![xxx工程合同中英文版_第1頁](http://file3.renrendoc.com/fileroot_temp3/2021-12/15/fc5a5e03-5b31-4895-8054-3df814a4a7f7/fc5a5e03-5b31-4895-8054-3df814a4a7f71.gif)
![xxx工程合同中英文版_第2頁](http://file3.renrendoc.com/fileroot_temp3/2021-12/15/fc5a5e03-5b31-4895-8054-3df814a4a7f7/fc5a5e03-5b31-4895-8054-3df814a4a7f72.gif)
![xxx工程合同中英文版_第3頁](http://file3.renrendoc.com/fileroot_temp3/2021-12/15/fc5a5e03-5b31-4895-8054-3df814a4a7f7/fc5a5e03-5b31-4895-8054-3df814a4a7f73.gif)
![xxx工程合同中英文版_第4頁](http://file3.renrendoc.com/fileroot_temp3/2021-12/15/fc5a5e03-5b31-4895-8054-3df814a4a7f7/fc5a5e03-5b31-4895-8054-3df814a4a7f74.gif)
![xxx工程合同中英文版_第5頁](http://file3.renrendoc.com/fileroot_temp3/2021-12/15/fc5a5e03-5b31-4895-8054-3df814a4a7f7/fc5a5e03-5b31-4895-8054-3df814a4a7f75.gif)
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、xxx engineering contractXXXC程合同Contract No ?:合同編號(hào):Party A: xxxCompany Limited甲方:xxxParty B:xxx Company LimitedxxxThis contract is made and entered into on the day of , 2021 by the following Parties in本合同于2021年 月 日由以下當(dāng)事方在簽署。Party A: xxx Company Limited ?甲方:XXX, XXX經(jīng)營的公司,住所地為 XXX,(下稱“甲方"),法世代表人:X
2、XXParty B: xxx Company Limited ?乙方:xxx, 一家xxx經(jīng)營的公司,注冊(cè)地址是:xxx,(下稱“乙方”),法定代表人: XXXParty A and Party B are called by a joint name of Both Parties under this contract, each of which is called as A Party.甲方和乙方在本合同項(xiàng)下統(tǒng)稱為“雙方 ",單獨(dú)稱為“一方"o1. Work Content and Requirements1. 工作內(nèi)容、要求1 ? 1 In accordance
3、with the items stipulated in this Contract, Party B shall conduct the project as per the Project standard and quality standard stipulated by Ministry of Engineering of the Union of xx.1.1 根據(jù)本合同所限筮的條款,乙方應(yīng)以XX工程部規(guī)定的建筑標(biāo)準(zhǔn)和質(zhì)量要求執(zhí)行本工程。2. Contract Period2. 合同期限2.1 Work period for the Road Construction Projec
4、t: the work shall be completed within 2 month upon signing the Contract. The condition of handover is that the Project Inspection & Acceptance Team constituted by Party A, shall issue the Inspection & Acceptance Sheet after onsite inspection.2.2 本次工程時(shí)間周期:合同簽訂后14個(gè)工作日內(nèi)完成,弁以甲方組成的開工驗(yàn)收小組現(xiàn)場檢驗(yàn)弁出具驗(yàn)收
5、單為開工交接條件。2.3 This contract shall be implemented after this is duly signed by the legal representatives or authorized representatives of the Parties and stamped with the seals of the Parties, and closed after the onsite acceptance of the Project and Contract payment.2.4 本合同自雙方法左代表人或受權(quán)代表人簽字蓋章后生效,現(xiàn)場驗(yàn)收合
6、格、款項(xiàng)支付完畢后關(guān)閉。3. Health, SaFety and Environment Principles (HSE)3. 安康、平安3.1 Thestaff from Party B shall follow the arrangement of Local government and Party A (or its representatives), and comply with the laws and regulations of Myanmar as well as niles and regulations on Health. Safety and Environmen
