurehaslengthof54。50m。Trusssystemisarrangedstartingfromcos+0600mandalongthedesignslopeto+9,676m.Thewidthofthesteeltrusssystemis3。4m。Theheightofthetrusssystemis2.5m.
J3beltconveyergallerysteelstructurehaslengthof124.00m。Trusssystemisarrangedstartingfromcos+1219mandalongthedesignslopeto+23,779m。Thewidthofthesteeltrusssystemis3。4m.Theheightofthetrusssystemis2。5m。
J4beltconveyergallerysteelstructurehaslengthof20。35m。Trusssystemisarrangedstartingfromcos+21,156mandalongthedesignslopeto+26,715m。Thewidthofthesteeltrusssystemis3.4m。Theheightofthetrusssystemis2。5m。
J5beltconveyergallerysteelstructurehaslengthof12.666m.Trusssystemisarrangedstartingfromcos+5007mandalongthedesignslopeto+6,710m.Thewidthofthesteeltrusssystemis3.4m。Theheightofthetrusssystemis2.5m.
Basedonthedesigndrawing,whichwerehandedbythePrincipalContractortoSubcontractor,wedividedintothefollowingtypesofcomponents:
SteelcolumnsStructuresupportingthemaintrussstructure:
-Columntype1(JZ4)hascrosssectionofemptycolumnwithwidthof3.4mandheightof14。52m.MainbarbysteelH300*305,bracingbarbysteelU16,andL75—L100.
—Columntype2(JZ2/3)hascrosssectionofemptycolumnwithwidthof3.4mandheightof10。35m。MainbarbysteelH488*300,bracingbarbysteelU18,andL56-L125。
-Columntype3(JZ2/3)hascrosssectionofemptycolumnwithwidthof3。4mandheightof19。55m。MainbarbysteelH700*300,bracingbarbysteelU18,andL56—L125。
—Allthecolumnshavelength>12mwillbedividedintosmallercomponentswithlength<=12mandallareproducedintheplant,thencombinedandconnectedintheconstructionsite。
B.J1-J5beltconveyergallerysteelstructure:Width3.4m;Height2。5matotallengthiscalculatedasthedesignslopeis:222.076m。
-Rackingplatform(HJ1—HJ8)hasstructureofanglesteeltrussformat:Height2。5m,Length31.2m(max)。Thebarinuppertrussandthebarinbellowtrussisusedhotrolledsteel2L100-2L130.Thewebbarsusehotrolledsteel2L63—2L90。
—BottomfloorofconveyorsarehorizontalbeamssupportconveyerusingsteelI18,verticalbeamssupportconveyerusingsteelI16,auxiliarybeamsusingsteelU8.Flooringsheetonthebeltconveyorgalleriesandstairsuse6mmanti—skidsteelplate.
-Steelstructurecoversbeltconveyorgalleriessystem:Theframeworkisusedtocoverusingcombinedsteel。BracingoftheframeusinganglesteelL56*5,thestructuresupportingthereligiousroofusingC200cold-rolledshapesteel,thestructuresupportingthereligiouswallusingC120cold-rolledsteel.
-Alltheframeshavelength〉12mwillbedividedintosmallercomponentswithlength〈=12mandareproducedattheplant,thencombinedandconnectedintheconstructionsite.
PARTII:
PREPARATIONOFFACILITIES,ENGINEERINGSUPPLIESANDMATERIALS
FORSTEELSTRUCTURALFABRICATIONOFBELTCONVEYORGALLERY
I.FACILITIESENGINEERINGSTEELPRODUCTION。
TheentiresteelstructureoftheitemsteelstructuresupportingbeltconveyorgallerysystemJ1toJ5aremanufacturedatfactoryofThangLongFerrousMetallurgyJSCinMyHaoDistrict-HungYenProvince.
Thestructuralwithweight≤5。000kgandlength≤20mareproducedinfactories。Thestructuralwithweight〉5000kgandlength〉30mareproducedoutsidetheprocessingofsteelstructures.
