1、cyberq consultingintroduction to cmmver 1.1optimizing level cyberq consultingtypical characteristics of a optimizing level organisationat level 4, the process is quantitatively understoodat level 5, continuous process improvement is a way of life. the focus is on preventing the occurrence of defects
2、 and innovations.cyberq consultingtypical characteristics of a optimizing level organisationin immature organizations, no one may be responsible for process improvementmature organizations usually have 70-80% participation in improvement activities at any given point in time - everyone is involved.c
3、ontinuous process improvement means controlled change and measurably improving process capabilitycyberq consultingkey process areas process change measurementtechnology change managementdefect preventioncyberq consulting defect prevention purpose is to identify the cause of defects and prevent them
4、from recurringinvolvesanalyzing defects that were encountered in the past.taking specific actions to prevent the occurrence of these types of defects in the future.trends are analyzed to track the types of defects that have been encountered and to identify defects that are likely to recur.cyberq con
5、sultingdefect prevention - common featurescommitmentwritten organizational policy / and policy for the project for defect prevention activities.abilityteam that is responsible for coordinating the defect prevention activities should exist at the organization level and project level.adequate resource
6、s and fundingtraining on defect prevention for personnel performing these activitiescyberq consultingdefect prevention - common features (contd)measurementto determine the status of the defect prevention activities.cyberq consulting defect prevention - activitiesdefect prevention activities are plan
7、ned.the software project develops and maintains a plan for its defect prevention activities.at the beginning of a software task, the members of the team performing the task meet to prepare for the activities of that task and the related defect prevention activities.cyberq consultingdefect prevention
8、 - activitiescommon causes of defects are sought out and identified.causal analysis meetings are conducted according to a documented procedure.defect prevention data are documented and tracked across the teams coordinating defect prevention activities.cyberq consulting defect prevention - activities
9、common causes of defects are prioritized and systematically eliminated. the teams assigned to coordinate defect prevention activities meets on a periodic basis to review and coordinate implementation of action proposals from the causal analysis meetings. revisions to the organizations ossp resulting
10、 from defect prevention actions are incorporated adocproc revisions to the projects dsp resulting from defect prevention actions are incorporated adocproc members of the software engineering group and software-related groups receive feedback on the status and results of the organizations and project
11、s defect prevention activities on a periodic basis.cyberq consultingdefect prevention - summarywhy did defects occur?causal analysisspecial causescommon causesremove common causes, thus preventing defects from recurringcyberq consultingdefect prevention - summaryteams exist at org. level and project
12、 level to coordinate defect prevention activitiesproject has a defect prevention plancausal analysis meetings heldaction points are implemented defect prevention data trackedcyberq consultingdefect prevention - summarychanges made to ossp.changes made to defined sw processmeasurements include defect
13、 age, cost of quality, defect density etc.cyberq consultingtechnology change managementpurpose is to identify new technologies (i.e.,tools, methods, and processes) and transfer them in an organization in an orderly manner.involves identifying, selecting, and evaluating new technologies(tools, method
14、s and processes). pilot efforts are performed to assess new technologies. incorporating effective technologies into the organization. cyberq consultingtechnology change management - common featurescommitment written organizational policy for managing software quality. senior management sponsors and
15、oversees the technology change management activities.ability group that is responsible for technology change management activities exists. adequate resources and funding support for collecting and analyzing data needed to evaluate technology changesmeasurement to determine the status of technology c
16、hange management activities.cyberq consulting technology change management -activitiesincorporation of technology changes are planned.the organization develops and maintains a plan for technology change management.cyberq consultingtechnology change management -activitiesnew technologies are evaluate
17、d to determine their effect on quality and productivity. the group responsible for the organizations tcm activities works with the software projects in identifying areas of technology change. the group responsible for the organizations tcm analyzes the ossp to identify areas that need or could benef
18、it from new technology. technologies are selected and acquired for the organization and software projects adocproc pilot efforts for improving technology are conducted, where appropriate, before a new technology is introduced into normal practice.cyberq consultingtechnology change management -activi
19、tiesappropriate new technologies are transferred into normal practice across the organization.software managers and technical staff are kept informed of new technologies.appropriate new technologies are incorporated into the organizations standard software process according to a documented procedure
20、.appropriate new technologies are incorporated into the projects defined software processes according to a documented procedure.cyberq consultingtechnology change managementidentify new technologies and track them into organization in an orderly mannertechnology support grouppilots done first; then
21、incorporated into normal practicecyberq consultingtechnology change managementanalysis of processes to identify areas that could benefit from new technology - based on datatechnologies selected & acquiredpilots carried outincorporated into standard processcyberq consultingprocess change mngt.pur
22、pose is to continuously improve the software process used in the organization with the intent of improving software quality, increasing productivity, and decreasing the cycle time for product developmentinvolvesdefining process improvement goalssystematically identifying, evaluating, and implementin
