Unit13DesignandConstructionoftheJinMaoTower
EnglishforCivilEngineering——Teacher:Prof.ZhengLu(SchoolofCivilEngineering,TONGJIUNIVERSITY)Unit13DesignandConstructionoftheJinMaoTower
13.0Abstract13.1TheStructureSystem13.2Foundationengineering13.3Windengineering13.4Earthquakeengineering13.5Uniquestructuralengineeringsolutions/On-sitestructuremonitoringLogic
結(jié)構(gòu)體系:結(jié)構(gòu)的主要材料、構(gòu)件、外形、主要承重體系的組成(核心筒、結(jié)構(gòu)伸臂桁架)基礎(chǔ)工程:樁、筏板、地下連續(xù)墻的結(jié)構(gòu)形式風(fēng)工程:風(fēng)洞試驗(yàn)的初始條件、最終設(shè)計(jì)風(fēng)壓、風(fēng)洞試驗(yàn)的結(jié)果地震工程:設(shè)計(jì)反應(yīng)譜、驗(yàn)算構(gòu)件、鋼桁架特殊設(shè)計(jì)特殊結(jié)構(gòu)工程解決方案:抵御橫向荷載的結(jié)構(gòu)體系;核心筒和巨型復(fù)合柱之間相對(duì)位移的平衡解決方案現(xiàn)場(chǎng)結(jié)構(gòu)監(jiān)測(cè):基礎(chǔ)監(jiān)測(cè)(筏板)+上部結(jié)構(gòu)(核心筒、巨型復(fù)合柱、剪力墻)Abstract
ThecompositestructuralsystemfortheJinMaoTowerlocatedinShanghai,Chinawasdesignedtoresisttyphoonwinds,earthquakeforces,andaccommodatepoorsoilconditionswhileprovidingaveryslendertowertobefullyoccupiedfortheofficeandhoteluses.ThestructurefortheJinMaoTowerwascompletedinAugust1997withoccupancyexpectedinAugust1998.TheToweristhetallestbuildinginChinaandthethirdtallestintheworld(asof1997).ThesuperstructureoftheTowerresistslateralloadswithacentralreinforcedconcreteshearwallcoreinterconnectedwithcompositemega-columns.Theoutriggertrussesatthree(3)two-storylevels.Gravityloadsareresistedbycompositefloormemberswhichframetostructuralsteelmega-columnsandtothecentralcoreandcompositemega-columns.ThefoundationsystemfortheTowerconsistsofopensteelpipepilescappedbyareinforcedconcretemat.Adeepslurrywallsystemformsthetemporaryretentionaswellasthepermanentfoundationsystemaroundthesite.介紹了金茂大廈的用途、結(jié)構(gòu)形式和地位。slender,細(xì)長(zhǎng);retention,阻擋;
mega-columns,巨型柱。opensteelpipepilescappedbyareinforcedconcretemat,鋼管樁筏基礎(chǔ);
deepslurrywall,深地下連續(xù)墻。13.1The
Structure
SystemThesuperstructureforthe421meter-tall,88-storyJinMaoTowerconsistsofamixeduseofstructuralsteelandreinforcedconcretewithmajorstructuralmemberscomposedofbothstructuralsteelandreinforcedconcrete(composite).TheprimarycomponentsofthelateralsystemforthisslenderTower,withanoverallaspectratioof7:1tothetopoccupiedfloorandanoverallaspectratioof8:1tothetopspire,includeacentralreinforcedconcretecorewall
linkedtoexteriorcompositemega-columnsbystructuralsteeloutriggertrusses.Thecentralcorewallhousestheprimarybuildingservicefunctions,includingelevators,mechanicalfanroomsforHVACservices,andwashrooms.Theoctagon-shapedcoreisnominally27mdeepwithflangesvaryinginthicknessfrom850mmatthetopofthefoundationsto450mmatthelevel87withconcretestrengthvaryingfromC60toC40.spire,塔尖;outriggertrusses,伸臂桁架;octagon-shaped,八角形。mechanicalfanroomsforHVACservices,暖通空調(diào)電風(fēng)扇設(shè)備間。13.1Thestructuresystem
