1、 HEAVY EQUIPMENT INSPECTIONHeavy Equipment Inspection移移動動式式起起重重機(jī)機(jī)壓壓挖挖掘掘機(jī)機(jī)Heavy Equipment InspectionOwner:Manufacture/Model:Year of Manufacture:Product Serial Number:Date of Using:Loading capacity:Inspection Report:Inspection Date:Detail Inspection ItemsChecklistOK Not OK N/A1. Handrail/Protection Eq
2、uipment2. Windows(Clear,no crack,推推土土機(jī)機(jī)分分級級機(jī)機(jī) 觀后鏡)3. CoverTop structure4. Lifting Arm(Position limit switch) 5. Hook(Small hook, big hook),安全 止動銷6. 機(jī)架,滾筒7. Rope(串形繩索,球形繩索)8. 承力支架,聯(lián)鎖9. Hydraulic pressure pipeline10. Leaking 11. Recruiting gasElevator轉(zhuǎn)轉(zhuǎn)臂臂起起重重機(jī)機(jī)12. 承載表13. Gesture signal14. Improvement
3、which qualified by manufacturer 15. 帶有合格刻度數(shù)的計量器16.Fire Extinguisher17. Inside cleaning up(no waste and grease) 18. Tyre19. Sound and light alarm signal20. Outside arrester support壓壓路路機(jī)機(jī)21. Operator certification Inspector:_Inspection date:_ FORK TRUCK INSPECTIONForklift InspectionForklift Inspection
4、Owner:Manufacture/Model:Year of Manufacture:Product Serial Number:Date of Using:Loading capacity:Inspection Report:Inspection Date:Detail Inspection ItemsChecklistOK Not OK N/A1. Speaker2. Turning Equipment3. Accumulator Indicator4. Lifting Control5. Sloping control6. Assistant Control7. Tyre and wh
5、eel8. Overhead protection equipment9. Lighting system10. Arrester 11. Position limit switch12. Fork rack, branch and chain13. Baffle and backrest14. Hydraulic pressure crock15. Hydraulic pressuer pipes and accessories16. Low pressure leaking17. Operator Certification Inspector:_Inspection date:_ CON
6、CRETE CUTTING / PLATE COMPACTOR M/C INSPECTION混凝土切割機(jī)/盤形夯土機(jī)檢查混混凝凝土土切切割割機(jī)機(jī) M/C混凝土切割機(jī)/盤形夯土機(jī)檢查Owner:Manufacture/Model:Year of Manufacture:Product Serial Number:Date of Using:Loading capacity:Inspection Report:Inspection Date:Detail Inspection ItemsChecklistOK Not OK N/A1. General structure safety 2. Pro
7、tection equipment is available for moving parts 3. Engine startup system is safe 4. No crack and leaking on the engine5. Control and emergency button of the engine is available6. Box cover is available on the fuel box盤盤形形夯夯土土機(jī)機(jī) M/C7. No black gas diacharged Inspector:_Inspection date:_CompactorAir C
8、ompressor InspectionAir Compressor InspectionOwner:Manufacture/Model:Year of Manufacture:Product Serial Number:Date of Using:Loading capacity:Inspection Report:Inspection Date:Detail Inspection ItemsChecklistOK Not OK N/A1. General structure safety2. All of the control bottom and swithches are in go
9、od condition3. Distrubite valve in good condition 4. Engine cover is well supported 5. Tow connection in good condition 6. Accumulator cover is in place7. Air storage tank is in good condition8. No crack and leaking on the engine9. Safety valve installed on air system10. 與分配閥相連接的的空氣主連接 器有安全電纜 11. Fi
10、re Extinguisher12. 有輪震器 Inspector:_Inspection date:_Generator InspectionGenerator InspectionOwner:Manufacture/Model:Year of Manufacture:Product Serial Number:Date of Using:Loading capacity:Inspection Report:Inspection Date:Detail Inspection ItemsChecklistOK Not OK N/A1. General structure safety2. Al
11、l of the control bottom and swithches are in good condition3. Emergendy switch is available5. 配電點(diǎn)狀態(tài)良好 6. 安裝有接地電纜連接點(diǎn) 7. All cable in good condition8. Fire extinguisher is available for using9. 其中點(diǎn)或者牽引點(diǎn)安全 10. No crack and leaking on the engine Inspector:_Inspection date:_場場分分布布面面板板檢檢查查場分布面板檢查Owner:Man
12、ufacture/Model:Year of Manufacture:Product Serial Number:Date of Using:Loading capacity:Inspection Report:Inspection Date:Detail Inspection ItemsChecklistOK Not OK N/A1. The cover is waterproof2. Main breaker is in good condition and match the load 3. Creepage breaker is installed4. Standard cable i