7、t (HSE) of Party A.3.2 乙方工作人員必須聽從地方政府、甲方人員或代表 )的安排,遵守緬甸法律、法規(guī)和甲方的平安環(huán)境安康規(guī)章制度等。3.3 Before or during the implementation of this Project, Party B shall acknowledge, avoid and prevent the possible damage of the Project to the surrounding environment and other affiliated facilities, and the resulting losse
8、s shall be borne by Party B.3.4 在工程施行之前或進(jìn)展當(dāng)中.乙方應(yīng)識(shí)別工程可能對(duì)周邊環(huán)境及原有設(shè)施造成的危害,應(yīng)進(jìn)展躲避和防護(hù),對(duì)由此帶來的損失,應(yīng)由乙方承當(dāng)。3.5 During the performance of this Contract, Party B shall bear the personal and property losses of Party B or Party B s personnel nyury by itself if the losses are not caused by Party A.3.6 在合同履行過程中,假設(shè)發(fā)生非
9、甲方原因?qū)е碌囊曳交蛞曳饺藛T人身或財(cái)產(chǎn)損失的,由乙方自行承當(dāng)。4. Contract Price, Payment and Taxes4.合同價(jià)格、付款事宜及稅費(fèi)4 As per the stipulated construction contents, both Parties agree that this Contract is a lump sum contract. The contract payment includes all constniction costs and related cost for construction preparation and constru
10、ction implementation .Please refer to the following table for the details4.1 按照本合同所確泄的工程內(nèi)容,甲方與乙方確左本次馬德島崗?fù)すこ虨橘M(fèi)用總包合同,合同費(fèi)用包含全部工程施工費(fèi)用及其他與工程準(zhǔn)備.工程執(zhí)行相關(guān)的費(fèi)用。詳見下表警務(wù)室預(yù)算報(bào)表(USD)NO.particularQityRate(usd)Amount(usd)123456789101112NO.1234567891011121314NO.12345The total amount:費(fèi)用合汁:XXX美金4.2 The Contract shall be v
11、alued in USD, and the payment shall be settled in equivalent value of KYAT. The exchange rate shall be at the spot exchange rate from USD to KYATon the day of payment by the handling bank of Party A. Unless otherwise specified by Party B and agreed by Party A, Party A shall only conduct payment in a
12、ccordance with the bank account of Party B agreed in this contract.Party B shall be responsible for the authenticity, safety and accuracy of its designated account information. If Party A fails to pay or delays payment due to the causes of Party B 's account, all responsibilities and consequence
13、s hereof shall be undertaken by Party B itself. The account information assigned by Party B is as follows:4.3 本合同以美金計(jì)價(jià),以美元或等值緬幣結(jié)算。匯率為付款銀行付款當(dāng)天美元兌緬幣的即時(shí)匯率。除非乙方有特別說明弁經(jīng)甲方同意,甲方僅按本合同約N的乙方銀行帳號(hào)付款,乙方應(yīng)對(duì)英指左的賬戶信息真實(shí)性、平安性、準(zhǔn)確性負(fù)責(zé)。因乙方賬戶的原因造成甲方不能付款或付款遲延的,由此引起的一切責(zé)任及后果由乙方自己承當(dāng)。乙方指宦的賬戶信息如下:Account Name:賬戶夕 i:Account Numbe
14、r:賬號(hào):Beneficiary's Bank:收款銀行:SWIFT/BIC Code:銀行國際代碼:Correspondent Bank:代理專艮行:Swift Code of Correspondent Bank 代理銀行國際代碼:Address:地址:Tel4.4 Both Parties shall perform their respective taxation obligations in accordance with the tax laws and regulations of the Union of Myanmar. The Contract Price inc
15、ludes withholding tax and other taxes of Party B. ?4.5 本合同簽約雙方應(yīng)按照緬甸國家的相關(guān)稅收法律法規(guī),履行納稅義務(wù),乙方在合同總價(jià)中包含有預(yù)扣所得稅和其他稅費(fèi)部分。4.6 The payment of this Contract shall be conducted in three instalments:4.7 本合同付款一次付清,付款方式為電匯:Within 10 working days after signing this Contract. Party A shall make the first payment equals