Ourplantincludesfactorysystem,technicalstaffandskilledworkersequippedwiththemodernequipmentandmachinerytoproduceproductsmeetingthetechnicalrequirementsofdesignsandcurrentstandards.Equipmentsforproductioninplantsisasfollows:
AProcessingequipmentembryos
1.Hydrauliccutterbutflatproduction(Imported) : 01
2。CNCembryoscutter(Imported) : 02
3.Punching-and—shearingmachine : 01
4。Hydraulicpressmachine300T—PPN31200 : 01
5。Steelcutters : 01
B.Mechanicalequipment
1.3-axiswindmachines : 01
2。U—millmachine : 01
3.LatheT750,T823 : 01
4.Automaticdriftingmachine : 01
5.Large—diameterdrillZ3050x16 : 01
6.Twostonegrinder : 02
7。Handforever:05
8。Drillingmachine : 01
C。Weldingequipment–bending
1.
AutomaticWeldingMachine2burners : 01
2.
Semi—automaticweldingmachine : 03
3.
MachinefittingcombinationsH-beamsautomatically : 01
4。
Wingbendingmachine : 01
5。
Ta350CO2weldingmachine–Win : 05
D.Cleaningandpainting
1。
Bogocompressors : 01
2。
Sandblastingmachine : 01
E.
Transportequipmentlifting
1.
Q=10toncrane : 04
2。
Fork—lifttruck:01
F.
Testequipment
1。
EquipmentandtestkitsKCS : 01
2.
Coatingthicknessmeasurement:01
3。
Panme,gripsize
G。
Equipmentandconstructionmachineryatconstructionsite
1.
Welder : 02
2。
Generators : 01
3。
Ironcuttingmachines : 01
4.
Machinesforconstructionother
II。
HUMANresourcesforSTEELstructurePRODUCTION.
TotalnumberoftechnicalworkersofthefactorywentintoproductionofsteelstructuresforCokebeltconveyorgalleriesto94peopleatitspeak.
Ofwhich:
1.
Welder:25workers
2。
Themeddetailsfixtures:15workers
3。
Mechanistskilledmanufacturinggrade4/7ormore:05workers
4.
Turner:02workers
5.
Electrician:02workers
5。
Coldassemblyworkers:15workers
6。
Theotherworkersforproduction:20workers
7。
Technicalengineeringstaffforproduction:10people
III.
PREPARATIONMATERIALS,MATERIALSTEELPRODUCTION.
1。
Steel:Alltypesofsteelinproductionofsteelstructurestoensurethenewsteel,stainlesspitting,nowarping。
Steelmusthaveaclearorigin,musthaveaqualitycontrolcheckofeachtypeofbatchproduction。
Aftertheinvestment,supervisionconsultantstoagreetotestforsamplingqualitycontroltoensurethenewsteelwasputintoproduction。
TheentireproductionofsteelforbeltconveyergallerysteelstructureisQ235BsteelwhichmadefromChinaorothersteelwithequivalentspecifications。
2。
Weldingmaterials:weldingmaterialsofchoiceforelectricweldingmethodaccordingtoautomaticweldingandmanualwelding。
a)Manualwelding:AttherequestofdesigninginweldingofQ235Bsteelstructure,usingE43weldingrodsofChina。TypesofweldingrodshasthesametechnicalfeaturesofJ421weldingrodofVietnameseGermanWeldingCompany,F(xiàn)S-E421andFS—E422ofthecompany‘sHuuNghiweldingandconstructionofVietnam’smechanicalproduction.
b)Automaticwelding:WhenweldingsteelstructureswithsteelQ235AandQ235BusingweldingwireandweldingcompoundH08EH08AorequivalentweldingwireandweldingcompoundFS-HW08A,HF-402。
3。ChoosePaint:
-EpoxyPrimer,EpoxyintermediatepaintandcoatingofPUpaintofmanufacturersinVietnamwasacceptedbytheInvestorandMCC(HanoiGeneralPaintCorporation/JotunVietNam/Interpaint/Chugoku.。。)withappropriatequalitymeetingtherequirementsoftheproposeddesign.