13、s used5. Connection is fixup6. Jacket is available for the plug and its waterproof 7. The size of earthing cable is one fifth of the power supply cable8. Connet to the earthing stick9. Warning lable should be available 10. Located in dry area 11. 使用電纜帶緊固電纜 12. Cut off the power while connecting or d
14、isconnecting Inspector:_Inspection date:_Temporary Cable Connection InspectionTemporary Cable Connection InspectionOwner:Manufacture/Model:Year of Manufacture:Product Serial Number:Date of Using:Loading capacity:Inspection Report:Inspection Date:Detail Inspection ItemsChecklistOK Not OK N/A1. All of
15、 the plugs and cable is in good condition 2. All of the bolts are fastened3. The plugs are waterproof4. Jackets for the plugs are available5. Double insulator cable is used6. The minimum size is 1.5 3 Sqm7. No any connection on the cable Inspector:_Inspection date:_Welding Machine InspectionWelding
16、Machine InspectionOwner:Manufacture/Model:Year of Manufacture:Product Serial Number:Date of Using:Loading capacity:Inspection Report:Inspection Date:Detail Inspection ItemsChecklistOK Not OK N/A1. The body of welding machine is in good condition 2. All of the switches are in good condition 3. Manost
17、at is in good condition 4. The size of the power supply cable should be at least 10 Sqm 5. Bolts should be used to fasten the welding cable and the earthing cable6. Electrode welding fixer is in good condition 7. Welding cable and earthing cable is in good condition Inspector:_Inspection date:_Elect
18、ric Drill and Torque spanner InspectionElectric Drill and Torque spanner InspectionOwner:Manufacture/Model:Year of Manufacture:Product Serial Number:Date of Using:Loading capacity:Inspection Report:Inspection Date:Detail Inspection ItemsChecklistOK Not OK N/A1. Machine structure is in good condition
19、 2. Double insulator cable is used3. Cable ans plugs are in good condition 4. 拆卸速度控制鎖定 5. The size of the cable should be at least 31.5 Sqm 6. Protection cover is available for moving parts Inspector:_Inspection date:_電電機(jī)機(jī)爐爐檢檢查查電機(jī)爐檢查Owner:Manufacture/Model:Year of Manufacture:Product Serial Number:D
20、ate of Using:Loading capacity:Inspection Report:Inspection Date:Detail Inspection ItemsChecklistOK Not OK N/A1. The machine body is in good condition2. Cover of the furnace is available3. The switch is available 4. Cable ans plugs are in good condition 5. The size of the cable should be at least 31.
21、5 Sqm 6. Temperature control switch is in good condition Inspector:_Inspection date:_Gas Cutting Equipment InspectionGas Cutting Equipment InspectionOwner:Manufacture/Model:Year of Manufacture:Product Serial Number:Date of Using:Loading capacity:Inspection Report:Inspection Date:Detail Inspection It
22、emsChecklistOK Not OK N/A1. Cylinder is in good condition 2. Cylinder is installed on the handcart and fastened by the chain 3. Gas adjuster is in good condition, without broken 4. Backfire stopper is installed(applicable for oxygen and acetylene) 5. Use tube nip at connection point 6. Gas tube is i
23、n good condition7. Spanner for the acetylene is available8.Ignition power supply is available9. Suds is available10. Fire extinguisher is available11. Cover of the cylinder is available Inspector:_Inspection date:_Safety Belt InspectionSafety Belt InspectionOwner:Manufacture/Model:Year of Manufactur
24、e:Product Serial Number:Date of Using:Loading capacity:Inspection Report:Inspection Date:Detail Inspection ItemsChecklistOK Not OK N/A1. The whole belt is in good condition, without cut, broken, expand and crack 2. The lock on the belts are in good condition 3. D ring is without rust and bending .4.
