平流式沉淀池計(jì)算_第1頁
平流式沉淀池計(jì)算_第2頁
平流式沉淀池計(jì)算_第3頁
平流式沉淀池計(jì)算_第4頁
平流式沉淀池計(jì)算_第5頁
免費(fèi)預(yù)覽已結(jié)束,剩余1頁可下載查看

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)

文檔簡(jiǎn)介

1、平流式沉淀池計(jì)算1、設(shè)計(jì)進(jìn)水水質(zhì) 參數(shù)設(shè)計(jì)流量(Q) 5000 m3/d設(shè)計(jì)水溫(T) 25 ? COD (CO) 500 mg/L SS (SO) 400 mg/L BOD(BO)300 mg/L NH3N(N0) 25 mg/L TN(TNO) 40 mg/L TP (TPO) 15 mg/L2、設(shè)計(jì)去除率%COD 20 % SS(SO) 40 % BOD (B0) 15 % NH3-N 0 % TN(TNO) 5 % TP (TPO) 7.5 % 3、設(shè)計(jì)出水水質(zhì)參數(shù)COD(Ce) 400 mg/L SS(Se) 240 mg/L BOD(Be) 255 mg/L NH3N(Ne) 25

2、 mg/L TN(TNe) 38mg/L TP (TPe) 13. 875 mg/L 4、沉淀池相關(guān)參數(shù)及一些基本要求對(duì)于城市污水,初沉池表面負(fù)荷一般取值1.2-2. 0之間,堰口負(fù)荷?2. 91/(s. m)表面負(fù)荷(q) 1.2 m3/(m2. h)二次沉淀池,活性污泥法后,表面負(fù)荷一般取值0. 6-1. 0之間,堰口負(fù)荷?1.71/(s. m)沉淀時(shí)間(t) 1.5 h生物膜法后,表面負(fù)荷一般取值1. o-l. 5之間,堰口負(fù)荷?1.71/(s. m)水平流速(v) 5 mm/sHighway 1/2. Rail transportation and land use there Big

3、. Urban rail transit asa low-pollution urban public transport has become a major positive development andconstruction of the citys main transport infrastructure through the construction ofurban rail transit will help curb rapid growth in traffic demand and help reduce thecore frequency4.1、靜壓排泥管的直徑不應(yīng)

4、小于200mm4. 2、初次沉淀池的靜壓排泥水頭不應(yīng)小于1. 5m;二次沉淀池的靜壓水頭:生物膜法不應(yīng)小于1.2m,活性污泥法不應(yīng)小于0. 9mO4.3、平流沉淀池 的長(zhǎng)寬比不小于4,一般取值4-54.4、平流沉淀池的長(zhǎng)深比不小于8,一般取值8-124.3、池底縱坡:采用機(jī)械刮泥時(shí),不小于0. 005,一般取值0. 01-0. 024.6、最大水平流 速:初次沉淀池7mm/s,二次沉淀池5mm/s4.7、進(jìn)出口處應(yīng) 設(shè)置擋板,高岀池內(nèi)水面0. 1-0 15mo擋板淹沒深度:進(jìn)口處不應(yīng)小于0. 25m,一般為0. 51. 0m;出口處一般為0. 30. 4m=擋板位置:距進(jìn)水口0. 51. 0m

5、,距出水口Highway 1/2 Rail transportation and land use there Big Urban rail transitas a low-pollution urban public transport has become a major positive development andconstruction of the citys main transport infrastructure through the construction ofurban rail transit will help curb rapid growth in traf

6、fic demand and help reduce thecore frequency0. 25-0. 5m3、沉淀池設(shè)計(jì)計(jì)27 m計(jì)算堰長(zhǎng)L 19. 95530013 20 m長(zhǎng)(L?)6. 430041152 m復(fù)核長(zhǎng)寬4. 5寬度(B)比:四舍五入得6 m復(fù)核長(zhǎng)深15比:5.6、設(shè)池子個(gè)2個(gè)(格)(格)數(shù)(n)則每個(gè)3 m(格)的寬度5.7、污泥部分所 需的總?cè)莘e(V)兩次清除0. 5 d污泥間隔5. 1、池子的表面173. 6111111 m2積(A)5.2.沉淀部分有1.8 m效水深(h2)5.3.沉淀部分有312.5 m3效容積(V?)5.4.沉淀池的池5.5.沉淀池的總時(shí)間(T

7、)污泥密度1 t/m3(Y)污泥含水98 %率(P0)V=Q*(SO-Se) 20 m3 *10(6)*100*T/(Y (100-P0)=5.8、池體總高度2. 72 m (H)沉淀池超0. 3 m高(hl)緩沖層高0. 5 m般取值度(h3) 0. 3-0. 5Highway 1/2. Rail transportation and land use there Big. Urban rail transitas a low-pollution urban public transport has become a major positive development andconstru

8、ction of the city,s main transport infrastructure through the construction ofurban rail transit will help curb rapid growth in traffic demand and help reduce thecore frequency污泥區(qū)高0. 12 m度(h4)5.9、污泥斗容積(VI)設(shè)污泥斗0. 75 m高度(h4)7. 875四舍五入得8 m3Highway 1/2 Rail transportation and land use there Big Urban rail transitas a low-pollution urban public transport has become a major positive development andconstruction of the citys main transport infrast

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論