PARTIII:
STEELFABRICATION
A-GENERALPRINCIPLES
FabricationofsteelstructuresforbeltconveyergallerystructuralsystemcomplieswithconstructionstandardsandacceptanceofGB50205—2001,steelstructuralweldingstandardJGJ81-91,205—83China'smanufacturingstandardsandstructures
170-8920TCN—steelofVietnamasfollows:
a,Steelstructureandtexturefontaneltiounon—standardpartismanufacturedaccordingtodesigndrawings,detaileddrawingsofcomponentsthatareavailableforapprovalandpromulgation。
b,Whenprocessingusingadvancedmethods,inaccordancewiththerequirementsoftechnologyandstrictcontrolofthestages。
c,Materialsusedforprocessingandmanufacturingtoqualityandnumberofsteelgradesinaccordancewithdesignrequirements。
d,Fortheparticularsteelcomponents,inadditiontogeneralprovisionsalsocomplywithspecificregulationsforsteelmaterialsofthatstructures。
e,Requirementsforsteelandweldingmaterials:Allthesteelintothemanufacturingtobetestedmuscleandphysicallybythelegalunit’sperformance.
Weldingrod,weldingwireandweldingcompound’squalitycertificatesshouldcallthemanufacturertoprovide,priortousetocheckquality.
f,Othermaterials:
Bolts-linktypemusthavethecertificate,thequality.
Anti-rustpaintandprotectedbypaintarespecifiedaccuratelyasthedesignofpaintacomponentortwocomponents,thelevelofcleaningandcoatingthicknessofeachlayer.
B—MANUFACTURINGPROCESSOFSTEELCOMPANY
Researchdesigndrawings,constructiondrawingsmade
Inspectionandapprova/Check,Approval
Updemandformaterials
Purchaseofsuppliesbyprojectrequirements
Checkinputs
Returnprovider
No.
Reach Okreached
Impression,bycuttingembryodrawingshavebeenapproved
Flatstraightening,preparingjointcombineddetails
Inspectionanddocumentation
Detailedfittingcombination
consortiumweldingafterdetailshavebeencombined
Straighteningwingdetailafterwelding
Perfectfittingassemblies
Inspectionanddocumentation
Weldingcompletedetails
Straightening,flat,heated,groundfix
Inspectionanddocumentation
Surfacecleaningproducts
Inspectionanddocumentation
Paintproducts
Inspectionanddocumentation
Lastinspection.
Makingrecordsofcompletedtests
Publictransporttoconstructionsite
C-Steelstructuremanufacturing
I.Billetprocess(billetforming,markingandcutting)
I。1.Formingandmarking:Beforeformingandmarking,steelsurfacemustbecleanedsothatthereisnogreaseordust.Steelmustnotberustyandabscessed。Workerwhoisinchargeofforming,markingmustbeskilledandwell-trainedexperiencedandabletounderstand,detaildesigndrawing.Superviseengineermustpopularizemanufacturingoartstechnologyandinstruetmarkingworkdertomakearedundancyincaseoftheshrinkageincutting,weldingandchamfering.Theredundantindexofbilletisexecuted4。1。2,4.1。3,4.1.5,4.1。6oftheChineseGB50205-2001standardorVietnamese20TCN170-89standard(table4vμtable7).
Toolsforformingandmarkingare:steelpen,paranecalipersquare,iron-sheetmeasuringtape,setquare.
I。2。Billetcutting:
2。1.Cuttingbilletbyheatingmethod:Duringthecuttingprocess,tempermustbestableinordertoreducethebilletwarping.Temperatureatthecutoffpointshouldbecontrolledfrom9000Cto10000Csothatthecuttinglineisflatandnotburneddueandthereisnosteelslagatlowtemperatureinordertoreducethelaborcostforthebilletcleaningprocesstochamfering.
Meansandtoolsforbilletcuttingbyheatingmethodareincluding:Gas–oxyplane-shearingmachinemadeinChina,KEROIgas-oxyplate—shearingmachinemadeinJapan..