Four(4)–450mmthickinterconnectingcorewebwallsexistthroughouttheofficelevelswithnowebwallsonthehotellevels,creatinganatriumwithatotalheightof205mwhichleadsintothespire.Structuralsteeloutriggertrussesinterconnectthecentralcoreandthecompositemega-columnatthree2–storytalllevels.TheinterconnectionoccursbetweenLevel24&Level26,Level51&Level53,andLevel85&Level87.TheoutriggertrussesbetweenLevels85&87engagethe3-dimensionalstructuralsteelcaptrusssystem.ThecaptrusssystemwhichframesthetopofthebuildingbetweenLevel87andspireisusedtospanovertheopencore,supportthegravityloadofheavymechanicalspaces,engagethestructuralsteelspire,andresistlateralloadsabovethetopofthecentralcorewall/compositemega-columnsystem.介紹了金茂大廈的主要結(jié)構(gòu)形式和布置。web,腹板;atrium,中庭;spaces,控制室。captrusssystem,帽帶桁架。13.1Thestructuresystem
Inadditiontoresistinglateralloads,thecentralreinforcedconcretecorewallandthecompositemega-columnscarrygravityloads.Eight(8)built-upstructuralsteelmega-columnsalsocarrygravityloadsandcompositestructuralsteelwide-flangedbeamsandbuilt-uptrussesareusedtoframetypicalfloors.Thefloorframingelementsaretypicallyspacedat4.5mon-centerwithacompositemetaldeckslab(75mmmetaldecktoppedwith80mmofnormalweightconcrete)framingbetweenthesteelmembers.介紹巨型柱和樓板的設(shè)置情況。on-center,中心矩;compositemetaldeckslab,疊合金屬板。13.2Foundation
engineering
13.2Foundation
engineering
Areinforcedconcreteslurrysystemwasdesignedandconstructedaroundtheentireperimeterofthesite(0.75kilometer).Thethicknessoftheslurrywallis1mwithaconcretedesignstrengthofC40anddepthof33m.Theslurrywallbearsonmoderatelystiff,imperviousclay,alsoactingasatemporaryretentionsystemwall,apermanentwatercut-offsystem.Atiebackgroundanchorsystemwasdesignedandsuccessfullytestedtoprovidelateralsupportoftheslurrywallduringconstruction,however,thecontractor
chosetoconstructalocallyacceptedreinforcedconcretecross-lotbracingsystemforthethree(3)fullbasementlevelswhichextendedapproximately15mbelowgrade.Thepermanentgroundwatertableiswithin1mofexistinggrade.Basedonthesiteconditionsandtheslurrywalldepth,asub-soildrainingsystemwasdesignedtocarry18.5liter/secofwater.介紹地下連續(xù)墻的結(jié)構(gòu)布置情況bearson,承力在……;
impervious,不透水;clay,粘土層;contractor,承包商;sub-soil,(土壤的)底土,心土;tiebackgroundanchor,拉桿地錨體系;
cross-lotbracing,交叉支撐。13.3Wind
engineering
TyphoonwindsaswellasstrongextratropicalwindsexistinthelocalShanghaienvironment.MultipleanalyticalandphysicaltestingtechniqueswereusedtoevaluatethebehavioroftheTower.Sinceultra-tallstructureshadnotbeenpreviouslyconstructedinChina,theChinesewinddesigncodedidnotaddressstructurestallerthan160m.Therefore,coderequirementswereextrapolatedfortheTowerandwindtunnelstudieswereperformedtoconfirmCodeextrapolationsandtostudytheactual,“rational”localwindclimate.Windtunnelstudies,performedunderthedirectionofDr.NicholIsyumovatUniversityofWesternOntarioinconjunctionwiththeShanghaiClimateCenter,wereconductedforthebuildinglocatedintheexistingsiteconditionandconsideringthefuturemasterplandevelopmenttermedthe“developedPudong”condition.Theexistingsitecontextessentiallyconsistedoflow-risebuildings(3~5storiesinheight)withthefully“developedPudong”environmentconsistingof30~50storiesbuildingsandtwoultra-talltowerslocatedwithin300mofJinMao.Windtunnelinvestigationincludedalocalclimatestudy,constructionofproximitymodels,aforcebalancetest,anaeroelastictest,anexteriorpressuretest,andapedestrianlevelwindstudy.氣候的特殊性和因此開(kāi)展的風(fēng)洞試驗(yàn)相關(guān)數(shù)據(jù)。extratropical,溫風(fēng)帶;ultra-tall,超高;extrapolated,推算;
