【BS英國標(biāo)準(zhǔn)】BS EN 61400-25-3-2007 Wind turbines. Communications for monitoring and control of wind power plants. Information exchange models.doc_第1頁
【BS英國標(biāo)準(zhǔn)】BS EN 61400-25-3-2007 Wind turbines. Communications for monitoring and control of wind power plants. Information exchange models.doc_第2頁
【BS英國標(biāo)準(zhǔn)】BS EN 61400-25-3-2007 Wind turbines. Communications for monitoring and control of wind power plants. Information exchange models.doc_第3頁
【BS英國標(biāo)準(zhǔn)】BS EN 61400-25-3-2007 Wind turbines. Communications for monitoring and control of wind power plants. Information exchange models.doc_第4頁
【BS英國標(biāo)準(zhǔn)】BS EN 61400-25-3-2007 Wind turbines. Communications for monitoring and control of wind power plants. Information exchange models.doc_第5頁
已閱讀5頁,還剩32頁未讀, 繼續(xù)免費(fèi)閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)

文檔簡介

british standard bs en61400-25-3:2007wind turbines part 25-3: communications for monitoring and control of wind power plants information exchange modelsthe european standard en 61400-25-3:2007 has the status of abritish standardics 27.180 bs en 61400-25-3:2007national forewordthis british standard was published by bsi. it is the uk implementation ofen 61400-25-3:2007. it is identical with iec 61400-25-3:2006.the uk participation in its preparation was entrusted to technical committeepel/88, windturbine systems.a list of organizations represented on this committee can be obtained on request to its secretary.this publication does not purport to include all the necessary provisions of a contract. users are responsible for its correct application.compliance with a british standard cannot confer immunity from legal obligations.amd. no.datecommentsthis british standard was published under the authority of the standards policy and strategy committeeon 31 may 2007 bsi 2007isbn 978 0 580 50676 5amendments issued since publicationeuropean standarden 61400-25-3norme europenneeuropische norm february 2007 ics 27.180english versionwind turbines -part 25-3: communications for monitoring and control of wind power plants - information exchange models(iec 61400-25-3:2006)eoliennes -partie 25-3: communicationspour la surveillance et la commande des centrales oliennes -modles dchange dinformations(cei 61400-25-3:2006)windenergieanlagen -teil 25-3: kommunikationfr die berwachung und steuerung von windenergieanlagen -dienste-modelle fr den informationsaustausch (iec 61400-25-3:2006)this european standard was approved by cenelec on 2007-02-01. cenelec members are bound to comply with the cen/cenelec internal regulations which stipulate the conditions for giving this european standard the status of a national standard without any alteration.up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the central secretariat or to any cenelec member.this european standard exists in three official versions (english, french, german). a version in any other language made by translation under the responsibility of a cenelec member into its own language and notified to the central secretariat has the same status as the official versions.cenelec members are the national electrotechnical committees of austria, belgium, bulgaria, cyprus, the czech republic, denmark, estonia, finland, france, germany, greece, hungary, iceland, ireland, italy, latvia, lithuania, luxembourg, malta, the netherlands, norway, poland, portugal, romania, slovakia, slovenia, spain, sweden, switzerland and the united kingdom.ceneleceuropean committee for electrotechnical standardization comit europen de normalisation electrotechnique europisches komitee fr elektrotechnische normungcentral secretariat: rue de stassart 35, b - 1050 brussels 2007 cenelec -all rights of exploitation in any form and by any means reserved worldwide for cenelec members.ref. no. en 61400-25-3:2007 een 61400-25-3:2007 19 forewordthe text of document 88/276/fdis, future edition 1 of iec 61400-25-3, prepared by iec tc 88, wind turbines, was submitted to the iec-cenelec parallel vote and was approved by cenelec as en 61400-25-3 on 2007-02-01.the following dates were fixed: latest date by which the en has to be implemented at national level by publication of an identicalnational standard or by endorsement(dop)2007-11-01 latest date by which the national standards conflictingwith the en have to be withdrawn(dow)2010-02-01annex za has been added by cenelec.endorsement noticethe text of the international standard iec 61400-25-3:2006 was approved by cenelec as a europeanstandard without any modification.contentsintroduction . 51scope . 62normative references . 73terms and definitions . 84abbreviated terms . 115general . 116information exchange models overview . 127operational functions . 7.4general . 14association and authorisation model . 14control model . 15monitoring, reporting and logging model . 158management functions . 8.48.5general . 17user management/access security model . 17setup model . 17time synchronisation model . 17diagnostic (self-monitoring) model . 179the acsi for wind power plant information models . general . 18services of association and authorisation . 18services of server class . 19services of logical device class . 19services of logical node class . 20services of data class . 20services of dataset class. 20services of report control block class . 21services of log control block and log classes . 239.10 services of control class. 25annex a (informative) examples of reporting and logging services . 26annex b (normative) relationship between acsi services and functional constraints . 28annex c (informative) relationship between acsi defined in iec 61850-7-2 andiec 61400-25-3 . 30annex za (normative) normative references to international publications with theircorresponding european publications. 32figure 1 conceptual communication model of the iec 61400-25 series . 7figure 2 association and authorisation model (conceptual) . 14figure 3 control model (conceptual) . 15figure 4 monitoring, reporting and logging model (conceptual) . 16figure 5 conceptual information exchange model for a wind power plant . 18figure 6 buffered report control block conceptual . 22figure 7 log control block conceptual . 25figure a.1 mapping of information models to data sets for reporting (example) . 26figure a.2 logging basics (example) . 27figure c.1 conceptual service model of the acsi . 31table 1 information exchange models . 13table 2 comparison of the information retrieval methods . 17table 3 two-party-application-association . 19table 4 server . 19table 5 logical device . 19table 6 logical node . 