23、g improvements to the organizations standard software process and the projects defined software processescyberq consultingprocess change management - common features commitment written organizational policy for implementing software process improvements. senior management sponsorship for software pr
24、ocess improvement.ability adequate resources and funding training for software managers in software process improvement. senior management receives required training in software process improvement.measurement to determine the status of the software process improvement activities.cyberq consultingpr
25、ocess change management - activities continuous process improvement is planned.the group responsible for the organizations software process activities (e.g., software engineering process group) coordinates the software process improvement activities.the organization develops and maintains a plan for
26、 software process improvement according to a documented procedure.the software process improvement activities are performed in accordance with the software process improvement plan.cyberq consultingprocess change management - activitiesparticipation in the organizations software process improvement
27、activities is organisation wide.a software process improvement program is established which empowers the members of the organization to improve the processes of the organization. members of the organization actively participate in teams to develop software process improvements for assigned process a
28、reas.cyberq consultingprocess change management - activities participation in the organizations software process improvement activities is organisation wide. software managers and technical staff receive feedback on the status and results of the software process improvement activities on an event-dr
29、iven basis.cyberq consultingprocess change management - activitiesthe organisations standard software process and the projects defined software process are improved continuously.the software process improvement activities are performed in accordance with the software process improvement plan.softwar
30、e process improvement proposals are handled according to a documented procedure.where appropriate, the software process improvements are installed on a pilot basis to determine their benefits and effectiveness before they are introduced into normal practice.cyberq consultingprocess change management
31、 - activitiesthe organisations standard software process and the projects defined software process are improved continuously.when the decision is made to transfer a software process improvement into normal practice, the improvement is implemented according to a documented procedure.records of softwa
32、re process improvement activities are maintained.cyberq consulting challenges in implementing level 5 requirementsdiscussionscyberq consulting summary - level 2requirements managementcontrol system requirements allocated to software to establish the baselinekeep software plans, products, and activit
33、ies consistent with the system requirements allocated to software.change to requirements are reviewed and incorporated into the software projectsoftware project planning document estimatesdevelop and document plansestablish commitments and negotiateinvolve all affected groupscyberq consulting summar
34、y - level 2 software project tracking and oversight manage the project according to the documented plans. take corrective action when required. renegotiate commitments and and adjust the plan based on the actual results.software subcontract management define the work to be subcontracted. establish c
35、ommitment between prime and subcontractor select and monitor the subcontractor maintain ongoing communicationcyberq consulting summary - level 2 software quality assurance sqa group is formed and their activities are planned. review and/or audit software product and processes report results escalate
36、 noncompliance issues that cannot be resolved. involve in making plans for the project.software configuration management plan scm activities identify and maintain configuration items systematically control changes maintain integrity and traceability of baseline throughout the software life cyclecybe
37、rq consulting summary - level 3 organization process focus form a group to coordinate software process improvement activities identify strengths and weaknesses of processes plan organizations software process improvement efforts coordinate training activities on defined processes.organization proces
38、s definition develop and maintain an organizations standard software process and description of life cycles approved for use. develop and maintain tailoring guidelines. collect, review, and distribute data and documents related to the standard software process.cyberq consulting summary - level 3 tra
39、ining program plan organizational training activities provide training for developing skills and knowledge for the organization ensure that individuals are trained develop standards for developing and delivering training programs.integrated software management develop the projects defined software p
40、rocess manage the project according to a plan which includes the projects defined software process take corrective action as appropriate.cyberq consulting summary - level 3 software product engineering perform software activities in a defined, integrated, and consistent manner ensure consistency between products collect measures to determine process efficiency and defects.intergroup coordina
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 北京市通州區(qū)2024-2025學(xué)年高二上學(xué)期期末考試生物學(xué)試題(含答案)
- 產(chǎn)品使用體驗(yàn)數(shù)據(jù)收集表
- 農(nóng)民合作社互助保險(xiǎn)協(xié)議
- 農(nóng)村新型農(nóng)業(yè)組織發(fā)展合作協(xié)議
- 鄉(xiāng)村有機(jī)果園經(jīng)營(yíng)管理協(xié)議
- 物資采購(gòu)框架協(xié)議
- 人力資源派遣與服務(wù)外包合同
- 生產(chǎn)物料采購(gòu)周期表
- 西游記中的團(tuán)隊(duì)精神與道德啟示評(píng)析
- 《星系與宇宙探索概述:九年級(jí)地理教學(xué)教案》
- 物流園區(qū)倉(cāng)儲(chǔ)管理手冊(cè)
- 職業(yè)技術(shù)學(xué)院《口腔頜面外科學(xué)》課程標(biāo)準(zhǔn)
- 高中英語(yǔ)北師大版(2019)必修第二冊(cè)Unit 5 Humans and Nature Lesson 1 A sea story 教學(xué)設(shè)計(jì)
- 港口液體?;费b卸管理人員理論考試題及答案
- TSG ZF001-2006《安全閥安全技術(shù)監(jiān)察規(guī)程》
- 13《少年中國(guó)說(shuō)》課件
- 2024版小學(xué)英語(yǔ)新課程標(biāo)準(zhǔn)測(cè)試題及答案
- 《學(xué)前兒童藝術(shù)教育活動(dòng)指導(dǎo)》第7章
- 2025年駕駛證資格考試科目一必刷題庫(kù)及答案(共300題)
- 南京醫(yī)科大學(xué)科技成果轉(zhuǎn)移轉(zhuǎn)化管理辦法-資產(chǎn)管理處
- AQ 1110-2014 煤礦帶式輸送機(jī)用盤式制動(dòng)裝置安全檢驗(yàn)規(guī)范(正式版)
評(píng)論
0/150
提交評(píng)論