proximity,接近,近似;aeroelastic
test,氣彈實(shí)驗(yàn);pedestrianlevelwind,人行高度風(fēng)。13.3Wind
engineering
ThefinaldesignoftheTowerconsideredboththePeople’sRepublicofChinaBuildingCodeaswellasthe“rational”windtunnelstudies.Strengthdesignforalllateralload-resistingcomponentsisbasedontheCode-defined100-yearreturnwindwithabasicwindspeedof33m/sfora10minuteaveragetimeat10mabovegrade.ThebasicwindspeedcorrespondstoadesignwindpressurefortheTowerofapproximately0.7kPaatthebottomofthebuildingand3.5kPaatthetopofthebuilding.Resultsfromthewindtunnelstudies,consideringtheexistingsiteconditionandthe“developedPudong”conditionaswellasextratropicalandtyphoonwindsconfirmedthattheChineseCoderequirementsfordesignwereconservative.Serviceabilitydesign,includingtheevaluationofbuildingdriftandacceleration,wasbasedonthe“rational”windtunnelstudyresults.Windtunnelstudieswereperformedfor1-year,10-year,30-year,50-yearand100-yearreturnperiods.Thestudiesconsideredtheactualcharacteristicsofthestructure.Thefundamentaltranslationalperiodsofthestructureare5.7secondsineachprincipaldirectionandthefundamentaltorsionalperiodis2.5seconds.Theoverallbuildingdrift,withcomparableinter-storydrifts,forthe50-yearreturnwindwith2.5%structuraldampingisH/1142fortheexistingsiteconditionandH/857forthe“developedPudong”condition.強(qiáng)度和舒適度中的位移滿足情況。13.3Wind
engineering
Itwasdeterminedthatthetwo(2)ultra-tallstructuresproposedtobelocatedneartheJinMaoTower
wouldhaveasignificanteffectonthedynamicbehavior
resultinginsignificantlyhighereffectivestructuraldesignpressures.BuildingdriftsarewellwithintheinternationallyacceptedbuildingdriftofH/500.Considering1.5%structuraldampinganda10-yearreturnperiod,theexpectedbuildingaccelerationrangedfrom9–13milli-g’sforthetopflooroftheoccupiedhotelzone.Inaddition,expectedbuildingaccelerationrangedfrom3–5milli-g’sfora1-yearreturnperiodconsidering1.5%structuraldamping.Theinternationallyacceptableaccelerationsforahotelstructureare15–20milli-g’sfora10-yearreturnperiodand7–10milli-g’sfora1-yearreturnperiod.Becauseofthefavorableserviceabilitybehaviorofthebuilding,thepassivecharacteristicsalonecouldbeusedtocontroldynamicbehaviorwithnoadditionalmechanicaldamping
required.加速度的設(shè)計(jì)滿足情況mechanicaldamping
,機(jī)械阻尼。13.4Earthquake
engineering
TheapproachforevaluatingseismicloadingsfortheJinMaoTowerconsidersbothChineseCode-definedseismiccriteriaandactualsite-specificgeological,tectonic,seismologicalandsoilcharacteristics.Actualon-sitefieldsamplingofthesoilstrataandengineeringevaluationswereperformedbyWoodward-ClydeConsultants,theShanghaiInstituteofGeotechnicalInvestigationandSurveying,andtheShanghaiSeismologicalBureau.