16、 to 30% of the total Contract Price.驗(yàn)收合格后,甲方向乙方支付全部合同金額。5? Alterations5. 變更事宜5.1 Party A shall have the right to require increasing the work scope (hereinafter referred to as "Alterations") on the basis of this Contract.5.2 甲方有權(quán)在此合同的根底上,要求增加工作范圍(以下稱之為“變更”)。5.3 All the requirements on alter
17、ation shall be in the written form. clearly defining necessary alterations ? Party B shall submit corresponding work plan, working hours and cost estimates according to the alterations proposed by Party A within 3 working days for the approval of Party A.5.4 所有的變更要求均應(yīng)以書而的方式,清楚地指明所需的變更內(nèi)容,乙方應(yīng)在三個(gè)工作日內(nèi)對(duì)甲
18、方提出的變更,提交相應(yīng)的工作方案、工時(shí)和費(fèi)用估算,供甲方審批。6. Termination oF Contract6?合同終卜6.1 If the termination of this Contract is caused by Party A. Party A shall pay reasonable fees to Party B for the Work (including preparatory work) completed by the date of termination of this Contract. Otherwise, if the termination of
19、this Contract is caused by the breach of Party B. Party A shall not pay for the expenses generated6.2 在因甲方終止合同的情況下,甲方應(yīng)支付乙方截止合同終止日時(shí)已完成的工作(含準(zhǔn)備工作)及為 此項(xiàng)工作已發(fā)生的合理費(fèi)用。假設(shè)因乙方違約導(dǎo)致合同終止的,甲方對(duì)已經(jīng)發(fā)生的費(fèi)用不予支付。7. Responsibilities & Duties7. 責(zé)任與義務(wù)7.1 Party A and Party B shall guarantee each other that one party shall
20、 provide support to and protect the other party from any loss, claim, or responsibility caused by or related to this Contract under the following conditions:7.2 甲方和乙方均應(yīng)互相保證,保護(hù)和支持對(duì)方在發(fā)生以下情況時(shí)不受由于本合同或與之相關(guān)而產(chǎn)生的任何形式的損失,索賠或責(zé)任:a) Injuries and deaths of any employee, representative or subcontractor's pers
21、onnel;a) 任何職員,代表或分包方人員的傷亡,b) Property loss of staff, representatives or subcontractor s personnel;b) 職員,代表或分包方人員的財(cái)產(chǎn)損失,c) Expenses, losses, or damages indirectly or directly caused by significant, special or accidental event, no matterhow it occurs and which form it takes;c)由于重大,特殊或意外(直接或間接)造成的費(fèi)用,損失或
22、損壞,不管英如何發(fā)生的,不管是何種形式。7.3 Each party shall be responsible for the loss of any third party caused by its own intention or faults, and undertake related indemnification obligations ?7.4 雙方應(yīng)對(duì)由于各自成心或過失而造成的任何第三方的損失負(fù)責(zé)弁承當(dāng)相關(guān)賠償義務(wù)。7.5 If either party of this Contract has realized any possible accident during th
23、e performance of the Contract that cannot be executive, the other party shall be notified immediately.7.6 假如合同雙方任意一方在合同履行過程已意識(shí)到任何有可能出現(xiàn)意外而導(dǎo)致合同無法執(zhí)行的情況時(shí),應(yīng)立即通知另一方。7.7 Party B shall procure the insurances and bear the premiums in accordance with the provisions relating to insurance as specified in the la
24、ws of the Union of Myanmar ? Party B shall ensure that the aforesaid insurances remain effective during the period of validity of this Contract. All the expenses arising from the aforesaid insurances shall be included in the service fees under this Contract and shall be borne by Party B.7.8 乙方應(yīng)根拯緬甸聯(lián)