2.2.Beveled:Allthebutt-weldingforpartswiththebilletthickness≥8mmshouldbechamferedbymachineorautogenouscuttingmachine.Toleranceofchamferingisexecutedbaseontable4.3.2standardGB50205—2001ChinesestandardorAWSD1.1standardonpage11。Table5appliestoVmanualweldingjoint。
2.3Billetstraighteningbeforejiggingwelding:
—Methodofstraighteningcomponentsmadebystraighteningmachinededicatedstructuresforhot—rolledstructuralsteelandcombinedweldingsteel。Manualstraighteningmethodforstraighteninghot—rolledcornersteelcomponentsandothercomponentswhichhavecomplexsizeandbeamstraighteningmachinefails。
—Theremustbenodimplesonsurfaceofparts,depthofcastmarksonsurface0。5mmafterstraighening。
-Theallowancetolerancetableafterstraighteningsteelmaterial。
No。
Category
Diagram
Allowancetolerance(mm)
1
Partialsmoothnessoftheplate
t≤14
t≥14
1000
t
Tolerancerange1000mm:
1,5
1,0
2
Theheightoftheformsteel’sbow(f)
f
1/1000
5mm
3
b
Verticalstraightnessofanglesteel(Δ)
Δ
Δ
b
Δ=b/1000
4
b
TheslopingofsideedgeofUshapedsteel:(Δ)
b
Δ
Δ
Δ=b/80
5
TheslopingofsideedgeofI&Hshapedsteel:(Δ)b
H
Δ
b
Δ
Δ=b/100
I.3.Processingparts,hollowofpartandpartassembly。
—Singlehollowsofsimilarpartscanbejiggedmanyplatefordrillingatthesametime,Usingafixedofclambingsettoavoidbacklashwhendrilling。Drillholesconnectingpartsbymultiboltsmustbeexactlymarkedandimplementedbypair,dependingonthedrillhole’sdiametertomakeadrillingtestfirst。
-Thedrillholesthatcannotbeconfirmendtobeimplementedfirstshouldbedoneafterstructurecompletiontoensuretheaccuracy。
-Lightstructuralparts:roofpurlin,framepurlintobedrilledbyverticaldrillpressshownonthedetailedmanufacturingdrawingforeachtype。Quantityoftypesandsymmetricbars(ifany)needtobepaidattentionwhenstitching。
—Angle—steelbracewhichhasdrillholeatthetwoendofthebartoconnecttemporaryDhole=db1+2mm
Tolerancetableofprocessingforhighintensivebolt’shole.
No。
Name
Nominaldiameterandallowancetolerance(mm)
1
Bolt
Nominaldiameter
12
16
20
22
24
27
30
Allowancetolerance
±0,43
±0,52
±0,84
2
Bolt’shole
diameter
13,5
17,5
22
24
26
30
33
Allowancetolerance
+1
—0
3
Verticalstraightness
Nomorethan0,03tand〉2,0mm
Allowancetolerancetableofhole’sdistance
No.
Category
Allowancetolerance
≤500
〉500~1200
〉1200~3000
≥3000
1
2
3
Betweentwocontiguousholesofsamegroup.
Betweentworandomholesofsamegroup
Betweenthefirsttwoholesoftwocontiguousgroups。
±0,7
±1,0
±1,2
±1,2
±1。5
±2,0
±3
Afterdrilling,thesharpeninganglesofholesmustbegrindedandcleaned.
II。jiggingcombinationsandCOMPLETELYWELDINGfortheHshapedSTEEL,BRACINGCOLUMNANDSTEELtrusS.