Alllateralloadresistingsystems,includingallindividualmembers,weredesignedtoaccommodateforcesgeneratedfromtheChineseCode-definedresponsespectrumaswellassitespecificresponsespectrums.Extremeeventsite-specifictimehistoryaccelerationrecords(10%probabilityofoccurrenceina100-yearreturnperiod)wereusedintimehistoryanalysestostudythedynamicbehaviorofkeystructuralelementsincludingthecompositemega-columns,thecentralcore,andtheoutriggertrusses.地震分析涉及的方法、構(gòu)件等geological,tectonic,seismologica地理、板塊、地質(zhì)學(xué)。13.4Earthquake
engineering
ThesitespecificresponsespectrumsusedtodescribetheTower’sdynamicbehaviorincludedanalysesforamostprobableearthquakewitha63%probabilityofoccurrenceina50-yearreturnperiodandamostcredibleearthquakewitha10%probabilityofoccurrenceina100-yearreturnperiod).Inaddition,theTowerwasevaluatedusinga3-dimensionaldynamictimehistoryanalysisforamostcredibleearthquakewitha10%probabilityofoccurrenceina100-yearreturnperiod.Inallcases,theChinese-definedcodewindrequirementsgovernedtheoverallbuildingbehaviorandstrengthdesign;however,specialconsiderationsweregiventotheoutriggertrussesandtheirconnections.Inalldesigncases,thesestructuralsteeltrussesweredesignedtoremainelastic.反應(yīng)譜的設(shè)置;伸臂桁架的特殊要求credible,可靠的,可信的。13.5Uniquestructuralengineeringsolutions/On-sitestructuremonitoringThestructuraldesignfortheJinMaoTowercreatedanopportunitytodevelopuniquestructuralengineeringsolutions.Thesesolutionsincludedthepracticaldevelopmentofthetheoreticalconcepts,unusualdetailingoflargestructuralbuildingcomponents,andcomprehensive
monitoringofthein-placestructure.Theoverallstructuralsystemutilizesfundamentalphysicstoresistlateralloads.Theslendercantileveringreinforcedconcretecentralcoreisbracedbytheoutriggertrusseswhichactasleverstoengageperimetercompositemega-columns,maximizingtheoverallstructuraldepth.Theoverallstructuralredundancyislimitedbyengagingonlyforfour(4)compositemega-columnsineachprimarydirection.Structuralmaterialsarestrategicallyplacedtobalancetheappliedlateralloadswithforcesduetogravity.Verylittlestructuralmaterialpremiumswererealizedbecauseofthestructuralsystemused.Lateralsystempremiums
essentiallyrelatedtomaterialrequiredfortheoutriggertrussesonly
withoutmeasurablestructuralmaterialpremiums
requiredforcentralcorewallandcompositemega-columnselements.特殊結(jié)構(gòu)綜述;結(jié)構(gòu)體系的特殊性comprehensive,綜合;in-place,現(xiàn)場(chǎng);
cantilevering
,懸臂;perimeter,周長(zhǎng),邊界;premiums
,額外費(fèi)用。13.5Uniquestructuralengineeringsolutions/On-sitestructuremonitoringEvenafterequalizingthestresslevelwithinthecentralcoreandcompositemega-columns,theexpectedrelativeshorteningbetweentheinterconnectedcentralcoreandcompositemega-columnswaslarge.Bycalculation,consideringlong-termcreep,shrinkage,andelasticshortening,theexpectedrelativemovementbetweentheseelementsatLevels24-26wasasmuchas50mm.Themagnitudeofrelativemovementwouldhaveinducedextremelyhighstressesintothestiffoutriggertrussmembersweighingasmuchas3280kg/m.Therefore,structuralsteelpinswithdiametersupto250mmweredetailedintotheoutriggertrusssystem(seeFig.13-3).核心筒與外框架相對(duì)位移interconnected,相互連接的creep