25、 Slings are without broken and abrasion Absorber is in good condition 6. Spring hook is in good condition, for example camber, distortion, crack, broken and useless dowel Inspector:_Inspection date:_Gemel InspectionGemel InspectionOwner:Manufacture/Model:Year of Manufacture:Product Serial Number:Dat
26、e of Using:Loading capacity:Inspection Report:Inspection Date:Detail Inspection ItemsChecklistOK Not OK N/A1. No parts missed(Bolts, screw cap and so on) 2. No bend or twist on the safety latch3. Lifting hooks are in good condition, for example camber, distortion, crack, broken and useless dowel 4.
27、,No broken point, abrasion, rust,contortion and distortion on the chains 5. Fixation system is in good condition Inspector:_Inspection date:_Tightwire InspectionTightwire InspectionOwner:Manufacture/Model:Year of Manufacture:Product Serial Number:Date of Using:Loading capacity:Inspection Report:Insp
28、ection Date:Detail Inspection ItemsChecklistOK Not OK N/A1.No break rope(along the sling ,at eye of sling) 2.No crushing or planishing(reason:over loading,shaking loding, and drag on the barrier) 3. 無打扣,無雙向折彎或者變形(產(chǎn) 生原因:包裝太緊,在承載情況下 拖動,不正確的安裝或者操作) 4. No knoting of the steelwire (reason:quick release o
29、f shaking loading) 5.No extention breaks(reason:over loading) 6. Check the abrasion and crushing situation based on the color o the sling7. While checking the tightwire or slings, if 6 lines borken in one sling or 3 lines broken in one section of one sling, the sling should be replaced Inspector:_In
30、spection date:_Nylon Sling InspectionNylon Sling InspectionOwner:Manufacture/Model:Year of Manufacture:Product Serial Number:Date of Using:Loading capacity:Inspection Report:Inspection Date:Detail Inspection ItemsChecklistOK Not OK N/A1.No abrading hole2.End accessories of the sling is without abras
31、ion or distortion3.No cut, avulsion and holes4. No material abrasion5. No melting or carbonization at any part of the slings6. No acid or caustic burns7. No knots at any part of the sling8. Identification labels should be sewed at the side of the sling (the label should contain: type, length, loadin
32、g limit for uprightness work, synthetic material type and sling manufature) 9. Check the situation at the suture to ensure the strip is folded, suture should cling the strip and cant be tore down Inspector:_Inspection date:_Polyester Ring Sling InspectionPolyester Ring Sling InspectionOwner:Manufact
33、ure/Model:Year of Manufacture:Product Serial Number:Date of Using:Loading capacity:Inspection Report:Inspection Date:Detail Inspection ItemsChecklistOK Not OK N/A1. Identification labels should be sewed at the side of the sling (the label should contain: type, length, loading limit for uprightness w
34、ork, synthetic material type and sling manufature) 2. Check the polyester cover(including puncture, cut or perforation, melt down at any part of the sling, acid or causticity burn) Inspector:_Inspection date:_Hook InspectionHook InspectionOwner:Manufacture/Model:Year of Manufacture:Product Serial Nu
35、mber:Date of Using:Loading capacity:Inspection Report:Inspection Date:Detail Inspection ItemsChecklistOK Not OK N/A1. No distortion: bend, expand or distortion 2. Dont knock the holes at the end 3. No crack4. No cauterization 5. .No damage on the whorl 6. 使用有鉤環(huán)的螺釘銷吊鉤 7. All of the dowel should be st
36、raight and should be totally fixed 8. 不要用未經(jīng)認(rèn)證的螺栓替換鉤 環(huán)銷。只使用推薦的鉤環(huán)銷。 Inspector:_Inspection date:_SafetySafety InstructionInstruction forfor liftinglifting platfomplatfom andand 轉(zhuǎn)轉(zhuǎn)臂臂升升降降機(jī)機(jī) Lifting platformSafety Instruction for lifting platfom and 轉(zhuǎn)臂升降機(jī)Detail Inspection ItemsChecklistOK Not OK N/A1. Set
