版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)
文檔簡介
1、fromcanadian journal of civil engineeringbuilding construction concrete crack ofprevention and processingabstractthe crack problem of concrete is a widespread existence but again difficult in solve of engineering actual problem, this text carried on a study analysis to a little bit familiar crack pr
2、oblem in the concrete engineering, and aim at concrete the circumstance put forward some prevention, processing measure. keyword:concrete crack prevention processingforeword concretes ising 1 kind is anticipate by the freestone bone, cement, water and other mixture but formation of the in addition m
3、aterial of quality brittleness not and all material.because the concrete construction transform with oneself, control etc. a series problem, harden model of in the concrete existence numerous tiny hole, spirit cave and tiny crack, is exactly because these beginning start blemish of existence just ma
4、ke the concrete present one some not and all the characteristic of quality.the tiny crack is a kind of harmless crack and accept concrete heavy, defend shen and a little bit other use function not a creation to endanger.but after the concrete be subjected to lotus carry, difference in temperature et
5、c. function, tiny crack would continuously of expand with connect, end formation we can see without the aid of instruments of macro view the crack be also the crack that the concrete often say in the engineering. concrete building and gou piece usually all take sewer to make of, because of crack of
6、existence and development usually make inner part of reinforcing bar etc. material creation decay, lower reinforced concrete material of loading ability, durable and anti- shen ability, influence building of external appearance, service life, severity will threat arrive peoples life and property saf
7、ety.a lot of all of crash of engineerings is because of the unsteady development of the crack with the result that.modern age science research with a great deal of of the concrete engineering practice certificate, in the concrete engineering crack problem is ineluctable, also acceptable in certainly
8、 of the scope just need to adopt valid of measure will it endanger degree control at certain of scope inside.the reinforced concrete norm is also explicit provision:some structure at place of dissimilarity under the condition allow existence certain the crack of width.but at under construction shoul
9、d as far as possible adopt a valid measure control crack creation, make the structure dont appear crack possibly or as far as possible decrease crack of amount and width, particularly want to as far as possible avoid harmful crack of emergence, insure engineering quality thus. concrete crack creatio
10、n of the reason be a lot of and have already transformed to cause of crack:such as temperature variety, constringency, inflation, the asymmetry sink to sink etc. reason cause of crack;have outside carry the crack that the function cause;protected environment not appropriate the crack etc. caused wit
11、h chemical effect.want differentiation to treat in the actual engineering, workout a problem according to the actual circumstance. in the concrete engineering the familiar crack and the prevention 1.stem suo crack and prevention stem the suo crack much appear after the concrete protect be over of a
12、period of time or concrete sprinkle to build to complete behind of around a week.in the cement syrup humidity of evaporate would creation stem suo, and this kind of constringency is cant negative.stem suo crack of the creation be main is because of concrete inside outside humidity evaporate degree d
13、issimilarity but cause to transform dissimilarity of result:the concrete is subjected to exterior condition of influence, surface humidity loss lead quick, transform bigger, inner part degree of humidity variety smaller transform smaller, bigger surface stem the suo transform to be subjected to conc
14、rete inner part control, creation more big pull should dint but creation crack.the relative humidity is more low, cement syrup body stem suo more big, stem the suo crack be more easy creation.stem the suo crack is much surface parallel lines form or the net shallow thin crack, width many between 0.0
15、5-0.2 mm, the flat surface part much see in the big physical volume concrete and follow it more in thinner beam plank short to distribute.stem suo crack usually the anti- shen of influence concrete, cause the durable of the rust eclipse influence concrete of reinforcing bar, under the function of th
16、e water pressure dint would creation the water power split crack influence concrete of loading dint etc.concrete stem the suo be main with water ash of the concrete ratio, the dosage of the composition, cement of cement, gather to anticipate of the dosage of the property and dosage, in addition etc.
