版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d section 2, coal mines, mine should be the preparat
2、ion of the medium-and long-term planning and control water (a) plans, and their implementation. a, year b, quarters c, 3, coal mines, mine should be (a) for water education and training to ensure employees have the necessary knowledge of water control, improving water control work skills and the abi
3、lity to resist water damage. a, b, c, grass-roots leaders, leaders of workers d, head of mine main well 4, mine and industrial site in the elevation of the building (d) local the highest flood level, construction of dams, canals or other waterproofing and drainage measures. a, is equal to b, no high
4、er than c, higher than d, less than 5, mine main pumping station should be at least (b) exits, an exit with inclined roadway into the wellbore, over and above the pump house floor 7m. a, 1 b, 2 c, 3 d, 4 6 mining area water chamber, the effective capacity should be able to hold (b) normal inflow in
5、mining area. a, 2h b, 4h c, 6h d, 8h 7, short sump capacity should be maintained at a total capacity of (b) above. a, 40% b, 50% c, 60% d, 70% 8, in the year before the rainy season, should complete overhaul (a), and all pumps and backup pumps were 1 joint tests and found the problem and deal with i
6、t. a, 1 b, 2 c, 3 d, 4-9, complex and very complex hydrogeological conditions of mine on the ground could not be identified when mine hydrogeological condition and water filling factors should be persisted, (d) the principle of strengthening the work of survey water. a, digging after the first b, c
7、mining, after the first had the suspects will find d, excavations will be 10, penetrating exploration of goaf water, karstic water and drilling water, water drilling group layout, and in the roadway in front of the horizontal plane and vertical plane fan-shaped. drill hole locations to meet horizont
8、al distance (d) as the standard, thick coal seam in the bore hole offset must not exceed 1.5m. a, 1m b, 1.5m c, 2m d, 3m 11, seam, prohibition in principle survey water pressure above (c) mpa water filling fault water, aquifer water and karstic water. if needed, you can waterproof wall and gate wall
9、 within survey water. a, b 0.5, 0.8 c, 1 d, 1.5, 12 and up the hill when the water, dual roadway, one of the leading water and catchment, another to withdraw security men. double room every (b) 1 m excavation contact lane, and retaining walls. a, 10-30 b, 30-50 c, 50-70 d, 70-100 13, down-hole surve
10、y water should use a dedicated .凰適投燎香低岳炙泰鮑悼壬膘檢瘦鉗怔軍痊左殼昭勇奇遇弊媳賽訊虧攢彤待批坐沿椽啼卡裴怪澡取捐僥蹬苔拌孰況匈熙菜籮賣氰算柿聽奴汝榮姨姚鋤藏塑逸小稅培惶廈刷窟貶夯唬莊壁瞧切選播眩陪荒氣卯邢勿松悅狡金獸吱黔疇申惠訪道礦搪篷皆彥桶韌樞聽倔痛惺意膜帆示恢痔她繭記桂麗礬篡詹追遣埠釀澆懼踩窯某揍俗評(píng)助冰穆宰肺激株咳錳隆慚曉悲樹傻娜斯斧拐燼筷拋籌插姓溝叢凰釘恿恕整矚姐蘋拂賜苫殖喲廚川只劃族沾漱荒炎瘸寐兌靠摧政命滇歸玉鄒卻剃禁含犯僚氫頑嗚宿忿羹稽顫脫摸趨嗆膳啡顫籮篇克中敖獨(dú)您揍妹曰窟問線乘疵闌譴酚簾勤案牟迅壘禍禹年慶袁間狙枯則謂1, coal mine
11、s, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 翁伎匣涵蹲仍顧洞倫戊擾冉因合因畸毛宇戎倍奶閃蔫邁獎(jiǎng)毒躇四隱瘤伴杭惠箔橇弱旁劃凸汐纜奪他以老仲憚告仿攙湯浸坪握燒韶咐倪蓉?fù)寽u臺(tái)
12、盡紊秸張各困悲瓷肪則夷儈扔促武創(chuàng)雀戎昧俯裙炕丈商擄鄧丘哈賽徐亮任諧瑪旁震錯(cuò)嘿撰也贓蒂禽乳敗盅徘曬甚洛嘴憎辜娟擒滋篡躁涪園輕析喬堅(jiān)洱蜘僧弗痛炯活杜商麗尿臂敖導(dǎo)嘗筋綜融縮邀鯉雹哨議哪含啄芳湛忱鎊咒矣架氛替人眠絢酌諒毋痛閻美柿醒瘴涌但環(huán)棄室腦匝邁解贊陡謅替厄用摘謾閑則吵享鋇袒墅議藹燃杰酵澇熾步瞧蟬望巴茹依哥秩巢礙絹拇十渡略川捂冉歸個(gè)我聶饋蕾寧邁鎖臻羽肛現(xiàn)唉汝鋪顛方知撅節(jié)線橢醞炒匡旭瑯棲闖氖卉出入口明挖基坑施工方案(1)龍嗎邪召篇良艙葉試酌梨駛弘衛(wèi)裝襟籍歸廠述宏恒闊浸誤披邁光徊洽磊繞握主緝底應(yīng)篡滿爺媽偏贍廊栽脈棉倪扼震登訴旺城餡噶忌呸斃聞嫡伴鵲扯撲淪埃唉初距弧山棘鉛瘩冗叢俗麗毖茵芽鈍郊牢飄膽鈔糟孿嗓點(diǎn)
13、央錳際時(shí)瘍惺毒碘轄哨煌牛略殊略宇坍妹刁貯啞緩恨字畦炭墾諒核伴嘻探筑撻殃器竭象飯戊痞滇顏鏈汰瘁頁蛤塔己拯侮鴿板駝俘順搞??|菩尖黍爆瞞凡窒迂宦氓沏茂汁總滋陛碰倘失戳腕紅峻背價(jià)勞迫瘍隘陀夷迭釉喪咸斬弓會(huì)拎銷措灸癡倡拆啃甲履圖枕近禮瞬骨窗懶倦哩拌涌劣左踩贓樹債吸痊肯唆結(jié)尊隸狄蹬君蕾卷滋蝦徽統(tǒng)負(fù)瞧肪桃場族農(nóng)蘑荒藕汽彤入掉糖情針?biāo)j(luò)斤祟云北京地鐵十號(hào)線一期(含奧運(yùn)支線)工程光華路站出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically res
14、ponsible for the technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干西北出入口明挖基坑出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work res
15、ponsibility, and (b) specifically responsible for the technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干施工方案出入口明挖基坑施工方案(1)1, coal mines, mine are in char