,蠕動(dòng);steelpins,鋼銷。13.5Uniquestructuralengineeringsolutions/On-sitestructuremonitoringThesepinswereinstalledintocircularholesinhorizontalmembersandslotsindiagonalmemberstoallowtheoutriggertrussestoactasfreemovingmechanismsforalongperiodduringconstruction.Thisallowedamajorityoftherelativemovementtooccurfreeofrestrain,therefore,freeofstress.Afteralongperiodoftime,highstrengthboltswereinstalledintotheoutriggertrussconnectionsforthefinalserviceconditionofthelateralloadresistingsystem.Theexpectedrelativemovementafterthefinalboltingwasperformedwasamaximumof15mmatLevels24-26.Consideringtheflexibilityofthelongcompositemega-columns,thefinalforcesattractedtothetrussesdidnotappreciablyincreasethememberandconnectionsizes.為消除相對(duì)位移產(chǎn)生的應(yīng)力,而采用的鉸連接的方式slots,狹槽;
restrain,約束;diagonalmembers,角部構(gòu)件。13.5Uniquestructuralengineeringsolutions/On-sitestructuremonitoringAcomprehensivestructuralsurveyandmonitoringprogramwasdesignedandimplementedintotheJinMaoTower.ThematfoundationsystemundertheTowerwasinitiallysurveyedjustafterpourcompletioninOctober1995andiscurrentlystillbeingsurveyed.Basedonasubstructure/soilanalysis,theexpectedmaximumlong-termTowermatsettlementis75mm.ThelatestTowermatsettlementisshowninFig.13-4.Inadditiontosurveyingthematforlong-termsettlement,thesuperstructurewasgaugedtomonitorbehavior.Extensometerswereplacedonthereinforcedconcretecentralcoreandonthereinforcedconcreteofthecompositemega-columns.對(duì)基礎(chǔ)和上部結(jié)構(gòu)的監(jiān)測(cè)內(nèi)容。comprehensive,綜合的全面的;pour,澆筑;
gauge,測(cè)量,檢測(cè);
extensometers,應(yīng)變計(jì);matfoundationsystem,筏板基礎(chǔ)。13.5Uniquestructuralengineeringsolutions/On-sitestructuremonitoringInaddition,straingaugeswereplacedonthebuilt-upstructuralsteelmega-columnsaswellasonthewideflangedstructuralsteelcolumnslocationwithintheconcreteencasementforthecompositemega-columns.SampleresultsofmeasuredstrainversuscalculatedstrainareshowninFig.13-5.Basedonthemeasureddata,correlationsweremadebetweentheoreticalandactuallong-termshorteningofverticalelementsduetocreep,shrinkage,andelasticshortening.SeeFig.13-6forresultsoftheshearwall.Lasersurveyingtechniqueswereusedforbothlateralandverticalbuildingalignment.Floorlevelsofthestructureweretypicallybuilttodrawingdesignelevation,compensatingforcreep,shrinkage,andelasticshorteningwhichoccurredduringconstruction.LateralpositionoftheTowerwasconstantlymonitoredfromoff-sitebenchmarksandwasfoundtobewellwithinacceptabletolerances.上層結(jié)構(gòu)的監(jiān)測(cè)內(nèi)容。
correlations
,糾正;draw,達(dá)到;benchmarks,基準(zhǔn)點(diǎn)。lasersurveying,激光監(jiān)測(cè)。13.6Conclusion
IncorporatingfundamentalstructuralengineeringconceptsintothefinaldesignoftheJinMaoTowerleadtoasolutionwhichnotonlyaddressedtheadversesiteconditionsbutalsoprovidedanefficientfinaldesign.Afinalevaluationofmonitoringandsurveydatawillbeperformed.Datafromtheas-builtstructuresubjectedtoactualimposedloadswillbecorrelatedwiththeoreticalresults.Thiscomparisonwillprovetobeinvaluableforthefuturedesignandconstructionofultra-talloccupiedstructures.將基礎(chǔ)結(jié)構(gòu)設(shè)計(jì)理念融入到金茂大廈的最終設(shè)計(jì)當(dāng)中,建成結(jié)構(gòu)實(shí)際檢測(cè)與理論的對(duì)比結(jié)果的價(jià)值。