20table 7 data . 20table 8 data-set . 20table 9 report-control . 21table 10 addsubscription service . 22table 11 removesubscription service . 23table 12 log and log-control . 24table 13 data filter . 24table 14 control . 25table b.1 relationship between acsi services and functional constraints . 29introductionthe iec 61400-25 series defines communications for monitoring and control of wind power plants. the modeling approach of the iec 61400-25 series has been selected to provide abstract definitions of classes and services such that the specifications are independent of specific protocol stacks, implementations, and operating systems. the mapping of these abstract classes and services to a specific communication profile is not inside the scope of this part (iec 61400-25-3) but inside the scope of iec 61400-25-41.this part of iec 61400-25 defines services of the model of the information exchange of intelligent electronic devices in wind power plants. the services are referred to as the abstract communication service interface (acsi). the acsi has been defined so as to be independent of the underlying communication systems.the information exchange model is defined in terms ofa hierarchical class model of all information that can be accessed,information exchange services that operate on these classes,parameters associated with each information exchange service.the acsi description technique abstracts away from all the different approaches to implement the cooperation of the various devices.these abstract service definitions shall be mapped into concrete object definitions that are to be used for a particular protocol. mapping to specific protocol stacks is specified in iec 61400-25-4.note 1 abstraction in acsi has two meanings. firstly, only those aspects of a real device (for example, a rotor) or a real function that are visible and accessible over a communication network are modelled. this abstraction leads to the hierarchical class models and their behaviour defined in iec 61400-25-2. secondly, the acsi abstracts from the aspect of concrete definitions on how the devices exchange information; only a conceptual cooperation is defined. the concrete information exchange is defined in iec 61400-25-4.note 2 performance of the iec 61400-25 series implementations are application specific. the iec 61400-25 series does not guarantee a certain level of performance. this is beyond the scope of the iec 61400-25 series. however, there is no underlying limitation in the communications technology to prevent high speed application (millisecond level responses).1 to be published.wind turbines part 25-3: communications for monitoring and control of wind power plants information exchange models1scopethe focus of the iec 61400-25 series is on the communications between wind power plant components such as wind turbines and actors such as scada systems. internal communication within wind power plant components is outside the scope of the iec 61400-25 series.the iec 61400-25 series is designed for a communication environment supported by a client- server model. three areas are defined, that are modelled separately to ensure the scalability of implementations: (1) wind power plant information models, (2) information exchange model, and (3) mapping of these two models to a standard communication profile.the wind power plant information model and the information exchange model, viewed together, constitute an interface between client and server. in this conjunction, the wind power plant information model serves as an interpretation frame for accessible wind power plant data. the wind power plant information model is used by the server to offer the client a uniform, component-oriented view of the wind power plant data. the information exchange model reflects the whole active functionality of the server. the iec 61400-25 series enables connectivity between a heterogeneous combination of client and servers from different manufacturers and suppliers.as depicted in figure 1, the iec 61400-25 series defines a server with the following aspects:information provided by a wind power plant component, e. g., “wind turbine rotor speed” or “total power production of a certain time interval” is modelled and made available for access. the information modelled in the iec 61400-25 series is defined in iec 61400-25-2;services to exchange values of the modelled information defined in part iec 61400-25-3;mapping to a communication profile, providing a protocol stack to carry the exchanged values from the modelled information (part iec 61400-25-4).the iec 61400-25 series only defines how to model the information, information exchange and mapping to specific communication protocols. the iec 61400-25 series excludes a definition of how and where to implement the communication interface, the application program interface and implementation recommendations. however, the objective of the iec61400-25 series is that the information associated with a single wind power plant component(such as a wind turbine) is accessible through a corresponding logical device.this part of iec 61400-25 specifies an abstract communication service interface describing the information exchange between a client and a server for:data access and retrieval,device control,event reporting and logging,publisher/subscriber,self-description of devices (device data dictionary),data typing and discovery of data types.communication model of the iec 61400-25 seriesclient serveractor e.g. scadainformation exchange model (get, set, report, log, control, publish / subscribe, etc.)information exchange model (get, set, report, log, control, publish / subscribe, etc.)defined iniec 61400-25-3defined iniec 61400-25-3messaging through mapping to communication profile (read, write, . message)messaging through mapping to communication profile (read, write, . message)defined iniec 61400-25-4defined iniec 61400-25-4information exchange model (get, set, report, log, control, publish / subscribe, etc.)information exchange model (get, set, report, log, control, publish / subscribe, etc.)defined iniec 61400-25-3defined iniec 61400-25-3wind power plant componente.g. wind turbineapplicationoutside scopewind power plant information modeldefined inwind power plant information modeldefined iniec 61400-25-2iec 61400-25-2wind power plant information model (rotor speed, break status, total power production, etc.)wind power plant information model (rotor speed, break status, total power production, etc.)defined iniec 61400-25-2defined ini

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論