17、 relevant. main prevention measure:while being to choose to use the constringency quantity smaller cement, general low hot water mire and powder ash from stove cement in the adoption, lower the dosage of cement.two is a concrete of stem the suo be subjected to water ash ratio of influence more big,
18、water ash ratio more big, stem suo more big, so in the concrete match the ratio the design should as far as possible control good water ash ratio of choose to use, the chan add in the meantime accommodation of reduce water.three is strict control concrete mix blend with under construction of match r
19、atio, use of concrete water quantity absolute cant big in match ratio design give settle of use water quantity.four is the earlier period which strengthen concrete to protect, and appropriate extension protect of concrete time.winter construction want to be appropriate extension concrete heat preser
20、vation to overlay time, and tu2 shua protect to protect.five is a constitution the accommodation is in the concrete structure of the constringency sew. 2.the su constringency crack and prevention su constringency is the concrete is before condense, surface because of lose water quicker but creation
21、of constringency.the su constringency crack is general at dry heat or strong wind the weather appear, cracks much presenting in the center breadth, both ends be in the centerthin and the length be different, with each other not coherent appearance.shorter crack general long 20-30 cm, the longer crac
22、k can reach to a 2-3 m, breadth 1-5 mm.it creation of main reason is:the concrete is eventually almost having no strength or strength before the ning very small, perhaps concrete just eventually ning but strength very hour, be subjected to heat or compare strong wind dint of influence, the concrete
23、surface lose water to lead quick, result in in the capillary creation bigger negative press but make a concrete physical volume sharply constringency, but at this time the strength of concrete again cant resist its constringency, therefore creation cracked.the influence concrete su constringency ope
24、n the main factor of crack to have water ash ratio, concrete of condense time, environment temperature, wind velocity, relative humidity.etc. main prevention measure:one is choose to use stem the suo value smaller higher huo sour salt of the earlier period strength or common the huo sour brine mire.
25、two is strict the control water ash ratio, the chan add to efficiently reduce water to increment the collapse of concrete fall a degree and with easy, decrease cement and water of dosage.three is to sprinkle before building concrete, water basic level and template even to soak through.four is in tim
26、e to overlay the perhaps damp grass mat of the plastics thin film, hemp slice etc., keep concrete eventually before the ning surface is moist, perhaps spray to protect etc. to carry on protect in the concrete surface.five is in the heat and strong wind the weather to want to establish to hide sun an
27、d block breeze facilities, protect in time. 3.sink to sink crack and prevention the creation which sink to sink crack is because of the structure foundation soil quality not and evenly, loose soft or return to fill soil dishonest or soak in water but result in the asymmetry sink to decline with the
28、result that;perhaps because of template just degree shortage, the template propped up to once be apart from big or prop up bottom loose move etc. to cause, especially at winter, the template prop up at jelly soil up, jelly the soil turn jelly empress creation asymmetry to sink to decline and cause c
29、oncrete structure creation crack.this kind crack many is deep enter or pierce through sex crack, it alignment have something to do with sinking to sink a circumstance, general follow with ground perpendicular or present 30 s-45 cape direction development, bigger sink to sink crack, usually have cert
30、ain of wrong, crack width usually with sink to decline quantity direct proportion relation.crack width under the influence of temperature variety smaller.the foundation after transform stability sink to sink crack also basic tend in stability. main prevention measure:one is rightness loose soft soil
31、, return to fill soil foundation a construction at the upper part structure front should carry on necessity of hang solid with reinforce.two is the strength that assurance template is enough and just degree, and prop up firm, and make the foundation be subjected to dint even.three is keep concrete f