Generalrequirement:inspectionforbilletbeforejiggingsteelstructurecombinations。Allwrongsize,warpingbilletsmustberejectedbeforejiggingsteelstructurecombinations。
II.1.Jiggingandweldingsteeltrussandlinkingbracingcolumntocreateframes:
Erectingmold:moldiserectedonflatfloortoensuregradedimension(ifany)。Thelockcodemustnotbecrossed;thecentrallineofflatisonhorizontal(theweb)shouldbeonthesamelevel(testbybled)
Theworkofjiggingarecarriedoutbymeansoftemporaryattachmentweldthencheckallthegeometricdimensionsoftheframeofsteeltruss,thewarpingofdetailparts,flatsurfacesinsideandoutsidetheframeofsteeltruss。Oncetheparameterscontrolledbytherequirementtoconductcompleteattachmentlinkthenodesofthesteeltruss
II.2.Completelyjiggingcolumnpartsandsteeltruss:
Beforecompletelyjiggingparts:technicaldepartmenttocheckallthedetailswhichweretemporaryfixturesandtorejectallpartsthatdonotmeettherequirementofsize,straightnessandreplacenewones.Partsareonlyjiggedwhentheyareconfirmedforsmoothnessandstraightness.
Whenweldinglinkingbuttonsofthetrussandlinkingbracingcolumnstoconductaccuratelytechnicalrequirementsinordertoavoidimproperweldingprocessescausingwarpingofthelinkcodeduetoshrinkageoftheheat.
Jigginggussetplateofcolumnbase:Beforejiggingcolumn,beammustbestraightened,withoutwarping,theflangemustbeflatsothatthegussetplatewillbecrossedwiththeflangeandthewebtoensuresizeformatching.
Jigginggussetplateofbeamhead:Donelikejiggingcolumns,weldingcombinationshouldbefinishedbeforejiggingparts;bracingstrutsand“conbo”(steelplateunderparlin,ifany)shouldbestraightened,smoothedandnottwisted.
Toleranceofcombinationjiggingbasesontable8:
Table8:
Nameofvariation
Allowancetolerance(mm)
Appliedstandard
1.Flangewarping(foroneside)onlyaftercompletion。
0.005B
(B:Flangewidth)
20TCN170—89
2。Flangefan—in(foroneside)onlyaftercompletion。
0。005B
(B::Flangewidth)
3.Non-perpendicularbetweenendgussetplatewithwebafterfinishingwelding。
H/100(H:Icombinationheight)lessthan2
FW—SP–0017
4.Crowningofpartaftercompletion。
L/1000nomorethan10mm(applytotruss)
L/1000nomorethan5(applytocolumnandcranebridge)withlengthofpart:L
FW—SP–0017
5.Distortionofpartaftercompletion
0.001Lnomorethan10
20TCN170-89
6。web'spartialwarping
0.003H(H:web'swidthatthemeasuringpoint)
7。Smoothlessonhighintensionbolt-installingsurface(columnend’sgussetplate,crancebeam,trussbase)
<0。3
1.Toleranceofpart’slengthafterfinishing.
3
FW—SP–0017
II。3.WeldingforI,steelbeamstructure,Hcolumnandtruss
1。Weldingmaterials:
-Manualweldingrod:UseE43weldingrodorweldingrodwiththesameintension(FSJ421).
—Automaticalweldingwireandcompound:useH08EorH08AweldingwireandcompoundwiththesameintensionFS—HW08A,HF-402
GettingcertificateformbyVietnamRegistrationDepartment.
2.Weldingprocess:
2.1Manualweldingjoint:
Manualweldingisonlyapppliestoweldpart,nottocombinationwelding(exceptforsmallpartsthatconnotbedonebyautomaticmachine)。Beforewelding,mustdefinepositionforpartsandpayattentiontodeformationinweldingprocess,especiallywithpartsthathavesurfaceinstalledhighintensionbolts。Usingareconductingplatetoensuresimilarmechanicalcapacityatthefirst,endandmiddlepointofweldingpoints.
Ensuringespeciallywelldoneforbuttweldsduringweldingprocess(connectingplangeandweb)adjustelectricpressureasregulationsfromtheweldingmaterialmanufacturer(notedonpackages)toavoiderrorsofweldingjointwhichcausesbyunstableelectricpressure。Manualweldingrodsshouldbedriedbeforeusing.Writtingnameofwelderforweldingjointspositionwhichhehasdone。Allbuttweldingmusthavearcconductingplate.Beforeweldingjoints,weldersmustcleanallpositionofweldingpointandknowweldingpoint’sheight。Usingmoldtocheckofheightofweldingjoints,Ultrawsonicinspectionshouldbeappliedtoallbuttweldsandre-weldallthepointsthatdonotmeetthetechnicalrequirements.