25、邦的相關(guān)保險(xiǎn)法規(guī)的規(guī)定辦理各項(xiàng)保險(xiǎn)弁承當(dāng)齊項(xiàng)保險(xiǎn)費(fèi)用。乙方應(yīng)確保上述保險(xiǎn)在本合同有效期間內(nèi)持續(xù)有效。辦理上述保險(xiǎn)所發(fā)生的所有費(fèi)用應(yīng)包含在本合同項(xiàng)下的總費(fèi)中,由乙方自行承當(dāng)。8. Force Majeure8. 不可抗力8.1 Force Majeure refers to the events that cannot be predicted by either party of the Contract and their occurrence and consequences cannot be avoided, including but not limited to wars, unr
26、ests, fires and natural disasters such as wind, rain and earthquake etc.不可抗力是指合同的任何一方不能預(yù)見,對(duì)其發(fā)生和后果不能防止.弁無法控制的事件,包括但不限于戰(zhàn)爭、動(dòng)亂、火災(zāi)以及風(fēng)、雨、地震等自然災(zāi)害。8.2 Any party shall timely notify the other party when it is unable to perform the Contract due to Force Majeure. After gaining the certificate of related author
27、ity, the performance of the Contract could be delayed or suspended temporarily? Each party shall notify the other party of actual conditions, and continue to lOperform the Contract after the end or disappearance of Force Majeure, Both Parties can be exempted from some parts or all of the liabilities
28、 for breach of the Contract according to the actual conditions. Necessary remedial measures shall be adopted to reduce the loss to the minimuni.8.3 任何一方由于不可抗力不能履行合同時(shí),應(yīng)當(dāng)及時(shí)向?qū)Ψ酵▓?bào)。在獲得有關(guān)機(jī)關(guān)證明以后,允許延期履行或者暫時(shí)不履行合同。各方應(yīng)把實(shí)際情況通知對(duì)方,弁在不可抗力停頓或消失后繼續(xù)履行合同。雙方根據(jù)情況可部分或者全部免予承當(dāng)違約責(zé)任。采取必要的補(bǔ)救措施將損失降到最低程度。9. Applicable Laws &
29、; Dispute Resolution9. 適用法律及爭議解決方式9.1 The laws of Myanmar shall apply to the signing. performance and explanation of this Contract.9.2 本合同的簽訂、履行及解釋均適用緬甸聯(lián)邦法律。10. Appendix to the Contract and Others10 .合同附件及其他事項(xiàng)10.1 ? The appendix to this Contract shall be an integral part of this Contract and shall have the same legal effect as the Contract?10.2 本合同附件是本合同的有效組成部分,與本合同有同等法律效力。10.3 ? In respect of any matters unmcntioncd herein, written complementary agree
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 住院高血壓患者合并血糖異常對(duì)靶器官損害影響的相關(guān)分析
- 二零二五年度股東協(xié)議書-股東投票權(quán)及決策機(jī)制協(xié)議3篇
- 時(shí)代楷模先進(jìn)事跡在高中思政課教學(xué)中的應(yīng)用研究
- 投訴管理制度及處理流程
- 開啟自主學(xué)習(xí)的閘門
- 二零二五年度農(nóng)業(yè)高新技術(shù)田地租賃合作協(xié)議3篇
- 航空器材采購招標(biāo)合同三篇
- 2025屆南通市海安高三語文上學(xué)期期末考試卷附答案解析
- 醫(yī)學(xué)美容科護(hù)士總結(jié)
- 專業(yè)化妝前臺(tái)接待員工作總結(jié)
- 肺切除手術(shù)的術(shù)前評(píng)估課件
- 《大學(xué)生創(chuàng)新與創(chuàng)業(yè)》課件
- 護(hù)士的護(hù)理職業(yè)生涯規(guī)劃
- 義務(wù)教育數(shù)學(xué)課程標(biāo)準(zhǔn)(2022年版)重點(diǎn)
- 2021上海春考作文題解析及范文(怎樣做與成為什么樣人)
- 體育館改造裝修工程施工組織設(shè)計(jì)
- 137案例黑色三分鐘生死一瞬間事故案例文字版
- 【魔鏡洞察】2024藥食同源保健品滋補(bǔ)品行業(yè)分析報(bào)告
- 鋼結(jié)構(gòu)工程施工(第五版) 課件 2項(xiàng)目四 高強(qiáng)度螺栓
- 大學(xué)生就業(yè)指導(dǎo)(高等院校學(xué)生學(xué)習(xí)就業(yè)指導(dǎo)課程)全套教學(xué)課件
- 《實(shí)驗(yàn)診斷學(xué)》課件
評(píng)論
0/150
提交評(píng)論