32、rom sprinkle infusing the foundation in the process is soak by water.four is time that template tore down to cant be too early, and want to notice to dismantle a mold order of sequence.five is at jelly soil top take to establish template to notice to adopt certain of prevention measure. 4.temperatur
33、e crack and prevention temperature crack much the occurrence is in big surface or difference in temperature variety of the physical volume concrete compare the earth area of the concrete structure.concrete after sprinkling to build, in the hardening the process, cement water turn a creation a great
34、deal of of water turn hot, .(be the cement dosage is in the 350-550 kg/m 3, each sign square the rice concrete will release a calories of 17500-27500 kj and make concrete internal thus the temperature rise to reach to 70 or so even higher)because the physical volume of concrete be more big, a great
35、deal of of water turn hot accumulate at the concrete inner part but not easy send forth, cause inner part the temperature hoick, but the concrete surface spread hot more quick, so formation inside outside of bigger difference in temperature, the bigger difference in temperature result in inner part
36、and exterior hot the degree of the bulge cold suo dissimilarity, make concrete surface creation certain of pull should dint.when pull should dint exceed the anti- of concrete pull strength extreme limit, concrete surface meeting creation crack, this kind of crack much occurrence after the concrete u
37、nder construction period.in the concrete of under construction be difference in temperature variety more big, perhaps is a concrete to be subjected to assault of cold wave etc., will cause concrete surface the temperature sharply descend, but creation constringency, surface constringency of the conc
38、rete be subjected to inner part concrete of control, creation very big of pull should dint but creation crack, this kind of crack usually just in more shallow scope of the concrete surface creation. the alignment of the temperature crack usually none settle regulation, big area structure the crack o
39、ften maneuver interleave;the size bigger structure of the beam plank length, the crack run parallel with short side more;thorough with pierce through sex of temperature crack general and short side direction parallelism or close parallelism, crack along long side cent the segment appear, in the cent
40、er more airtight.crack width the size be different, be subjected to temperature variety influence more obvious, winter compare breadth, summer more narrow.the concrete temperature crack that the heat inflation cause is usually in the center the thick both ends be thin, but cold suo crack of thick th
41、in variety not too obvious.the emergence of the this kind crack will cause the rust eclipse of reinforcing bar, the carbonization of concrete, the anti- jelly which lower concrete melt, anti- tired and anti- shen ability etc. main prevention measure:one is as far as possible choose to use low hot or
42、 medium hot water mire, like mineral residue cement, powder ash from stove cement.etc.two is a decrease cement dosage, cement dosage as far as possible the control is in the 450 kg/m 3 following.three is to lower water ash ratio, water ash of the general concrete ratio control below 0.6.four is impr
43、ovement the bone anticipate class to go together with, the chan add powder ash from stove or efficiently reduce water etc. to come to reduce cement dosage and lower water to turn hot.five is an improvement concrete of mix blend to process a craft, lower sprinkle of concrete to build temperature.six
44、is the in addition that the chan add a have of fixed amount to reduce water and increase su, slow ning etc. function in the concrete, improvement the concrete mix to match a thing of mobility, protect water, lower water to turn hot, postpone hot feng of emergence time.seven is the heat season sprink
45、le to build can the adoption take to establish to hide sun plank etc. assistance measure control concrete of wen sheng, lower to sprinkle temperature of build the concrete.eight is the temperature of big physical volume concrete should the dint relate to structure size, concrete structure size more
46、big, temperature should dint more big, so want reasonable arrangement construction work preface, layering, cent the piece sprinkle to build, for the convenience of in spread hot, let up control.nine is at great inner part constitution of the physical volume concrete cool off piping, cold water perha