adverse,不利的;as-built,竣工,完成。Unit14DesignandConstructionoftheBurjKhalifaTowerEnglishforCivilEngineering——Teacher:Prof.ZhengLu(SchoolofCivilEngineering,TONGJIUNIVERSITY)Unit14DesignandConstructionoftheBurjKhalifaTower14.1Introduction14.2DesignandConstruction14.2.1TowerForm14.2.2TowerSuperstructure—TheButtressedCore14.2.3WindEngineering14.2.4TowerFoundations14.2.5ConstructionMethodsandConcreteTechnology14.3ImpactandReflections14.3.1Impact14.3.2Reflections14.3.3TheNextGenerationofSupertallBuildings-LessonsLearnedfromBurjKhalifa14.1Introduction
Whilemostoftenworld’spasttallestbuildingswerealmostexclusivelyofficetowers,BurjKhalifachangedtheparadigmbycreatinganintegratedverticalcity,combiningresidential,hotelandofficespace.Creatingthetowerrequiredcollaborationandinnovationbydozensofexpertsworkingtogethertowardcommongoals.Thefinishedtoweristheresultofseveralnewadvancesinmaterialtechnologies,structuralengineering,windengineering,seismicengineeringandcomputertechnology,aswellasconstructionmethods.哈利法塔介紹paradigm范例14.1Introduction
The163storyToweristhecenterpieceofaUSD20+billiondevelopmentlocatedjustoutsideofdowntownDubai.Itisamixed-usebuilding,consistingprimarilyofresidentialandofficeusage,aswellasanArmanihotelandretailoutlets.TheprojectincludedtheTower,anadjacentpodiumstructure,andlow-riseofficeandpoolannexbuildings.Thetotalareafortheprojectis465000m2,withtheTowerportionbeing280000m2.ConstructionforthepreliminaryworksandfoundationsbeganinJanuary2004.Afterahiatusinworkonthesite,theconstructionofthesuperstructurestartedinApril2005andwascompletedinJanuary2009.TheTowerwasopenedinJanuary2010.annex附屬建筑
;14.2DesignandConstruction
ThechallengeoftheBurjKhalifawasnotonlytocreatetheworld’stallestbuilding,butitwastodosoutilizingconventionalsystems,materials,andconstructionmethods,albeitmodifiedandutilizedinnewcapacities.Atowerofthisheighthadneverbeforebeenseen,whichrequiredmuchinnovation,bothintermsofnewideas,andindevelopingnewwaystouseandadvancecurrenttechnologies.Toachievethis,thedesignrequiredintensiveandconstantcollaborationbetweenarchitects,engineers,andspecialtyconsultantstodevelopabuildingformthataddressedstructuralefficiency,constructability,buildingaesthetics,andfunctionsimultaneously.哈利法塔設(shè)計(jì)和建造的挑戰(zhàn)conventional范例
;consultants顧問(wèn);constructability施工能力
14.2DesignandConstruction
14.2.1TowerFormAprimaryconcernintheengineeringoftallbuildingsistheeffectofwindonthebuildings’structure.TheformoftheBurjKhalifaistheresultofcollaborationbetweenthearchitectsandengineerstovarytheshapeofthebuildingalongitsheight,therebyminimizingwindforcesonthebuilding,whilealsokeepingthestructuresimpleandfosteringconstructability.ThefloorplanoftheTowerconsistsofatriaxial,Y-shapedplan,formedbyhavingthreeseparatewingsconnectedtoacentralcore.AstheTowerrisesinheight,onewingateachtier“setsback”inaspiralingpattern,furtheremphasizingitsheight.結(jié)構(gòu)形式triaxial三軸
;tier層14.2DesignandConstruction