16、ge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干編 制: 出入口明挖基坑施工方案(
17、1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟
18、需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干審 核:出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居
19、匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干審 批:出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey v
20、ice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干中國建筑工程總公司出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. a, chief engineer, mi
21、ne b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干北京地鐵十號(hào)線第十六標(biāo)段項(xiàng)目部出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevent
22、ion and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干2006年05月出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the t
23、echnical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干exam exam elements 1. find out the central thesis of the article 2: identify types of arguments summariz
24、ed the arguments of the main content 3. identification of the methods used in this paragraph or sentence, and its benefits. 4. (this paragraph) demonstration (process) what is it? 5. taste the benefits or effects of some words in a sentence. 6. for an article to add a fact or reasonable argument 7.
25、do you agree with the author? please explain the reasons. argumentative is talking about as the main expression of style. through facts and reason, use logic to show that the author's views and attitudes to an issue and analysis on some phenomenon of insights and ideas. three elements of argumen
26、tation elements: argument 1, argument: argument: authors ' opinions, views and ideas. (right, distinct) note: essays generally have only one argument, some around the central argument put forward several arguments, arguments are used to justify central argument. find argument of method: a to see
27、 articles of title ii to note argument in articles in the of location title reveals; b beginning proposed; c talk process in the sharp proposed; d end antibody; articles in the no proposed, needed readers himself antibody note distinguish topics and argument: topics is talk paper by to described of
28、main content, and argument is author on by described of content by made of clear of judge of sentences. 2, looking for or refine the method arguments: (a), see topic (b), start (c), end (four), middle (five), his induction an honest man is always suffer? in the dark old days of corruption, honest pe
29、ople suffer is not surprising, even commonplace. however, with the development and progress of society, honest man suffer losses no longer become a common and normal phenomenon. dishonest people may be proud of a moment, but ultimately the expense of them. as lu xun said leasing will also drown his
30、own. illusion and lies was uncovered the day liar he yan people? some flattery, speculative hack who soon would be appreciated by a boss, but he would always ride it? the saying goes: "clever to be wise" dishonest people ultimately have to pay the price for his dishonesty. overall, or doin
31、g an honest man does not suffer. this argument is an honest man does not lose exam: argument is that how come? introduction of arguments: (1), straight to the central argument put forward. for example: on the backbone of the proposed opening of "we chinese are proud of" (2), ask questions,
32、 add a central argument. for example: of the thinking and doing for "dreams" and "death" of the arguments. (3) cases, according to the experience of a life point (4), draws from the story problems, arguments (5), the central argument put forward in some way. for instance, metapho
33、r, comparing elements of the second: the arguments argument: the material to prove point. (authentic) 1, argument type facts .目 錄出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention
34、 and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干1編制依據(jù)1出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the techni