47、ps cold air cool off, let up concrete of inside outside difference in temperature.ten is the supervision which strengthen concrete temperature, adopt to cool off in time, protection measure.11 is to reserve temperature constringency to sew.12 is to let up to control, sprinkle proper before building
48、concrete in the ji rock and old concrete top build a 5 mm or so sand mat a layer or usage asphalt etc. material tu2 shua.13 is to strengthen concrete to protect, the concrete after sprinkle build use moist grass lian in time, hemp slices etc. overlay, and attention sprinkle water to protect, appropr
49、iate extension protect time, assurance the concrete surface be slow-moving cool off.at the cold season, concrete surface should constitution heat preservation measure, in order to prevent cold wave assault.14 is the allocation be a little amount in the concrete of reinforcing bar perhaps add fiber m
50、aterial concrete of temperature crack control at certain of scope inside.5.crack and prevention that the chemical reaction cause alkali bones anticipating the crack that reaction crack and reinforcing bar rust eclipse cause is the most familiar in the reinforced concrete structure of because of chem
51、ical reaction but cause of crack. the concrete blend a future reunion creation some alkalescence ion, these ion with some activity the bone anticipate creation chemical reaction and absorb surroundings environment in of water but the physical volume enlarge, make concrete crisp loose, inflation open
52、 crack.in this kind of crack general emergence concrete structure usage period, once appear very difficult remediable, so should at under construction adopt valid the measure carry on prevention.main of prevention measure:while being to choose to anticipate with the alkali activity small freestone b
53、one.two is the in addition which choose to use low lye mire with low alkali or have no alkali.three is the chan which choose to use accommodation with anticipate to repress an alkali bone to anticipate reaction. because the concrete sprinkle to build, flap dao bad perhaps is a reinforcing bar protec
54、tion layer thinner, the harmful material get into concrete to make reinforcing bar creation rust eclipse, the reinforcing bar physical volume of the rust eclipse inflation, cause concrete bulge crack, the crack of this kind type much is a crack lengthways, follow the position of reinforcing bar appe
55、ar.usually of prevent measure from have:one is assurance reinforcing bar protection the thickness of the layer.two is a concrete class to go together with to want good.three is a concrete to sprinkle to note and flap dao airtight solid.four is a reinforcing bar surface layer tu2 shua antisepsis coat
56、ing.crack processing the emergence of the crack not only would influence structure of whole with just degree, return will cause the rust eclipse of reinforcing bar, acceleration concrete of carbonization, lower durable and anti- of concrete tired, anti- shen ability.therefore according to the proper
57、ty of crack and concrete circumstance we want differentiation to treat, in time processing, with assurance building of safety usage. the repair measure of the concrete crack is main to have the following some method:surface repair method, infuse syrup, the qian sew method, the structure reinforce a
58、method, concrete displacement method, electricity chemistry protection method and imitate to living from heal method. surface repair the method be a kind of simple, familiar of repair method, it main be applicable to stability and to structure loading the ability dont have the surface crack of influ
59、ence and deep enter crack of processing.the processing measure that is usually is a surface in crack daubery cement syrup, the wreath oxygen gum mire or at concrete surface tu2 shua paint, asphalt etc. antisepsis material, at protection of in the meantime for keeping concrete from continue under the influence of various function to open crack, usually can adoption the surface in crack glue to stick glass fiber cloth etc. measure. 1, infuse syrup, the qian sew method in
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 銷售部的實習報告大全
- 銷售工作總結(jié)工作計劃5篇范文
- 小學數(shù)學教學中問題情境創(chuàng)設(shè)現(xiàn)狀的調(diào)查問卷
- 銷售月工作計劃7篇范文
- 商標使用權(quán)授權(quán)協(xié)議
- 年度法治工作計劃4篇
- 信息技術(shù)園區(qū)砂石路施工
- 教育園區(qū)停車位交易樣本
- 建筑混凝土安全文明施工協(xié)議
- 城市噴泉建設(shè)施工合同類型
- 心電圖操作技能培訓
- 2024下半年江蘇蘇州城市學院招聘管理崗位工作人員27人歷年公開引進高層次人才和急需緊缺人才筆試參考題庫(共500題)答案詳解版
- 學校飲用水自查表
- SYT 6739-2021 石油鉆井參數(shù)監(jiān)測儀技術(shù)條件-PDF解密
- 日本國家概況歷年試題及答案
- 2014年4月自考00804金融法二試題及答案含解析
- 跨文化溝通心理學智慧樹知到期末考試答案2024年
- 婦產(chǎn)科臨床路徑分析:優(yōu)化醫(yī)療流程
- 《海鮮知識培訓》課件
- 2023四年級學生勞動素養(yǎng)考試試題
- 《航空法規(guī)全》課件
評論
0/150
提交評論