37、 up daily inspection checklist before work started 2. Check the working area before work started everyday3. Check PPE and necessary fall protection equipment4. Dont touch any other parts outside the guardrail and also dont climb outside the rail 5. Always lock the hydraulic pressure system after adj
38、usting the balance6. 使用圓盤支撐外制動器并將其推 到外端位置,此時輪子不要接觸 地面同時推動手剎 7. Set obstacle strip and warning signals around the working area8. Open the warning lights while equipment is running 9. Tools and equipments should be fastened by cord 起重臂升降機(jī) 10.Operators should get certification 11. Finish equipment clea
39、ning up everyday Inspector:_Inspection date:_Safety Instruction for Movable Scaffolding Safety Instruction for Movable Scaffolding Detail Inspection ItemsChecklistOK Not OK N/A1.Check the structure of the scaffolding before using2. Workers must receive working at height training before using scaffol
40、ding3. Using safety belt with absorber 4. .Dont change the scaffolding5. Dont put any equipment or materials on the platform of the scaffolding 6. Dont move the scaffolding while people standing on it. 7. Dont move the scaffolding while people standing in front of it. 8. All of the tools and equipme
41、nt used on the scaffolding should be safely fastened by cord 9. All of the wheels should be locked before using the scaffolding.10. Set up road-block around the working area12. Dont take heavy things while working at scaffolding13. Dont stand on the rails and also dont climb beyond the scaffolding14
42、. Clean the working area after work fnished everyday Inspector:_Inspection date:_SafetySafety InstructionInstruction ofof FuelFuel RecruitRecruit atat thethe GasGas StationStation Safety Instruction of Fuel Recruit at the Gas Station Detail Inspection ItemsChecklistOK Not OK N/A1. Overflow container
43、 should be prepared at the fuel recruit equipment and the fuel truck2. Fire extinguishers should be available on the fuel truck 3. 準(zhǔn)備手壓泵以及軟管以便補(bǔ)充 燃料4. Prepare the leaking control equipment at the fuel recruit area5. MSDS should be available on the fuel truck6. Earthing cable should be connected to th
44、e earthing stick 7. Proper PPE should be prepared while recruiting the fuel8. Shut the engine before recruiting the fuel9. Dont use taper filler while recruiting the fuel10. Dont make the fuel outside the fuel box 11. Dont recruit the fuel inside the building12. Dont recruit the fuel around hot work
45、 area Inspector:_Inspection date:_Temporary Hazardous Material Storage InspectionTemporary Hazardous Material Storage InspectionDetail Inspection ItemsChecklistOK Not OK N/A1. Storing at open area2. Provide adequate fire extinguisher3. Provide SUI at storage area4. Set visable warning signs at stora
46、ge area 5. Provide containers to prevent leaking while mixing or transporting6. No hot work is permitted around 50 feets of the storage areas7. Using earthing stick for the earthing operation Inspector:_Inspection date:_CommentsHeavy Equipment InspectionProduct Serial Number:Detail Inspection ItemsI
47、nspection date:_CommentsForklift InspectionProduct Serial Number:Detail Inspection ItemsInspection date:_Comments混凝土切割機(jī)/盤形夯土機(jī)檢查Product Serial Number:Detail Inspection Items2. Protection equipment is available for moving parts 5. Control and emergency button of the engine is availableInspection date:
48、_CommentsAir Compressor InspectionProduct Serial Number:Detail Inspection Items2. All of the control bottom and swithches are in good conditionInspection date:_CommentsGenerator InspectionProduct Serial Number:Detail Inspection Items2. All of the control bottom and swithches are in good conditionIns
49、pection date:_Comments場分布面板檢查Product Serial Number:Detail Inspection Items2. Main breaker is in good condition and match the load7. The size of earthing cable is one fifth of the power supply cableInspection date:_CommentsTemporary Cable Connection InspectionProduct Serial Number:Detail Inspection I
50、temsInspection date:_CommentsWelding Machine InspectionProduct Serial Number:Detail Inspection Items4. The size of the power supply cable should be at least 10 Sqm5. Bolts should be used to fasten the welding cable and the earthing cable7. Welding cable and earthing cable is in good conditionInspect
51、ion date:_CommentsElectric Drill and Torque spanner InspectionProduct Serial Number:Detail Inspection ItemsInspection date:_Comments電機(jī)爐檢查Product Serial Number:Detail Inspection ItemsInspection date:_CommentsGas Cutting Equipment InspectionProduct Serial Number:Detail Inspection Items2. Cylinder is i
52、nstalled on the handcart and fastened by the chain4. Backfire stopper is installed(applicable for oxygen and acetylene)Inspection date:_CommentsSafety Belt InspectionProduct Serial Number:Detail Inspection Items1. The whole belt is in good condition, without cut, broken, expand and crack6. Spring ho
53、ok is in good condition, for example camber, distortion, crack, broken and useless dowelInspection date:_CommentsGemel InspectionProduct Serial Number:Detail Inspection Items3. Lifting hooks are in good condition, for example camber, distortion, crack, broken and useless dowel4. ,No broken point, ab
54、rasion, rust,contortion and distortion on the chainsInspection date:_CommentsTightwire InspectionProduct Serial Number:Detail Inspection Items2.No crushing or planishing(reason:over loading,shaking loding, and drag on the barrier)4. No knoting of the steelwire (reason:quick release of shaking loadin
55、g)6. Check the abrasion and crushing situation based on the color o the sling7. While checking the tightwire or slings, if 6 lines borken in one sling or 3 lines broken in one section of one sling, the sling should be replacedInspection date:_CommentsNylon Sling InspectionProduct Serial Number:Detai
56、l Inspection Items2.End accessories of the sling is without abrasion or distortion8. Identification labels should be sewed at the side of the sling (the label should contain: type, length, loading limit for uprightness work, synthetic material type and sling manufature)9. Check the situation at the
57、suture to ensure the strip is folded, suture should cling the strip and cant be tore down Inspection date:_CommentsPolyester Ring Sling InspectionProduct Serial Number:Detail Inspection Items1. Identification labels should be sewed at the side of the sling (the label should contain: type, length, loading limit for uprightness work, synthetic
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 課題申報書高校怎么寫的
- 藥學(xué)課題申報書范文
- 科技課題立項申報書
- 微課教學(xué)課題申報書
- 學(xué)校美育特色課題申報書
- 涉穩(wěn)調(diào)研課題申報書
- 足球現(xiàn)狀課題申報書
- 課題申報書資料哪里找
- 品牌vi授權(quán)合同范本
- 樂理課題申報書
- 2025部編版九年級語文下冊全冊教學(xué)設(shè)計
- 2024-2030年中國留學(xué)服務(wù)行業(yè)市場前景預(yù)測及發(fā)展戰(zhàn)略規(guī)劃分析報告
- 初中作文課件教學(xué)課件
- 亞??谱o(hù)理建設(shè)思路
- 中職安全主題班會教育課件
- 生 物植物的三大作用-說課課件-2024-2025學(xué)年人教版生物七年級上冊
- 2024年新課標(biāo)卷高考化學(xué)試卷試題真題答案詳解(精校打印版)
- 2024年高等教育文學(xué)類自考-01210對外漢語教學(xué)法考試近5年真題集錦(頻考類試題)帶答案
- 500-3000總噸船舶大副培訓(xùn)大綱(2021版)
- 2024至2030年中國錢幣類收藏品行業(yè)市場前景調(diào)查及投融資戰(zhàn)略研究報告
- 三級安全培訓(xùn)考試題附參考答案(滿分必刷)
評論
0/150
提交評論