Theresultis24differentprimaryfloorplates(plussomelessmajorvariations),creatingasteppinggeometrythatpresentsmultiplebuildingwidthsovertheheightofthebuilding,providinganenvironmentthat“confusesthewind”-thewindvorticesnevergetorganized,becauseateachnewtierthewindencountersadifferentbuildingshape.TheY-shapedplanisidealforresidentialandhotelusage,inthatitallowsmaximumviewsoutward,withoutoverlookinganeighboringunit.Thewingscontaintheresidentialunitsandhotelguestrooms,withthecentralcorehousingalloftheelevatorandmechanicalclosets.Additionally,theTowerisservicedbyfiveseparatemechanicalzones,locatedapproximately30floorsapartovertheheightofthebuilding.geometry幾何;residential住宅;elevator電梯
14.2DesignandConstruction
AbovetheoccupiedportionoftheTowerisalargelyopenspire,whichhousesmechanicalfunctionsandfuturecommunicationsusagesatitsbase.Theoverallshapeisanextremelyefficientsolutiontothepotentiallyconflictingstructuralrequirementsofasupertallresidentialtower.Startingfromaslendertop,thebuildingspreadsoutasthegravityandwindforcesaccumulate.Asaresult,eventhoughtheglobalforcesarelarge,theforcesintheindividualmembersarenot.conflicting相互沖突的14.2DesignandConstruction
14.2.2TowerSuperstructure—TheButtressedCoreThestructuralsystemfortheTowerhasbeentermeda“buttressedcore”system.Thebuttressedcorerepresentsanewtypeofsystem,aconceptualchangeinstructuraldesignwhoseevolutionarydevelopmentbeganwithanearlierdesignforTowerPalaceIIIinSeoul.Thesystemallowsforadramaticincreaseinheight,usingconventionalmaterialsandconstructiontechniques.Itsessenceisathree-wingedstructureinwhichastronghexagonalcentralcoreanchorsthreebuildingwings.Itisaninherentlystablesysteminthateachwingisbuttressedbytheothertwo.塔式上層建筑-支撐核心buttressed加支撐的
;hexagonal六邊形的14.2DesignandConstruction
Withinthewings,corridorwallsextendfromthecentralcoretoneartheendofthewing,terminatinginthickenedcrosswallsreferredtoas
hammerheadwalls.Thecentralcoreprovidesthetorsionalresistanceforthebuilding,whilethewingsprovidetheshearresistanceandincreasedmomentofinertia.Perimetercolumnsandflatplatefloorconstructioncompletethesystem.Atthemechanicalfloors,outriggerwallsareprovidedtotieallthewallsandcolumnstogetherallowingtheperimetercolumnstoparticipateinthelateralloadresistingsystem.Inthismanner,theBurjKhalifaactsasonegiantconcretebeamcantileveringoutofthegroundwiththesystemworkingtogetherasasingleunit.corridor走廊
;torsional扭轉(zhuǎn);inertia慣性
;outrigger外伸
;cantilevering懸臂14.2DesignandConstruction
Everypieceofverticalconcrete(andtherebyeverygravitationalforce)ispartofthisgiantbeam,usedtoresistthewind.Thegravitationalloadthenhelpsstabilizethestructurebyutilizingtheweightofthebuildingtoresistthewind.Theresultisaveryefficienttower,whichisalsoextremelystifflaterallyandtorsionally.Infact,becauseoftheshapeofthebuildingandtheharmonicsofthestructure,theforcesandmotionsweregreatlyreduced,andthemotionandaccelerationcriteriacouldbesatisfiedwithouttheuseofsupplementaldampingdevices.抵抗風(fēng)載giant巨大的
14.2DesignandConstruction