2.2.WeldingsteelstructurewithportweldingmachinemadeinChina.
AfterjiggingforIshapedbeam,Hshapedcolumnandtruss,usingcranebridgeinworkshoptoliftcombinationstoautomaticweldingmachine。
Thejiggingbeamiskeptslopingonthefixedbracket,(unmovable)。Themachinehastwosupportedbracketssothatitcanweldtwobeamsatthesametime。Afterbeinginstalledandadjusted,towedingheadsautomaticallyprotrudetothepositionneedtobeweded.Theframeismoving,thebitsasoperatingandbeamisweldedonallitslength.
-Weldingproess:Adjustweldingangleofbittoavoiddefectedfootwelding,adjustingweldingcurrentandvelocitytoavoidburningrootofweldingjoint;toensurejointsareevensmooth,lustrousandhighenoughasdesign。Usingarcsheettoensurequatilyofweldingjointatthefirstandendpointsaresimilarasthemiddleone。Weldermusthavemoldtoeasureheightofweldingjoint.Writtingwelder'snameinthepositionofeverypointhemade。
WecommitthattheuseofautomaticportweldingmachinetoproducesteelstructurewillguaranteetheprogressandthequalityofproductsthattheInvestorswant。
Table9:
ApplytoAWSplates
Msterialsuseforautomaticandmannualwelding
Appiedstandard
Manualweldingrod。
FS-E421
E43
ConversionperarticleA5.1—91ofAWS
Weldingrod'sdiameter
4
4
Autoweldingwire
FH—HW08A
H08A
Autoweldingcompound
HF—402
EL12
3.Checkingweldingjoint。
3。1Buttwelding:
—Byvisual 100%
—Byultrasonic 100%forsteelwiththickness≥8mmappliedasVietnamstandard6735:2000(BS3923—1:1988)
-Checkingbytest(tensiletest)forsteelwithvariuosthichnesses:01sample/pertest。
3。2。angleweldjoint:
-Byvisual: 100%
—BymoldasVietnamStandard338-2005: 100%
-Byultrsonic: 0%
Defectsattheweldingjointfoundduringcheckingwillberecorded.Allnecessaryworksforrepairingdefectsanderrorswillbealsorecordedaswell.Theweldingjointmustbecleandtoensurenon-residuaryofdefectsduringchecking。
DefectingtolenceofanglejointweldasinfigureAandBareaccepted.DefectsasinfigureCmustberepaired。
DefectingtolenceofbuttweldasinfigureDisaccepted,defectsasinfigureEmustberepaired.(AccordingtoAWSD1.1page40)
PictureA:Bestweldingjoints
PictureB:AcceptabledefectedweldingjointwithCpointisfrom0。1Sto0。8mm
(S:lengthmeasuredaccordingtotherightanglesideoftheweldingjoint)
PictureC:unacceptabledefectedweldingjoints
PictureD:AcceptablebuttweldingjointwithR=0to3mm。
ErrorweldingjointInsufficientweldingjoint(notfullydone)Burned-baseweldingjointbearingweldingjoint
3.3.StraighteningIshapedbeam,Hshapedcolumn,andtrussafterwelding:
Afterwelding,Ishapedbeam,Hshapedcolumnandtrussalmostarewarpedanddeformedbecauseofheat.Therefore,wehavetostraightenthemagainasinitialdesign。