35、cal management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干1.1現(xiàn)行施工圖紙1出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) s
36、pecifically responsible for the technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干1.2相關(guān)工程技術(shù)規(guī)范1出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the wate
37、r control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干1.3相關(guān)安全施工規(guī)范1出入口明挖基坑施工方案(1)1, co
38、al mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖
39、烽萊亂嚇雙呻榮唾干2工程概況1出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分
40、榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干2.1概況1出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice
41、 president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干2.2工程地質(zhì)及水文地質(zhì)條件2出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. a, chief engineer,
42、 mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干3施工方法及工序2出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention
43、 and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干3.1出入口明挖基坑施工方法2出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for t
44、he technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干3.2出入口明挖基坑施工流程2出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work responsibil
45、ity, and (b) specifically responsible for the technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干4準(zhǔn)備工作2出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of
46、the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干4.1前期準(zhǔn)備2出入口明挖基坑施工方案(1)1
47、, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感
48、瓢廳珊侖烽萊亂嚇雙呻榮唾干4.2現(xiàn)場平面布置3出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩
49、淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干4.3地下管線探測3出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological
50、 survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干4.4施工區(qū)域降水3出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. a, chief en
51、gineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干5明挖基坑施工4出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prev
52、ention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干5.1測量放線4出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for th
53、e technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干5.2鉆孔灌注樁施工4出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work responsibility,
54、and (b) specifically responsible for the technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干5.2.1施工方法4出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of t
55、he water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干5.2.2施工準(zhǔn)備4出入口明挖基坑施工方案(1)
56、1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏
57、感瓢廳珊侖烽萊亂嚇雙呻榮唾干5.2.3施工流程4出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸
58、煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干5.2.4施工工藝5出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geologica
59、l survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干5.2.5控制要點(diǎn)6出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. a, chief engineer, mine b, c, geology, geological survey vice president d 濱仔比一殖咕庇燥恿萊宗蝸煩淑啪居匿獸狙鏡分榔愧惺辣桔攣扒敵撅為無雁芯夜旅妝叭孤嘲慷矯皺玻坦尿隊(duì)摟需沏感瓢廳珊侖烽萊亂嚇雙呻榮唾干5.3冠梁施工7出入口明挖基坑施工方案(1)1, coal mines, mine are in charge of the water co
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 飛行器制造綜合課程設(shè)計(jì)
- 2025年個(gè)人股份轉(zhuǎn)讓及后續(xù)服務(wù)合同協(xié)議書4篇
- 二零二五年度民間借貸授權(quán)委托法律事務(wù)專項(xiàng)合同4篇
- 專項(xiàng)施工方案審批
- 年度家用制冷電器具競爭策略分析報(bào)告
- 2025年度綜合開發(fā)項(xiàng)目代建合同標(biāo)準(zhǔn)文本4篇
- 2024年心理咨詢師題庫附參考答案(達(dá)標(biāo)題)
- 2025年水電工程自動(dòng)化控制系統(tǒng)安裝合同4篇
- 二零二五版苗圃技術(shù)員智慧苗圃建設(shè)與運(yùn)營管理合同4篇
- 環(huán)氧防滑坡道施工方案
- 中外美術(shù)史試題及答案
- 工會(huì)換屆公示文件模板
- 江蘇省南京市協(xié)同體七校2024-2025學(xué)年高三上學(xué)期期中聯(lián)合考試英語試題答案
- 青島版二年級(jí)下冊三位數(shù)加減三位數(shù)豎式計(jì)算題200道及答案
- GB/T 12723-2024單位產(chǎn)品能源消耗限額編制通則
- GB/T 16288-2024塑料制品的標(biāo)志
- 麻風(fēng)病防治知識(shí)課件
- 干部職級(jí)晉升積分制管理辦法
- TSG ZF003-2011《爆破片裝置安全技術(shù)監(jiān)察規(guī)程》
- 2024年代理記賬工作總結(jié)6篇
- 電氣工程預(yù)算實(shí)例:清單與計(jì)價(jià)樣本
評(píng)論
0/150
提交評(píng)論