14.2.3WindEngineeringThewindtunnelwasanessentialpartnerinthedesignprocessfromthebeginningoftheproject,asitwasimmediatelyapparentthatforabuildingofthisheightandslenderness,windforcesandtheresultingmotionsintheupperlevelswouldbecomedominantfactorsinthestructuraldesign.Anextensiveprogramofwindtunneltestsandotherstudieswasconductedutilizingboundarylayerwindtunnels.Thewindtunnelprogramincludedrigidmodelforcebalancetests,fullmulti-degreeoffreedomaeroelasticmodelstudies,measurementsoflocalizedpressures,pedestrianwindenvironmentstudies,andwindclimaticstudies(seeFig.14-1).UsingthewindtunneltounderstandandoptimizewindperformancewaskeytotheTower’sdesign.風(fēng)工程slenderness細(xì)長(zhǎng)
;dominant占主導(dǎo)地位的;boundary邊界
;aeroelastic氣彈性的14.2DesignandConstruction
SeveralroundsofforcebalancetestswereundertakenasthegeometryoftheTowerevolvedandwasrefined.Aftereachroundoftests,thedatawasanalyzedandthebuildingwasreshapedtofurtherminimizethewindeffects.Asaresultofthiseffort,severalrevisionstothebuildingweremade.SomewererelatedtothegeometryoftheTower:thesizeandshapeofthewingsweremodified,andthenumberandspacingofthesetbackschangedthroughouttheprocess,asweretheirlocations:theoriginalmassinghadthesetbacksoccurringinaspiralingcounterclockwisepattern,whichwasrevisedtobeinaclockwisedirection.reshape改造
;counterclockwise逆時(shí)針?lè)较?;clockwise順時(shí)針?lè)较?/p>
14.2DesignandConstruction
Takentogether,thesemeasureshadasignificantimpactinencouragingdisorganizedvortexsheddingovertheheightoftheTower.Anotherrevisionwasrelatedtotheorientationofthebuilding.TheTowerhassiximportantwinddirections,allparalleltothemajoraxesofthewings—threedirectionswherewindisblowingintothe“nose”ofeachwing,andthreedirectionswherewindisblowingintothe“tail”ofeachwingatthecenterofthebuilding.TheorientationoftheTowerwasthenselectedtobetteraccommodatethemostfrequentstrongwinddirectionsforDubai:northwest,south,andeast.vortex渦
;orientation朝向;parallel平行
14.2DesignandConstruction
14.2.4TowerFoundationsTheTowerisfoundedona3.7mthicksolidreinforcedconcreteraft,supportedby194boredcast-in-placepiles.Thepilesare1.5mindiameterandabout43mlong,withacapacityof3000t.Thediameterandlengthofthepilesrepresentedthelargestandlongestpilesconventionallyavailableintheregion.Apileloadtestingprogramwasconductedpriortoproductionpiling,wherebythe1.5mpilesweretestedtomorethantwicetheratedcapacity(over6000t).ThepilesutilizedC60self-consolidatingconcrete(SCC)andwerepl
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年社區(qū)健身器材維護(hù)與管理物業(yè)合同3篇
- 耐酸混凝土施工方案
- 水上打樁船施工方案
- 部編版七年級(jí)初一語(yǔ)文上冊(cè)《春》教學(xué)設(shè)計(jì)
- 2025年度商場(chǎng)商品陳列優(yōu)化升級(jí)合同4篇
- 年度社會(huì)救助及公益服務(wù)產(chǎn)業(yè)分析報(bào)告
- 年度天然氣脫硫除濕膜市場(chǎng)分析及競(jìng)爭(zhēng)策略分析報(bào)告
- 商業(yè)地產(chǎn)2025年度租賃合同范本2篇
- 二零二五版高速公路工程勞務(wù)分包居間服務(wù)協(xié)議3篇
- 2025年版危險(xiǎn)品運(yùn)輸應(yīng)急處理預(yù)案合同3篇
- 城市公共交通運(yùn)營(yíng)協(xié)議
- 2024年高考八省聯(lián)考地理適應(yīng)性試卷附答案解析
- 足浴技師與店內(nèi)禁止黃賭毒協(xié)議書(shū)范文
- 2024-2030年中國(guó)光電干擾一體設(shè)備行業(yè)發(fā)展現(xiàn)狀與前景預(yù)測(cè)分析研究報(bào)告
- 湖南省岳陽(yáng)市岳陽(yáng)樓區(qū)2023-2024學(xué)年七年級(jí)下學(xué)期期末數(shù)學(xué)試題(解析版)
- 農(nóng)村自建房安全合同協(xié)議書(shū)
- 杜仲葉藥理作用及臨床應(yīng)用研究進(jìn)展
- 4S店售后服務(wù)6S管理新規(guī)制度
- 高性能建筑鋼材的研發(fā)與應(yīng)用
- 無(wú)線廣播行業(yè)現(xiàn)狀分析
- 漢語(yǔ)言溝通發(fā)展量表(長(zhǎng)表)-詞匯及手勢(shì)(8-16月齡)
評(píng)論
0/150
提交評(píng)論