StraighteningIshapedbeamwillbeprocessedbystraighteningmachine.Procedureofstraighteningforbeamstraighteningisasfollows:usingcranebridgeintheworkshoptolifttheIshapedbeamorHshapedbeamuptobedofstraighteningmachine.PressingelectricbuttonforoperatingreelsothebeamwillmoveonalongitsbedsmoothlywithoutanyproblemsfortraslationalmovementofIbeamorHbeam.AdjustingthestraighteningengineofmachinegraduatlylowerdowntotheundersidesurfaceofIbeamorHbeam.Bushinggreaseonsurfaceofbeamrib。Pressingstartbottonforhydraulicengineofstraighteningbeamtooperatetogetherwiththereelsothatthebeamsurfaceisalwayscontactedwithbeamstraighteningengine,pressureforcewillbeincreased。IshapedbeamorHshapedbeamismovingtranslationallyonenginefewtime,itwillbestraight,smoothlyasdesign。
ProcedureofstraighteningsteeltrussisdonebymanualstraighteningtechniquewithGas-oxygenburnerisasfollows:professionalworkerswithknowledgeandexperiencewillobservewiththenakedeyeandsupportingdevicestodeterminethepositionstoimpactheatingandcoolingimmediatelytoputthesecomponentsarelinkedintothesystembacktoflatlayoutwhichisallowedasthedesignandcurrentregulations。
Checkingweldjoint:
Buttweld
Byvisual100%
Byultrasonic:
Steelwiththickness≥8mm:100%(asVietNamstandard6735:2000).
Steelwiththickness<8mm:0%(asVietNamstandard6735:2000).
Angleweldjoint
Byvisual100%
Bymold(asVNstandard338-2005)100%
Byultrasonic0%
3。4.weldingsmallparts,finishingweldforbeam.
AfterstraighteningHbeamrid,thecranebridgewillliftthebeamontothewagonandmovetothecompleteweldingstage.Righthere,thebeamisweldedadditionalheadplate,bracingstrut,supportedbeambug,gussetplateforbrace,etc…togetherwithdrillinganddrifting…
Beforewelding,thesurfaceofelementsmustbecleanedattheweldingpointswithnolessthan20mmofwidth.Assembliesmustbecheckedbeforewelding.Nextlayersareonlyallowedtoweldwhenstains,dirty,craksofpreveouslayerwithcavityarecleaned。Thesizeofeachweldingjointmustbefollowedasspecifiedstructuraldrawing.
Weequippedmodernmachinessuchas:6—burnerweldingmachine,CO2gaswelding,drillersandpunching—and—shearingmachineintheworshop。
Thesefollowingtolerancesmustbeensuredtoexe
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024年全功能重型貨車租賃服務(wù)協(xié)議
- 2024年擔(dān)保協(xié)議模板集錦
- 2024科技創(chuàng)新項(xiàng)目前期咨詢服務(wù)協(xié)議
- 鋼渣交易協(xié)議:2024年權(quán)威本
- 2024年度工程建設(shè)項(xiàng)目施工協(xié)議模板
- 中小學(xué)德育教育的任務(wù)分解
- 教師教育轉(zhuǎn)型的階段性目標(biāo)
- 高品質(zhì)不銹鋼水箱銷售協(xié)議2024
- 2024年拍攝項(xiàng)目安全管理協(xié)議
- 場(chǎng)員工2024年度固定期限勞動(dòng)協(xié)議
- 材料力學(xué)課程導(dǎo)學(xué)與考研指導(dǎo)
- 小學(xué)各年級(jí)小學(xué)一年級(jí)提高思維能力的方法主題班會(huì)
- 宣傳欄安裝施工方案
- 張曉風(fēng)散文自選集
- 膽囊息肉的護(hù)理查房
- 新課標(biāo)下小學(xué)生運(yùn)算能力的培養(yǎng)研究的開題報(bào)告
- 餐飲行業(yè)初期投資預(yù)算分析
- 遼寧省重點(diǎn)高中沈陽(yáng)市郊聯(lián)體2023-2024學(xué)年高三上學(xué)期期中生物試題(解析版)
- 剪映:手機(jī)短視頻制作-配套課件
- 西氣東輸二線25標(biāo)段山嶺隧道內(nèi)管道安裝技術(shù)
評(píng)論
0/150
提交評(píng)論